CN101967985A - 自行式仰拱模板施工方法 - Google Patents

自行式仰拱模板施工方法 Download PDF

Info

Publication number
CN101967985A
CN101967985A CN 201010275573 CN201010275573A CN101967985A CN 101967985 A CN101967985 A CN 101967985A CN 201010275573 CN201010275573 CN 201010275573 CN 201010275573 A CN201010275573 A CN 201010275573A CN 101967985 A CN101967985 A CN 101967985A
Authority
CN
China
Prior art keywords
inverted arch
template
invert form
construction
invert
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010275573
Other languages
English (en)
Other versions
CN101967985B (zh
Inventor
段平安
邓国才
黄亮
杨文影
付建国
张维
裴生平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
Sanchu Co Ltd of China Railway Tunnel Group Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN 201010275573 priority Critical patent/CN101967985B/zh
Publication of CN101967985A publication Critical patent/CN101967985A/zh
Application granted granted Critical
Publication of CN101967985B publication Critical patent/CN101967985B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开的一种隧道的自行式仰拱模板施工方法,具体包括以下施工步骤,根据设计要求放样出仰拱开挖断面及纵向施工缝的控制线;预先对隧道仰拱进行光面爆破开挖;移动仰拱栈桥就位;利用挖掘机和运输设备将仰拱石碴装动出洞外弃碴场,清理干净仰拱基底;安装仰拱端头模板;铺设钢轨,移动仰拱模板自行纵移就位;启动液压装置下放仰拱模板,利用丝杆千斤顶将模板支撑牢固;浇筑仰拱混凝;养护等强,收起丝杆千斤顶,液压油缸收回脱模;本施工方法成本较低、操作方便、提高了施工工效,纵向施工缝处混凝土振捣较普通模板施工密实,对提高隧道工程施工质量有积极作用。

