CN1019637B - 玻璃钢伞骨部件制作方法 - Google Patents
玻璃钢伞骨部件制作方法Info
- Publication number
- CN1019637B CN1019637B CN 90103971 CN90103971A CN1019637B CN 1019637 B CN1019637 B CN 1019637B CN 90103971 CN90103971 CN 90103971 CN 90103971 A CN90103971 A CN 90103971A CN 1019637 B CN1019637 B CN 1019637B
- Authority
- CN
- China
- Prior art keywords
- umbrella
- umbrella frame
- enhanced
- glass fiber
- reinforced plastic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Images
Landscapes
- Injection Moulding Of Plastics Or The Like (AREA)
- Casting Or Compression Moulding Of Plastics Or The Like (AREA)
Abstract
本发明所述的玻璃钢伞骨部件的制作方法,是一种以玻璃钢伞骨为模芯,注塑形成附加构件,并完成伞骨部件组装的方法,这种方法使伞骨结构一体化,各构件连接牢度和部件强度提高,还可使接头和马鞍等零件的成型同伞骨部件的制作一次完成,大大提高了生产效率。
Description
本发明涉及一种玻璃钢伞骨部件的制作方法。
玻璃钢伞骨部件包括玻璃钢长伞骨部件和玻璃钢短伞骨部件,长伞骨部件由长伞骨、接头和马鞍组成,接头和马鞍为附加构件,分别设在长伞骨的端部和中间适当部位;短伞骨部件由短伞骨和接头组成,接头为附加构件,设在短伞骨的两头。目前,玻璃钢伞骨部件的制作方法是将分别用金属材料制造的接头和马鞍零件,通过数道工序套装到玻璃钢伞骨上,然后将接头和马鞍铆固在玻璃钢伞骨上。这种方法首先要制作零件,然后套装铆固,工序步骤较多,生产效率不高,而且铆固过程中要伤及玻璃钢伞骨的本体,影响伞骨强度,且连接牢度欠佳。
本发明的目的是提供一种连接牢度高,生产效率也高的玻璃钢伞骨部件的制作方法。
本发明的解决方案是首先在玻璃钢伞骨安装附加构件的部位制作沟槽,然后把伞骨的沟槽部分放进附加构件的型模中,以玻璃钢伞骨作模芯,向型模中注入高强度的塑料,最后是冷却卸模。
为阐明上述方案,本说明书提供如下附图:
图1:玻璃钢伞骨材料结构图;
图2:长伞骨部件结构图;
图3:短伞骨部件结构图;
图4:伞骨部件制作方法步骤一图。
玻璃钢伞骨材料的芯部是经拉伸预应力处理的长玻璃丝束(1),外部是由高强度树脂和填充剂形成的注塑包裹层(2);伞骨部件的零件包括长伞骨(3)、接头(4、7)、马鞍(5)和短伞骨(6);首先在伞骨安装接头(4或7)和马鞍(5)的部位制作沟槽(8),然后是将伞骨装进接头或马鞍模具,接着注塑高强度塑料,如ABS塑料,冷却卸模后,即得到伞骨部件。
用上述注塑成型装配的方法来制造伞骨部件,既可使伞骨结构一体化,提高各构件间的连接牢度和部件强度,还可使接头和马鞍等零件的成型同伞骨部件的制作一次完成,大大提高了生产效率。
Claims (1)
1、一种玻璃钢伞骨部件的制作方法,其特征是:首先在玻璃钢伞骨安装附加构件的部位制作沟槽(8),然后把伞骨的沟槽部分放进附加构件的型模中,以玻璃钢伞骨作模芯,向型模中注入高强度的塑料,最后冷却卸模。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 90103971 CN1019637B (zh) | 1990-05-28 | 1990-05-28 | 玻璃钢伞骨部件制作方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 90103971 CN1019637B (zh) | 1990-05-28 | 1990-05-28 | 玻璃钢伞骨部件制作方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1047022A CN1047022A (zh) | 1990-11-21 |
CN1019637B true CN1019637B (zh) | 1992-12-30 |
Family
ID=4878320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 90103971 Expired CN1019637B (zh) | 1990-05-28 | 1990-05-28 | 玻璃钢伞骨部件制作方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1019637B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107997322A (zh) * | 2017-12-18 | 2018-05-08 | 杭州天堂伞业集团有限公司 | 一种手开直杆竹伞 |
CN109549305B (zh) * | 2018-12-14 | 2021-02-05 | 深圳大学 | 伞骨及其制备方法和伞 |
-
1990
- 1990-05-28 CN CN 90103971 patent/CN1019637B/zh not_active Expired
Also Published As
Publication number | Publication date |
---|---|
CN1047022A (zh) | 1990-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103974876B (zh) | 车身构件 | |
US5803476A (en) | Composite bicycle frame and method of manufacturing | |
PT87149A (pt) | Processo para a preparacao de uma pre-forma de matriz de resina reforcada com fibra e artigos obtidos a partir dela | |
RU2009103204A (ru) | Способ изготовления конструктивного компонента из армированного волокнами композиционного материала, предназначенного для авиакосмической отрасли, формовочный стержень для изготовления такого компонента и конструктивный компонент, полученный этим способом и/или посредством этого стержня | |
CN104249464A (zh) | 用于制造风力涡轮机叶片的方法及生产线 | |
FR2658090B1 (fr) | Procede d'assemblage d'un ski par surmoulage, et structure de ski obtenue par ce procede. | |
FR2616106B1 (fr) | Materiau composite metal-matiere plastique et procede pour sa fabrication | |
EP0374123B1 (de) | Verfahren zur Herstellung eines Ballspielschlägerrahmens | |
CN1019637B (zh) | 玻璃钢伞骨部件制作方法 | |
CN1072637A (zh) | 玻璃钢船体注入发泡整体成型制造工艺与模具装置 | |
CA2017403A1 (en) | Bicycle frame and method for its manufacture | |
US5310516A (en) | Method of making a composite racket | |
US4393024A (en) | Method of producing a racket frame | |
CN209365245U (zh) | 一种注胶成型模具 | |
US20020014721A1 (en) | Method of producing a high-strength component from plastic, and a high-strength component | |
CN204775552U (zh) | 导流罩 | |
CN2474898Y (zh) | 一种美耐灯多向贝壳式接头 | |
CN2175684Y (zh) | 全长注塑竹竿 | |
CN218256907U (zh) | 一种碳纤维复合材料的成型模具 | |
CN209289625U (zh) | 一种高效均匀填充异型多腔模具注塑工艺装 | |
Mohan | SRIM composites for automotive structural applications | |
JPS57167217A (en) | Manufacture of hollow synthetic resin molding | |
JPH04112014A (ja) | 樹脂中空成形品の製法 | |
FR2501571A1 (fr) | Pieces moulees renforcees par des profiles realises par pultrusion | |
JPH07226529A (ja) | 太陽電池集光板およびその製法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C13 | Decision | ||
GR02 | Examined patent application | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |