CN101899950B - 高应力煤体水力冲钻成孔的方法 - Google Patents

高应力煤体水力冲钻成孔的方法 Download PDF

Info

Publication number
CN101899950B
CN101899950B CN 201010231227 CN201010231227A CN101899950B CN 101899950 B CN101899950 B CN 101899950B CN 201010231227 CN201010231227 CN 201010231227 CN 201010231227 A CN201010231227 A CN 201010231227A CN 101899950 B CN101899950 B CN 101899950B
Authority
CN
China
Prior art keywords
drilling
hole
coal
drill
water pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010231227
Other languages
English (en)
Other versions
CN101899950A (zh
Inventor
王恩元
宋大钊
李忠辉
刘晓斐
沈荣喜
赵恩来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN 201010231227 priority Critical patent/CN101899950B/zh
Publication of CN101899950A publication Critical patent/CN101899950A/zh
Application granted granted Critical
Publication of CN101899950B publication Critical patent/CN101899950B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
  • Earth Drilling (AREA)

Abstract

一种高应力煤体水力冲钻成孔的方法,在选定的采掘空间区域内布置水力冲钻设备;选定打孔的位置,将水力冲钻设备的喷头朝向成孔方向,开启水力冲钻设备;用高压水向煤体冲钻,在水力冲钻过程中喷头及高压水管随孔深不断深入而深入,当冲钻孔深达到设计要求时,关闭水力冲钻设备,退出喷头和高压水管,冲钻成孔完成;将喷头和高压水管移动至下一孔位置,继续进行下一孔的冲钻,直至完成所有冲钻成孔。该方法可有效防止钻孔冲击、炸孔或夹钻的情况,解决在高应力区煤体中打钻困难的问题。适用于防治煤与瓦斯突出、冲击地压和瓦斯抽放。其方法简单,易操作,成孔速度快。

Description

高应力煤体水力冲钻成孔的方法
技术领域
本发明涉及一种在煤体中水力冲钻成孔的方法,属煤矿灾害防治及煤矿安全技术领域,尤其适用于在高应力煤体中的水力冲钻成孔。
背景技术
在煤矿进行采掘工作时,或者防治煤与瓦斯突出、冲击地压、水害及抽放瓦斯、注水等工作中,需要在煤体中打钻孔,有探测钻孔、卸压钻孔、爆破钻孔、注水钻孔和排放或抽放瓦斯钻孔等,打钻通常用钻机来完成,属于机械钻孔。但在采动影响区、煤柱区、构造影响区等高应力区及冲击地压、煤与瓦斯突出等动力灾害高危险区,打钻时经常出现严重的钻孔冲击、炸孔或夹钻等情况,钻孔壁煤岩瞬间突然破坏或大量缓慢变形(流变或蠕变)会将钻杆报死,无法完成打钻作业。在冲击地压、煤与瓦斯突出严重或地应力较高的煤矿,煤层钻孔只能打2~4米深,无法满足需要。
发明内容
技术问题:本发明的目的是针对已有技术中存在问题,提供一种方法简单、成孔速度快、排屑容易、成孔方向及孔内卸压范围可调节的高应力煤体水力冲钻成孔的方法。
技术方案:本发明的高应力煤体水力冲钻成孔的方法:
(1)在选定的采掘空间区域内布置水力冲钻设备;
(2)选定打孔的位置,将水力冲钻设备的喷头朝向成孔方向,开启水力冲钻设备;
(3)用高压水向煤体冲钻,在水力冲钻过程中喷头及高压水管随孔深不断深入而深入,利用高压水将孔内的煤岩碎屑带出孔外;
(4)当冲钻孔深达到设计要求时,关闭水力冲钻设备,退出喷头和高压水管,完成一个成孔冲钻;
(5)将喷头和高压水管移动至下一孔位置,继续进行下一孔的冲钻,直至完成所有冲钻成孔。
所述的高压水为高压水射流、磨料水射流或旋转水射流;所述高压水的压力为25~100MPa、流量为5~80L/min;当冲钻过程中出现钻孔变形严重、且影响水管移动时,退回喷头和高压水管,对变形严重区段再次进行冲刷;当冲钻过程中遇到构造作用区、应力集中带且不能充分卸压时,延长对该区域冲刷的时间。
有益效果:本发明能有效防止钻孔冲击、炸孔或夹钻的情况,解决了在高应力区煤体中打钻困难的问题,孔可用作卸压孔、煤层注水、深孔或松动爆破、排放或抽放瓦斯等,可应用于防治煤与瓦斯突出、冲击地压和瓦斯抽放。用高压水射流法在煤体内冲孔或用旋转水射流方法在煤体内钻孔,因为水压远大于煤体抗拉强度,所以煤体破碎速度快,且能够连续进行冲钻,避免了机械钻进时换钻杆占用较长时间的问题,成孔速度快;利用高压水将孔内碎屑排出,排屑容易;水射流或旋转水射流具有冲刷距离远、范围较大的优点,因此水力冲孔或钻孔时不会出现卡钻、夹钻等致使机械钻孔钻杆被卡死或报死的情况,容易成孔,即使出现塌孔、炸孔或蠕变等情况时,退回喷头和水管再次重新冲钻或冲刷即可解决问题;水力冲钻可对某一固定区域进行大范围、长时间的冲钻,形成较大的卸压范围;水力冲钻的喷头很小,喷头和水管占用空间小,对空间适应性强,不受空间尺寸的限制,可向任意方向成孔。因此,利用该方法可有效防止钻孔冲击、炸孔或夹钻的情况,解决在高应力区煤体中打钻困难的问题,特别适合于在采动影响区、煤柱区、构造影响区等高应力区及冲击地压、煤与瓦斯突出等动力灾害高危险区成孔,孔可用作卸压孔、煤层注水、深孔或松动爆破、排放或抽放瓦斯等,可应用于防治煤与瓦斯突出、冲击地压和瓦斯抽放,其方法简单,易操作,成孔速度快。
附图说明
附图是本发明高应力煤体水力冲钻成孔方法的流程示意图。
具体实施方式
附图所示,本发明的高应力煤体水力冲钻成孔方法:首先在巷道或工作面等采掘空间选定要打孔的区域,布置好水力冲钻设备,水力冲钻设备包括压力泵、与泵站相连的高压水管和水力喷头;选定好打钻的位置,将水力冲钻设备的喷头朝向成孔方向,即需钻孔的位置及方向,开启水力冲钻设备,向设计方向用压力为25~100MPa、流量为5~80L/min的高压水向煤体冲钻,高压水为高压水射流、磨料水射流或旋转水射流。在水力冲钻过程中喷头及高压水管随孔深不断深入而深入,孔内的煤岩碎屑随高压水流流出孔外;冲钻过程中对重点区域进行重点冲钻,当钻孔变形严重且影响水管移动时,退回喷头和高压水管,对变形严重区段再次进行冲刷;当冲钻过程中遇到构造作用区、应力集中带且需要充分卸压时,延长对该区域冲刷的时间,直到煤岩碎屑不再从孔内流出时,表面该区域的煤体达到了卸压效果。当孔深达到设计深度时,关闭水力冲钻设备,退出喷头和高压水管,完成一个成孔冲钻;需要进行下一个孔的冲钻时,将喷头和高压水管移至下一个选定打钻的位置,继续进行下一个孔的水力冲钻作业,直至完成所有冲钻成孔,结束冲钻作业。

Claims (1)

1.一种高应力煤体水力冲钻成孔的方法,包括如下步骤:
(1)在选定的采掘空间区域内布置水力冲钻设备;
(2)选定打孔的位置,将水力冲钻设备的喷头朝向成孔方向,开启水力冲钻设备;
(3)用高压水向煤体冲钻,在水力冲钻过程中喷头及高压水管随孔深不断深入而深入,利用高压水将孔内的煤岩碎屑带出孔外;
(4)当冲钻孔深达到设计要求时,关闭水力冲钻设备,退出喷头和高压水管,完成一个成孔冲钻;
其特征在于:
将喷头和高压水管移动至下一孔位置,继续进行下一孔的冲钻,直至完成所有冲钻成孔;所述的高压水为高压水射流、磨料水射流或旋转水射流;所述高压水的压力为25~100MPa、流量为5~80L/min;当冲钻过程中出现钻孔变形严重、且影响水管移动时,退回喷头和高压水管,对变形严重区段再次进行冲刷;当冲钻过程中遇到构造作用区、应力集中带且不能充分卸压时,延长对该区域冲刷的时间。
CN 201010231227 2010-07-14 2010-07-14 高应力煤体水力冲钻成孔的方法 Active CN101899950B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010231227 CN101899950B (zh) 2010-07-14 2010-07-14 高应力煤体水力冲钻成孔的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010231227 CN101899950B (zh) 2010-07-14 2010-07-14 高应力煤体水力冲钻成孔的方法

Publications (2)

Publication Number Publication Date
CN101899950A CN101899950A (zh) 2010-12-01
CN101899950B true CN101899950B (zh) 2013-02-13

Family

ID=43225830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010231227 Active CN101899950B (zh) 2010-07-14 2010-07-14 高应力煤体水力冲钻成孔的方法

Country Status (1)

Country Link
CN (1) CN101899950B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102031950B (zh) * 2010-12-06 2012-02-15 煤炭科学研究总院西安研究院 煤层顶板梳状瓦斯抽采钻孔的成孔工艺方法
CN102287217B (zh) * 2011-04-29 2013-12-25 贵州铸安矿山科技股份有限公司 水力割缝多孔排渣法
CN104452752A (zh) * 2014-11-27 2015-03-25 河南黄河勘测设计研究院 一种水泥土搅拌桩在高致密板结黏土层中的施工方法
CN105545296B (zh) * 2015-12-29 2019-05-03 中国矿业大学 一种煤矿动力灾害的湿式钻屑法测试系统及测试方法
CN107023295B (zh) * 2017-04-14 2021-05-28 华北科技学院 一种硬煤防冲卸压钻孔施工方法及设备

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5363927A (en) * 1993-09-27 1994-11-15 Frank Robert C Apparatus and method for hydraulic drilling
CN1397717A (zh) * 2002-08-30 2003-02-19 曾细平 无人下井钻孔水力采煤方法
CN101463708A (zh) * 2009-01-08 2009-06-24 吉林大学 环状水力喷射钻头及复杂地层锚杆孔水力喷射施工方法
CN101586441A (zh) * 2009-07-01 2009-11-25 煤炭科学研究总院重庆研究院 高压水射流煤层钻扩孔系统和方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5363927A (en) * 1993-09-27 1994-11-15 Frank Robert C Apparatus and method for hydraulic drilling
CN1397717A (zh) * 2002-08-30 2003-02-19 曾细平 无人下井钻孔水力采煤方法
CN101463708A (zh) * 2009-01-08 2009-06-24 吉林大学 环状水力喷射钻头及复杂地层锚杆孔水力喷射施工方法
CN101586441A (zh) * 2009-07-01 2009-11-25 煤炭科学研究总院重庆研究院 高压水射流煤层钻扩孔系统和方法

Also Published As

Publication number Publication date
CN101899950A (zh) 2010-12-01

Similar Documents

Publication Publication Date Title
CN108643877B (zh) 煤矿井下煤层长钻孔分段压裂增透与抽采瓦斯方法
CN101581231B (zh) 穿层钻孔水力压裂疏松煤体瓦斯抽放方法
CN102094668B (zh) 上抽巷高压水力掏穴卸压消突方法
CN101575983B (zh) 煤矿井下定向压裂增透消突方法及压裂增透消突装置
CN105971663B (zh) 一种煤层高压水力割缝压裂的钻孔布置结构及增透方法
CN101899950B (zh) 高应力煤体水力冲钻成孔的方法
CN102022133B (zh) 区域瓦斯井下高压射流掏穴卸压防突方法
CN102619552A (zh) 导向槽定向水力压穿增透及消突方法
CN103541710A (zh) 煤矿井下气液两相交替相驱压裂煤体强化瓦斯抽采方法
CN102704905A (zh) 分段水力压裂煤层卸压装置及卸压方法
CN107023295B (zh) 一种硬煤防冲卸压钻孔施工方法及设备
CN108868874B (zh) 一种下向顺层钻孔水力割缝工艺方法
CN114165197B (zh) 一种脉冲水力裂切煤层卸压增透装置及卸压增透方法
CN110195580A (zh) 一种气液两相联合作用煤层增透方法
CN102926797B (zh) 煤矿三高区钻孔、排粉、增透一体化装置
CN106801588B (zh) 承压水地层钻孔施工半封闭泥浆保压循环工艺
CN111677448B (zh) 不稳定地层可变径套管护孔钻进工艺
CN101975023A (zh) 一种顺层钻进松软煤层深长瓦斯抽采孔的方法及装置
CN204492646U (zh) 钻碎一体化水力冲刷内排式坑道钻具
CN105134125A (zh) 瓦斯立井壁后环空底端封堵施工工艺
CN113187551A (zh) 一种长钻孔分段定点控制性压裂防治动力灾害的方法
RU2435925C1 (ru) Способ сооружения горизонтальной дренажной скважины в неустойчивых подвижных горных породах и буровой снаряд для его осуществления
RU2640611C2 (ru) Способ скважинной гидродобычи полезных ископаемых
CN111894671B (zh) 一种针对工作面顶板离层水害的地面抽水孔抽排方法
KR101402128B1 (ko) 연속굴반기의 굴착방법

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant