CN101936603B - Method for controlling split instantaneous heat-pump water heater and water heater thereof - Google Patents

Method for controlling split instantaneous heat-pump water heater and water heater thereof Download PDF

Info

Publication number
CN101936603B
CN101936603B CN2010102728195A CN201010272819A CN101936603B CN 101936603 B CN101936603 B CN 101936603B CN 2010102728195 A CN2010102728195 A CN 2010102728195A CN 201010272819 A CN201010272819 A CN 201010272819A CN 101936603 B CN101936603 B CN 101936603B
Authority
CN
China
Prior art keywords
water
boiler
teat pump
tena
water heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102728195A
Other languages
Chinese (zh)
Other versions
CN101936603A (en
Inventor
张加振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGGUAN CARNOY ENERGY-CONSERVATION SCIENCE Co Ltd
Original Assignee
DONGGUAN CARNOY ENERGY-CONSERVATION SCIENCE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGGUAN CARNOY ENERGY-CONSERVATION SCIENCE Co Ltd filed Critical DONGGUAN CARNOY ENERGY-CONSERVATION SCIENCE Co Ltd
Priority to CN2010102728195A priority Critical patent/CN101936603B/en
Publication of CN101936603A publication Critical patent/CN101936603A/en
Application granted granted Critical
Publication of CN101936603B publication Critical patent/CN101936603B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The invention discloses a method for controlling a split instantaneous heat-pump water heater. The method comprises a starting operation method and a stopping operation method. The split instantaneous heat-pump water heater applying the method comprises a heat-pump water heater host machine, a hot water tank and a central control device which are connected and communicated with one another, wherein a condenser is arranged in the hot water tank; the hot water tank is a horizontal hot water tank with the volume of between 35 and 70 L for a single person; a high-power host machine is adopted and is provided with an ambient temperature sensor; the hot water tank is provided with a water temperature sensor; and a shell of the hot water tank is provided with a display screen for displaying a water temperature and a water level. The start and stop of the water heater are controlled intelligently and the split instantaneous heat-pump water heater is designed accordingly. A design scheme of a large heat-pump water heater host machine and a small hot water tank is adopted, so that the heat-pump water heater is installed like an ordinary electric water heater and the problems of difficult installation, waste of water source or energy source, low water producing speed, inconvenient use and the like are solved.

Description

A kind of control method and water heater thereof of split fast heating type Teat pump boiler
Technical field
The present invention relates to a kind of control method and water heater thereof of split Teat pump boiler, particularly relate to a kind of control method and water heater thereof of split fast heating type Teat pump boiler.
Background technology:
The Energy Saving Control of general Teat pump boiler is to adopt method for controlling timed power on/off; This is controlled at the high hot water temperature who keeps in the timed power on/off time period in the boiler; Do not guarantee the water temperature in the boiler outside time period at timed power on/off, possibly be cold water in the boiler.This control can be bigger the heat of reduction boiler scatter and disappear, can reach reasonable energy-saving effect.But the Along with people's growth in the living standard needs all to have at any time hot water, and the energy-saving effect of timed power on/off control is lost thereupon.
At present household heat pump water heater generally has two kinds of split type Teat pump boiler and circulating Teat pump boilers, and circulating Teat pump boiler is not by the circulation line of Teat pump boiler main frame, band water pump, form with the boiler and the controller of heat pump water heater of heat pump condenser; Split type Teat pump boiler is made up of the boiler and the controller of heat pump water heater of Teat pump boiler main frame, cold-producing medium tube connector, band heat pump condenser.Controller of heat pump water heater is furnished with hot water temperature's sensor, the start and stop of control Teat pump boiler main frame.These two types of ubiquitous problems of commercially available Teat pump boiler are that because the heating capacity of Teat pump boiler is generally less, heat production water is slow; Need accumulation of heat in the actual use; (be generally 100~600L), so heat-pump water-heater water tank configuration is all bigger so cause at first that difficult installation---modern architecture is skyscraper particularly, the general installing space of not reserving big capacity boiler; Cause difficult installation, can't use this energy-conserving product of Teat pump boiler; Next is that waste is serious---because water tank is big; Promptly enabling to install also generally is to be installed on balcony; Distant apart from the toilet, must bleed off the cold water among the hot water line waste that then can cause water resource during use, and can cause the waste of the energy hot water line's insulation that circulates; It three is that to produce water speed slow, and influence is used---need several hours as heating one case water in the winter time, after hot water uses, then also must wait for several hours; It four is to use inconvenience---and whether whether main frame, boiler etc. are all away from the toilet, have hot water, hot water enough etc. all unclear in the boiler.For circulating Teat pump boiler; Because recirculated water can not be at same position; In the process that hot water uses, can cause a large amount of hot and cold waters to mix inevitably; The available heat water capacity of water tank is reduced, cause the characteristics that effectively to utilize the low hot water temperature's high energy efficiency ratio of Teat pump boiler, cause the increase of system energy consumption.
Summary of the invention:
The objective of the invention is to overcome the deficiency of prior art; A kind of control method and water heater thereof of split fast heating type Teat pump boiler are provided; The opening and closing of Based Intelligent Control water heater, and design a kind of split fast heating type Teat pump boiler thus, adopt the design of big Teat pump boiler main frame, little boiler; Teat pump boiler is installed as the common electrical water heater, with this solve difficult installation, water resource or the energy waste, produce water speed slow, use problems such as inconvenience.
In order to achieve the above object, the technical scheme of the present invention's employing is: a kind of control method of split fast heating type Teat pump boiler, this method comprise open operation method and shutoff operation method.
This method relates to following data, and according to user's needs the hot water temperature being set is T0, and using water period is t, and the temperature of middle part cooling-water temperature sensor (27) is T1, and bottom water temperature sensor (26) temperature is T2, and the typical environment mean temperature is Tena.
The opening procedure of this split fast heating type Teat pump boiler is following:
Step 1, start request is arranged or when heating state;
Step 2, judge that the current time is whether in using water period t;
Step 3, when in using water period t, execution in step 3.1, when not in using water period t, execution in step 3.2;
Step 3.1, current time detect continuous 2 seconds and one of following two kinds of situation occur in using water period t the time
T1≤T0-4℃
Tena<20℃,T2≤T0-24℃
Then execution in step 4;
Step 3.2, current time detect continuous 2 seconds and one of following three kinds of situation occur not in using water period t the time
Tena<20 ℃, T1≤44 ℃ or T2≤30 ℃
25℃>Tena≥20℃,T1≤42℃
Tena≥25℃,T1≤40℃
Then execution in step 4;
Step 4, unlatching split fast heating type Teat pump boiler heat.
Temperature described in the step 3 is adjustable temperature, regulates by concrete condition.
The shutoff operation step of this split fast heating type Teat pump boiler is following:
Step 1, when shutdown request is arranged,
Step 2, judge the current time whether in using water period t,
Step 3, when in using water period t, execution in step 3.1, when not in using water period t, execution in step 3.2,
Step 3.1, current time be in using water period t the time, detects continuous 2 seconds and occur following situation T1 >=T0 and T2 >=T0-4 ℃, and then execution in step 4,
Step 3.2, current time detect continuous 2 seconds and one of following three kinds of situation occur not in using water period t the time
Tena<20℃,T1≥48℃,T2≥45℃
25℃>Tena≥20℃,T1≥46℃,T2≥42℃
Tena≥25℃,T1≥44℃,T2≥40℃
Then execution in step 4,
Step 4, close split fast heating type Teat pump boiler.
Temperature described in the step 3 is adjustable temperature, regulates by concrete condition.
A kind of water heater of using the control method of split fast heating type Teat pump boiler; Comprise the Teat pump boiler main frame, boiler and the control device that interconnect and be communicated with; Be arranged in the boiler with the condenser of main frame through pipeline connection, its boiler is horizontal boiler.The volume of this horizontal boiler is 35~70L, promptly supplies the water capacity of single use.In order to realize Fast Heating, this horizontal boiler is connected with main frame, and the power of main frame is 1.5~3, and is furnished with environment temperature sensor on the main frame.Simultaneously, the middle part of said horizontal boiler is provided with middle part cooling-water temperature sensor, bottom and is provided with the bottom water temperature sensor, and the shell of this horizontal boiler is provided with the display screen that shows water temperature and water level, and said each sensor and display screen are electrically connected with control device.
Compared with prior art, the invention has the beneficial effects as follows: the control method of split fast heating type Teat pump boiler guaranteeing all have under the situation of hot water at any time, has reduced the heat radiation of attemperater through dividing using water period and non-using water period; The energy-conservation start and stop control method of split fast heating type Teat pump boiler that different hot water temperatures' requirements and heat pump heating capacity characteristics are arranged through integrated environment temperature, attemperater middle heat coolant-temperature gage, attemperater bottom hot water temperature, water period, attemperater capacity, cold water temperature, different weather people; Guaranteeing under the hot water operating position; Reduced the time that attemperater is in the high-temperature-hot-water state to greatest extent; And reduced the water temperature of middle temperature keeping warm mode to greatest extent, reduced the heat radiation of attemperater to greatest extent.
The split fast heating type Teat pump boiler of adopting said method adopts the little volume boiler of single usefulness design, has solved Teat pump boiler because installing space is limited, and the problem of difficult installation is beneficial to popularizing of this energy-conserving product of Teat pump boiler; Because little volume boiler can be installed on the toilet as the common electrical water heater, avoided that boiler is remote installs the water resource that causes or the waste of the energy; Little
The volume boiler has guaranteed one person-time of hot water supply of having a shower; And through introducing environment temperature sensor and cooling-water temperature sensor; Guaranteed the in good time startup of Teat pump boiler; And can in using the hot water process, keep heating operation always, shortened the extremely about 10 minutes stand-by period when waiting for water in turn significantly; Show owing on the boiler outer wall, installed the water yield and water temperature additional, the user is come into plain view to the operation duty of heat pump, be more convenient for using; Utilize the split design, the free convection heating has alleviated the hot water or cold water in the use to greatest extent and has mixed.
Description of drawings:
Accompanying drawing 1 is the open operation flow chart of split fast heating type Teat pump boiler of the present invention;
Accompanying drawing 2 is the shutoff operation flow chart of split fast heating type Teat pump boiler of the present invention;
Accompanying drawing 3 is the parts decomposing schematic representations after the present invention assembles;
Accompanying drawing 4 is that the master of parts boiler of the present invention looks the complete section sketch map.
The specific embodiment:
Central idea of the present invention is to overcome the deficiency of prior art; A kind of control method and water heater thereof of split fast heating type Teat pump boiler are provided; The opening and closing of Based Intelligent Control water heater; And design a kind of split fast heating type Teat pump boiler thus, and adopt the design of big Teat pump boiler main frame, little boiler, Teat pump boiler is installed as the common electrical water heater.Be elaborated with reference to accompanying drawing below in conjunction with embodiment, so that technical characterictic of the present invention and advantage are carried out more deep annotation.
A kind of control method of split fast heating type Teat pump boiler, this method comprise open operation method and shutoff operation method.
This method relates to following data, and according to user's needs the hot water temperature being set is T0, and using water period is t, and the temperature of middle part cooling-water temperature sensor (27) is T1, and bottom water temperature sensor (26) temperature is T2, and the typical environment mean temperature is Tena.
The open operation flow chart of split fast heating type Teat pump boiler of the present invention is as shown in Figure 1, and step is following:
Step 1, start request is arranged or when heating state;
Step 2, judge that the current time is whether in using water period t;
Step 3, when in using water period t, execution in step 3.1, when not in using water period t, execution in step 3.2;
Step 3.1, current time detect continuous 2 seconds and one of following two kinds of situation occur in using water period t the time
T1≤T0-4℃
Tena<20℃,T2≤T0-24℃
Then execution in step 4;
Step 3.2, current time detect continuous 2 seconds and one of following three kinds of situation occur not in using water period t the time
Tena<20 ℃, T1≤44 ℃ or T2≤30 ℃
25℃>Tena≥20℃,T1≤42℃
Tena≥25℃,T1≤40℃
Then execution in step 4;
Step 4, unlatching split fast heating type Teat pump boiler heat.
Temperature value described in the step 3 is adjustable value, regulates by concrete condition.
The shutoff operation flow chart of split fast heating type Teat pump boiler of the present invention is as shown in Figure 2, and step is following:
Step 1, when shutdown request is arranged,
Step 2, judge the current time whether in using water period t,
Step 3, when in using water period t, execution in step 3.1, when not in using water period t, execution in step 3.2,
Step 3.1, current time be in using water period t the time, detects continuous 2 seconds and occur following situation T1 >=T0 and T2 >=T0-4 ℃, and then execution in step 4,
Step 3.2, current time detect continuous 2 seconds and one of following three kinds of situation occur not in using water period t the time
Tena<20℃,T1≥48℃,T2≥45℃
25℃>Tena≥20℃,T1≥46℃,T2≥42℃
Tena≥25℃,T1≥44℃,T2≥40℃
Then execution in step 4,
Step 4, close split fast heating type Teat pump boiler.
Temperature value described in the step 3 is adjustable value, regulates by concrete condition.
Xx is the concrete time instantly, and this moment, hour environment temperature was Tenxx, and initial 2min hourly detects and record environment temperature Ten, is labeled as a hour environment temperature Tenxx, and for example Ten08 is the temperature of 8:00 in morning, and be 8:00~8:02 detection time.
If the typical environment mean temperature be Tena then
Tena = Ten 20 + Ten 21 + Ten 22 3
Typical environment mean temperature Tena is the mean temperature of the environment of Ten20, Ten21, Ten22 every day in the formula, environment temperature when Ten20, Ten21, Ten22 are respectively 20:00 every day, 21:00,22:00, Tena for every day 22:03 calculate.
Split fast heating type Teat pump boiler calculates using water period t automatically:
Power on for the first time or during 14 days No Computed Datas of less than service time, be t with 6:00~8:00,17:00~23:00.
0:00~23:59 divided as T1 and in 2 minutes, lower the temperature >=4 ℃ the time every day, and writing down this time point is the water time point, if no longer detect the temperature drop of T1 in the 5min, no longer writes down the water time point, recording occurring continuously 14 days, and record is full, and after 14 days the earliest 1 day of automatic removing.
During record water time point, 00:00~5:00,5:00~11:00,11:00~16:00,16:00~00:00 totally 4 periods be will be divided into every day, Ti1, Ti2, Ti3, Ti4 will be designated as respectively.Time point was included in the period before the day part, and back time point is not included in the period.Using water period in period T1~T4 is denoted as t1~t4.
The calculating of using water period t1, N10 equals water time point quantity in the Ti1 period, and N10 calculates as follows before the 0:00 timesharing every day basis.T1 is not calculated in N10<6 o'clock, N10 >=6 o'clock, and the step of calculating t1 is following:
(N10 * 80%+0.5), int representes to round for step 1, N1=int;
Step 2, get Ti1 and comprise N1 in the period and use the shortest time section of water spot to be t11;
Step 3, get that earliest time point is the t1 starting point in the t11 period; When Tena<20 ℃, push away 90min before time point; When 25 ℃>Tena >=20 ℃, push away 40min before time point, when Tena >=25 ℃, push away 20min before time point, time point pusher 20min is the t1 terminal point the latest.
The method of calculating t2, t3, t4 is identical with the method for calculating t1.
The parts decomposing schematic representation after a kind of water heater of using the control method of split fast heating type Teat pump boiler assembles with reference to Fig. 3 and the master of Fig. 4 parts boiler look shown in the complete section sketch map and comprise; Teat pump boiler main frame 1; On this main frame surface housing, set up environment temperature sensor 11; In establish the horizontal boiler 2 of condenser 25; Condenser is provided with refrigerant inlet 21, refrigerant outlet 22 and cooling water inlet 24, hot water outlet 23 through passing through pipeline connection with main frame on the boiler housing, and the display screen 28 that shows water temperature and water level.The volume of said horizontal boiler is 35~70L, promptly singlely uses the hot water volume, and the power of main frame is 1.5~3, has adopted the mode of low load with strong power to guarantee to provide apace the user required hot water.Simultaneously, be provided with middle part cooling-water temperature sensor 27 at the middle part of said horizontal boiler, the bottom is provided with bottom water temperature sensor 26, said each sensor and display screen 28 are electrically connected with control device.
Although the present invention has made clear and complete description through specific embodiment to it; But the present invention is not limited only to said embodiment; And to one skilled in the art; All improvement and the selection made based on the present invention are contingent and all be included in the present invention.

Claims (4)

1. the control method of a split fast heating type Teat pump boiler, this method comprises open operation method and shutoff operation method, it is characterized in that,
This method relates to following data, and according to user's needs the hot water temperature being set is T0, and using water period is t, and the temperature of middle part cooling-water temperature sensor (27) is T1, and bottom water temperature sensor (26) temperature is T2, and the typical environment mean temperature is Tena,
The opening procedure of this split fast heating type Teat pump boiler is following:
Step 1, start request is arranged or when heating state,
Step 2, judge the current time whether in using water period t,
Step 3, when in using water period t, execution in step 3.1, when not in using water period t, execution in step 3.2,
Step 3.1, current time detect continuous 2 seconds and one of following two kinds of situation occur in using water period t the time
T1≤T0-4℃
Tena<20℃,T2≤T0-24℃
Then execution in step 4,
Step 3.2, current time detect continuous 2 seconds and one of following three kinds of situation occur not in using water period t the time
Tena<20 ℃, T1≤44 ℃ or T2≤30 ℃
25℃>Tena≥20℃,T1≤42℃
Tena≥25℃,T1≤40℃
Then execution in step 4,
Step 4, unlatching split fast heating type Teat pump boiler heat;
The shutoff operation step of this split fast heating type Teat pump boiler is following:
Step 1, when shutdown request is arranged,
Step 2, judge the current time whether in using water period t,
Step 3, when in using water period t, execution in step 3.1, when not in using water period t, execution in step 3.2,
Step 3.1, current time be in using water period t the time, detects continuous 2 seconds and occur following situation T1 >=T0 and T2 >=T0-4 ℃, and then execution in step 4,
Step 3.2, current time detect continuous 2 seconds and one of following three kinds of situation occur not in using water period t the time
Tena<20℃,T1≥48℃,T2≥45℃
25℃>Tena≥20℃,T1≥46℃,T2≥42℃
Tena≥25℃,T1≥44℃,T2≥40℃
Then execution in step 4,
Step 4, close split fast heating type Teat pump boiler.
2. the control method of split fast heating type Teat pump boiler according to claim 1 is characterized in that: the temperature in the above-mentioned steps is an adjustable temperature.
3. the split fast heating type Teat pump boiler of each said method in the application rights 1~2; Comprise the Teat pump boiler main frame (1), boiler (2) and the control device that interconnect and be communicated with; Be arranged in the boiler (2) with the condenser (25) of main frame through pipeline connection, it is characterized in that: boiler (2) is connected with main frame, and the power of main frame is 1.5~3; And is furnished with environment temperature sensor (11) on the main frame; Be provided with middle part cooling-water temperature sensor (27) at the middle part of boiler, the bottom is provided with bottom water temperature sensor (26), the shell of boiler is provided with the display screen (28) that shows water temperature and water level, and each sensor and display screen (28) are electrically connected with control device.
4. split fast heating type Teat pump boiler according to claim 3 is characterized in that: said boiler (2) is horizontal boiler, and the volume of horizontal boiler is 35~70L.
CN2010102728195A 2010-09-02 2010-09-02 Method for controlling split instantaneous heat-pump water heater and water heater thereof Expired - Fee Related CN101936603B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102728195A CN101936603B (en) 2010-09-02 2010-09-02 Method for controlling split instantaneous heat-pump water heater and water heater thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102728195A CN101936603B (en) 2010-09-02 2010-09-02 Method for controlling split instantaneous heat-pump water heater and water heater thereof

Publications (2)

Publication Number Publication Date
CN101936603A CN101936603A (en) 2011-01-05
CN101936603B true CN101936603B (en) 2012-07-18

Family

ID=43390063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102728195A Expired - Fee Related CN101936603B (en) 2010-09-02 2010-09-02 Method for controlling split instantaneous heat-pump water heater and water heater thereof

Country Status (1)

Country Link
CN (1) CN101936603B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102889683A (en) * 2011-07-20 2013-01-23 珠海格力电器股份有限公司 Control method, controller and air energy water heater
CN103363671B (en) * 2012-03-31 2016-03-30 珠海格力电器股份有限公司 Air energy water heater and control method and device thereof
CN103574906B (en) * 2012-07-30 2016-03-09 珠海格力电器股份有限公司 Start and stop control method for heat pump water heater
CN103499143A (en) * 2013-09-18 2014-01-08 东莞市康源节能科技有限公司 Split type heat-pump water heater and water supply control method thereof
CN105042874A (en) * 2015-07-28 2015-11-11 芜湖美的厨卫电器制造有限公司 Electric water heater and method for controlling electric water heater
JP6775688B2 (en) * 2017-07-18 2020-10-28 三菱電機株式会社 Hot water heater
CN108106013A (en) * 2017-10-31 2018-06-01 宁波奥克斯电气股份有限公司 Heat-pump water heater control method and control device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2331892Y (en) * 1998-07-01 1999-08-04 中国科学院广州能源研究所 Split multifunction heat pump type air conditioner
JP2008008540A (en) * 2006-06-28 2008-01-17 Sanyo Electric Co Ltd Refrigerating cycle device, heat pump-type water heater, and control method of refrigerating cycle device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2331892Y (en) * 1998-07-01 1999-08-04 中国科学院广州能源研究所 Split multifunction heat pump type air conditioner
JP2008008540A (en) * 2006-06-28 2008-01-17 Sanyo Electric Co Ltd Refrigerating cycle device, heat pump-type water heater, and control method of refrigerating cycle device

Also Published As

Publication number Publication date
CN101936603A (en) 2011-01-05

Similar Documents

Publication Publication Date Title
CN101936603B (en) Method for controlling split instantaneous heat-pump water heater and water heater thereof
JP5121882B2 (en) Boiling control system, boiling control method and program
CN104101106B (en) Directly-heated type double-source heat pump water heater and control method thereof
CN104121703B (en) Method and device for controlling direct heat type double-source heat pump water heater
CN102705980B (en) Device with heating and water-heating device multi-machine parallel system and use method thereof
CN102269484B (en) Solar-assisted heat ground source air-conditioning hot water integrated machine
CN102589030B (en) Solar hot water managing system
JP2011220655A (en) Boiling-up control system, boiling-up control method, and program
CN104832976A (en) Climate compensation apparatus for temperature control valve of heat exchange station
CN104165406B (en) Heating system of automatic energy-saving wall hanging stove and energy saving method thereof
WO2011036524A1 (en) Heat pump hot-water supply system
KR20160003677A (en) In-line heated solar thermal storage collector
CN203687416U (en) Solar water heating system with two water tanks
CN104613526B (en) Combined application system of solar energy and boiler and control method
JP2004069196A (en) Heat pump type water heater
JP5590188B1 (en) Hybrid hot water supply system
CN111780421A (en) Water temperature control method, processor and air-source heat pump hot water system
CN203443109U (en) Novel air-source heat pump water heater
CN204006660U (en) A kind of directly-heated type double-source heat pump hot water machine
JP6045682B2 (en) Energy management system, system controller, thermal insulation control method and program
CN202792580U (en) Domestic water circulation system
CN202853103U (en) Device with heating water heater multimachine parallel system
CN102322693B (en) Solar water heater with indoor thermal insulation box
CN210055683U (en) Water boiler
CN204438548U (en) The solar energy hot water supply device of external heat exchanger

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120718

CF01 Termination of patent right due to non-payment of annual fee