CN101929151B - Treatment method for saturated over-wet soil - Google Patents

Treatment method for saturated over-wet soil Download PDF

Info

Publication number
CN101929151B
CN101929151B CN 201010296653 CN201010296653A CN101929151B CN 101929151 B CN101929151 B CN 101929151B CN 201010296653 CN201010296653 CN 201010296653 CN 201010296653 A CN201010296653 A CN 201010296653A CN 101929151 B CN101929151 B CN 101929151B
Authority
CN
China
Prior art keywords
soil
over
wet
wet soil
saturated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010296653
Other languages
Chinese (zh)
Other versions
CN101929151A (en
Inventor
饶平
周州
王遂泸
龚成
刘颖
王天恒
文华
古松
陈科
鲜志
张玲玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Chuanqing Drilling Engineering Co Ltd filed Critical CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN 201010296653 priority Critical patent/CN101929151B/en
Publication of CN101929151A publication Critical patent/CN101929151A/en
Application granted granted Critical
Publication of CN101929151B publication Critical patent/CN101929151B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Soil Conditioners And Soil-Stabilizing Materials (AREA)

Abstract

The invention relates to a treatment method for saturated over-wet soil, and relates to a treatment method for over-wet soil. The problem that saturated over-wet soil cannot be effectively treated in the prior art is solved. The technical scheme is as follows: comprises the following steps: measuring the natural water content of the soil and reducing the natural water content by a vacuum preloading method; the over-wet soil curing material comprises 1-12 parts of cement, 0-12 parts of lime and 0-0.02 part of soil curing agent by weight calculated according to 100 parts of dry soil of saturated over-wet soil to be treated; removing the vacuum prepressing equipment after the natural water content is reduced to below 30 percent, ploughing, crushing and leveling the soil, and uniformly spreading 2/3 over-wet soil curing material with specified dosage on the soil; ploughing, mixing and rolling; carrying out material sealing on the rolled soil layer; and uniformly scattering the residual over-wet soil solidifying material on a soil layer, and then turning, stirring and crushing the soil until the soil particles are below 30 mm. The method is mainly applied to the treatment of saturated and over-wet soil in a humid area.

Description

A kind of punishment method that is used for saturated over-wet soil
Technical field
The present invention relates to a kind of over-wet soil processing method, particularly relate to a kind of method of disposal to saturated over-wet soil.
Technical background
In moist area of heavy rainfull, the time in rainy season is long, amount of precipitation is big, and groundwater table is high in addition, and foundation soil usually was in wet even saturation state.The over-wet soil water content of moist area of heavy rainfull is high, and bearing capacity is low, poor stability, easy deformation." spring " phenomenon usually appears during construction, and can't compacting; After the completion, under the effect of traffic load, very easily cause subgrade and pavement to produce destructions such as depression, distortion, frost boiling, unstability.According to existing subgrade Design job specfication, over-wet soil can't meet the demands, and often can only do the side's of abandoning processing, yet moist area of heavy rainfull lacks high quality filler, change fill out time-consuming.Fill out even change, original ecological environment all will be destroyed in excavation district and the spoil area changed after filling out, cause hostile environment influence and social influence.
Punishment and utilization for over-wet soil; Domestic and international project circle has proposed many punishment methods; But these methods mainly are to the saturated far away over-wet soil of water content, for then generally taking airing near saturated or saturated over-wet soil or directly changing the method for filling out.In moist area of heavy rainfull, very long and sunshine in rainy season, fate was very limited, and the use of airing method has significant limitation; Adopt cushion then can cause than havoc to peripheral ecological environment.Therefore, these two kinds of methods are not too to be suitable in moist area of heavy rainfull.
Except airing method and cushion, the saturated over-wet soil roadbed filling of domestic engineering bound pair also directly effectively do not punish and utilize method, the saturated over-wet soil of especially moist area of heavy rainfull.
Summary of the invention
The objective of the invention is in order to overcome the deficiency that prior art exists; Propose a kind of punishment of saturated over-wet soil and utilize method; This method is mainly used in moist area of heavy rainfull, have the punishment effect better, economical, can be in rainy season construction, do not receive characteristics such as weather effect, environmental protection.
For achieving the above object, the technical scheme that the present invention adopts is: a kind of punishment method that is used for saturated over-wet soil comprises the following steps:
(1) natural moisture content of mensuration place soil;
(2) adopt vacuum method to reduce the natural moisture content of saturated over-wet soil;
(3) preparation over-wet soil curing materials heavily is that the over-wet soil curing materials comprises 1~12 part of cement, 0~12 part in lime, 0~0.02 part of soil-solidified-agent under 100 parts of weight situation about calculating according to the dry ground of the saturated over-wet soil of required processing;
(4) after (2) make the soil natural moisture content reduce to 30% below through step, remove vacuum preloading equipment, with soil turn over, broken 1~2 time, after flattening processing with the even spreading of over-wet soil curing materials of prescribed dose 2/3 on it;
(5) with place soil turn over, mix 4~6 times, roll then one time comprehensively;
(6) the soil layer shelving 24~28h to tentatively rolling;
(7) the over-wet soil curing materials with remaining prescribed dose 1/3 evenly spreads on the soil layer, and row turns, is crushed to soil particle below 30mm again, rolls at last to get final product.
In such scheme, the over-wet soil curing materials in the said step (4) comprises cement 4-8 part, lime 5-9 part, soil-solidified-agent 0.005-0.015 part.
Can find out that from the characteristic of the invention described above its advantage is: it is better that this method is not only punished effect, comparatively economical, and can not receive weather effect in rainy season construction, can not damage peripheral ecological environment simultaneously.
The specific embodiment
Through specific embodiment the present invention is done further explanation below:
Embodiment 1
In the present embodiment, come saturated over-wet soil is handled through the following step:
(1) natural moisture content of mensuration place soil;
(2) adopt vacuum method to reduce the natural moisture content of saturated over-wet soil;
(3) preparation over-wet soil curing materials heavily is that the over-wet soil curing materials comprises that 1 part of cement, 12 parts in lime, soil-solidified-agent adopt 0.02 part in road nation curing compound under 100 parts of weight situation about calculating according to the dry ground of the saturated over-wet soil of required processing;
(4) after (2) make the soil natural moisture content reduce to 30% below through step, remove vacuum preloading equipment, with soil turn over, broken 2 times, after flattening processing with the even spreading of over-wet soil curing materials of prescribed dose 2/3 on it;
(5) with place soil turn over, mix 4 times, roll then one time comprehensively;
(6) the soil layer shelving 24h to tentatively rolling;
(7) the over-wet soil curing materials with remaining prescribed dose 1/3 evenly spreads on the soil layer, and row turns, is crushed to soil particle below 30mm again, rolls at last to get final product.
Embodiment 2
In the present embodiment, come saturated over-wet soil is handled through the following step:
(1) natural moisture content of mensuration place soil;
(2) adopt vacuum method to reduce the natural moisture content of saturated over-wet soil;
(3) preparation over-wet soil curing materials heavily is that the over-wet soil curing materials comprises that 4 parts of cement, 5 parts in lime, soil-solidified-agent adopt 0.005 part in road nation curing compound under 100 parts of weight situation about calculating according to the dry ground of the saturated over-wet soil of required processing;
(4) after (2) make the soil natural moisture content reduce to 30% below through step, remove vacuum preloading equipment, with soil turn over, broken 1 time, after flattening processing with the even spreading of over-wet soil curing materials of prescribed dose 2/3 on it;
(5) with place soil turn over, mix 6 times, roll then one time comprehensively;
(6) the soil layer shelving 28h to tentatively rolling;
(7) the over-wet soil curing materials with remaining prescribed dose 1/3 evenly spreads on the soil layer, and row turns, is crushed to soil particle below 30mm again, rolls at last to get final product.
Embodiment 3
In the present embodiment, come saturated over-wet soil is handled through the following step:
(1) natural moisture content of mensuration place soil;
(2) adopt vacuum method to reduce the natural moisture content of saturated over-wet soil;
(3) preparation over-wet soil curing materials heavily is that the over-wet soil curing materials comprises that 6 parts of cement, 7 parts in lime, soil-solidified-agent adopt 0.01 part in road nation curing compound under 100 parts of weight situation about calculating according to the dry ground of the saturated over-wet soil of required processing;
(4) after (2) make the soil natural moisture content reduce to 30% below through step, remove vacuum preloading equipment, with soil turn over, broken 2 times, after flattening processing with the even spreading of over-wet soil curing materials of prescribed dose 2/3 on it;
(5) with place soil turn over, mix 6 times, roll then one time comprehensively;
(6) the soil layer shelving 28h to tentatively rolling;
(7) the over-wet soil curing materials with remaining prescribed dose 1/3 evenly spreads on the soil layer, and row turns, is crushed to soil particle below 30mm again, rolls at last to get final product.
Embodiment 4
In the present embodiment, come saturated over-wet soil is handled through the following step:
(1) natural moisture content of mensuration place soil;
(2) adopt vacuum method to reduce the natural moisture content of saturated over-wet soil;
(3) preparation over-wet soil curing materials heavily is that the over-wet soil curing materials comprises that 8 parts of cement, 9 parts in lime, soil-solidified-agent adopt 0.015 part in road nation curing compound under 100 parts of weight situation about calculating according to the dry ground of the saturated over-wet soil of required processing;
(4) after (2) make the soil natural moisture content reduce to 30% below through step, remove vacuum preloading equipment, with soil turn over, broken 2 times, after flattening processing with the even spreading of over-wet soil curing materials of prescribed dose 2/3 on it;
(5) with place soil turn over, mix 6 times, roll then one time comprehensively;
(6) the soil layer shelving 24h to tentatively rolling;
(7) the over-wet soil curing materials with remaining prescribed dose 1/3 evenly spreads on the soil layer, and row turns, is crushed to soil particle below 30mm again, rolls at last to get final product.
Embodiment 5
In the present embodiment, come saturated over-wet soil is handled through the following step:
(1) natural moisture content of mensuration place soil;
(2) adopt vacuum method to reduce the natural moisture content of saturated over-wet soil;
(3) preparation over-wet soil curing materials heavily is that the over-wet soil curing materials comprises that 12 parts of cement, 12 parts in lime, soil-solidified-agent adopt 0.02 part in road nation curing compound under 100 parts of weight situation about calculating according to the dry ground of the saturated over-wet soil of required processing;
(4) after (2) make the soil natural moisture content reduce to 30% below through step, remove vacuum preloading equipment, with soil turn over, broken 2 times, after flattening processing with the even spreading of over-wet soil curing materials of prescribed dose 2/3 on it;
(5) with place soil turn over, mix 6 times, roll then one time comprehensively;
(6) the soil layer shelving 28h to tentatively rolling;
(7) the over-wet soil curing materials with remaining prescribed dose 1/3 evenly spreads on the soil layer, and row turns, is crushed to soil particle below 30mm again, rolls at last to get final product.
Disclosed all characteristics in this manual except mutually exclusive characteristic, all can make up by any way.
Disclosed arbitrary characteristic in this manual (comprising any accessory claim, summary and accompanying drawing) is only if special narration all can be replaced by other equivalences or the alternative features with similar purpose.That is, only if special narration, each characteristic is an example in a series of equivalences or the similar characteristics.

Claims (1)

1. a punishment method that is used for saturated over-wet soil is characterized in that comprising the following steps:
(1) natural moisture content of mensuration place soil;
(2) adopt vacuum method to reduce the natural moisture content of saturated over-wet soil;
(3) preparation over-wet soil curing materials heavily is that the over-wet soil curing materials comprises 6~12 parts of cement, 7~12 parts in lime, 0.01~0.02 part of soil-solidified-agent under 100 parts of weight situation about calculating according to the dry ground of the saturated over-wet soil of required processing;
(4) after (2) make the soil natural moisture content reduce to 30% below through step, remove vacuum preloading equipment, with soil turn over, broken 1~2 time, after flattening processing with the even spreading of over-wet soil curing materials of prescribed dose 2/3 on it;
(5) with place soil turn over, mix 4~6 times, roll then one time comprehensively;
(6) the soil layer shelving 24~28h to tentatively rolling;
(7) the over-wet soil curing materials with remaining prescribed dose 1/3 evenly spreads on the soil layer, and row turns, is crushed to soil particle below 30mm again, rolls at last to get final product.
CN 201010296653 2010-09-29 2010-09-29 Treatment method for saturated over-wet soil Active CN101929151B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010296653 CN101929151B (en) 2010-09-29 2010-09-29 Treatment method for saturated over-wet soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010296653 CN101929151B (en) 2010-09-29 2010-09-29 Treatment method for saturated over-wet soil

Publications (2)

Publication Number Publication Date
CN101929151A CN101929151A (en) 2010-12-29
CN101929151B true CN101929151B (en) 2012-08-29

Family

ID=43368553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010296653 Active CN101929151B (en) 2010-09-29 2010-09-29 Treatment method for saturated over-wet soil

Country Status (1)

Country Link
CN (1) CN101929151B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951552B (en) * 2016-05-20 2019-01-01 湖南云中再生科技股份有限公司 A method of over-wet soil is handled by construction refuse regenerated aggregate
CN107119521B (en) * 2017-05-25 2019-12-17 中电建十一局工程有限公司 Method for improving high-water-content silt and silt soil to fill roadbed
CN110230312A (en) * 2018-03-06 2019-09-13 上海港湾基础建设(集团)股份有限公司 Waterproof solidified earth method for processing foundation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101050087A (en) * 2007-05-14 2007-10-10 涂生荣 Mixture for stationary layer of pavement base
CN101265060A (en) * 2008-04-25 2008-09-17 天津市市政工程设计研究院 Soil solidifying material and applying method thereof on heavy load soft ground foundation
CN101560760A (en) * 2009-05-22 2009-10-21 中冶京唐建设有限公司 Construction method for fast concreting and dredging and filling ultra-fine earth foundation
CN101712872A (en) * 2009-11-27 2010-05-26 四川蜀渝石油建筑安装工程有限责任公司 Soil solidifying material used for over-wet soil and use method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2933901B2 (en) * 1997-12-17 1999-08-16 太平工業株式会社 Strengthening method for soft ground using slag

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101050087A (en) * 2007-05-14 2007-10-10 涂生荣 Mixture for stationary layer of pavement base
CN101265060A (en) * 2008-04-25 2008-09-17 天津市市政工程设计研究院 Soil solidifying material and applying method thereof on heavy load soft ground foundation
CN101560760A (en) * 2009-05-22 2009-10-21 中冶京唐建设有限公司 Construction method for fast concreting and dredging and filling ultra-fine earth foundation
CN101712872A (en) * 2009-11-27 2010-05-26 四川蜀渝石油建筑安装工程有限责任公司 Soil solidifying material used for over-wet soil and use method thereof

Also Published As

Publication number Publication date
CN101929151A (en) 2010-12-29

Similar Documents

Publication Publication Date Title
Rahimi et al. Effect of soil organic matter, electrical conductivity and sodium adsorption ratio on tensile strength of aggregates
Barzegar et al. Effectiveness of sugarcane residue incorporation at different water contents and the Proctor compaction loads in reducing soil compactibility
CN205420953U (en) Ground surface parking lawn
CN105887609B (en) A kind of construction method on sponge urban ecology diafiltration ground
CN101602946B (en) Overwetting soil solidified agent and method for solidifying soil
CN101929151B (en) Treatment method for saturated over-wet soil
CN108660890A (en) Native construction method is stablized in a kind of road cement stabilization soil and environment-friendly water-based solidification
CN104631274A (en) Temporary road pavement technology
CN105464069A (en) Compaction process of collapsible loess roadbeds
CN112982050A (en) Regenerated roadbed base filler and regenerated roadbed construction method
CN101761009A (en) Construction method for lowering construction compactness requirement of high-liquid-limit soil subgrade construction by doping sand
RU2592588C1 (en) Composition for stabilisation of clay soil and method for creating ground roads using thereof
CN207362616U (en) Permeable brick paving structure
CN101768950A (en) Improving method of high liquid limit soil in subgrade engineering
CN114045714A (en) Construction process suitable for improving weathered soft rock roadbed filler as roadbed reinforcing layer
CN104762859B (en) Mountain skin stone processes soft soil roadbed method
CN108941145B (en) Intermediate covering layer of refuse landfill and preparation method and application thereof
CN205839512U (en) A kind of water conservation temperature reduction asphalt pavement structure being applicable to heavy traffic
CN105544344A (en) Method for enhancing water permeability of permeable pavement of urban gentle slope
CN205839503U (en) A kind of block-stone pavement structure being applicable to heavy traffic
CN102322010B (en) Road surface porous resin seal layer and construction method thereof
JP4848043B1 (en) Roadbed material
CN105735095B (en) The method for preventing back-up sand construction machinery from falling into wheel
CN103469709A (en) Application method of consolid material
CN107540272A (en) It is a kind of to utilize asphalt of concrete debris and preparation method thereof and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant