CN101956523A - Multifunctional engineering driller of rock tunnel - Google Patents

Multifunctional engineering driller of rock tunnel Download PDF

Info

Publication number
CN101956523A
CN101956523A CN2009100126418A CN200910012641A CN101956523A CN 101956523 A CN101956523 A CN 101956523A CN 2009100126418 A CN2009100126418 A CN 2009100126418A CN 200910012641 A CN200910012641 A CN 200910012641A CN 101956523 A CN101956523 A CN 101956523A
Authority
CN
China
Prior art keywords
tunnel
main shaft
rock tunnel
cutter assembly
hydraulic cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2009100126418A
Other languages
Chinese (zh)
Inventor
李福明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009100126418A priority Critical patent/CN101956523A/en
Publication of CN101956523A publication Critical patent/CN101956523A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a multifunctional engineering driller of a rock tunnel. A hydraulic supporting plate is mounted on a shell which is internally provided with a motor, a main shaft and a hydraulic cylinder, wherein the motor is connected with a cutter assembly, spiral lifting plates are mounted on the circumference of the cutter assembly, the main shaft is respectively connected with the cutter assembly and the hydraulic cylinder, driving wheels are mounted below the shell the rear part of which an control room is arranged, a belt conveyer is mounted behind the cutter assembly, two groups of saw blades are respectively mounted at both sides of the bottom of the control room, and two groups of saw blades are mounted on the bottom plane of the control room. The multifunctional engineering driller of the rock tunnel can creatively finish the whole process of processing the arc rock tunnel once, the drilled tunnel is in a complete geometrical shape, and wall rock has stable physical and mechanical performance and safe and reliable quality. The invention can substitute a traditional drilling and blasting process, solves the problem of unsafe factors and personal injury accidents caused by drilling and blasting, realizes the mechanical cycle automation control of the working program and has high benefits and speed which is 6-8 times of the drilling and blasting engineering scheduler of a similar rock tunnel.

Description

Multifunctional rock construction of tunnel rig
Technical field
The invention relates to mining, diversion, builds highway tunnel equipment.
Background technology
The main employing bored quick-fried technology in China's rock gangway tunnel piercing at present, and operation is various, and labour intensity is big, and benefit is low, and security incident hidden danger is many.
Summary of the invention
In order to solve the problem of above-mentioned existence, the invention provides the multifunctional rock construction of tunnel rig of a kind of mechanical automation control, easy and simple to handle, construction safety; The purpose of the invention is achieved through the following technical solutions: multifunctional rock construction of tunnel rig, it is characterized in that: the hydraulic pressure gripper shoe is installed on housing, motor is installed in housing, main shaft, hydraulic cylinder, motor is connected with the cutterhead assembly, on cutterhead assembly circumference, spiral is installed and rises flitch, the cutterhead assembly is connected with main shaft, main shaft is connected with hydraulic cylinder, driving wheel is installed below housing, be provided with operating room at the housing rear portion, cutterhead assembly back is equipped with belt conveyor, in the operating room two bottom sides two groups of saw blades is installed, and two groups of saw blades are housed in the operating room baseplane.
The beneficial effect of the invention: motor-driven cutterhead assembly rotation, the spiral that the cutterhead assembly drives on its circumference rises the flitch rotation, hydraulic cylinder drives main shaft and axially moves, the cutterhead assembly is finished in operation process vertically and is crept into cutting, spiral rises flitch and brings detritus into the belt conveyor discharge, the tunnel bottom edge shape is finished cutting synchronously at random by operating room two bottom sides saw blade and baseplane saw blade, creep into a stroke, rig repeats to continue the work of creeping into after replenishing a distance forward fast under the drive of driving wheel.The invention multifunctional rock construction of tunnel rig can disposablely be finished all processes that the arch rock tunnel is processed, and the tunnel geometry is complete after boring, and the country rock physical and mechanical property is stable, and quality safety is reliable.Replace traditional quick-fried technology of brill, solve because of the unsafe factor that bores quick-fried generation and the difficult problem of human casualty accident.Working programme realizes mechanical cycles automation control.Speed is fast, high efficiency, be similar rock tunnel bore quick-fried programming 6-8 doubly.
Description of drawings
Fig. 1 is a multifunctional rock construction of tunnel drill configuration schematic diagram;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the vertical view of Fig. 1;
Fig. 4 is the A-A sectional drawing of Fig. 3.
The specific embodiment
Multifunctional rock construction of tunnel rig, hydraulic pressure gripper shoe 3 is installed on housing 7, motor 4, main shaft 5, hydraulic cylinder 6 are installed in housing 7, motor 4 is connected with cutterhead assembly 1, on cutterhead assembly 1 circumference, spiral is installed and rises flitch 2, cutterhead assembly 1 is connected with main shaft 5, main shaft 5 is connected with hydraulic cylinder 6, driving wheel 10 is installed below housing 7, be provided with operating room 9 at housing 7 rear portions, cutterhead assembly 1 back is equipped with belt conveyor 8, in operating room 9 two bottom sides two groups of saw blades 11 is installed, and in operating room 9 baseplanes two groups of saw blades 12 is housed.

Claims (1)

1. multifunctional rock construction of tunnel rig, it is characterized in that: the hydraulic pressure gripper shoe is installed on housing, motor, main shaft, hydraulic cylinder are installed in housing, motor is connected with the cutterhead assembly, on cutterhead assembly circumference, spiral is installed and rises flitch, the cutterhead assembly is connected with main shaft, main shaft is connected with hydraulic cylinder, driving wheel is installed below housing, be provided with operating room at the housing rear portion, cutterhead assembly back is equipped with belt conveyor, in the operating room two bottom sides two groups of saw blades is installed, and two groups of saw blades are housed in the operating room baseplane.
CN2009100126418A 2009-07-21 2009-07-21 Multifunctional engineering driller of rock tunnel Pending CN101956523A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100126418A CN101956523A (en) 2009-07-21 2009-07-21 Multifunctional engineering driller of rock tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100126418A CN101956523A (en) 2009-07-21 2009-07-21 Multifunctional engineering driller of rock tunnel

Publications (1)

Publication Number Publication Date
CN101956523A true CN101956523A (en) 2011-01-26

Family

ID=43484090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100126418A Pending CN101956523A (en) 2009-07-21 2009-07-21 Multifunctional engineering driller of rock tunnel

Country Status (1)

Country Link
CN (1) CN101956523A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075100A (en) * 2013-01-09 2013-05-01 孙跃强 Palm disk shaft mechanism for thousand-palm compound wagon drill
CN104005772A (en) * 2014-05-16 2014-08-27 浙江海洋学院 Small tunnel excavation device
CN109356606A (en) * 2018-10-26 2019-02-19 张世远 A kind of solid rock stratum hole brill method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075100A (en) * 2013-01-09 2013-05-01 孙跃强 Palm disk shaft mechanism for thousand-palm compound wagon drill
CN103075100B (en) * 2013-01-09 2015-02-18 孙跃强 Palm disk shaft mechanism for thousand-palm compound wagon drill
CN104005772A (en) * 2014-05-16 2014-08-27 浙江海洋学院 Small tunnel excavation device
CN109356606A (en) * 2018-10-26 2019-02-19 张世远 A kind of solid rock stratum hole brill method

Similar Documents

Publication Publication Date Title
CN201723151U (en) Downhole excavator
CN103244139B (en) Rectangular cross section pipe jacking tunnelling machine
CN205369357U (en) Multi -functional brill explodes machine
CN101956523A (en) Multifunctional engineering driller of rock tunnel
CN204476409U (en) Development machine combined type cut breaks rock and is split up device
CN201443406U (en) Multifunctional drilling machine for rock tunnel project
CN101781992A (en) Rock tunnel cut-through machine
CN202108507U (en) Cutting-type coal cutting equipment
CN103195421A (en) Reciprocating impact tunnel boring machine
CN103216226A (en) Water-jet cutting and impacting mining machine
CN202745866U (en) Water-jet cutting and impacting mining machine
CN112855198B (en) Cutter head convenient for replacing cutter head and push bench applying cutter head
CN203809004U (en) Sand stone mining machine
CN101054899A (en) Coal-excavating grooving machine suitable for excavating lump coal
CN103670397A (en) Cutting disc type rotating arm heading machine cutting device
CN111287482B (en) Construction treatment process for outer wall of building decoration project
CN210049894U (en) Diesel-electric dual-purpose mine cutting vehicle
CN217270300U (en) Single-side coal seam slotting equipment
CN202388631U (en) Diamond saw chain
CN1164859C (en) Driving cutting device
CN204800073U (en) Square hole drilling tool device
CN102748025A (en) Cutting coal mining method and device thereof
CN201053321Y (en) Coal-excavating grooving machine suitable for excavating lump coal
CN2573676Y (en) Driving cutting device
CN103670398A (en) Cutting disc type heading machine cutting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110126