Description

自行式仰拱模板施工方法
【技术领域】
本发明涉及一种隧道和地下工程的仰拱混凝土模筑的施工方法,具体涉及一种隧道仰拱的自行式仰拱模板施工方法。
【背景技术】
隧道仰拱是指隧道路面下面的支护,仰拱施工在隧道衬砌中一般是先浇筑,浇筑后模板台车就可以在仰拱砼上定位和支撑,从而进行隧道拱墙砼的浇筑。
目前,国内在隧道仰拱施工中采用整体模板的实例很少,大部分是人工利用小钢模或槽钢拼装,再利用大量的钢筋对小钢模或槽钢进行焊接定位和加固;而部分采用整体模板施工的,需要大型的起吊机械如挖掘机、装载机配合进行模板的吊装就位,施工工效不高。由于模板的加固定位受人工拼装模板或整体模板吊装的不定影响因素较大,造成仰拱模板在浇筑过程中跑模,纵向施工缝处混凝土不能及时振捣或振捣不密实;且模板就位加固需要大量的人员或机械配合进行,耗时长,使得隧道施工中比较重要的环节仰拱施工的进度往往跟不上开挖的进度,造成隧道不能及时封闭基底成环,隧道施工安全步距不能得到有效的控制。
上述施工实例中,利用大量的钢筋对模板进行加固不仅浪费大量的资源,且与国家倡讨的节约型社会不相符;同时大量的人员及电焊机等小型机具堆积在洞内仰拱施工作业处,不利于隧道文明施工和施工安全。
【发明内容】
为了克服背景技术中的不足,本发明所要解决的技术问题是提供一种自行式仰拱模板施工方法;以满足仰拱施工的进度对于隧道开挖进度的快速跟进的要求,从根本上解决了仰拱施工模板安装加固的施工难点,更好的控制了仰拱施工的质量,使纵向施工缝处混凝土振捣较普通模板施工密实,且相应提高了施工工效。
为实现上述发明目的,本发明采用如下技术方案:
本发明的自行式仰拱模板施工方法,将仰拱施工中模板安装加固的各道工序整合在一起,充分利用机械的快速及可靠性能,达到快速施工的目的。
具体包括如下施工步骤:
a)、根据设计要求放样出仰拱开挖断面及纵向施工缝的控制线;根据仰拱的弧形断面按照爆破设计参数准确的放样出底板眼的孔位,底板眼放样时为防止过大的超挖造成砼回填量过大应将底板眼向上抬高5~10cm;同时在环向施工缝处两侧边墙对应里程高出纵向施工缝20cm的位置利用膨胀螺栓放样出仰拱施工的控制基准点;
b)、对隧道仰拱进行光面爆破开挖;根据确定的仰拱开挖断面大小及岩石的软硬程度做出仰拱光面爆破设计,底板眼间距尽量控制在40~50cm之间,采用间隔装药;
c)、移动仰拱栈桥就位;
若采用普通机械式仰拱栈桥,其就位方法为:先在下一仰拱循环处安放好栈桥钢架蹬,然后采用装载机、挖掘机等大型机械设备一前一后各一台将栈桥两端固定后向上举起,然后前车向前退,后车向前进,将栈桥抬到下一个仰拱循环处,重复操作就将两片栈桥移动就位;在移动栈桥过程中尽量采用装载机作为前车移动栈桥;
若采用步进式仰拱栈桥,其就位方法为:先用扒渣机或挖机对仰拱前方进行场地平整,清理出仰拱栈桥前支腿支撑的位置后,进行仰拱栈桥就位;栈桥移动时,首先铺设好拱栈前后行走轮轨道,轨道铺设长度不能超过12米;其后收栈桥的前后支腿、前后引桥,紧接操纵液压系统进行栈桥的纵向移动;栈桥就位后,放下栈桥前后支腿并固定,之后放下栈桥前后引桥,工序完成;
d)、利用挖掘机和运输设备将仰拱石碴装运出洞外弃碴场,采用人工清理干净仰拱基底,要求不能虚碴;
e)、安装仰拱端头模板;仰拱端头模板根据仰拱环向弧形制作,由上下两层拼装而成,上下层模板高度为仰拱设计厚度的1/2;
待出渣完成,现场人员对仰拱按设计要求进行检查,以达到设计仰拱尺寸要求;如果仰拱里存水,则要用抽水机抽掉里面的水;然后在挖好的设计仰拱框架下以设计施工缝间距进行仰拱端头模板的安装,若是独立第一次仰拱填充,需要进行仰拱两端端头模板的安装,若是一次以上连续仰拱施工,需要进行连续仰拱端头模板的安装;
安装时先放出仰拱端头模板的安装位置,然后用钢筋打桩固定仰拱端头模板位置;安装弧形的仰拱端头模板时,用铅锤校正其竖直度,找到支撑点焊接钢筋加固模板,固定仰拱端头模板位置,防止在打仰拱混凝土时倾覆;之后在上下两层仰拱端头模板的拼缝处安装仰拱止水带,仰拱端头模板安装完成;
f)、铺设钢轨,移动仰拱模板就位;
移动仰拱模板装置由钢结构桁架下部的纵移机构、横移机构,钢结构桁架下部前后端的前后液压支腿、钢结构桁架上部的配重小车机构及钢结构桁架下部前端的仰拱模板组成;横移机构在纵移机构的上层,带动钢结构桁架、配重小车以及移动仰拱模板在轨道上横向左右滑动,以此来调整移动仰拱模板横向就位;配重小车机构由小车轨道、小车、电动行走部分以及水泥块组成;其中,横移机构的动力由液压油缸提供,经丝杆千斤传动;纵移机构的动力由电动机提供,经减速器减速后输出纵向匀速恒扭矩;
根据施工设计要求在已完成的仰拱砼面上放出钢轨铺设位置,再人工铺设好钢轨;钢轨铺设好后,操纵纵移机构使整车沿着钢轨向前纵移至要施工工作面;纵移就位后,操作横移机构的液压系统,放下整组仰拱模板使其达到仰拱施工要求,此时检查仰拱断面数据是否与设计相符,如有偏差则使用横移机构进行调整;再次检查所有数据与设计相符后,放下前后液压支腿并固定,之后移动配重小车到钢结构桁架的中间位置处以压实仰拱模板,防止仰拱模板端上浮,保证仰拱填充时达到设计精度;
g)、仰拱模板支撑牢固;
仰拱模板就位后,采用横移机构的丝杆千斤顶连接移动仰拱模板与仰拱模板端桁架,增加仰拱模板稳定性;
h)、浇筑仰拱混凝土;
i)、混凝土养护到达设计脱模强度后,横移机构的液压油缸缩回,收起丝杆千斤顶,仰拱模板脱模。
由于采用如上所述的技术方案,本发明具有如下优越性:
(1)、本方法中仰拱模板及钢结构桁架一次加工成型,成本较低,采用钢结构桁架代替传统方法中的大量钢筋对仰拱模板进行定位加固,操作方便、需要的劳动力较少,提高了施工工效。
(2)、本仰拱模板较普通仰拱模板多了配重小车机构,在打仰拱混泥土时模板不易上浮,纵向施工缝处混凝土振捣较普通模板施工密实,对提高隧道工程施工质量有积极作用。
(3)、采用自行式仰拱模板后,仰拱施工各工序间的循环时间更加合理,缩短了仰拱施工的整个工序时间。从整个开始就位到安装完毕整个用时只需要2个小时就可完成,而采用传统的施法施工最少用时在5~6个小时。为此使整个隧道施工能均衡进行,有利于保证工期。
(4)、节约成本,实现较大经济效益。采用仰拱模板及钢桁架后,将其做为仰拱施工所需的周转机具进行统一使用管理,减少了零星材料的周转次数避免了材料严重浪费的现象,同时实现了仰拱模筑混凝土的浇筑,减少了因小块钢模拼装出的尺寸偏差引起砼的浪费。
【附图说明】
图1为本发明仰拱模板装置的主视图;
图2是本发明仰拱模板的断面图;
图3为本仰拱模板脱模状态图大样图;
图4为浇筑仰拱混凝土图;
图中:1、纵移机构;2、横移机构;3、仰拱模板;4、配重小车机构;5、钢结构桁架;6、后液压支腿;7、前液压支腿;8、钢轨;9丝杆千斤顶;10、液压油缸;11、仰拱端头模板。
【具体实施方式】
以下实施例可以更详细地解释本发明,但本方法保护范围并不局限于以下实施例。
结合附图1~4,以某隧道仰拱施工为例对采用的自行式仰拱模板施工方法加以具体说明;
工程概况
隧道全长14598米,Ⅲ级围岩7185米,占全隧的49.2%;Ⅳ、Ⅴ级围岩7413米,占全隧的50.8%。全隧大型区域断裂带13条,分进口及1号平导、1号横洞、2号横洞和出口四个作业工点组织施工。隧道均设计为有仰拱的复合式衬砌断面,地质条件较为复杂,且处于岩溶地区,渗水量大。本工程设计的仰拱段弧长为14m,一次浇筑的长为12m。
开挖设备采用了先进的三臂凿台车,配以大型的出碴装运设备。
施工过程为:
(1)根据设计图纸给定的仰拱弧形尺寸放样出仰拱开挖断面,结合二衬台车的长度考虑搭接后的有效长度确定纵向施工缝的里程桩号控制线,分别在两侧初期支护边墙对应里程高出纵向施工缝20cm的位置采用膨胀螺栓钻孔、埋设高程及位置控制基准点做为检查仰拱开挖断面及仰拱模板就位检查的依据;根据仰拱的弧形断面按照爆破设计参数准确的放样出底板眼的孔位,底板眼放样时为防止过大的超挖造成砼回填量过大应将底板眼向上抬高5~10cm;
(2)预先对隧道仰拱进行光面爆破开挖:按设计仰拱的弧度,用凿岩机打好仰拱底板眼及辅助眼,然后在打好的底板眼和辅助眼中装上炸药,底板眼间距尽量控制在40~50cm之间,采用间隔装药;用导爆管、非电毫秒雷管、起爆器进行引爆;在进行爆破设计时仰拱开挖的抵抗线取值尽量取小值,确保仰拱爆破一次成型;
(3)移动仰拱栈桥就位;
本实施例中,采用步进式仰拱栈桥;
(4)利用挖掘机和运输设备将仰拱石碴装动出洞外弃碴场,利用人工配合挖掘机清理干净仰拱基底,达到仰拱基坑内无虚碴,无积水;
(5)安装仰拱端头模板;
待出渣完成,施工人员按设计尺寸对仰拱断面进行检查,确认无欠挖后利用待浇筑仰拱段纵向施工缝处放样的高程及位置基点挂线,采用五寸台法检查纵向施工缝处的仰拱弧形断面,分段浇筑仰拱的纵向施工缝处出现的基坑超挖部份利用钻眼孔布设钢筋支架调整个仰拱端头模板安装高度,以达到仰拱端头模板底部安装高度满足仰拱弧形要求;确保仰拱端头模板11与仰拱模板3的面板在交叉处密贴;
仰拱端头模板11的加固利用在其外缘按间距50~80cm钻孔埋设直径不小16mm的钢筋,加固钢筋应埋入仰拱基坑内20cm以上,并高出仰拱端头模板1.1m高,将仰拱端头模板点焊在加固钢筋上,加固钢筋与仰拱端头模板之间的缝隙利用木块塞紧;用铅锤校正其竖直度,防止仰拱端头模板在浇筑仰拱混凝土时倾覆;仰拱端头模板11由上下两层拼装而成,上下层模板高度为仰拱设计厚度的1/2,在拼缝处安装环向施工缝的中埋式止水带,仰拱端头模板11安装完成;
(6)铺设钢轨,移动仰拱模板自行纵移就位;
结合图1,移动仰拱模板装置由钢结构桁架5下部的纵移机构1、横移机构2,钢结构桁架下部前后端的前液压支腿7、后液压支腿6、钢结构桁架上部的配重小车机构4及钢结构桁架下部前端的仰拱模板3组成;横移机构2与仰拱模板3连成一体,操作横移机构时能使仰拱模板安装尺寸达到设计要求;配重小车机构由小车轨道、小车、电动行走部分以及15t水泥块组成;其中,横移机构的动力由液压油缸提供,经丝杆千斤传动;纵移机构的动力由电动机提供,经减速器减速后输出纵向匀速恒扭矩;
根据行走轮距要求在已完成的仰拱砼面上放样出钢轨8铺设位置,再人工铺设好钢轨8;钢轨8铺设好后,操纵纵移机构使其整车沿着钢轨向前纵移至要施工工作面;图2中,纵移就位后,操作横移机构2的液压系统,放下整组仰拱模板3使用其达到仰拱施工要求,此时检查仰拱断面数据是否与设计相符,如有偏差则使用横移机构进行调整;再次检查所有数据与设计相符后,放下前液压支腿7、后液压支腿6并固定,其后移动配重小车到移动仰拱模板钢结构桁架5的中间位置处以压实仰拱模板3,防止仰拱模板端上浮,保证仰拱填充时达到设计精度;
(7)仰拱模板支撑牢固;
仰拱模板就位后,采用横移机构的丝杆千斤顶9连接移动仰拱模板与仰拱模板端桁架,增加仰拱模板稳定性;
(8)图4中,罐车输出混凝土至仰拱模板3下方,浇筑仰拱混凝;
(9)图3中,混凝土养护到达设计脱模强度后,收起丝杆千斤顶9,液压油缸10收回脱模。
自行式仰拱模板施工工法在本工程的实用效果:
本工程采用自行式仰拱模板施工,单月仰拱施工最高进度为单幅220m/月,比原采用人工拼装小钢模施工仰拱速度提高了80m/月;且节约了大量的仰拱模板加固用的钢筋,相比于采用人工拼装小钢模每延米少消耗加固用钢筋18公斤,且混凝土的浪费明显减少。

