CN101967799B - Light-weight truss cradle - Google Patents
Light-weight truss cradle Download PDFInfo
- Publication number
- CN101967799B CN101967799B CN201010545953A CN201010545953A CN101967799B CN 101967799 B CN101967799 B CN 101967799B CN 201010545953 A CN201010545953 A CN 201010545953A CN 201010545953 A CN201010545953 A CN 201010545953A CN 101967799 B CN101967799 B CN 101967799B
- Authority
- CN
- China
- Prior art keywords
- truss
- steel
- hanging basket
- light
- main structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域 technical field
本发明涉及用于高速铁路、高架道路等桥梁防撞墙组拆模、悬臂浇筑混凝土施工、箱梁横向预应力束张拉作业及悬外装修施工的专用施工设备,具体涉及一种轻型桁架挂篮。 The invention relates to special construction equipment for formwork removal of anti-collision wall groups of bridges such as high-speed railways and elevated roads, cantilever pouring concrete construction, box girder transverse prestressed beam tensioning operations, and hanging exterior decoration construction, in particular to a light truss hanging basket.
背景技术 Background technique
目前在高速铁路、高架道路等桥梁防撞墙组拆模、悬臂浇筑混凝土施工和箱梁横向预应力束张拉作业及悬外装修施工时,多采用落地钢管脚手架、悬挂式模板支撑、三角支架形式模板支撑或悬挂式钢管模板支撑等。落地钢管脚手架对场地要求高、钢管用量大且施工周期长,不能用于跨线桥施工或上跨既有线施工;悬挂式模板支撑和三角支架形式模板支撑安装和拆除困难,安全风险大;悬挂式模板支撑需要在桥面混凝土铺装层施工时预埋抗拔钢筋并与钢管焊接以防止支撑体系的倾覆,其刚度不大、成本高、构造复杂。 At present, in the demolition of anti-collision walls of bridges such as high-speed railways and elevated roads, cantilever concrete construction, box girder transverse prestressed beam tensioning operations, and suspension decoration construction, floor-to-ceiling steel pipe scaffolding, suspended formwork supports, and triangular supports are mostly used. Formwork support or suspended steel pipe formwork support, etc. Ground steel pipe scaffolding has high requirements on the site, a large amount of steel pipes, and a long construction period. It cannot be used for the construction of overpass bridges or the construction of existing lines on spans; the installation and removal of suspended formwork supports and triangular formwork supports are difficult, and the safety risks are large; Formwork support requires pre-embedded pull-out steel bars during the construction of the bridge deck concrete pavement and welds them with steel pipes to prevent the support system from overturning. It has low rigidity, high cost, and complex structure.
发明内容 Contents of the invention
本发明的目的是根据上述现有技术的不足之处,提供一种轻型桁架挂篮,该轻型桁架挂篮采用装配式设计,并将整体结构分为桁架主体结构,吊挂系、尾部配重平衡系、行走系,克服了上述技术中的不足,提供了一种组装简单且互换性强的挂篮。 The purpose of the present invention is to provide a light-duty truss hanging basket according to the shortcomings of the above-mentioned prior art. The balance system and the walking system overcome the deficiencies in the above-mentioned technologies, and provide a hanging basket with simple assembly and strong interchangeability.
