CN101956556A - 一种无顶底柱阶段上向连续充填采矿法 - Google Patents

一种无顶底柱阶段上向连续充填采矿法 Download PDF

Info

Publication number
CN101956556A
CN101956556A CN2009101156995A CN200910115699A CN101956556A CN 101956556 A CN101956556 A CN 101956556A CN 2009101156995 A CN2009101156995 A CN 2009101156995A CN 200910115699 A CN200910115699 A CN 200910115699A CN 101956556 A CN101956556 A CN 101956556A
Authority
CN
China
Prior art keywords
nugget
stage casing
ore
continuous
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009101156995A
Other languages
English (en)
Other versions
CN101956556B (zh
Inventor
杨成林
孙德民
喻波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ruim engineering technology Limited by Share Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN200910115699A priority Critical patent/CN101956556B/zh
Publication of CN101956556A publication Critical patent/CN101956556A/zh
Application granted granted Critical
Publication of CN101956556B publication Critical patent/CN101956556B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种无顶底柱阶段上向连续充填采矿法,根据矿体形态和最大主应力方向,每间隔矿块长度设置一条柱,将矿体划分为若干采区。再将每个采区按矿块宽度等距划分为若干矿块,上下中段矿块的位置完全对应,采用由下往上的回采顺序,直接在充填体的上部回采矿石,嗣后胶结充填,最终使上下中段以至于整个矿体高度范围内形成连续的充填体。解决了充填接顶的问题,保证了矿石的安全回采,同时由于无需要设置顶底柱,提高了矿石回收率。

Description

一种无顶底柱阶段上向连续充填采矿法
技术领域
本发明涉及一种由下往上回采顺序的阶段连续充填采矿法。
背景技术
充填法作为一种安全高效环保的采矿方法广泛的应用于各矿山,尤其对于矿岩不稳固或高地应力等开采条件恶劣的矿山,充填法更是几乎唯一的开采方法。然而充填采矿法的接顶一直是一个难以克服的难题,由于充填料的安息角与其自然沉降等因素,充填体与顶板之间始终存在一定的间隙,因此不能起到理想的支撑顶板压力的作用,接顶效果的好坏与充填质量直接相关。
发明内容
本发明所要解决的技术问题正是为了弥补上述现有技术的缺陷,提出一种无顶底柱阶段上向连续充填采矿法,采用由下往上的回采顺序,直接在充填体之上回采上中段矿石,嗣后胶结充填,使上下中段以至于整个矿体高度范围内形成连续的充填体,解决了充填接顶的问题,保证了矿石的安全回采,同时由于无需设置顶底柱,提高了矿石回收率。
本发明的技术问题通过以下技术方案予以解决。
一种无顶底柱阶段上向连续充填采矿法:首先,根据矿体形态和最大主应力方向,每间隔矿块长度设置一条柱,将矿体划分为若干个采区,再将每个采区按矿块宽度等距划分为若干个矿块,上下中段矿块的布置完全对应,相邻矿块间隔采用嗣后胶结充填与尾砂充填,阶段上向连续充填。回采顺序为:由下往上,下中段超前上中段回采,先回采矿体最下部中段的胶结充填矿块,待该矿块充填体养护达到强度后直接在充填体之上回采与之对应的上中段矿块,嗣后胶结充填,上下中段的胶结充填体形成一个连续的整体,中段矿块之间不再设置顶底柱。待连续两中段的充填体形成之后再于充填体内掘进采准工程回采相邻两胶结充填体之间下中段的矿块,嗣后尾砂充填。然后再回采胶结充填矿块上部对应的矿块,充填后又将形成连续的胶结充填体。再回采充填体之间下中段的矿块,嗣后尾砂充填。如此循环,使得采区内每间隔矿块宽度形成一条高度为整个矿体开采高度的连续充填体。
无顶底柱阶段上向连续充填,中段与中段之间由下往上回采;中段之间不设顶底柱;上下中段的充填体形成了一个连续的整体,实现了完全接顶。增强了充填效果,提高了矿石回采安全性,同时也提高了矿石回收率。
综上所述,本发明与现有技术对比的有益效果是:
本发明方法解决了充填法一直以来难以克服的充填不能接顶的问题,由于在采区中每间隔矿块宽度形成了一条高度为整个矿体开采高度的连续充填体,在该充填体的支撑下,可以实现矿石的连续安全回采;同时由于无需设置顶底柱,提高了矿石回收率。特别适用于大规模安全高效回采高价值、深井高应力厚大矿体。
附图说明
附图为本发明的无顶底柱阶段上向连续充填采矿法流程图。
具体实施方式
一种无顶底柱阶段上向连续充填采矿法:
首先垂直矿体走向每隔矿体长度间隔布置宽15m与10m的条柱,在15m条柱中布置出矿运输巷道,在10m条柱中布置回风巷道,再将条柱之间的矿体等距划分为20m宽矿块,上下中段矿块的布置完全对应。采用大直径深孔落矿,铲运机出矿,嗣后本中段相邻矿块间隔采用胶结充填与尾砂充填。矿块回采顺序为:
(1)首先于最底部中段每隔一个矿块回采一个矿块(隔一采一),嗣后胶结充填;
(2)待第(1)步回采的矿块充填体养护达到强度后,直接在充填体之上回采与之对应的上中段矿块,嗣后胶结充填,上下中段矿块之间不再设置顶底柱;
(3)待第(2)步回采的矿块充填体养护达到强度,上下中段的胶结充填体形成连续的整体后,再于充填体内掘进采准工程回采相邻两胶结充填体之间下中段的矿块,嗣后尾砂充填。
然后再回采第(2)步胶结充填矿块上中段对应的矿块,充填后又将形成连续的胶结胶结充填体。再回采充填体之间下中段的矿块,嗣后尾砂充填。如此循环,由下往上,下中段超前上中段回采,使得采区内每间隔矿块宽度形成一条高度为整个矿体开采高度的连续充填体。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下做出若干等同替代或明显变型,而且性能或用途相同,则应当视为属于本发明由所提交的权利要求书确定的保护范围。

Claims (2)

1.一种无顶底柱阶段上向连续充填采矿法:首先,根据矿体形态和最大主应力方向,每间隔矿块长度设置一条柱,将矿体划分为若干个采区,再将每个采区按矿块宽度等距划分为若干个矿块,其特征在于:上下中段矿块的布置完全对应,相邻矿块间隔采用嗣后胶结充填与尾砂充填,阶段上向连续充填;回采顺序为由下往上,下中段超前上中段回采,首先回采矿体最下部中段的胶结充填矿块,待矿块充填体养护达到强度后直接在充填体之上回采与之对应的上中段矿块,嗣后胶结充填,上下中段的胶结充填体形成一个连续的整体,中段矿块之间不再设置顶底柱;待连续两中段的充填体形成之后再于充填体内掘进采准工程回采相邻两胶结充填体之间下中段的矿块,嗣后尾砂充填;然后再回采胶结充填矿块上部对应的矿块,充填后又将形成连续的胶结充填体,再回采充填体之间下中段的矿块,嗣后尾砂充填;如此循环,最终使得采区内每间隔矿块宽度形成一条高度为整个矿体开采高度的连续充填体。
2.根据权利要求1所述的无顶底柱阶段上向连续充填采矿法,其特征在于:阶段上向连续充填,中段与中段之间由下往上连续回采;中段之间不设顶底柱;上下中段的充填体形成了一个连续的整体,实现了完全接顶。增强了充填效果,提高了矿石回采安全性,同时也提高了矿石回收率。
CN200910115699A 2009-07-16 2009-07-16 一种无顶底柱阶段上向连续充填采矿法 Active CN101956556B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910115699A CN101956556B (zh) 2009-07-16 2009-07-16 一种无顶底柱阶段上向连续充填采矿法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910115699A CN101956556B (zh) 2009-07-16 2009-07-16 一种无顶底柱阶段上向连续充填采矿法

Publications (2)

Publication Number Publication Date
CN101956556A true CN101956556A (zh) 2011-01-26
CN101956556B CN101956556B (zh) 2012-10-10

Family

ID=43484121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910115699A Active CN101956556B (zh) 2009-07-16 2009-07-16 一种无顶底柱阶段上向连续充填采矿法

Country Status (1)

Country Link
CN (1) CN101956556B (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155226A (zh) * 2010-11-30 2011-08-17 淄博市王庄煤矿 中厚及以上煤层的巷道式充填开采方法
CN102155227A (zh) * 2011-02-18 2011-08-17 北京矿冶研究总院 垂直方向上连续开采方法及在全矿体连续开采中的应用
CN102678119A (zh) * 2012-05-09 2012-09-19 河北钢铁集团矿业有限公司 一种控制岩移高效充填采矿方法
CN103104261A (zh) * 2013-02-18 2013-05-15 中南大学 一种多层矿体三维空间协同采矿法
CN103147761A (zh) * 2013-03-25 2013-06-12 武汉科技大学 一种缓倾斜松软顶板薄矿床充填采矿方法
CN103437768A (zh) * 2013-09-09 2013-12-11 中南大学 一种不留顶底柱预置空间充填采矿法
CN103527200A (zh) * 2013-10-25 2014-01-22 河北省矾山磷矿有限公司 无底柱分段菱形矿房嗣后充填采矿法
CN103628877A (zh) * 2013-11-26 2014-03-12 武汉科技大学 一种多层缓倾斜薄-中厚矿床充填采矿方法
CN104153782A (zh) * 2014-07-29 2014-11-19 长沙矿山研究院有限责任公司 连续崩落采矿方法
CN104712337A (zh) * 2015-02-25 2015-06-17 韦立坚 一种采矿方法
CN104727820A (zh) * 2015-04-07 2015-06-24 长沙有色冶金设计研究院有限公司 一种两步骤分段空场嗣后充填采矿方法
CN105888668A (zh) * 2016-06-15 2016-08-24 山东华联矿业股份有限公司 预控顶上向高分段中深孔嗣后充填采矿方法
CN106761756A (zh) * 2015-11-19 2017-05-31 中钢集团马鞍山矿山研究院有限公司 一种用于上向分层全尾砂胶结充填法的采场结构
CN106761912A (zh) * 2015-11-19 2017-05-31 中钢集团马鞍山矿山研究院有限公司 一种适合于不稳定岩层的高效上向进路分层充填采矿方法

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155226A (zh) * 2010-11-30 2011-08-17 淄博市王庄煤矿 中厚及以上煤层的巷道式充填开采方法
CN102155227A (zh) * 2011-02-18 2011-08-17 北京矿冶研究总院 垂直方向上连续开采方法及在全矿体连续开采中的应用
CN102678119A (zh) * 2012-05-09 2012-09-19 河北钢铁集团矿业有限公司 一种控制岩移高效充填采矿方法
CN103104261A (zh) * 2013-02-18 2013-05-15 中南大学 一种多层矿体三维空间协同采矿法
CN103147761B (zh) * 2013-03-25 2014-11-19 武汉科技大学 一种缓倾斜松软顶板薄矿床充填采矿方法
CN103147761A (zh) * 2013-03-25 2013-06-12 武汉科技大学 一种缓倾斜松软顶板薄矿床充填采矿方法
CN103437768A (zh) * 2013-09-09 2013-12-11 中南大学 一种不留顶底柱预置空间充填采矿法
CN103527200A (zh) * 2013-10-25 2014-01-22 河北省矾山磷矿有限公司 无底柱分段菱形矿房嗣后充填采矿法
CN103527200B (zh) * 2013-10-25 2015-12-09 河北省矾山磷矿有限公司 无底柱分段菱形矿房嗣后充填采矿法
CN103628877A (zh) * 2013-11-26 2014-03-12 武汉科技大学 一种多层缓倾斜薄-中厚矿床充填采矿方法
CN103628877B (zh) * 2013-11-26 2015-09-02 武汉科技大学 一种多层缓倾斜薄-中厚矿床充填采矿方法
CN104153782A (zh) * 2014-07-29 2014-11-19 长沙矿山研究院有限责任公司 连续崩落采矿方法
CN104153782B (zh) * 2014-07-29 2016-03-23 长沙矿山研究院有限责任公司 连续崩落采矿方法
CN104712337A (zh) * 2015-02-25 2015-06-17 韦立坚 一种采矿方法
CN104727820A (zh) * 2015-04-07 2015-06-24 长沙有色冶金设计研究院有限公司 一种两步骤分段空场嗣后充填采矿方法
CN106761756A (zh) * 2015-11-19 2017-05-31 中钢集团马鞍山矿山研究院有限公司 一种用于上向分层全尾砂胶结充填法的采场结构
CN106761912A (zh) * 2015-11-19 2017-05-31 中钢集团马鞍山矿山研究院有限公司 一种适合于不稳定岩层的高效上向进路分层充填采矿方法
CN106761756B (zh) * 2015-11-19 2018-07-03 中钢集团马鞍山矿山研究院有限公司 一种用于上向分层全尾砂胶结充填法的采场结构
CN106761912B (zh) * 2015-11-19 2018-07-03 中钢集团马鞍山矿山研究院有限公司 一种适合于不稳定岩层的高效上向进路分层充填采矿方法
CN105888668A (zh) * 2016-06-15 2016-08-24 山东华联矿业股份有限公司 预控顶上向高分段中深孔嗣后充填采矿方法

Also Published As

Publication number Publication date
CN101956556B (zh) 2012-10-10

Similar Documents

Publication Publication Date Title
CN101956556B (zh) 一种无顶底柱阶段上向连续充填采矿法
CN103557002B (zh) 一种盘区机械化集中溜井上向水平分层充填采矿法
CN103615285B (zh) 一种利于充填接顶的采场进路布置方式及方法
CN102518438B (zh) 一种顶板再造中深孔落矿嗣后充填采矿法
CN108868771B (zh) 一种水平中深孔回采倾斜中厚矿体的采矿方法
CN104564072B (zh) 近距离煤层群完全无煤柱连续卸压开采方法
CN103244123B (zh) 一种急倾斜中厚矿体采矿方法
CN202064981U (zh) 软煤层巷道支护结构
CN105240046B (zh) 大采高综采工作面初采及回采期间瓦斯抽采钻孔布置方法
CN104373125B (zh) 两步骤上向高分层袋装充填采矿法
CN104481543B (zh) 阶段留矿崩落采矿法
CN104632220B (zh) 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法
CN101737052A (zh) 一种分段充填采矿方法
CN104712358A (zh) 基于首采全岩卸压工作面沿空留巷的高瓦斯煤层群卸压共采方法
CN102392678A (zh) 井上下联合压裂增透抽采瓦斯的方法
CN103161492A (zh) 一种基于上覆岩层裂隙壳的瓦斯抽采钻孔布置方法
CN102839984B (zh) 井下超大断面支护结构
AU2013354613A1 (en) Method of local filling to control surface subsidence in worked-out area
CN104100270A (zh) 一种缓倾斜矿脉无轨开采方法
CN103206215A (zh) 一种预控顶上向进路充填采矿法
CN103557001B (zh) 一种低段高无底柱留矿嗣后充填采矿法
CN109296367A (zh) 一种中厚缓倾斜破碎矿体上向水平分层充填采矿法
CN105863727B (zh) 间柱采空区处理方法
CN102155227A (zh) 垂直方向上连续开采方法及在全矿体连续开采中的应用
CN102777205B (zh) 一种确定水平井在采空区瓦斯抽放的空间位置的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 330031 No. 888, Qian Hu Road, Hongjiao Island, Nanchang, Jiangxi.

Patentee after: China ruim engineering technology Limited by Share Ltd

Address before: No. 1, Bayi Avenue, Nanchang, Jiangxi Province, Jiangxi

Patentee before: China Nerin Engineering Co., Ltd.

CP03 Change of name, title or address