Claims (5)

1.一种自行式仰拱模板施工方法,其特征在于:包括安装仰拱端头模板(11)、移动仰拱模板(3)就位及将仰拱模板(3)支撑牢固;
仰拱端头模板(11)根据仰拱环向弧形制作,由上下两层拼装而成,上下层模板高度为仰拱设计厚度的1/2;安装仰拱端头模板时,先放出仰拱端头模板的安装位置,然后用钢筋打桩固定仰拱端头模板位置;安装仰拱端头模板时,用铅锤校正其竖直度,找到支撑点焊接钢筋加固模板,固定仰拱端头模板位置,防止在打仰拱混凝土时倾覆;之后在上下两层仰拱端头模板的拼缝处安装仰拱止水带,仰拱端头模板(11)安装完成;
移动仰拱模板的装置由钢结构桁架(5)下部的纵移机构(1)、横移机构(2),钢结构桁架下部前后端的前液压支腿(7)、后液压支腿(6)、钢结构桁架上部的配重小车机构(4)及钢结构桁架下部前端的仰拱模板(3)组成;横移机构(2)在纵移机构(1)的上层,带动钢结构桁架(5)、配重小车机构(4)以及仰拱模板(3)在轨道上横向左右滑动,以此来调整移动仰拱模板横向就位;配重小车机构由小车轨道、小车、电动行走部分以及水泥块组成;其中,横移机构(2)的动力由液压油缸(10)提供,经丝杆千斤传动;纵移机构(1)的动力由电动机提供,经减速器减速后输出纵向匀速恒扭矩;移动仰拱模板(3)就位时,根据施工设计要求在已完成的仰拱砼面上放出钢轨(8)铺设位置,再人工铺设好钢轨(8);钢轨铺设好后,操纵纵移机构(1)使整车沿着钢轨(8)向前纵移至要施工工作面;纵移就位后,操作横移机构(2)的液压系统,放下整组仰拱模板使其达到仰拱施工要求,此时检查仰拱断面数据是否与设计相符,如有偏差则使用横移机构进行调整;再次检查所有数据与设计相符后,放下前后液压支腿并固定,之后移动配重小车到钢结构桁架的中间位置处以压实仰拱模板,防止仰拱模板端上浮,保证仰拱填充时达到设计精度;
仰拱模板(3)就位后,采用横移机构(2)的丝杆千斤顶(9)连接移动仰拱模板与仰拱模板端桁架,增加仰拱模板稳定性;从而使仰拱模板支撑牢固。
2.根据权利要求1所述的自行式仰拱模板施工方法,其特征在于:在进行仰拱端头模板安装前,需进行以下施工步骤操作:
a)、根据设计要求放样出仰拱开挖断面及纵向施工缝的控制线;根据仰拱的弧形断面按照爆破设计参数放样出底板眼的孔位;同时在环向施工缝处两侧边墙对应里程高出纵向施工缝20cm的位置利用膨胀螺栓放样出仰拱施工的控制基准点;
b)、对隧道仰拱进行光面爆破开挖;
c)、移动仰拱栈桥就位;
d)、利用挖掘机和运输设备将仰拱石碴装运出洞外弃碴场,清理干净仰拱基底,要求不能虚碴;
3.根据权利要求1所述的自行式仰拱模板施工方法,其特征在于:在仰拱模板支撑牢固后,需浇筑仰拱混凝土;混凝土养护到达设计脱模强度后,将横移机构(2)的液压油缸(10)缩回,收起丝杆千斤顶(9),仰拱模板脱模。
4.根据权利要求1所述的自行式仰拱模板施工方法,其特征在于:用钢筋打桩固定仰拱端头模板(11)位置时,在仰拱端头模板的外缘按间距50~80cm钻孔埋设直径不小16mm的钢筋,加固钢筋应埋入仰拱基坑内20cm以上,并高出仰拱端头模板1.1m高。
5.根据权利要求2所述的自行式仰拱模板施工方法,其特征在于:底板眼放样时为防止过大的超挖造成砼回填量过大应将底板眼向上抬高5~10cm;底板眼间距尽量控制在40~50cm之间。
CN 201010275573 2010-09-08 2010-09-08 自行式仰拱模板施工方法 Active CN101967985B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010275573 CN101967985B (zh) 2010-09-08 2010-09-08 自行式仰拱模板施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010275573 CN101967985B (zh) 2010-09-08 2010-09-08 自行式仰拱模板施工方法

Publications (2)

Publication Number Publication Date
CN101967985A true CN101967985A (zh) 2011-02-09
CN101967985B CN101967985B (zh) 2012-11-07

Family

ID=43547195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010275573 Active CN101967985B (zh) 2010-09-08 2010-09-08 自行式仰拱模板施工方法

Country Status (1)

Country Link
CN (1) CN101967985B (zh)

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102146796A (zh) * 2011-03-10 2011-08-10 中铁二局股份有限公司 一种高速铁路双线隧道仰拱的施工工艺
CN102146799A (zh) * 2011-03-10 2011-08-10 中铁二局股份有限公司 一种用于高速铁路双线隧道仰拱的施工设备
CN102230383A (zh) * 2011-06-14 2011-11-02 中交隧道工程局有限公司 全液压隧道仰拱栈桥式移动模架
CN102383856A (zh) * 2011-07-12 2012-03-21 中铁隧道集团二处有限公司 大坡度平导施工运输方法
CN102635369A (zh) * 2012-03-20 2012-08-15 中铁十二局集团有限公司 栈桥配合顶模整体浇筑仰拱混凝土施工方法
CN102797479A (zh) * 2011-05-23 2012-11-28 中交隧道工程局有限公司 带有跨越行走装置的仰拱移动模架
CN102996143A (zh) * 2012-11-19 2013-03-27 中铁十二局集团有限公司 一种隧道仰拱整幅浇筑的施工方法
CN103016029A (zh) * 2012-12-28 2013-04-03 成都中铁隆工程集团有限公司 一种大断面隧道分组二衬施工方法
CN103147763A (zh) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 一种隧道仰拱端头组合钢模
CN103195450A (zh) * 2013-04-03 2013-07-10 湖南远东钢模电子科技有限责任公司 液压隧道仰拱作业台车及仰拱施工方法
CN104775831A (zh) * 2015-02-09 2015-07-15 中交二公局第三工程有限公司 一种隧道二衬仰拱与拱墙结合部免矮边墙弧化施工方法
CN105649654A (zh) * 2016-03-17 2016-06-08 湖南五新机械有限公司 自动液压仰拱栈桥台车及其施工方法
CN106223960A (zh) * 2016-07-22 2016-12-14 中铁建大桥工程局集团第五工程有限公司 高铁长大隧道仰拱整体移动模架施工工法
CN106499411A (zh) * 2016-11-29 2017-03-15 中铁隧道集团二处有限公司 一种单线隧道大区段仰拱自行式悬挂模板及施工方法
CN106593469A (zh) * 2016-12-02 2017-04-26 中铁五局集团第工程有限责任公司 一种用于仰拱施工的台车
CN106677802A (zh) * 2016-12-28 2017-05-17 杭州江润科技有限公司 隧道仰拱浇筑结构的施工方法
CN106988762A (zh) * 2017-05-11 2017-07-28 四川省创力隧道机械设备有限公司 全断面二衬仰拱盾构设备
CN107201908A (zh) * 2017-06-16 2017-09-26 中铁五局集团有限公司 一种酷寒地区隧道深埋中心水沟的施工方法
CN108150197A (zh) * 2018-02-05 2018-06-12 中铁隧道集团处有限公司 弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法
CN109026074A (zh) * 2018-10-25 2018-12-18 中铁工程装备集团有限公司 大跨度自行式隧道仰拱栈桥
CN110617088A (zh) * 2019-09-11 2019-12-27 山东大学 一种基于施工台架的机械化快速立拱装置及方法
CN111058869A (zh) * 2019-12-31 2020-04-24 中铁十九局集团第三工程有限公司 仰拱模板的牵引固定方法
CN111749711A (zh) * 2020-07-08 2020-10-09 长沙理工大学 一种隧道台车的移动方法
CN111794796A (zh) * 2020-07-14 2020-10-20 中电建路桥集团有限公司 永临结合巷道式通风方法
CN112065454A (zh) * 2020-09-30 2020-12-11 湖南五新模板有限公司 一种仰拱模板及其施工方法
CN112177633A (zh) * 2020-09-30 2021-01-05 湖南五新模板有限公司 一种仰拱施工用模板及其施工方法
CN112228108A (zh) * 2020-09-30 2021-01-15 湖南五新模板有限公司 一种可滑动的仰拱模板及其施工方法
CN112814711A (zh) * 2021-01-06 2021-05-18 中铁隆工程集团有限公司 一种暗挖隧道二衬型钢模板支架施工方法
CN113107538A (zh) * 2021-04-26 2021-07-13 甘肃省公路交通建设集团有限公司北仙项目管理分公司 一种公路隧道组装式仰拱曲面附着模板
CN113465582A (zh) * 2021-05-27 2021-10-01 中铁隧道局集团建设有限公司 可调节重复使用的弧形定位放线装置及其放线方法
CN114251106A (zh) * 2021-12-09 2022-03-29 中交第二航务工程局有限公司 便于安拆的整体式仰拱端头钢模及施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS642199A (en) * 1987-06-25 1989-01-06 Matsushita Electric Works Ltd Automatic fire alarm
JP2005083014A (ja) * 2003-09-05 2005-03-31 Ishikawajima Constr Materials Co Ltd プレキャストトンネル工法およびそれに用いる部材搬送装置
CN1904315A (zh) * 2006-05-12 2007-01-31 中铁西南科学研究院有限公司 一种具有浮动式行车底架的隧道仰拱模板台车
CN101215970A (zh) * 2008-01-02 2008-07-09 中铁五局(集团)有限公司 隧道仰拱作业台车
CN101586464A (zh) * 2008-05-22 2009-11-25 中铁十一局集团第一工程有限公司 一种铁路隧道衬砌边墙混凝土施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS642199A (en) * 1987-06-25 1989-01-06 Matsushita Electric Works Ltd Automatic fire alarm
JP2005083014A (ja) * 2003-09-05 2005-03-31 Ishikawajima Constr Materials Co Ltd プレキャストトンネル工法およびそれに用いる部材搬送装置
CN1904315A (zh) * 2006-05-12 2007-01-31 中铁西南科学研究院有限公司 一种具有浮动式行车底架的隧道仰拱模板台车
CN101215970A (zh) * 2008-01-02 2008-07-09 中铁五局(集团)有限公司 隧道仰拱作业台车
CN101586464A (zh) * 2008-05-22 2009-11-25 中铁十一局集团第一工程有限公司 一种铁路隧道衬砌边墙混凝土施工方法

Cited By (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102146799A (zh) * 2011-03-10 2011-08-10 中铁二局股份有限公司 一种用于高速铁路双线隧道仰拱的施工设备
CN102146796A (zh) * 2011-03-10 2011-08-10 中铁二局股份有限公司 一种高速铁路双线隧道仰拱的施工工艺
CN102146799B (zh) * 2011-03-10 2013-01-09 中铁二局股份有限公司 一种用于高速铁路双线隧道仰拱的施工设备
CN102797479A (zh) * 2011-05-23 2012-11-28 中交隧道工程局有限公司 带有跨越行走装置的仰拱移动模架
CN102797479B (zh) * 2011-05-23 2015-04-01 中交隧道工程局有限公司 带有跨越行走装置的仰拱移动模架
CN102230383B (zh) * 2011-06-14 2013-07-03 中交隧道工程局有限公司 全液压隧道仰拱栈桥式移动模架
CN102230383A (zh) * 2011-06-14 2011-11-02 中交隧道工程局有限公司 全液压隧道仰拱栈桥式移动模架
CN102383856A (zh) * 2011-07-12 2012-03-21 中铁隧道集团二处有限公司 大坡度平导施工运输方法
CN102635369B (zh) * 2012-03-20 2014-12-03 中铁十二局集团有限公司 栈桥配合顶模整体浇筑仰拱混凝土施工方法
CN102635369A (zh) * 2012-03-20 2012-08-15 中铁十二局集团有限公司 栈桥配合顶模整体浇筑仰拱混凝土施工方法
CN102996143A (zh) * 2012-11-19 2013-03-27 中铁十二局集团有限公司 一种隧道仰拱整幅浇筑的施工方法
CN102996143B (zh) * 2012-11-19 2015-07-08 中铁十二局集团有限公司 一种隧道仰拱整幅浇筑的施工方法
CN103016029A (zh) * 2012-12-28 2013-04-03 成都中铁隆工程集团有限公司 一种大断面隧道分组二衬施工方法
CN103016029B (zh) * 2012-12-28 2014-12-31 成都中铁隆工程集团有限公司 一种大断面隧道分组二衬施工方法
CN103147763A (zh) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 一种隧道仰拱端头组合钢模
CN103147763B (zh) * 2013-01-04 2015-09-09 中铁二十二局集团有限公司 一种隧道仰拱端头组合钢模
CN103195450A (zh) * 2013-04-03 2013-07-10 湖南远东钢模电子科技有限责任公司 液压隧道仰拱作业台车及仰拱施工方法
CN104775831A (zh) * 2015-02-09 2015-07-15 中交二公局第三工程有限公司 一种隧道二衬仰拱与拱墙结合部免矮边墙弧化施工方法
CN105649654A (zh) * 2016-03-17 2016-06-08 湖南五新机械有限公司 自动液压仰拱栈桥台车及其施工方法
CN106223960A (zh) * 2016-07-22 2016-12-14 中铁建大桥工程局集团第五工程有限公司 高铁长大隧道仰拱整体移动模架施工工法
CN106499411A (zh) * 2016-11-29 2017-03-15 中铁隧道集团二处有限公司 一种单线隧道大区段仰拱自行式悬挂模板及施工方法
CN106499411B (zh) * 2016-11-29 2019-02-12 中铁隧道集团二处有限公司 一种单线隧道大区段仰拱自行式悬挂模板及施工方法
CN106593469A (zh) * 2016-12-02 2017-04-26 中铁五局集团第工程有限责任公司 一种用于仰拱施工的台车
CN106593469B (zh) * 2016-12-02 2018-08-31 中铁五局集团第一工程有限责任公司 一种用于仰拱施工的台车
CN106677802A (zh) * 2016-12-28 2017-05-17 杭州江润科技有限公司 隧道仰拱浇筑结构的施工方法
CN106677802B (zh) * 2016-12-28 2018-07-24 浙江沧海建设有限公司 隧道仰拱浇筑结构的施工方法
CN106988762B (zh) * 2017-05-11 2023-08-01 四川省创力隧道机械设备有限公司 全断面二衬仰拱盾构设备
CN106988762A (zh) * 2017-05-11 2017-07-28 四川省创力隧道机械设备有限公司 全断面二衬仰拱盾构设备
CN107201908B (zh) * 2017-06-16 2023-10-31 中铁五局集团有限公司 一种酷寒地区隧道深埋中心水沟的施工方法
CN107201908A (zh) * 2017-06-16 2017-09-26 中铁五局集团有限公司 一种酷寒地区隧道深埋中心水沟的施工方法
CN108150197A (zh) * 2018-02-05 2018-06-12 中铁隧道集团处有限公司 弧形模板径向翻转仰拱栈桥及其安装定位脱膜方法
CN109026074A (zh) * 2018-10-25 2018-12-18 中铁工程装备集团有限公司 大跨度自行式隧道仰拱栈桥
CN110617088A (zh) * 2019-09-11 2019-12-27 山东大学 一种基于施工台架的机械化快速立拱装置及方法
CN110617088B (zh) * 2019-09-11 2021-07-30 山东大学 一种基于施工台架的机械化快速立拱装置及方法
CN111058869A (zh) * 2019-12-31 2020-04-24 中铁十九局集团第三工程有限公司 仰拱模板的牵引固定方法
CN111058869B (zh) * 2019-12-31 2022-07-05 中铁十九局集团第三工程有限公司 仰拱模板的牵引固定方法
CN111749711A (zh) * 2020-07-08 2020-10-09 长沙理工大学 一种隧道台车的移动方法
CN111794796A (zh) * 2020-07-14 2020-10-20 中电建路桥集团有限公司 永临结合巷道式通风方法
CN112177633A (zh) * 2020-09-30 2021-01-05 湖南五新模板有限公司 一种仰拱施工用模板及其施工方法
CN112228108A (zh) * 2020-09-30 2021-01-15 湖南五新模板有限公司 一种可滑动的仰拱模板及其施工方法
CN112065454A (zh) * 2020-09-30 2020-12-11 湖南五新模板有限公司 一种仰拱模板及其施工方法
CN112814711A (zh) * 2021-01-06 2021-05-18 中铁隆工程集团有限公司 一种暗挖隧道二衬型钢模板支架施工方法
CN113107538A (zh) * 2021-04-26 2021-07-13 甘肃省公路交通建设集团有限公司北仙项目管理分公司 一种公路隧道组装式仰拱曲面附着模板
CN113465582A (zh) * 2021-05-27 2021-10-01 中铁隧道局集团建设有限公司 可调节重复使用的弧形定位放线装置及其放线方法
CN113465582B (zh) * 2021-05-27 2023-03-21 中铁隧道局集团建设有限公司 可调节重复使用的弧形定位放线装置及其放线方法
CN114251106A (zh) * 2021-12-09 2022-03-29 中交第二航务工程局有限公司 便于安拆的整体式仰拱端头钢模及施工方法
CN114251106B (zh) * 2021-12-09 2023-11-03 中交第二航务工程局有限公司 便于安拆的整体式仰拱端头钢模及施工方法

Also Published As

Publication number Publication date
CN101967985B (zh) 2012-11-07

Similar Documents

Publication Publication Date Title
CN101967985B (zh) 自行式仰拱模板施工方法
KR101205783B1 (ko) 지하구조물의 철거와 신축을 동시에 진행하는 복합 시공방법
CN108678751B (zh) 先顶进后开挖的盾构刀盘检修井装配式施工方法
CN110656959B (zh) 一种大断面黄土隧道初期支护侵限换拱施工方法
CN110671131A (zh) 基于高压旋喷桩的黄土隧道基底加固结构及方法
CN110306593A (zh) 一种车站施工方法
CN105545323A (zh) 隧道明洞衬砌的施工方法
CN109653233A (zh) 大体积承台单壁钢套箱可回收式底板施工方法
CN112575670B (zh) 一种适用于隧道穿越巨型溶洞的t形刚构桥及其施工技术
CN110761808A (zh) 一种大断面黄土隧道支护体系及支护施工方法
CN103711056A (zh) 钢质工具式临时施工道路及其施工方法
CN114263168A (zh) 一种地层止水围护结构嵌岩地连墙施工方法
CN113216832A (zh) 岩溶地区桩孔水磨钻施工工法
CN110847929B (zh) 基于分区爆破的隧道洞口段预加固及开挖施工方法
CN110700860B (zh) 一种穿越黄土沟谷的土石分界隧道施工方法
CN104963348A (zh) 一种软土地区塔吊基础施工支护结构及其施工方法
TWI623669B (zh) 連續壁施工前防止工地下陷的先行鋪面的施工方法
CN205742215U (zh) 一种可重复使用的综合管廊基坑支护与结构外模组合结构
CN211038656U (zh) 一种大断面黄土隧道支护体系
CN110863496B (zh) 一种填石筑岛区域混凝土支护换撑开挖施工拱座基础方法
CN113585336A (zh) 软弱地基环境中下沉式混凝土拌合站的快速施工方法
CN113356189A (zh) 一种旋挖钻机全套管成孔施工工法
CN110685719A (zh) 一种双跨简支仰拱栈桥快速施工工法
CN111155782A (zh) 一种高水位既有地下室桩基施工工法
CN115217151B (zh) 一种明挖隧道长距离下穿施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant