CN101967836A - Reinforcing method of building foundation by using jacking method - Google Patents

Reinforcing method of building foundation by using jacking method Download PDF

Info

Publication number
CN101967836A
CN101967836A CN2010105007136A CN201010500713A CN101967836A CN 101967836 A CN101967836 A CN 101967836A CN 2010105007136 A CN2010105007136 A CN 2010105007136A CN 201010500713 A CN201010500713 A CN 201010500713A CN 101967836 A CN101967836 A CN 101967836A
Authority
CN
China
Prior art keywords
foundation
jack
steel
concrete
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105007136A
Other languages
Chinese (zh)
Other versions
CN101967836B (en
Inventor
丁飞
马旭
徐胜利
朱根来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Mine Construction Group Co., Ltd.
Original Assignee
China Coal No 3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 3 Construction Group Co Ltd filed Critical China Coal No 3 Construction Group Co Ltd
Priority to CN2010105007136A priority Critical patent/CN101967836B/en
Publication of CN101967836A publication Critical patent/CN101967836A/en
Application granted granted Critical
Publication of CN101967836B publication Critical patent/CN101967836B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a reinforcing method of a building foundation by using a jacking method, which comprises the following construction steps of: digging guide grooves on both sides and the bottom of the foundation; putting concrete cushion layers and steel plates; permanently and firmly supporting the foundation by using steel wedge blocks on the steel plates; then binding reinforcing cages on the steel plates on the periphery of the steel wedge blocks; casting high-strength concrete; thoroughly enwrapping the steel wedge blocks and the steel plates by using the concrete to permanently support the foundation together; and preventing a building from sinking again.

Description

Jacking method building foundation reinforcement means
Technical field:
The present invention relates to a kind of jacking method building foundation reinforcement means.
Background technology:
The common buildings design life is 50 years, but empirical discovery, considerable part is built up phenomenons such as promptly occurring wall body cracking in time several years of back, this phenomenon majority is owing to the foundation uneven settlement that foundation soil is dealt with improperly or local foundation soil is soaked by rainwater to cause, also has the part building to make the building integral sinking because of increasing layer.Strengthening foundation width is to solve the effective means that building sinks, and whole building of evenly sinking should wholely strengthen foundation width, and the building of differential settlement only need strengthen and sedimentation part foundation width takes place gets final product.
Summary of the invention:
For overcoming the defective of prior art, the object of the present invention is to provide a kind of jacking method building foundation reinforcement means, can effectively solve the settlement issues of building foundation.
Technical solution problem of the present invention adopts following technical scheme:
Jacking method building foundation reinforcement means, construction as follows:
The first step: building foundation is divided into some elementary sections, excavates guide groove to the following 1-1.5m of foundation bottom along the edge of foundation both sides in each elementary section, squeeze into steel sheet pile in advance at the sidewall of guide groove and protect;
Second step: the thick fast hardening concrete mattress layer of one deck 200mm is built in the guide groove bottom surface at excavation, or lays prefabricated concrete mattress layer, and lays steel plate on described mattress layer; Each limit of steel plate is shorter than concrete mattress layer 30mm as topping;
The 3rd step: balance is placed a hydraulic jack on described steel plate, and interim support is done by jack jacking building foundation portion;
The 4th step: symmetry is squeezed into two gad pieces respectively in described jack both sides, carve piece with described two steel building foundation is formed permanent firmly support, afterwards with jack retraction and taking-up, then squeeze into the 3rd gad piece in the position of putting jack originally, and with the permanent support of these three gad pieces as the basis;
The 5th step: the assembling reinforcement cage, build high-strength concrete, concrete fully wraps up described three gad pieces, steel plates, together forms the permanent support on described basis; Stop the sinking once more of building.
Compared with the prior art, beneficial effect of the present invention is embodied in:
Differential settlement can cause building body to tilt and structure crack, has had a strong impact on the safe in utilization of structure, and general way is discarded or with its demolition, consumes costly; Building increases in the layer construction, and the ground bearing load increases, and also can make building that bulk settling takes place, and has also influenced the safe in utilization of structure.This method is expensive little, method is simple, has then played the effect of throwing a sprat to catch a herring undoubtedly.
Description of drawings:
Fig. 1 is the structure chart of the building foundation of an elementary section; Fig. 2 is the structure chart of basic both sides and following excavation guide groove; Fig. 3 is the structure chart of interior laying of guide groove or fluid concrete mattress layer; Fig. 4 is the structure chart with jack jacking basis; Fig. 5 is for squeezing into the structure chart that steel is carved piece in the jack both sides; Fig. 6 takes off jack to squeeze into the structure chart that three steel are carved piece and assembling reinforcement cage under the basis; The structure chart on steel concrete jacking basis after Fig. 7 finishes for constructing.
Number in the figure: 1 basis, 2 guide grooves, 3 steel sheet piles, 4 concrete mattress layers, 5 steel plates, 6 jack, 7 steel are carved piece, 8 reinforcing cages, 9 concrete.
Below pass through the specific embodiment, and the invention will be further described in conjunction with the accompanying drawings.
The specific embodiment:
Embodiment: the jacking method building foundation reinforcement means of present embodiment, construction as follows:
The first step: referring to Fig. 1,2, building foundation is divided into some elementary sections, and along the both sides of edges excavation guide groove 2 on basis 1, guide groove is excavated to the following 1-1.5m of foundation bottom in each elementary section, if the basis is buried deeplyer, can squeeze into steel sheet pile 3 in advance at the sidewall of guide groove 2 and protect;
Second step: referring to Fig. 3, build the thick fast hardening concrete mattress layer 4 of one deck 200mm in the guide groove bottom surface of excavation, or lay prefabricated concrete mattress layer, and on described mattress layer, lay steel plate 5; Each limit of steel plate is shorter than concrete mattress layer 30mm as topping;
The 3rd step: referring to Fig. 4, balance is placed a hydraulic jack 6 on described steel plate 5, and interim support is done by jack jacking building foundation portion;
The 4th step: referring to Fig. 5, symmetry is squeezed into two gad pieces 7 respectively in described jack both sides, carve piece with described two steel building foundation is formed permanent firmly support, afterwards with jack 6 retractions and taking-up, then squeeze into the 3rd gad piece in the position of putting jack originally, and with the permanent support of these three gad pieces as the basis;
The 5th step: referring to Fig. 6,7, carve assembling reinforcement cage 8 on the steel plate of piece periphery at three steel, build high-strength concrete 9, concrete fully wraps up described three gad pieces, steel plates, together forms the permanent support on described basis; Stop the sinking once more of building.

