CN101888070B - 10KV bypass cable operation method - Google Patents

10KV bypass cable operation method Download PDF

Info

Publication number
CN101888070B
CN101888070B CN2009100513321A CN200910051332A CN101888070B CN 101888070 B CN101888070 B CN 101888070B CN 2009100513321 A CN2009100513321 A CN 2009100513321A CN 200910051332 A CN200910051332 A CN 200910051332A CN 101888070 B CN101888070 B CN 101888070B
Authority
CN
China
Prior art keywords
bypass
bypass cable
cable
pass switch
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100513321A
Other languages
Chinese (zh)
Other versions
CN101888070A (en
Inventor
陈伟明
张锦绣
蓝耕
何国兴
何宝龙
李祖江
胡达
黄峥
朱飞
丁文渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SOUTH ELECTRIC POWER ENGINEERING Co Ltd
Original Assignee
SHANGHAI SOUTH ELECTRIC POWER ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SOUTH ELECTRIC POWER ENGINEERING Co Ltd filed Critical SHANGHAI SOUTH ELECTRIC POWER ENGINEERING Co Ltd
Priority to CN2009100513321A priority Critical patent/CN101888070B/en
Publication of CN101888070A publication Critical patent/CN101888070A/en
Application granted granted Critical
Publication of CN101888070B publication Critical patent/CN101888070B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention relates to a 10KV bypass cable operation method, which comprises the steps of ancillary facilities mounting, bypass cable erection, bypass fuse protector mounting, bypass switch mounting and nuclear phase and load transfer. The invention replaces the common mode that the line repair is carried out only under the power-off condition, thus providing a safe, reliable, effective and convenient approach for improving the power supply reliability and for the power supply reliability in China to achieve the international advanced level, and having obvious economic and social benefits.

Description

A kind of 10 KV bypass cable operation methods
Technical field
The present invention relates to the distribution line live working method in a kind of electric power system, relate in particular to a kind of 10 KV bypass cable operation methods.
Background technology
Because the restriction of prior art in the comprehensive maintenance of 10kV distribution line, must have a power failure to the user, just can carry out conventional form of construction work, therefore usually makes enterprise and numerous residents suffer the trouble that causes because of power failure.
Summary of the invention
In order to overcome the deficiency that above-mentioned prior art exists; The present invention aims to provide a kind of 10 KV bypass cable operation methods; To solve always in the comprehensive maintenance of 10kV distribution line the conventional form of construction work that must under the power failure condition, carry out the user, make enterprise and numerous residents avoid having a power failure and the trouble that causes.
A kind of 10 KV bypass cable operation methods of the present invention may further comprise the steps:
A., affiliated facility is installed: the bypass cable support is installed respectively, the intermediate studdle support is installed, is taken temporary guy in strain insulator shelves electric pole two sides on straight line pole on the job site bar; The bypass cable bearing rope is installed; And on mounting rod on the electric pole of bypass cable importing place fixed support, simultaneously placing fixed support on the ground near the place, ground;
B. set up bypass cable: import the every 2m of coaster and place a movable block; Connect through connection cord between said movable block; Said bypass cable imports movable block through the bearing rope traction; And pass fixed support on the bar described in the steps A, the transition joint with said bypass cable simultaneously firmly connects, and adopts bearing rope to reinforce in said transition joint two sides;
C., the bypass fuse is installed: several bypass fuses are installed on the bypass cable described in the step B;
D., by-pass switch is installed: at the two end strain insulator shelves of bypass cable described in the step B one 10 KV bypass switches are installed respectively, and said by-pass switch is placed unzipped positions, with the by-pass switch earthing of casing;
E. nuclear phase: incoming call side by-pass switch among the incoming call said bypass fuse of side and the step D among the step of the closing C, disconnection receives electric side apparatus, carries out nuclear phase to receiving electric side apparatus both sides;
F. load transfer: the bypass fuse and the by-pass switch that close and receive electric side; Relevant devices with reason overhead transmission line power supply in the strain insulator shelves; Change into by the power supply of the bypass cable described in the step B, the overhead transmission line of needs maintenance is out of service, carry out line maintenance and multiple labour operation.
In above-mentioned 10 KV bypass cable operation methods, described bypass cable rated current is less than or equal to 150A, and rated voltage is 10kv.
In above-mentioned 10 KV bypass cable operation methods, the length of said bypass cable is 350m.
Owing to adopted above-mentioned technical solution, the present invention passes through with the lead cross-over connection of temporary cable with the working region, and is transported to the user in the working region temporarily; The working region lead is isolated; Power failure work in the working region, but the user do not have a power failure, and recovers former wiring state after hours again; Thereby the trouble that makes enterprise and numerous residents avoid having a power failure and cause has good social benefit and economic benefit.
Description of drawings
Fig. 1 is the operation chart of a kind of 10 KV bypass cable operation methods of the present invention.
Embodiment
As shown in Figure 1, a kind of 10 KV bypass cable operation methods of the present invention may further comprise the steps:
At first; The bypass cable support is installed on the job site bar respectively, the intermediate studdle support is installed on straight line pole, is taken temporary guy in strain insulator shelves electric pole two sides; The bypass cable bearing rope is installed; And on mounting rod on the electric pole of bypass cable importing place fixed support, simultaneously placing fixed support on the ground near the place, ground.
Secondly, place a movable block through importing the every 2m of coaster, connect through connection cord between said movable block, bypass cable 1 passes through 10mm 2Bearing rope traction imports movable block, and passes fixed support on the described bar (this moment can be artificial to hold in the palm cable, to prevent block), and the transition joint with bypass cable 1 simultaneously firmly connects, and adopts bearing rope to reinforce in said transition joint two sides; In this process, three-phase bypass cable 1 can be placed simultaneously, and adopts in the people or hand strand mill or motor-driven strand mill mode realize.Set up the back reply bypass cable that finishes and carry out electric examination.Then, several bypass fuses are installed on bypass cable 1; At bypass cable 1 two end strain insulator shelves, prompt delivery electricity side with receive on the electric side two side segmented poles one 10 KV bypass switches 2 to be installed respectively, and by-pass switch 2 is placed unzipped positions, with by-pass switch 2 earthings of casing.
Then, said bypass fuse of the incoming call side of closing and incoming call side by-pass switch 2, disconnection receives electric side apparatus, carries out nuclear phase to receiving electric side apparatus both sides.
After nuclear phase finishes; The bypass fuse and the by-pass switch 2 that close and receive electric side; With the relevant devices of reason overhead transmission line power supply in the strain insulator shelves (comprising that pole transformer on the circuit, station, user worker-house house lead in cable, construction are with facilities such as transformers); Change into by bypass cable 1 power supply, the overhead transmission line of needs maintenance is out of service.
After described overhead transmission line out of service being carried out exchange wire and changing other equipment, (comprise that electric pole, pole transformer, 10 kilovolts are from relevant devices such as the fuse that falls, 90 ° of angle poles, extension bars); Change described overhead transmission line into operation from maintenance at last; And will return to by the overhead transmission line power supply by the equipment of described bypass cable power supply, make bypass cable out of service.
Bypass cable among the present invention, promptly 10kV flexible insulation cable is as a kind of " instrument ", and it is different from common single-core cable and three cores twist cable mutually, and its maximum difference is in softness, and stands alternating bending.The length of this bypass cable is 350m, can cross over 9 shelves continuously, and its rated current is less than or equal to 150A, and rated voltage is 10kV, can prevent that short circuit current from damaging bypass cable and protection personal safety through protection component is installed on bypass cable.
When setting up three-phase bypass cable 1; Bearing rope should be able to bear the weight of bypass cable; And the coaster that carries bypass cable passes through on rope smoothly, so this bearing rope has intensity height (the maximum Fracture Force of φ 12 bearing ropes can reach 4.5 tons), the little characteristics such as (less than 5%) of expansion and contraction.
For the user is not had a power failure in the gap; The present invention has adopted the on-load handoff technique; And to the separating of 10kV house lead in cable, pole transformer low-tension supply and bypass van-type transformer low voltage power supply, and operation all adopts the heat to fall method, thereby guarantee that the user does not have a power failure in the operation overall process, solved the technical barrier of maximum in the construction over the years; Replaced the conventional maintenance mode that line maintenance must carry out the user under the power failure condition; For improving power supply reliability, reaching advanced world standards for China's power supply reliability provides safe, reliable and effective, fast way, has tangible economic results in society.
Above embodiment specifies the present invention, and those skilled in the art can make the many variations example to the present invention according to above-mentioned explanation.Thereby some details among the embodiment should not constitute qualification of the present invention, and the scope that the present invention will define with appended claims is as protection scope of the present invention.

Claims (3)

1. KV bypass cable operation method is characterized in that it may further comprise the steps:
A., affiliated facility is installed: the bypass cable support is installed respectively, the intermediate studdle support is installed, is taken temporary guy in strain insulator shelves electric pole two sides on straight line pole on the job site bar; The bypass cable bearing rope is installed simultaneously; And on mounting rod on the electric pole of bypass cable importing place fixed support, simultaneously placing fixed support on the ground near the place, ground;
B. set up bypass cable: import the every 2m of coaster and place a movable block; Connect through connection cord between said movable block; Said bypass cable imports movable block through the bearing rope traction; And pass fixed support on the bar described in the steps A, the transition joint with said bypass cable simultaneously firmly connects, and adopts bearing rope to reinforce in said transition joint two sides;
C., the bypass fuse is installed: several bypass fuses are installed on the bypass cable described in the step B;
D., by-pass switch is installed: at the two end strain insulator shelves of bypass cable described in the step B one 10 KV bypass switches are installed respectively, and said by-pass switch is placed unzipped positions, with the by-pass switch earthing of casing;
E. nuclear phase: incoming call side by-pass switch among the incoming call said bypass fuse of side and the step D among the step of the closing C, disconnection receives electric side apparatus, carries out nuclear phase to receiving electric side apparatus both sides;
F. load transfer: the bypass fuse and the by-pass switch that close and receive electric side; Relevant devices with reason overhead transmission line power supply in the strain insulator shelves; Change into by the power supply of the bypass cable described in the step B, the overhead transmission line of needs maintenance is out of service, carry out line maintenance and multiple labour operation.
2. 10 KV bypass cable operation methods according to claim 1 is characterized in that, described bypass cable rated current is less than or equal to 150A, and rated voltage is 10kv.
3. 10 KV bypass cable operation methods according to claim 1 and 2 is characterized in that, the length of said bypass cable is 350m.
CN2009100513321A 2009-05-15 2009-05-15 10KV bypass cable operation method Active CN101888070B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100513321A CN101888070B (en) 2009-05-15 2009-05-15 10KV bypass cable operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100513321A CN101888070B (en) 2009-05-15 2009-05-15 10KV bypass cable operation method

Publications (2)

Publication Number Publication Date
CN101888070A CN101888070A (en) 2010-11-17
CN101888070B true CN101888070B (en) 2012-07-04

Family

ID=43073847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100513321A Active CN101888070B (en) 2009-05-15 2009-05-15 10KV bypass cable operation method

Country Status (1)

Country Link
CN (1) CN101888070B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102480109A (en) * 2010-11-29 2012-05-30 哈尔滨电业局 Method for replacing 10 kV distribution line lead with load
CN103078268A (en) * 2012-12-28 2013-05-01 上海市电力公司 Uninterrupted power overhauling method of 10kV cables between two annular net cabinets
CN104466788B (en) * 2013-09-23 2018-05-08 国家电网公司 The detection method and device of distribution overhead line
CN104377623A (en) * 2014-11-27 2015-02-25 国家电网公司 Vehicle-mouthed overhead cable layout device
CN104868398B (en) * 2015-05-22 2017-10-17 国网江苏省电力公司常州供电公司 The built on stilts laying street crossing device of 10KV bypass cables
CN113889900A (en) * 2021-08-30 2022-01-04 国网浙江省电力有限公司嘉兴供电公司 Construction method for live migration strain tower and wire of distribution network
CN114498313B (en) * 2022-02-09 2023-02-03 广东韶钢松山股份有限公司 Flexible connecting bus bridge and switch cabinet transitional connection method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1224262A (en) * 1999-01-25 1999-07-28 西宁供电局 Live-wire work method for 10 KV multiloop insulated conductor
CN101064431A (en) * 2006-04-29 2007-10-31 江苏省电力公司常州供电公司 Method for replacing 10kV distributing transformer with charge

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1224262A (en) * 1999-01-25 1999-07-28 西宁供电局 Live-wire work method for 10 KV multiloop insulated conductor
CN101064431A (en) * 2006-04-29 2007-10-31 江苏省电力公司常州供电公司 Method for replacing 10kV distributing transformer with charge

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
JP特开平7-39029A 1995.02.07
应鸿等.杭州电网的主要带电作业方法.《浙江电力》.2004,(第06期),全文. *
杨晓翔等.带负荷更换10kV线路柱上开关的作业方法.《湖州师范学院学报》.2009,第31卷全文. *
王明春.10kV电缆带电作业旁路系统.《农村电气化》.2006,(第09期),全文. *
罗俊华等.15kV柔性旁路电缆的不停电抢修作业技术.《高电压技术》.2009,(第04期),全文. *
肖国德等.引流线旁路带电作业法在配电检修工作中的应用及其扩展.《安徽电力》.2007,(第01期),全文. *

Also Published As

Publication number Publication date
CN101888070A (en) 2010-11-17

Similar Documents

Publication Publication Date Title
CN101888070B (en) 10KV bypass cable operation method
CN202749782U (en) Power-transmission-line ice melting system implemented by using switching operations in whole process
CN203734209U (en) Live working device for cable bypass
KR20100054948A (en) By-pass construction method for replacement of pole-top transformer (1phase/3phase) using 1phase portable transformer
Magg et al. Connecting networks with VSC HVDC in Africa: Caprivi Link interconnector
CN102227074B (en) Power transmission line deicing antifreeze system
CN102222862A (en) Intelligent open-type insulated transformer platform
CN109347134B (en) Bipolar flexible direct-current power grid polar line electric main wiring system and online maintenance method
CN204992611U (en) Photovoltaic contravariant single phase alternating current and box with a net
CN108134388A (en) A kind of electricity-fetching method and device of high voltage iron tower auxiliary equipment
CN201440584U (en) Ground potential replacement device for tension tower insulators and accessories in power transmission line
CN109245291B (en) Maintenance safety measure arrangement method for double-bus double-subsection power supply system of transformer substation
CN108736360A (en) A kind of integration loaded capacity regulating voltage regulating power distribution station
CN201270412Y (en) Temporary energy consumption general distribution box leakage protection and control apparatus for construction
CN208209544U (en) A kind of novel circuit configuration of electric main power connection in power plant
CN210866095U (en) Special shunting device for replacing drop-out fuse under load
CN210693223U (en) Voltage transformer isolation combination device applied to uninterrupted operation
HRP20210941T1 (en) Electric vehicle charging station for connecting to high or extra high voltage transmission line and operation method thereof
CN202650795U (en) Split type rectifier transformer for DC-based deicing
CN201263078Y (en) Integrated equipment of user demarcation circuit breaker
CN105071439A (en) Photovoltaic inversion single-phase AC grid-connected box
CN204967265U (en) Electric system of transformer substation
D'Souza et al. Conversion of 230 kV Switchyard to Gas-Insulated Substation in a Gas Plant
WO2019123424A1 (en) Electric vehicle charging station for connecting to high or extra high voltage transmission line and operation method thereof
CN202404196U (en) Grounding point inspection line for small current grounding system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Chen Weiming

Inventor after: Ding Wenyuan

Inventor after: Zhang Jinxiu

Inventor after: Lan Geng

Inventor after: He Guoxing

Inventor after: He Baolong

Inventor after: Li Zujiang

Inventor after: Hu Da

Inventor after: Huang Zheng

Inventor after: Zhu Fei

Inventor before: Chen Weiming

Inventor before: Zhang Jinxiu

Inventor before: Lan Geng

Inventor before: He Guoxing

Inventor before: He Baolong

Inventor before: Li Zujiang

Inventor before: Hu Da

Inventor before: Huang Zheng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHEN WEIMING ZHANG JINXIU LAN GENG HE GUOXING HE BAOLONG LI ZUJIANG HU DA HUANG ZHENG TO: CHEN WEIMING ZHANG JINXIU LAN GENG HE GUOXING HE BAOLONG LI ZUJIANG HU DA HUANG ZHENG ZHU FEI DING WENYUAN

C14 Grant of patent or utility model
GR01 Patent grant