CN101907203A - 一种煤气管可调节保护装置 - Google Patents

一种煤气管可调节保护装置 Download PDF

Info

Publication number
CN101907203A
CN101907203A CN 201010235585 CN201010235585A CN101907203A CN 101907203 A CN101907203 A CN 101907203A CN 201010235585 CN201010235585 CN 201010235585 CN 201010235585 A CN201010235585 A CN 201010235585A CN 101907203 A CN101907203 A CN 101907203A
Authority
CN
China
Prior art keywords
gas pipe
pipeline
protection device
steel
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010235585
Other languages
English (en)
Inventor
王圣涛
杨铭
孙爱军
刘庆丰
张积华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of CTCE Group filed Critical Fifth Engineering Co Ltd of CTCE Group
Priority to CN 201010235585 priority Critical patent/CN101907203A/zh
Publication of CN101907203A publication Critical patent/CN101907203A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

本发明涉及一种煤气管可调节保护装置,包括煤气管,所述的煤气管下方设有基础,基础顶部预埋钢板,所述的钢板上设有门型架,门型架上端设有固定螺母并连接丝杆,所述的丝杆下端连接钢护管,所述的煤气管穿过钢护管。从而解决了在地表发生较大沉降时亦能确保煤气管管线安全的问题。可确保地下工程施工时管道的安全,降低了安全风险,具有更方便、更安全的特点,且管道改接时间短。可广泛应用于隧道、地下通道、地下商场等地下工程中穿越煤气管施工时,作为管线可调节保护装置使用。

Description

一种煤气管可调节保护装置
技术领域
本发明涉及一种煤气管可调节保护装置,特别是一种隧道等地下工程中穿越煤气管施工时作为管线可调节保护装置使用的一种煤气管可调节保护装置,是一种在地下工程施工引起管道不均匀沉降时,通过调整装置适时调节管道,有效保证管线安全的装置。
背景技术
地下工程下穿煤气管施工时,均会不同程度引起管道的沉降变形,严重时会导致管道断裂引起爆炸等事故,在一般地下工程施工下穿煤气管时,通常采用工程施工到接近管线范围内后将管线改移到地下建筑物已穿越段、通过对管线范围内地表进行注浆加固或加强隧道超前预注浆等方法通过,以上方法较为传统,存在的问题是:1、管道改移将大大增加工程数量,造成资源浪费,同时进行管线改移耗时长,给周围用户生产、生活造成不便:2、对管线周围进行预加固或加强隧道超前预加固的方法由于工艺等各方面因素往往不能达到预期效果。3、不能直观的反应管线的沉降变形情况,施工过程中存在较大安全风险。
发明内容
本发明其目的就在于提供一种煤气管可调节保护装置,可确保地下工程施工时管道的安全,降低了安全风险,具有更方便、更安全的特点,且管道改接时间短。
实现上述目的而采取的技术方案,包括煤气管,所述的煤气管下方设有基础,基础顶部预埋钢板,所述的钢板上设有门型架,门型架上端设有固定螺母并连接丝杆,所述的丝杆下端连接钢护管,所述的煤气管穿过钢护管。
有益效果
该发明将埋深较大的原有煤气管道改接到可调节装置,在地下结构物下穿施工过程中,通过监控量测,适时掌握管道的沉降变形情况,根据量测数据及时通过可调节装置,将管道回复到原有位置。确保管道不发生大的沉降变形情况。这样管道本身不会由于地下工程施工发生沉降变形累加而断裂,而是将变形通过调节装置消除掉。可确保地下工程施工时管道的安全,降低了安全风险。同时管道改接需要时间短,一般仅在两端改接时停止供气3-4小时,不会对周围居民生产生活带来影响,具有更方便、更安全的特点,且管道改接时间短。
附图说明
下面结合附图对本发明作进一步详述。
图1为本装置结构示意主视图;
图2为本装置结构示意侧视图;
图3为本装置便用状态示意图。
具体实施方式
包括煤气管8,如图1、2所示,所述的煤气管8下方设有基础1,基础1顶部预埋钢板2,所述的钢板2上设有门型架3,门型架3上端设有固定螺母4并连接丝杆5,所述的丝杆5下端连接钢护管6,所述的煤气管8穿过钢护管6。
所述的煤气管8和钢护管6之间设有PVC护管7。
所述的固定螺母4设在门型架3上端中部。
所述的煤气管8与PVC护管7同轴,所述的钢护管6下端与PVC护管7相切。
所述的可调节装置沿煤气管8管线方向5-10m布置一处。
本发明为避免现有技术存在的不足之处提供一种更方便、更安全的解决地下工程下穿管线施工的有效装置。将管线直接原地改移到地表,通过可调节装置,结合监控量测技术,随时掌握管线的下沉和变形情况及时对管线进行调整,确保管线本身和工程施工的安全。本发明能够更及时更准确的掌握管线变形情况,随时对管线进行调整,在地表发生较大沉降时,亦能确保管线安全。
可调整装置结构为,设置可调整装置基础1,基础顶部预埋钢板2,然后在基础预埋钢板2上,采用钢板焊接可调整装置门型架3,门型架顶板上钻孔,并将固定螺母4焊于门型架顶板上,然后将可调节丝杆5带入螺栓孔,为了保证调整时的方便性和易操作性,可调节装置一般延管线方向5-10m布置一处。固定及可调节装置完成后,安装钢护管6,钢管纵向连接处焊接牢固,然后将丝杆5底部与钢护管6焊接,丝杆顶部露出地面5-10cm。可调整装置一般在原煤气管正上方施做,以减小管道改移长度,同时有利于地下工程施工完毕后恢复原管道。可调整装置施做完毕后,在钢保管内穿入PVC护管7,和新安装煤气管8。以上工作完毕后实施管道改接工作,主要是将下穿地下结构物10及受其影响段11两端挖开截断(需停止供气)通过弯头改接到带有可调整装置的管道上,如图3所示。管道改接需要设置工作井9,对工作井侧壁根据情况采取浇筑混凝土等围护措施。
在地下工程施工工程中,通过对可调节装置丝杆顶部进行沉降观测,当发现管道下沉值较大时(沉降允许值参照相关规范),及时采用可调节装置将管道调整到原标高,调整方法为通过转动丝杆5,将钢护管6、煤气管8提升到原标高。

Claims (5)

1.一种煤气管可调节保护装置,包括煤气管(8),其特征在于,所述的煤气管(8)下方设有基础(1),基础(1)顶部预埋钢板(2),所述的钢板(2)上设有门型架(3),门型架(3)上端设有固定螺母(4)并连接丝杆(5),所述的丝杆(5)下端连接钢护管(6),所述的煤气管(8)穿过钢护管(6)。
2.根据权利要求1所述的一种煤气管可调节保护装置,其特征在于,所述的煤气管(8)和钢护管(6)之间设有PVC护管(7)。
3.根据权利要求1所述的一种煤气管可调节保护装置,其特征在于,所述的固定螺母(4)设在门型架(3)上端中部。
4.根据权利要求1或2所述的一种煤气管可调节保护装置,其特征在于,所述的煤气管(8)与PVC护管(7)同轴,所述的钢护管(6)下端与PVC护管(7)相切。
5.根据权利要求1所述的一种煤气管可调节保护装置,其特征在于,所述的可调节装置沿煤气管(8)管线方向5-10m布置一处。
CN 201010235585 2010-07-23 2010-07-23 一种煤气管可调节保护装置 Pending CN101907203A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010235585 CN101907203A (zh) 2010-07-23 2010-07-23 一种煤气管可调节保护装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010235585 CN101907203A (zh) 2010-07-23 2010-07-23 一种煤气管可调节保护装置

Publications (1)

Publication Number Publication Date
CN101907203A true CN101907203A (zh) 2010-12-08

Family

ID=43262738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010235585 Pending CN101907203A (zh) 2010-07-23 2010-07-23 一种煤气管可调节保护装置

Country Status (1)

Country Link
CN (1) CN101907203A (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2231356Y (zh) * 1995-11-02 1996-07-17 中国石化兰州炼油化工总厂 可调节高度的固定支架
DE19506661A1 (de) * 1995-02-25 1996-08-29 Johann Sauer Eisenwarenfabrik Hänger für Rohrleitungen
CN201339769Y (zh) * 2008-12-12 2009-11-04 天津万联管道工程有限公司 预应力钢筋骨架塑料内衬石油、天然气管道抗震防护管
CN201396516Y (zh) * 2009-05-15 2010-02-03 中国石油天然气股份有限公司 管线固定卡
KR20100022881A (ko) * 2008-08-20 2010-03-03 김성구 내진 및 방진용 배관 행거
CN201437864U (zh) * 2009-05-20 2010-04-14 镇海石化工程有限责任公司 工业管道用可调式支架
CN201772143U (zh) * 2010-07-23 2011-03-23 中铁四局集团第五工程有限公司 一种煤气管可调节保护装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19506661A1 (de) * 1995-02-25 1996-08-29 Johann Sauer Eisenwarenfabrik Hänger für Rohrleitungen
CN2231356Y (zh) * 1995-11-02 1996-07-17 中国石化兰州炼油化工总厂 可调节高度的固定支架
KR20100022881A (ko) * 2008-08-20 2010-03-03 김성구 내진 및 방진용 배관 행거
CN201339769Y (zh) * 2008-12-12 2009-11-04 天津万联管道工程有限公司 预应力钢筋骨架塑料内衬石油、天然气管道抗震防护管
CN201396516Y (zh) * 2009-05-15 2010-02-03 中国石油天然气股份有限公司 管线固定卡
CN201437864U (zh) * 2009-05-20 2010-04-14 镇海石化工程有限责任公司 工业管道用可调式支架
CN201772143U (zh) * 2010-07-23 2011-03-23 中铁四局集团第五工程有限公司 一种煤气管可调节保护装置

Similar Documents

Publication Publication Date Title
CN101598023B (zh) 临近侧面有地下结构时的盾构隧道轴线的控制方法
CN110230499B (zh) 富水软土地区盾构近穿运营隧道主动保护结构及施工方法
CN105804758A (zh) 浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法
CN106437737B (zh) 一种顶管式煤矿小断面巷道掘进方法
CN103015519A (zh) 排水管顶管施工
CN104989873B (zh) 压力钢管斜拉倒拼装方法
CN108301842B (zh) 一种用于控制盾构隧道管片上浮的固定装置及施工方法
CN202117341U (zh) 建筑钢结构地脚螺栓埋设的模板
CN102021908A (zh) 一种用于预制方桩接桩的机械连接结构及施工方法
CN105697018A (zh) 一种竖井开挖施工工艺
CN111648780A (zh) 一种能有效稳定掘进速度的盾构机异形刀头
CN104032676B (zh) 一种平拉索桥钢丝绳自锚式桥台结构
CN111173528A (zh) 富水砂卵石地层大直径长区间隧道盾构施工方法
CN201772143U (zh) 一种煤气管可调节保护装置
CN112727470B (zh) 一种重叠段盾构隧道施工加固方法
CN206111241U (zh) 一种用于在隧道顶部安置全站仪的钢结构支撑托架
CN101907203A (zh) 一种煤气管可调节保护装置
CN103352704A (zh) 一种盾构通过竖井结构的施工方法
CN114233310B (zh) 一种方涵顶进施工装置、系统及方法
CN111946358B (zh) 一种处置富水砂层中盾尾变形的矫正工装及其施工工艺
CN210440037U (zh) 富水软土地区盾构近穿运营隧道主动保护结构
CN111561324A (zh) 盾构机下穿地连墙的施工方法
CN202107980U (zh) 便携式路面切缝机
CN112031824A (zh) 盾构隧道基底加固方法
CN210049911U (zh) 一种适用于炭质板岩隧道大变形的可调节拱架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20101208