CN101915079A - Integrated de-plugging yield increasing process - Google Patents

Integrated de-plugging yield increasing process Download PDF

Info

Publication number
CN101915079A
CN101915079A CN 201010200287 CN201010200287A CN101915079A CN 101915079 A CN101915079 A CN 101915079A CN 201010200287 CN201010200287 CN 201010200287 CN 201010200287 A CN201010200287 A CN 201010200287A CN 101915079 A CN101915079 A CN 101915079A
Authority
CN
China
Prior art keywords
plugging agent
well
plugging
agent
interval
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010200287
Other languages
Chinese (zh)
Other versions
CN101915079B (en
Inventor
王俊奇
陈军斌
屈展
盖海防
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongying Suncoo Petroleum Co., Ltd.
Original Assignee
Xian Shiyou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Shiyou University filed Critical Xian Shiyou University
Priority to CN 201010200287 priority Critical patent/CN101915079B/en
Publication of CN101915079A publication Critical patent/CN101915079A/en
Application granted granted Critical
Publication of CN101915079B publication Critical patent/CN101915079B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Soil Conditioners And Soil-Stabilizing Materials (AREA)

Abstract

The invention relates to an integrated de-plugging yield increasing process. In the process, plugging agents are extruded into a well, wherein the plugging agents comprise a gel plugging agent and a particle plugging agent; for an oil deposit deeper than 2000 m, the particle plugging agent is firstly injected, and the gel plugging agent is subsequently injected; and for an oil deposit not more than 2000 m, the gel plugging agent is independently injected. The gel plugging agent comprises the following components: 0.2-0.5% of polyacrylamide dry powder, 0.2-0.6% of resin accelerating agent, 0.2-0.5% of organic chromium cross-linking agent and the balance of water. The particle plugging agent comprises the following components: 0.1-0.3% of water solution of polyacrylamide and an oil-soluble particle plugging agent. The process is applicable to oil-water wells with channeling caused by great interlayer permeability difference, thin interlayer or sandwich layer, unclear production fluid profile and water injection profile or poor well cementation quality, and the injection speed and the injection pressure are strictly controlled, so that the plugging agents selectively enter a highly water-absorbing interval or a water producing interval, and damage to an oil-bearing interval is reduced as far as possible.

Description

A kind of integrated de-plugging yield increasing process
Technical field
The present invention relates to a kind of water plugging and profiling technology in the oil field development, particularly a kind of integrated de-plugging yield increasing process.
Background technology
The meaning of profile control and water plugging work is very important, its objective is the output of control oil-field brine, keeps stratum energy.Because of oil reservoir is inhomogeneous, have high permeability zone and in, less permeable layer, when water flood recovery, the water always high permeability zone of longshore current dynamic resistance minimum is charged into oil well, produces higher waterflood recovery efficiency factor, and involve less than in, less permeable layer, so waterflood recovery efficiency factor is not high.As time goes on, water washes away high permeability zone, forms the extra-high-speed permeable formation.At this moment, water invalid circulation in the loop of flood pattern, oil reservoir and sewerage treatment and re-injection system formation, waterflood recovery efficiency factor has just no longer improved.Therefore, must from water injection well or these high permeability zones of oil well plugging and extra-high-speed permeable formation force the water of injection enter oil saturation high, less permeable layer, to reach the purpose that improves oil recovery factor.It should be noted that transfer drive technology has two key problem in technology, the one, must with the viscosity of the preferred displacing agent of rock core, omit water-front advance velocity according to permeability faster than new water-entering interval to guarantee the profile control agent fltting speed; The 2nd, reduce the injury of enhancement Layer when clamp-oning profile control agent as far as possible, injection pressure must be greater than the startup pressure reduction of profile control interval, less than the startup pressure reduction of strengthening interval.Rock core (or artificial simulation rock core) actual measurement can be used in this two aspect.Oilwell water shutoff also has similar problem, because it is limited to stop up radius, units increased in production and period of validity are all very little, so concerning the porosity oil reservoir, unless holostrome water logging otherwise should not adopt the water blockoff measure to certain interval water outlet in the layer.And to block Fractured Reservoir with Bottom Water, owing to can't adjust at well, can only utilize the non-homogeneity in this class oil field to carry out water blockoff at oil well, begin large fracture is blocked, though like this exhalant canal is blocked, the oil discharge passage of the gap that also will be communicated with large fracture simultaneously blocks, so effect is also undesirable.Develop into the blocking agent of infiltrative stifled large fracture later on, effect makes moderate progress.But because the displacement pressure reduction of sillar system is very big, permeability decrease is very big in the large fracture, and filtrational resistance is bigger, and pressure is suppressed higherly in the large fracture, can not form big displacement pressure reduction, and the oil in the sillar system still can't get out.
Summary of the invention
In order to overcome the defective of above-mentioned prior art, the object of the present invention is to provide a kind of integrated de-plugging yield increasing process, this technology is suitable for that interlayer permeability difference is big, interlayer or interlayer is thin, production profile, intake profile is unclear or cementing quality difference and cause the oil-water well of scurrying groove, control injection rate and injection pressure, make plugging agent optionally enter high water-intake interval or water yield formation section, reduce the injury of oil-containing interval as far as possible.
In order to achieve the above object, technical scheme of the present invention realizes in the following manner:
A kind of integrated de-plugging yield increasing process may further comprise the steps:
One, when well is well, utilize original water injection string or flow string in the well, inject plugging agent from oil pipe; When well is oil well, trip out down-hole pipe and roofbolt, logical thorn inspection, and in well, transfer operating tool string, from operating tool string, inject plugging agent;
Two, the plugging agent described in the step 1 divides two kinds of frozen glue class plugging agent and granular pattern plugging agents, the stratum exhalant canal is more than 2000 meters during oil reservoir, inject the granular pattern plugging agent earlier, follow-up injection frozen glue class plugging agent, the volume ratio of granular pattern plugging agent and frozen glue class plugging agent is: 1: 2-5; Oil reservoir injects frozen glue class plugging agent separately during smaller or equal to 2000 meters;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2-0.6% resinae setting accelerator, the 0.2-0.5% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.2-0.5%, all the other components are water; The component of granular pattern plugging agent is: mass concentration is polyacrylamide solution and the oil-soluble particle blocking agent of 0.1-0.3%, the mass ratio of polyacrylamide solution and oil-soluble particle blocking agent is: 85-95: 5-15, injection viscosity≤the 50mPa.s of plugging agent, become adhesiveness greater than 100mpa.s, water plugging rate 〉=95%; The total amount of injecting plugging agent is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be the sandstone acid solution of 5-15%, replace clear water; The consumption of sandstone acid solution is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, after closing well 24-72 hour, the well recovery water filling that drives a well, oil well returns to normal production after then driving a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Q = 0.07675 · K · h · ΔP μ · ( ln r e r w + S )