Claims (1)

1. jacking method building foundation reinforcement means is characterized in that constructing as follows:
The first step: building foundation is divided into some elementary sections, excavates guide groove to the following 1-1.5m of foundation bottom along the edge of foundation both sides in each elementary section, squeeze into steel sheet pile in advance at the sidewall of guide groove and protect;
Second step: the thick fast hardening concrete mattress layer of one deck 200mm is built in the guide groove bottom surface at excavation, or lays prefabricated concrete mattress layer, and lays steel plate on described mattress layer; Each limit of steel plate is shorter than concrete mattress layer 30mm as topping;
The 3rd step: balance is placed a hydraulic jack on described steel plate, and interim support is done by jack jacking building foundation portion;
The 4th step: symmetry is squeezed into two gad pieces respectively in described jack both sides, carve piece with described two steel building foundation is formed permanent firmly support, afterwards with jack retraction and taking-up, then squeeze into the 3rd gad piece in the position of putting jack originally, and with the permanent support of these three gad pieces as the basis;
The 5th step: the assembling reinforcement cage, build high-strength concrete, concrete fully wraps up described three gad pieces, steel plates, together forms the permanent support on described basis; Stop the sinking once more of building.
CN2010105007136A 2010-09-30 2010-09-30 Reinforcing method of building foundation by using jacking method Expired - Fee Related CN101967836B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105007136A CN101967836B (en) 2010-09-30 2010-09-30 Reinforcing method of building foundation by using jacking method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105007136A CN101967836B (en) 2010-09-30 2010-09-30 Reinforcing method of building foundation by using jacking method

Publications (2)

Publication Number Publication Date
CN101967836A true CN101967836A (en) 2011-02-09
CN101967836B CN101967836B (en) 2012-02-29

Family

ID=43547051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105007136A Expired - Fee Related CN101967836B (en) 2010-09-30 2010-09-30 Reinforcing method of building foundation by using jacking method

Country Status (1)

Country Link
CN (1) CN101967836B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015448A (en) * 2012-11-16 2013-04-03 陕西省建筑科学研究院 Fracture-free foundation spanning ground fracture houses
CN104047306A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Method for lifting and centralizing sinking house

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1062573A (en) * 1990-10-26 1992-07-08 沈松华 A kind of method of integral correction inclined chimney
JPH09279619A (en) * 1996-04-15 1997-10-28 Sadao Yamamori Jack-up construction method for foundation of building
CN1818233A (en) * 2006-03-08 2006-08-16 中铁隧道勘测设计院有限公司 Underpinning method of pile ground underground
JP4111445B2 (en) * 2003-10-30 2008-07-02 積水ハウス株式会社 Basic settlement settlement method using sandbag

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1062573A (en) * 1990-10-26 1992-07-08 沈松华 A kind of method of integral correction inclined chimney
JPH09279619A (en) * 1996-04-15 1997-10-28 Sadao Yamamori Jack-up construction method for foundation of building
JP4111445B2 (en) * 2003-10-30 2008-07-02 積水ハウス株式会社 Basic settlement settlement method using sandbag
CN1818233A (en) * 2006-03-08 2006-08-16 中铁隧道勘测设计院有限公司 Underpinning method of pile ground underground

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015448A (en) * 2012-11-16 2013-04-03 陕西省建筑科学研究院 Fracture-free foundation spanning ground fracture houses
CN103015448B (en) * 2012-11-16 2015-09-23 陕西省建筑科学研究院 A kind ofly exempt from basis, crack across ground fissure house
CN104047306A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Method for lifting and centralizing sinking house

Also Published As

Publication number Publication date
CN101967836B (en) 2012-02-29

Similar Documents

Publication Publication Date Title
CN104453274B (en) Utilize supporting and protection structure and underpinning structure to support existing building underground and increase layer method
CN203782682U (en) Guide slot assembly type pile-intermediate plate device
CN107059773A (en) Assembled integral revetment structure and its construction method on a kind of soft soil foundation
CN104895089A (en) Construction method of permanent retaining system characterized by joint work of basement floor slabs and retaining piles
CN104818728A (en) Permanent supporting system with basement floor and supporting piles capable of working together
CN102953385B (en) Construction method for changing support of foundation pit at irregular place of rampway
CN201972155U (en) Topdown-construction-method foundation pit supporting structure of steel plate pile
CN204780933U (en) Shoring of trench landing stage system
CN209855277U (en) Conversion layer structure for underground added layer of existing building
CN101967836B (en) Reinforcing method of building foundation by using jacking method
CN106164380A (en) Wind-driven generator fabricated base
CN107165177A (en) A kind of side slope supporting construction method
CN206902491U (en) A kind of precast concrete roads plate
CN102797265A (en) Protective structure for bedding slope bridge piers and abutments
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
JP5171902B2 (en) Structure construction method and structure under construction
CN205557535U (en) Compound retaining wall of arch campshed formula
CN209925759U (en) Double-barrelled structure of laying in river course
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
JP7173459B2 (en) Construction method of structures
CN202577343U (en) External reinforcement retaining supporting structure
CN111894036A (en) Construction method for additionally arranging basement in strip foundation building
CN104895095A (en) A method of reinforcing deep water foundation pit steel sheet pile cofferdams
CN217000063U (en) Modular drainage inspection shaft
CN103437324B (en) Geogrid drain board vertical drainage system of municipal water storage channel and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA COAL MINE CONSTRUCTION GROUP CORPORATION LTD

Free format text: FORMER OWNER: CHINA COAL NO. 3 CONSTRUCTION (GROUP) CORPORATION LTD.

Effective date: 20110920

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 234000 SUZHOU, ANHUI PROVINCE TO: 230601 HEFEI, ANHUI PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20110920

Address after: 230601 No. 1, Pioneer Road, Hefei Economic Development Zone, Anhui

Applicant after: China Coal Mine Construction Group Co., Ltd.

Address before: 234000 Anhui city in Suzhou province near the River Road No. 215

Applicant before: China Coal No.3 Construction (Group) LLC

C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120229

Termination date: 20120930