本发明目的实现由以下技术方案完成: The object of the present invention is realized by the following technical solutions:
一种轻型桁架挂篮,用于桥梁防撞墙组拆模、悬臂浇筑混凝土施工、箱梁横向预应力束张拉作业及悬外装修施工,其特征在于所述桁架挂篮包括有: A light-duty truss hanging basket, which is used for formwork removal of bridge anti-collision walls, cantilever pouring concrete construction, box girder transverse prestressed beam tensioning operation and hanging external decoration construction, is characterized in that the truss hanging basket includes:
桁架主体结构, 具有多个由槽钢及工字钢焊接构成的框架结构,所述框架结构上下两端部均设有法兰板,所述槽钢上焊有带圆孔的钢板耳环,并通过角钢结构与所述钢板耳环栓接联为一体; The main structure of the truss has a plurality of frame structures welded by channel steel and I-beam. The upper and lower ends of the frame structure are equipped with flange plates, and the channel steel is welded with steel plate earrings with round holes, and Bolted together with the steel plate earrings through the angle steel structure;
吊挂系,设于所述桁架主体结构一侧,由至少一组相互垂直连接的上悬臂工字钢及方钢管构成,所述上悬臂工字钢与所述桁架主体结构上端之法兰板平行设置并栓接,所述方钢管与所述上悬臂工字钢可活动式连接; The suspension system is set on one side of the main structure of the truss, and is composed of at least one set of upper cantilever I-beams and square steel pipes vertically connected to each other. The upper cantilever I-beam and the flange plate at the upper end of the main structure of the truss Arranged in parallel and bolted, the square steel pipe is movably connected to the upper cantilever I-beam;
尾部配重平衡系,设于所述桁架主体结构相对于所述吊挂系的另一侧,并与所述桁架主体结构之法兰板栓接,所述尾部配重平衡系由上下两端采用法兰板栓接的方钢管作为吊挂杆件,并采用槽钢与方钢管栓接联为一体; The tail counterweight balance system is located on the other side of the truss main structure relative to the suspension system, and is bolted to the flange plate of the truss main structure. The tail counterweight balance system consists of upper and lower ends The square steel pipe bolted by the flange plate is used as the hanging rod, and the channel steel and the square steel pipe are bolted together as a whole;
行走系,对称安装于所述桁架主体结构底面之法兰板两侧的多个钢轮支座结构,用于所述挂篮于桥面上移动行走。 The walking system is a plurality of steel wheel support structures symmetrically installed on both sides of the flange plate on the bottom surface of the truss main structure, and is used for the hanging basket to move and walk on the bridge surface.
所述钢板耳环在所述主体结构中上下左右对称分布。 The steel plate earrings are symmetrically distributed up, down, left, and right in the main structure.
所述方钢管与所述上悬臂工字钢可活动式连接的具体方式为:所述方钢管与所述上悬臂工字钢端部通过套销结构连接。 The specific method for the movable connection of the square steel pipe and the upper cantilever I-beam is as follows: the square steel pipe and the end of the upper cantilever I-beam are connected through a sleeve pin structure.
所述套销结构中:任意二个垂直方向上相邻的销栓接孔的间距为10cm,所述销栓接孔的数量为7个;连接螺栓选择8.8级的M20高强度螺栓销接。 In the bushing pin structure: the distance between any two adjacent pin bolting holes in the vertical direction is 10cm, and the number of the pin bolting holes is 7; the connecting bolts are pinned with M20 high-strength bolts of grade 8.8.
所述相互垂直连接的上悬臂工字钢及方钢管的数量为4组。 The number of the vertically connected upper cantilever I-beams and square steel pipes is 4 groups.
所述钢轮支座结构包括有一用于和所述桁架主体结构之底面栓接固定的支撑板,所述支撑板下端焊接有两个平行的轮架,所述轮架的另一端分别设有相对应的铜套轴承,所述的两铜套轴承中套装有一主轴,所述主轴上固定设有一滚轮。 The steel wheel support structure includes a support plate for bolting and fixing to the bottom surface of the truss main structure, two parallel wheel frames are welded at the lower end of the support plate, and the other ends of the wheel frames are respectively provided with Corresponding to the copper sleeve bearings, a main shaft is set in the two copper sleeve bearings, and a roller is fixedly arranged on the main shaft.
所述滚轮的直径为100mm。 The diameter of the roller is 100mm.
所述钢轮支座结构的数量为8个,均分为两组并左右对称分布于所述桁架主体结构底部。 The number of the steel wheel support structures is 8, which are equally divided into two groups and symmetrically distributed at the bottom of the truss main structure.
所述的每侧四个钢轮支座结构均采用钢板或槽钢抄垫平。 The four steel wheel support structures on each side are all flattened by steel plates or channel steels.
本发明的优点是:本挂篮结构简单、轻巧、组拆装快速;可沿桥面走行、便于搬运、保管,悬臂高度可调、适应性强;结构分节段组合而成,组装简单且互换性强。 The advantages of the present invention are: the hanging basket is simple in structure, light and handy, and can be assembled and disassembled quickly; it can walk along the bridge deck, is convenient for handling and storage; Strong interchangeability.