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor
In practice of construction design, generally according to shutoff purpose difference, adopt different injection rates: permeability is lower than the LOW PERMEABILITY RESERVOIR of 50md, and injection rate is no more than 10m 3/ h reaches shutoff crack and macropore, reduces the purpose of formation contaminant and orderly start low-permeability layer; Better to rerum natura, the permeability that series of strata are single is not less than the oil reservoir of 50md, and injection rate is 8-12m 3/ h.
Process characteristic of the present invention is: can adjust the intake profile on water filling stratum more fully by injecting plugging agent, the exhalant canal that shutoff is big, the sandstone acid that has oil reservoir protection feature by follow-up injection, less permeable layer sweep efficiency and permeability in can strengthening, increased the water injection rate of middle less permeable layer, improve oil well productivity, reach the effect of oil well production increasing, well step-down augmented injection, energy efficiency; Technology success rate height, construction safety is reliable, can adjust the intake profile on water filling stratum by plugging agent, the exhalant canal that shutoff is big, the sealing ratiod height, simple to operate.Can open oil flow channel by injecting sandstone acid, reduce surface tension, and it be little to have corrosivity, the characteristics of Environmental Safety.
The specific embodiment
Embodiment one (well):
Present embodiment may further comprise the steps:
One, when well is well, utilize original water injection string or flow string in the well, clamp-on plugging agent from oil pipe;
Two, the plugging agent described in the step 1 divides two kinds of frozen glue class plugging agent and granular pattern plugging agents, the stratum water outlet is at oil reservoir more than 2000 meters, inject granular pattern plugging agent, follow-up injection frozen glue class plugging agent, the volume ratio of granular pattern plugging agent and frozen glue class plugging agent: 1: 2 earlier;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.4% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.5%, all the other components are water; The component of granular pattern plugging agent is: mass concentration is 0.2% polyacrylamide solution and oil-soluble particle blocking agent, the mass ratio of polyacrylamide solution and oil-soluble particle blocking agent is: 90: 10, the injection viscosity of plugging agent is 45mPa.s, the one-tenth adhesiveness is 110mpa.s, water plugging rate 96%; The total amount of injecting plugging agent is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be 10% sandstone acid solution, replace clear water; The consumption of sandstone acid solution is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, closing well is after 48 hours, the well recovery water filling that drives a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Q = 0.07675 · K · h · ΔP μ · ( ln r e r w + S )
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor
Present embodiment water injection pressure rising 3MPa, injectivity index decline 12m 3/ (dMPa); Pressure index rising 3.6MPa illustrates that high permeability zone or big water outlet duct have obtained effective shutoff; Intake profile has obtained effective improvement, and strong water accepting layer has obtained effective shutoff, and water absorption descends, and has started not water accepting layer, and the layer of suction difference is strengthened.Oil well output rises on every side, and water outlet reduces.
Embodiment two (well):
Present embodiment may further comprise the steps:
One, when well is well, utilize original water injection string or flow string in the well, clamp-on plugging agent from oil pipe;
Two, the plugging agent described in the step 1 divides two kinds of frozen glue class plugging agent and granular pattern plugging agents, the stratum exhalant canal is at oil reservoir more than 2000 meters, inject granular pattern plugging agent, follow-up injection frozen glue class plugging agent, the volume ratio of granular pattern plugging agent and frozen glue class plugging agent: 1: 4 earlier;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.4% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.3%, all the other components are water; The component of granular pattern plugging agent is: mass concentration is 0.3% polyacrylamide solution and oil-soluble particle blocking agent, the mass ratio of polyacrylamide solution and oil-soluble particle blocking agent is: 85: 15, the injection viscosity 40mPa.s of plugging agent becomes adhesiveness 130mpa.s, water plugging rate 95%; The total amount of injecting plugging agent is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be 7.5% sandstone acid solution, replace clear water; The consumption of sandstone acid solution is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, closing well is after 72 hours, the well recovery water filling that drives a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Q = 0.07675 · K · h · ΔP μ · ( ln r e r w + S )
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor
Present embodiment water injection pressure rising 4MPa, injectivity index decline 13m 3/ (dMPa); Pressure index rising 3.5MPa illustrates that high permeability zone or big water outlet duct have obtained effective shutoff; Intake profile has obtained effective improvement, and strong water accepting layer has obtained effective shutoff, and water absorption descends, and has started not water accepting layer, and the layer of suction difference is strengthened.Oil well output rises on every side, and water outlet reduces.
Embodiment three (well)
Present embodiment may further comprise the steps:
One, when well is well, utilize original water injection string or flow string in the well, clamp-on plugging agent from oil pipe;
Two, oil reservoir injects the plugging agent of frozen glue class separately less than 2000 meters;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.4% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.4%, all the other components are water; The injection viscosity of plugging agent is 45mPa.s, becomes adhesiveness 115mpa.s, water plugging rate 97%; The total amount of injecting plugging agent is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be 10% sandstone acid solution, replace clear water; The consumption of sandstone acid solution is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, closing well is after 48 hours, the well recovery water filling that drives a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Q = 0.07675 · K · h · ΔP μ · ( ln r e r w + S )
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor
Present embodiment water injection pressure rising 5MPa, injectivity index decline 15m 3/ (dMPa); Pressure index rising 4MPa illustrates that high permeability zone or big water outlet duct have obtained effective shutoff; Intake profile has obtained effective improvement, and strong water accepting layer has obtained effective shutoff, and water absorption descends, and has started not water accepting layer, and the layer of suction difference is strengthened.Oil well output rises on every side, and water outlet reduces.
Embodiment four (oil well):
Present embodiment may further comprise the steps:
One, when well is oil well, trip out down-hole pipe and roofbolt, logical thorn inspection, and in well, transfer operating tool string, from operating tool string, inject plugging agent;
Two, the plugging agent described in the step 1 divides two kinds of frozen glue class plugging agent and granular pattern plugging agents, the stratum exhalant canal is at oil reservoir more than 2000 meters, inject granular pattern plugging agent, follow-up injection frozen glue class plugging agent, the volume ratio of granular pattern plugging agent and frozen glue class plugging agent: 1: 3 earlier;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.4% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.4%, all the other components are water; The component of granular pattern plugging agent is: mass concentration is 0.2% polyacrylamide solution and oil-soluble particle blocking agent, the mass ratio of polyacrylamide solution and oil-soluble particle blocking agent is: 95: 5, the injection viscosity 30mPa.s of plugging agent becomes adhesiveness 130mpa.s, water plugging rate 95%; The total amount of injecting plugging agent is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be 10% sandstone acid solution, replace clear water; The consumption of sandstone acid solution is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, closing well is after 48 hours, and oil well returns to normal production after then driving a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Q = 0.07675 · K · h · ΔP μ · ( ln r e r w + S )
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor
Present embodiment construction back well water descends steadily, and daily oil production increases sharply.
Embodiment five (oil well):
Present embodiment may further comprise the steps:
One, when well is oil well, trip out down-hole pipe and roofbolt, logical thorn inspection, and in well, transfer operating tool string, from operating tool string, inject plugging agent;
Two, oil reservoir injects the plugging agent of frozen glue class separately less than 2000 meters;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.3% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.5%, all the other components are water; The injection viscosity 45mPa.s of plugging agent becomes adhesiveness 130mpa.s, water plugging rate 97%; The total amount of injecting plugging agent is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be the sandstone acid solution of 5-15%, replace clear water; The consumption of sandstone acid solution is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, closing well is after 24 hours, and oil well returns to normal production after then driving a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Q = 0.07675 · K · h · ΔP μ · ( ln r e r w + S )
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor
Present embodiment construction back well water descends steadily, and daily oil production increases sharply.
Embodiment six (oil well)
Present embodiment may further comprise the steps:
One, when well is oil well, trip out down-hole pipe and roofbolt, logical thorn inspection, and in well, transfer operating tool string, from operating tool string, inject plugging agent;
Two, the plugging agent described in the step 1 divides two kinds of frozen glue class plugging agent and granular pattern plugging agents, the stratum exhalant canal is at oil reservoir more than 2000 meters, inject granular pattern plugging agent, follow-up injection frozen glue class plugging agent, the volume ratio of granular pattern plugging agent and frozen glue class plugging agent: 1: 3 earlier;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.3% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.5%, all the other components are water; The component of granular pattern plugging agent: mass concentration is 0.3% polyacrylamide solution and oil-soluble particle blocking agent, the mass ratio of polyacrylamide solution and oil-soluble particle blocking agent is: 90: 10, the injection viscosity 45mPa.s of plugging agent becomes adhesiveness 115mpa.s, water plugging rate 96%; The total amount of injecting plugging agent is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be the sandstone acid solution of 5-15%, replace clear water; The consumption of sandstone acid solution is calculated as follows:
V = π Σ i = 1 n r i × h i × φ i
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, closing well is after 24 hours, and oil well returns to normal production after then driving a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Q = 0.07675 · K · h · ΔP μ · ( ln r e r w + S )
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor
Present embodiment construction back well water descends steadily, and daily oil production increases sharply.

Claims (9)

1. an integrated de-plugging yield increasing process is characterized in that, may further comprise the steps:
One, when well is well, utilize original water injection string or flow string in the well, clamp-on plugging agent from oil pipe; When well is oil well, trip out down-hole pipe and roofbolt, logical thorn inspection, and in well, transfer operating tool string, from operating tool string, inject plugging agent;
Two, the plugging agent described in the step 1 divides two kinds of frozen glue class plugging agent and granular pattern plugging agents, the stratum exhalant canal is more than 2000 meters during oil reservoir, inject granular pattern plugging agent, follow-up injection frozen glue class plugging agent, the volume ratio of granular pattern plugging agent and frozen glue class plugging agent: 1: 2-5 earlier; Oil reservoir injects frozen glue class plugging agent separately during smaller or equal to 2000 meters;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2-0.6% resinae setting accelerator, the 0.2-0.5% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.2-0.5%, all the other components are water; The component of granular pattern plugging agent is: mass concentration is polyacrylamide solution and the oil-soluble particle blocking agent of 0.1-0.3%, the mass ratio of polyacrylamide solution and oil-soluble particle blocking agent is: 85-95: 5-15, injection viscosity≤the 50mPa.s of plugging agent, become adhesiveness greater than 100mpa.s, water plugging rate 〉=95%; The total amount of injecting plugging agent is calculated as follows:
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval;
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be the sandstone acid solution of 5-15%, replace clear water; The consumption of sandstone acid solution is calculated as follows:
Figure FSA00000158604200021
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval;
Five, after closing well 24-72 hour, the well recovery water filling that drives a well, oil well returns to normal production after then driving a well.
2. a kind of integrated de-plugging yield increasing process according to claim 1, it is characterized in that, in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Figure FSA00000158604200031
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor.
3. a kind of integrated de-plugging yield increasing process according to claim 1 and 2 is characterized in that, may further comprise the steps:
One, when well is well, utilize original water injection string or flow string in the well, clamp-on plugging agent from oil pipe;
Two, the plugging agent described in the step 1 divides two kinds of frozen glue class plugging agent and granular pattern plugging agents, the stratum water outlet is at oil reservoir more than 2000 meters, inject granular pattern plugging agent, follow-up injection frozen glue class plugging agent, the volume ratio of granular pattern plugging agent and frozen glue class plugging agent: 1: 2 earlier;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.4% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.5%, all the other components are water; The component of granular pattern plugging agent is: mass concentration is 0.2% polyacrylamide solution and oil-soluble particle blocking agent, the mass ratio of polyacrylamide solution and oil-soluble particle blocking agent is: 90: 10, the injection viscosity of plugging agent is 45mPa.s, the one-tenth adhesiveness is 110mpa.s, water plugging rate 96%; The total amount of injecting plugging agent is calculated as follows:
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.Sm during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be 10% sandstone acid solution, replace clear water; The consumption of sandstone acid solution is calculated as follows:
Figure FSA00000158604200041
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, closing well is after 48 hours, the well recovery water filling that drives a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Figure FSA00000158604200051
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor.
4. a kind of integrated de-plugging yield increasing process according to claim 1 is characterized in that, may further comprise the steps:
One, when well is well, utilize original water injection string or flow string in the well, clamp-on plugging agent from oil pipe;
Two, the plugging agent described in the step 1 divides two kinds of frozen glue class plugging agent and granular pattern plugging agents, the stratum exhalant canal is at oil reservoir more than 2000 meters, inject granular pattern plugging agent, follow-up injection frozen glue class plugging agent, the volume ratio of granular pattern plugging agent and frozen glue class plugging agent: 1: 4 earlier;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.4% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.3%, all the other components are water; The component of granular pattern plugging agent is: mass concentration is 0.3% polyacrylamide solution and oil-soluble particle blocking agent, the mass ratio of polyacrylamide solution and oil-soluble particle blocking agent is: 85: 15, the injection viscosity 40mPa.s of plugging agent becomes adhesiveness 130mpa.s, water plugging rate 95%; The total amount of injecting plugging agent is calculated as follows:
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be 7.5% sandstone acid solution, replace clear water; The consumption of sandstone acid solution is calculated as follows:
Figure FSA00000158604200062
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, closing well is after 72 hours, the well recovery water filling that drives a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Figure FSA00000158604200071
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor.
5. a kind of integrated de-plugging yield increasing process according to claim 1 and 2 is characterized in that, may further comprise the steps:
One, when well is well, utilize original water injection string or flow string in the well, clamp-on plugging agent from oil pipe;
Two, oil reservoir injects frozen glue class plugging agent separately less than 2000 meters;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.4% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.4%, all the other components are water; The injection viscosity of plugging agent is 45mPa.s, becomes adhesiveness 115mpa.s, water plugging rate 97%; The total amount of injecting plugging agent is calculated as follows:
Figure FSA00000158604200081
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval;
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be 10% sandstone acid solution, replace clear water; The consumption of sandstone acid solution is calculated as follows:
Figure FSA00000158604200082
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval;
Five, closing well is after 48 hours, the well recovery water filling that drives a well.
6. a kind of integrated de-plugging yield increasing process according to claim 1 and 2 is characterized in that, may further comprise the steps:
One, when well is oil well, trip out down-hole pipe and roofbolt, logical thorn inspection, and in well, transfer operating tool string, from operating tool string, inject plugging agent;
Two, the plugging agent described in the step 1 divides two kinds of frozen glue class plugging agent and granular pattern plugging agents, the stratum exhalant canal is at oil reservoir more than 2000 meters, inject granular pattern plugging agent, follow-up injection frozen glue class plugging agent, the volume ratio of granular pattern plugging agent and frozen glue class plugging agent: 1: 3 earlier;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.4% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.4%, all the other components are water; The component of granular pattern plugging agent is: mass concentration is 0.2% polyacrylamide solution and oil-soluble particle blocking agent, the mass ratio of polyacrylamide solution and oil-soluble particle blocking agent is: 95: 5, the injection viscosity 30mPa.s of plugging agent becomes adhesiveness 130mpa.s, water plugging rate 95%; The total amount of injecting plugging agent is calculated as follows:
Figure FSA00000158604200091
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be 10% sandstone acid solution, replace clear water; The consumption of sandstone acid solution is calculated as follows:
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, closing well is after 48 hours, and oil well returns to normal production after then driving a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Figure FSA00000158604200101
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor.
7. a kind of stifled separating-the body yield-increasing technique according to claim 1 and 2 is characterized in that, may further comprise the steps:
One, when well is oil well, trip out down-hole pipe and roofbolt, logical thorn inspection, and in well, transfer operating tool string, from operating tool string, inject plugging agent;
Two, oil reservoir injects the plugging agent of frozen glue class separately less than 2000 meters;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.3% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.5%, all the other components are water; The injection viscosity 45mPa.s of plugging agent becomes adhesiveness 130mpa.s, water plugging rate 97%; The total amount of injecting plugging agent is calculated as follows:
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be the sandstone acid solution of 5-15%, replace clear water; The consumption of sandstone acid solution is calculated as follows:
Figure FSA00000158604200112
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, closing well is after 24 hours, and oil well returns to normal production after then driving a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Figure FSA00000158604200121
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor.
8. a kind of integrated de-plugging yield increasing process according to claim 1 and 2 is characterized in that, may further comprise the steps:
One, when well is oil well, trip out down-hole pipe and roofbolt, logical thorn inspection, and in well, transfer operating tool string, from operating tool string, inject plugging agent;
Two, the plugging agent described in the step 1 divides two kinds of frozen glue class plugging agent and granular pattern plugging agents, the stratum exhalant canal is at oil reservoir more than 2000 meters, inject granular pattern plugging agent, follow-up injection frozen glue class plugging agent, the volume ratio of granular pattern plugging agent and frozen glue class plugging agent: 1: 3 earlier;
Three, the component of frozen glue class plugging agent is: account for polyacrylamide dry powder, 0.2% resinae setting accelerator, the 0.3% Organic Chromium crosslinking agent of frozen glue class plugging agent gross mass 0.5%, all the other components are water; The component of granular pattern plugging agent: mass concentration is 0.3% polyacrylamide solution and oil-soluble particle blocking agent, the mass ratio of polyacrylamide solution and oil-soluble particle blocking agent is: 90: 10, the injection viscosity 45mPa.s of plugging agent becomes adhesiveness 115mpa.s, water plugging rate 96%; The total amount of injecting plugging agent is calculated as follows:
In the formula: V---plugging agent consumption, m 3
r i---the treatment radius of i interval, select fixed value 1.5m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Four, inject plugging agent after, at normal temperatures again in well implantation concentration be the sandstone acid solution of 5-15%, replace clear water; The consumption of sandstone acid solution is calculated as follows:
Figure FSA00000158604200132
In the formula: V---sandstone acid solution usage, m 3
r i---the treatment radius of i interval, m selects fixed value 1m during actual the use;
h i---the thickness of i interval, m;
Φ i---the effecive porosity of i interval.
Five, closing well is after 24 hours, and oil well returns to normal production after then driving a well.
More than in each step, when injecting plugging agent and sandstone acid solution, must control inject pump pressure, select the highest construction pump pressure that two principles are arranged: the one, be not more than flood pattern pressure, the 2nd, the construction pump pressure is injected plugging agent, for guaranteeing plugging agent shutoff target zone effectively less than the oil reservoir fracture pressure of converting to well head, minimizing is to the infringement of non-target zone, and plugging agent and sandstone acid solution injection pressure are determined by following formula:
0.8P it is broken 〉=P notes 〉=P ground+Pfr-PH
P breaks-the processing layer fracture pressure in the formula, MPa;
P notes-plugging agent squeeze pressure, MPa;
P ground-processing layer strata pressure, MPa;
Head of liquid in the Pfr-pit shaft, MPa;
PH-handles well head of liquid, MPa.
Blocking agent and sandstone acid solution inject express delivery and are determined by following formula:
Figure FSA00000158604200151
Q-injection rate in the formula, m 3/ h;
K-handles the effective mean permeability of interval, * 10 -3μ m 2
Δ P-injects pressure reduction, MPa;
M-profile control agent viscosity, mPas;
r e-drainage radius, m;
r w-wellbore radius, m;
The S-skin factor.
9. a kind of integrated de-plugging yield increasing process according to claim 1 and 2 is characterized in that, may further comprise the steps: permeability is lower than the LOW PERMEABILITY RESERVOIR of 50md, and injection rate is no more than 10m 3/ h; Better to rerum natura, the permeability that series of strata are single is not less than the oil reservoir of 50md, and injection rate is 8-12m 3/ h.
CN 201010200287 2010-06-13 2010-06-13 Integrated de-plugging yield increasing process Active CN101915079B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010200287 CN101915079B (en) 2010-06-13 2010-06-13 Integrated de-plugging yield increasing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010200287 CN101915079B (en) 2010-06-13 2010-06-13 Integrated de-plugging yield increasing process