附图说明 Description of drawings
附图1为本发明实施例总装主视图;
Accompanying
附图2为本发明实施例总装俯视图;
Accompanying
附图3为本发明实施例桁架主体结构示意图;
Accompanying
附图4为本发明实施例钢轮支座结构示意图。
Accompanying
具体实施方式 Detailed ways
以下结合附图通过实施例对本发明特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解: The features of the present invention and other related features will be further described in detail below in conjunction with the accompanying drawings through embodiments, so as to facilitate the understanding of those skilled in the art:
如图1至图4所示,总参考标号1-13分别表示:桁架主体结构1、吊挂系2、支撑连接系3、尾部配重平衡系4、行走系5、上悬臂工字钢6、方钢管7、支撑板8、轮架9、铜套轴承10、主轴11、滚轮12、销栓接孔13。
As shown in Figures 1 to 4, the general reference numerals 1-13 respectively represent: truss
参见图1-4,本发明中挂篮结构的基本结构按照用途不同可分为桁架主体结构1,吊挂系2、支撑连接系3、尾部配重平衡系4、行走系5五大部分。
Referring to Fig. 1-4, the basic structure of hanging basket structure in the present invention can be divided into truss
1 桁架主体结构1
1 Truss
桁架主体结构1为桁架,材料选用Q345普通低合金结构钢10号槽钢和8号工字钢组焊成排状结构,上下两端设有法兰板主要承担吊挂系2和尾部配重平衡系4传来的竖向剪力。10号槽钢上焊有带圆孔的钢板耳环,它的用途是在拼装时将支撑连接系3上的钢套螺栓插入孔内,使桁架与支撑连接系3紧密连接起来共同受力,形成框架结构。桁架上的所有连接孔上下左右对称均可互换使用。
The
2 吊挂系2
2
吊挂系2为挂篮施工的主要工作装置,它的主要材料选用方钢管7与上悬臂工字钢6,梁端方管套销连接,销栓接孔13的位置变化可以使吊杆平台以10cm间距进行调节,最大升降值为60cm,既任意二个垂直方向上相邻的销栓接孔13的间距为10cm,销栓接孔13的数量为7个。插销采用8.8级M20高强度螺栓连接。工字钢梁顶面孔眼作用供支撑架及一根角钢连接形成四排吊挂梁整体。工字钢梁底面法兰孔眼用来与桁架上的法兰螺栓连接。
The
3 支撑连接系3
3
支撑连接系3主要材料选用角钢,分大小两种规格。应用于桁架之间连接,小支撑架形成挂篮框架结构主要稳定构件。大支撑架形成一个6m长单元的整体性。大小支撑架外形尺寸不同,因此不能通用,但是支撑连接系3的连接形式全部选用钢套螺栓与桁架孔连接,连接螺栓均能互换通用。
The main material of the supporting
4 尾部配重平衡系4
4 Tail
尾部配重平衡系4主要用于挂篮抗倾覆安全置放压重材料的平台。它的材料选用100×50×5mm方钢管作吊挂杆件上下全部采用法兰板螺栓连接,平台结构采用10号普通槽钢与方钢管螺栓连接。吊杆安装尺寸全部做到互换。
The tail
5 行走系5
5
行走系5主要为挂篮组装后单元结构整体移动使用,为对称安装于桁架主体结构1底面之法兰板两侧的多个钢轮支座结构。其中钢轮支座结构包括有一用于和桁架主体结构1之底面栓接固定的支撑板8,支撑板8下端焊接有两个平行的轮架9,轮架9的另一端分别设有相对应的铜套轴承10,两个铜套轴承10中套装有一主轴11,主轴上固定设有一直径100mm的滚轮12。采用铜套轴承10的原因是在桥梁施工中环境恶劣,普通轴承易出现故障,而且铜套轴承10本身结构导致阻力大,尤其静摩擦系数和动摩擦系数相差较大,使得具有容易静止、固定的特性。该钢轮支座结构组装时应加注油脂,保证润滑减少零件磨损,为便于保养全部零件均可以拆装。
The
以上详细描述了本发明中所设计之挂篮的结构,以下上述的装置结构对于该吊篮的装配操作要求进行说明: The structure of the hanging basket designed in the present invention has been described in detail above, and the above-mentioned device structure is described below for the assembly operation requirements of the hanging basket:
(1)挂篮操作前必须熟悉说明书内结构简介。指定具体管理人员,了解结构主拼装顺序,使用与存放应采取必要的保护措施,以保证挂篮结构件的完好。 (1) Before operating the hanging basket, you must be familiar with the structure brief in the manual. Designate specific management personnel, understand the main assembly sequence of the structure, and take necessary protective measures for use and storage to ensure the integrity of the hanging basket structural parts.
(2)挂篮在高架桥上组拼时,悬吊挂装置应选择既有铁路线桥梁侧边有作业平台上安装。 (2) When the hanging basket is assembled on the viaduct, the suspension device should be installed on the working platform on the side of the bridge of the existing railway line.
(3)组拼完成一个单元体6米长挂篮后即可采取人工推移或捲扬拖拉顺桥向前移动。 (3) After the 6-meter-long hanging basket of a unit body is assembled, it can be manually pushed or hoisted and dragged to move forward along the bridge.
(4)每个挂篮单元结构的行走系5配置了8个钢轮支撑桥面。为了保证钢轮同时承受挂篮自重行走,须将每侧四个轮子抄垫平,抄垫平材料采用钢板或大于20号槽钢。尤其是轮子通过桥梁端伸缩缝时必须过渡垫平。
(4) The
(5)为防止人员施工时的工具、混凝土颗粒、杂物坠落,吊挂系2的底面板及侧面板全部采用18毫米厚的木模板封闭。侧面板2米高上方采用密目网封闭。固定方法采取木板上钻孔,4毫米铁铅丝绑扎。这一要求在上跨铁路段施工时更为重要。
(5) In order to prevent tools, concrete particles and sundries from falling during construction, the bottom panel and side panels of the
(6)挂篮的前吊挂方钢管7与套连接螺栓必须选择8.8级的M20高强度螺栓销接,螺栓数量一端头不得少于2个,严禁采用其他材料替用。
(6) The connecting bolts of the front hanging
(7)尾部压重材料选择标准模块重量的混凝土块来压重,可以搬运,重量清晰。要求尽靠尾部外侧堆放,力求均匀分布。严禁不规则体积重量的材料胡乱堆放作安全平衡压重。 (7) The tail ballast material chooses concrete blocks with standard module weights for ballast, which can be transported and the weight is clear. It is required to stack on the outer side of the tail, and strive to distribute evenly. It is strictly forbidden to randomly pile up materials with irregular volume and weight for safety balance.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201010545953A CN101967799B (en) | 2010-11-16 | 2010-11-16 | Light-weight truss cradle |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201010545953A CN101967799B (en) | 2010-11-16 | 2010-11-16 | Light-weight truss cradle |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101967799A CN101967799A (en) | 2011-02-09 |
| CN101967799B true CN101967799B (en) | 2012-08-29 |
Family
ID=43547014
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201010545953A Expired - Fee Related CN101967799B (en) | 2010-11-16 | 2010-11-16 | Light-weight truss cradle |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101967799B (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102168412A (en) * | 2011-03-15 | 2011-08-31 | 广东水电二局股份有限公司 | Cradle and method for dam elevation construction by using same |
| CZ304398B6 (en) * | 2011-05-26 | 2014-04-16 | Metrostav A. S. | Method of gradual transferable formation of shuttering bearing surface when casting highway bridge structure with transfer center |
| CN103015321A (en) * | 2011-09-23 | 2013-04-03 | 江苏雄宇重工科技股份有限公司 | Overlong hanging basket for triangular truss combined type bridge |
| CN102561211A (en) * | 2012-01-11 | 2012-07-11 | 中建七局第二建筑有限公司 | Hanging basket for protecting collision-prevention wall |
| CN103938554A (en) * | 2014-04-14 | 2014-07-23 | 中铁四局集团第一工程有限公司 | Method for constructing hanging basket under railway box girder flange plate |
| CN104179126B (en) * | 2014-08-29 | 2017-01-25 | 上海建工七建集团有限公司 | Municipal overhead anti-collision wall construction method |
| CN107060308B (en) * | 2017-03-17 | 2022-11-04 | 南通理工学院 | Outside-window operation rack |
| CN107059610A (en) * | 2017-05-10 | 2017-08-18 | 南昌大学 | Light movable packaged type bridges overhaul assistance platform |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN85104566A (en) * | 1985-06-14 | 1986-12-10 | 萨尔瓦多·普乔尔·巴康斯 | Movable walkway for construction engineering |
| CN2597531Y (en) * | 2002-11-21 | 2004-01-07 | 广东省长大公路工程有限公司第一分公司 | Single rope face tracting rope hanging cage |
| JP2008013998A (en) * | 2006-07-05 | 2008-01-24 | Yoneyama Kogyo Kk | Movable suspended scaffolding device |
| CN201169749Y (en) * | 2008-03-26 | 2008-12-24 | 中铁四局集团有限公司 | Simple pin-connected triangular hanging basket |