Publications (2)

Publication Number Publication Date
CN101915079A true CN101915079A (en) 2010-12-15
CN101915079B CN101915079B (en) 2013-03-06

Family

ID=43322693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010200287 Active CN101915079B (en) 2010-06-13 2010-06-13 Integrated de-plugging yield increasing process

Country Status (1)

Country Link
CN (1) CN101915079B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102424748A (en) * 2011-08-19 2012-04-25 克拉玛依新科澳石油天然气技术股份有限公司 Use method for oil-water well fiber plugging agent
CN102434139A (en) * 2011-08-19 2012-05-02 克拉玛依新科澳石油天然气技术股份有限公司 Method for using solid-phase proppant for water-plugging profile-control of oil-water well
CN103993876A (en) * 2014-05-13 2014-08-20 中国石油天然气股份有限公司 Method for evaluating adaptability of slow expansion particle oil reservoir
CN104573215A (en) * 2014-12-31 2015-04-29 大港油田集团有限责任公司 Calculation method of profile control agent particle concentration and diameter
CN104632194A (en) * 2013-11-13 2015-05-20 中国石油化工股份有限公司 Method for determining technical well spacing of low-permeability reservoir through system well testing
CN106468152A (en) * 2015-08-14 2017-03-01 中国石油化工股份有限公司 A kind of thick oil horizontal well intensity adjustable shutoff method
CN109057762A (en) * 2018-07-23 2018-12-21 中国石油大学(北京) A kind of acidization tool of carbonate rock hydrocarbon reservoir
CN111042779A (en) * 2019-11-26 2020-04-21 大庆油田有限责任公司 Method for calculating apparent water absorption index based on ground indicator diagram

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3718187A (en) * 1971-02-08 1973-02-27 Marathon Oil Co Method of injection well stimulation
RU2003138175A (en) * 2003-12-31 2005-08-10 Открытое акционерное общество "Акционерна нефт на компани "Башнефть"(ОАО "АНК "Башнефть") (RU) METHOD FOR DEVELOPING OIL DEPOSIT
CN101280678A (en) * 2008-05-09 2008-10-08 大庆汇联技术开发有限公司 Oil well chemical gorge and disgorge yield increasing and inverse direction regulating block connection working process

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3718187A (en) * 1971-02-08 1973-02-27 Marathon Oil Co Method of injection well stimulation
RU2003138175A (en) * 2003-12-31 2005-08-10 Открытое акционерное общество "Акционерна нефт на компани "Башнефть"(ОАО "АНК "Башнефть") (RU) METHOD FOR DEVELOPING OIL DEPOSIT
CN101280678A (en) * 2008-05-09 2008-10-08 大庆汇联技术开发有限公司 Oil well chemical gorge and disgorge yield increasing and inverse direction regulating block connection working process

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《内蒙古石油化工》 20060728 杨文海等 调剖工艺中的油气层保护技术 , 第07期 *
《内蒙古石油化工》 20080615 姚军等 关于低渗透油藏开发技术的探讨 , 第11期 *
《新疆石油天然气》 20060930 李远林等 KZ高温调堵剂在稠油开采中的应用 第02卷, 第03期 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102424748A (en) * 2011-08-19 2012-04-25 克拉玛依新科澳石油天然气技术股份有限公司 Use method for oil-water well fiber plugging agent
CN102434139A (en) * 2011-08-19 2012-05-02 克拉玛依新科澳石油天然气技术股份有限公司 Method for using solid-phase proppant for water-plugging profile-control of oil-water well
CN104632194A (en) * 2013-11-13 2015-05-20 中国石油化工股份有限公司 Method for determining technical well spacing of low-permeability reservoir through system well testing
CN103993876A (en) * 2014-05-13 2014-08-20 中国石油天然气股份有限公司 Method for evaluating adaptability of slow expansion particle oil reservoir
CN104573215A (en) * 2014-12-31 2015-04-29 大港油田集团有限责任公司 Calculation method of profile control agent particle concentration and diameter
CN104573215B (en) * 2014-12-31 2018-01-05 大港油田集团有限责任公司 A kind of computational methods of profile control agent granule density and diameter
CN106468152A (en) * 2015-08-14 2017-03-01 中国石油化工股份有限公司 A kind of thick oil horizontal well intensity adjustable shutoff method
CN106468152B (en) * 2015-08-14 2018-10-19 中国石油化工股份有限公司 A kind of thick oil horizontal well intensity adjustable shutoff method
CN109057762A (en) * 2018-07-23 2018-12-21 中国石油大学(北京) A kind of acidization tool of carbonate rock hydrocarbon reservoir
CN111042779A (en) * 2019-11-26 2020-04-21 大庆油田有限责任公司 Method for calculating apparent water absorption index based on ground indicator diagram

Also Published As

Publication number Publication date
CN101915079B (en) 2013-03-06

Similar Documents

Publication Publication Date Title
CN101915079B (en) Integrated de-plugging yield increasing process
CN105298438B (en) More fine profile control methods in round polymer gel deep
CN105089596B (en) Hydraulic fracturing transformation method for unconventional reservoir oil and gas well
EP2284359A1 (en) Method of enhanced oil recovery from geological reservoirs
CN104975829B (en) A kind of CO2 oil reservoirs recovery methods of grading control mobility
CN100543106C (en) The preparation of composite cation blocking agent and stifled poly-using method
CN106947451A (en) A kind of compound profile modification system and carried out adjusting stifled construction method with it
CN104632154A (en) Composite oil flooding experimental method of alternately injecting gel and polymer solution after water flooding and polymer flooding
CN102562012B (en) Method for improving recovery ratio of water-flooding developed common heavy oil reservoir
CN106837274B (en) Method for injecting oil displacement agent into oil layer by fracturing to improve recovery ratio
CN101333922A (en) Fracturing process for removing breakdown fluid contamination
CN101787864A (en) Water plugging method for fractured water-flooded oil well for water injection development of oil reservoir in low-permeability reservoir
CN104675371B (en) It is a kind of it is poly- drive plus subsequent waterflooding after alternately inject gel and polymer solution complex oil displacing experimental method
CN102619492A (en) Polymer flooding alternate injection method for heterogeneous reservoir
CN108049858A (en) The fine and close compound sand fracturing method of the preposition accumulation of energy of oil well carbon dioxide
CN103087699B (en) Sand-carrying profile control agent composition of fracture-cave type oil deposit and profile control method of profile control agent
CN102051161B (en) Thick oil huff and puff deep channel blocking system and injection method thereof
CN104594859A (en) Method for mining tight oil reservoir by nanometer fluid
CN101086210A (en) Profile control and water plugging technology for coal bed gas
CN102926701B (en) Continuous mixed type water plugging process method
CN107893648A (en) The cold mining method of heavy crude reservoir carbon dioxide accumulation of energy high pressure viscosity reduction
CN109751033A (en) A kind of fracturing process for tight sandstone reservoir
Chang et al. The use of oil-soluble polymers to enhance oil recovery in hard to recover hydrocarbons reserves
CN106958437A (en) A kind of wellfracturing improves recovery ratio new method
CN1995267A (en) Macropore plugging gelatin

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wang Junqi

Inventor after: Chen Junbin

Inventor after: Qin Wenlong

Inventor after: Qu Zhan

Inventor after: Gai Haifang

Inventor after: Su Hui

Inventor before: Wang Junqi

Inventor before: Chen Junbin

Inventor before: Qu Zhan

Inventor before: Gai Haifang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG JUNQI CHEN JUNBIN QU ZHAN GAI HAIFANG TO: WANG JUNQI CHEN JUNBIN QIN WENLONG QU ZHAN GAI HAIFANG SU HUI

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160726

Address after: 710065 Shaanxi Province, Xi'an Yanta District High Road No. 25 building 18A enjoye

Patentee after: Shaanxi Qinghua Petroleum Construction Co. Ltd.

Address before: Two East Road 710065 Shaanxi electronic city of Xi'an province No. 18

Patentee before: Xian Petroleum Univ.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170719

Address after: 257000 Shandong Dongying North Road building materials business building room 404 Xindu

Patentee after: Dongying Suncoo Petroleum Co., Ltd.

Address before: 710065 Shaanxi Province, Xi'an Yanta District High Road No. 25 building 18A enjoye

Patentee before: Shaanxi Qinghua Petroleum Construction Co. Ltd.