| CN201377078Y (en) * | 2009-03-04 | 2010-01-06 | 湖南省第五工程有限公司 | Movable operating platform for bridge railing transformation and maintenance |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201891083U (en) * | 2010-11-16 | 2011-07-06 | 中铁二十四局集团有限公司 | Light-duty truss hanging basket |
-
2010
- 2010-11-16 CN CN201010545953A patent/CN101967799B/en not_active Expired - Fee Related
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN85104566A (en) * | 1985-06-14 | 1986-12-10 | 萨尔瓦多·普乔尔·巴康斯 | Movable walkway for construction engineering |
| CN2597531Y (en) * | 2002-11-21 | 2004-01-07 | 广东省长大公路工程有限公司第一分公司 | Single rope face tracting rope hanging cage |
| JP2008013998A (en) * | 2006-07-05 | 2008-01-24 | Yoneyama Kogyo Kk | Movable suspended scaffolding device |
| CN201169749Y (en) * | 2008-03-26 | 2008-12-24 | 中铁四局集团有限公司 | Simple pin-connected triangular hanging basket |
| CN201377078Y (en) * | 2009-03-04 | 2010-01-06 | 湖南省第五工程有限公司 | Movable operating platform for bridge railing transformation and maintenance |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101967799A (en) | 2011-02-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206328678U (en) | Steel box-girder chooses arm and steel guard rail installs dual-purpose type Mobile operating platform | |
| CN105803947B (en) | A kind of cast-in-situ box girder gate-type full framing whole lateral moving system and method for traversing | |
| CN105239514B (en) | Stepless-adjustment ball-hinge type multi-support-leg forward transverse shifting track system of bridge girder erection machine | |
| CN101967799A (en) | Light-weight truss cradle | |
| CN206553923U (en) | A kind of mobile platform device for being used to install Collison fence for bridge | |
| CN205242278U (en) | A triangle string basket method is hanged and is watered device for deck bridge construction | |
| CN104213501A (en) | Cable-stayed bendable opening trestle structure and construction method thereof | |
| CN110409319A (en) | A kind of cast-in-place floorings bracket of large span steel reinforced concrete combination beam and construction method | |
| CN204109135U (en) | Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system | |
| CN101122115A (en) | A construction method for tower crane displacement | |
| CN112726411B (en) | Integral dragging construction method for single-hole large cantilever steel truss girder | |
| CN207267966U (en) | Zipline-type non-bracket support replacement operating platform | |
| CN210288140U (en) | Simple and easy prefabricated decking hoist and mount platform truck | |
| CN110158483B (en) | Cap beam prestressed high altitude tensioning operation cage | |
| CN102926330B (en) | Installation method of hanging basket suitable for bridge construction | |
| CN222990595U (en) | Multifunctional portal for suspension bridge construction | |
| CN100497834C (en) | Construction equipment for integral roof-holding highway bridge top structure | |
| JP6873435B2 (en) | Suspended scaffolding and its erection method | |
| CN104278628B (en) | A kind of light hanging basket being applicable to bridge machinery and maintenance activity | |
| CN202705923U (en) | Assembling platform installed close to bridge abutment roadbed | |
| CN204917745U (en) | Portable portal crane | |
| CN106320190A (en) | Platform of bridge maintenance, consolidation and suspension construction | |
| CN201588172U (en) | Integral single-tower non-dorsal-cord cable-stayed-bridge king tower lifting template | |
| CN217325044U (en) | Cast-in-place crossbeam bracket of reassembling type | |
| CN201891083U (en) | Light-duty truss hanging basket |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120829 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |