CN101865348B - Freeze temporary blocking method and device for large-diameter gas pipeline - Google Patents

Freeze temporary blocking method and device for large-diameter gas pipeline Download PDF

Info

Publication number
CN101865348B
CN101865348B CN201010186534XA CN201010186534A CN101865348B CN 101865348 B CN101865348 B CN 101865348B CN 201010186534X A CN201010186534X A CN 201010186534XA CN 201010186534 A CN201010186534 A CN 201010186534A CN 101865348 B CN101865348 B CN 101865348B
Authority
CN
China
Prior art keywords
pipeline
freeze
core
insulation
push pedal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010186534XA
Other languages
Chinese (zh)
Other versions
CN101865348A (en
Inventor
梁政
兰洪强
李莲明
邓雄
赵广慧
张梁
蒋发光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201010186534XA priority Critical patent/CN101865348B/en
Publication of CN101865348A publication Critical patent/CN101865348A/en
Application granted granted Critical
Publication of CN101865348B publication Critical patent/CN101865348B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a freeze temporary blocking method and a device for a large-diameter gas pipeline, which are applied in the pipeline after spark-free cutting of natural gas pipeline and prior to butt welding of two pipelines. The method can reduce the technical requirements for inert gas replacement prior to welding, and realize the rapid freeze temporary blocking to ensure that the welding position is free from oil and gas. In the technical scheme, the method comprises the following steps: placing pre-frozen cores into two ends of a cut-off pipeline; fixing a bag filled with a freezing medium on the corresponding outer wall of the pipeline, wrapping an insulation jacket, and fixing with a winding belt; pouring water-consolidating emulsifier into the hopper of a screw conveyor, shaking the handle to inject the water-consolidating emulsifier into a gap between the frozen core and the pipeline wall, and completely filling the gap; fixing the freezing medium onto the insulation layer, make an insulation push plate cling to the frozen core with a push rod, and taking out the push rod and the insulation push plate after freezing and consolidation, thereby completing the welding. The invention has the advantages of simple operation, short operating period, low operating cost and good safety and reliability, and is particularly suitable for the field construction of the large-diameter gas pipeline.

Description

A kind of large-diameter gas pipeline freeze temporary blocking method and equipment
Technical field
The present invention relates to a kind of large-diameter gas pipeline freeze temporary blocking method and equipment in the pipeline before the two segment pipe butt welding after with the cutting of natural gas pipeline no-spark that is used for.
Technical background
In the natural gas pipeline actual moving process; Owing to receive the influence of the factors such as change of burn into wearing and tearing, gas transmission route; Therefore just have the repairing of natural gas pipeline, the generation of actual engineering problem such as relocate; Relate to the coal Gas for safety Ignition of gas pipeline, problems such as oil gas isolation.
Present stage, the oil gas isolation technology for the gas pipeline of big caliber had balloon occluder, the shutoff of pipeline disc type, butter wall shutoff etc.
In the actual operating process of getting angry of gas pipeline of big caliber, common way is that the main valve of gas pipeline is turned off, and utilizes inert medium (like nitrogen, water vapour, carbon dioxide) to carry out for a long time, grow apart from pipeline purging; By the time inflammable substance (comprising condensate, rock gas) cuts pipeline in the pneumatic tube when concentration is less than explosion limit; If machine pluggings such as employing balloon occluder are put into equipment such as machine plugging device or leather bag plugging device then apart from the perforate on tube wall of otch one distance from perforate, carry out weld job then, construction finishes the back and takes out plugging device, and the repair welding leather bag is put into the hole again.If adopt sealing agent or butter wall then they to be put into the temporary transient oil gas of isolating of pipeline, detect the content of inflammable gas in the welding process, then stop weldering, displacement if hydrocarbon content reaches explosion limit, up to standard after thread weldering again, so repeatedly.These plugging technology complicated operations, can not pressure-bearing or bearing capacity low, have can pressure-bearing but can not avoid the later stage gas transmission being caused potential safety hazard in the perforate of pipeline wall, can not satisfy the requirement that site safety is accomplished construction fast.
Summary of the invention
The objective of the invention is to: in order to reduce the technical requirements of inert gas replacement in the welding preceding pipeline, guarantee that the welding part does not have oil gas, guarantees weld job safety, the spy provides a kind of large-diameter gas pipeline freeze temporary blocking method and equipment.
For achieving the above object; The technical problem that the present invention solves adopts following technological scheme: a kind of large-diameter gas pipeline freeze temporary blocking method; It is characterized in that: calculate the distance L (100mm-600mm) of large-diameter gas pipeline earlier apart from the welding heat affected zone of otch; In the pipeline that cuts off pipe ends, put into place to the core that freezes that freezes in advance earlier, freeze core by solid water emulsifier freezing processing in mould apart from conduits cut L; Again refrigerant dry ice is divided in the pouch, and is fixed on,, insulation jacket is fixed on the pipeline outer wall with take-up strap in pipeline outer wall parcel insulation jacket corresponding to the pipeline outer wall that freezes the core position; The solid water emulsifier is poured in the hopper of helix transporting device, shaken the handle of helix transporting device, the thrust of utilizing helix transporting device to produce is injected into the solid water emulsifier in the slit of freezing between core and the tube wall, with the slit and fill up; Again in the outer end of freezing core, be fixed on refrigerant on the thermal insulation layer of insulation push pedal, push rod is connected in the push pedal, with push rod whole insulation push pedal and freeze the applying of core front-end face; Solid water emulsifier in being injected into the slit of freezing between core and the pipeline and pipeline wall and freeze wicking surface and freeze when firm take out push rod and insulation push pedal, and can implement welding operation this moment.
Welding procedure is taken off insulation jacket and take-up strap and refrigerant packing pouch after accomplishing, and twine gas pipeline freezing position with heat tape winter, makes the solid water emulsifier recover original state, discharges with rock gas when treating gas pipeline recovery gas transmission.
The related insulation jacket of this method is to be fixed on the leather fabric with certain toughness with aluminum silicate insulation material to form, and the thermal insulating material edge is than the wide 20-40mm of leather fabric, so that compress when twining.The solid water emulsifier is by French chalk, latex powder, and water, organic phenolic aldehyde of making crosslinking agent is made in proportion.
The employed equipment of large-diameter gas pipeline freeze temporary blocking method; By manual helix transporting device, be incubated push pedal, freeze cores and form; Its structure characteristic is: manually helix transporting device has one to have the bearing that becomes 30 °-45 ° tilt angle with Vertical direction, on bearing, places worm conveyor; Hopper is installed above worm conveyor, and front end connects delivery hose, and bearing and handle are installed in the top; The diameter of insulation push pedal is formed with the push pedal of gas pipeline inwall Spielpassung and bonding superincumbent polyurethane foam insulation layer, and push pedal is connected with nut with the push rod that has scale; Freeze cores and connected and composed with the bolt symmetry by the two and half dumbbell shape shells that steel plate rolls, an end is equipped with capping, and the other end top is equipped with the injection channel of injecting the solid water emulsifier.
The present invention and existing technology relatively have following beneficial effect: avoided on large-diameter gas pipeline the perforate to cause stress to concentrate, having improved the Security that gas transmission is recovered in the construction back.Bearing capacity is high, does not need long-time, long distance displacement pipeline purging, saves the engineering time, reduces operating cost, improves the Security of operation.Do not influence normal gas transmission after the de-plugging of solid water emulsifier, need not adopt additive method to get rid of, be applicable to the site operation of large-diameter gas pipeline.
Description of drawings
Fig. 1 is the equipment assembling schematic representation of large-diameter gas pipeline freeze temporary blocking method of the present invention.
Fig. 2 is temporary blocking method thermal insulating material 3 of the present invention and take-up strap 2 structural representations.
Fig. 3 is the insulation of equipment push pedal assembling schematic representation of temporary blocking method of the present invention.
Fig. 4 freezes the cores structural representation for the equipment of temporary blocking method of the present invention.
Among the figure: 1, pipeline 2, take-up strap 3, insulation jacket 4, pouch 5, freeze core 6, refrigerant 7, thermal insulation layer 8, push pedal 9, bearing 10, hopper 11, worm conveyor 12, handle 13, delivery hose 14, bearing 15, leather fabric 16, push rod 17, half dumbbell shape shell 18, bolt 19, injection channel 20, capping 21, nut
Embodiment
Below in conjunction with accompanying drawing and mode of execution the present invention is described further.
According to shown in Figure 1; Freezing core 5 to the dumbbell shaped that freezes in advance puts into apart from pipeline 1 otch L place; Refrigerant 6 is divided in the pouch 4, is fixed on pouch 4 corresponding to pipeline 1 outer wall that freezes core 5 positions, again with take-up strap 2 fixedly insulation jacket 3 in refrigerant 6 outsides; The solid water emulsifier is poured in the hopper 10 of manually operated type helix transporting device, with delivery hose 13 the solid water emulsifier is imported to injection channel 19, the slit that will freeze core 5 and inner-walls of duct 1 fills up; Be fixed on refrigerant 6 on the thermal insulation layer 7 of insulation push pedal, push rod 16 be connected in the push pedal 8, with push rod 16 with whole insulation push pedal with freeze core front-end face applying.For the natural gas pipeline 1 of Φ=700m, insulation jacket 3 and take-up strap 2 winding pipelines 1 length 1000mm;
The thermal insulation layer 7 of insulation push pedal is 696mm with the diameter of push pedal 8, and the insulation push pedal is connected by nut 21 with push rod 16; Welding heat affected zone L=400mm.Manually the tilt angle of helix transporting device bearing 14 is 30 °-45 °, and worm conveyor 11 is installed on bearing 14; Above dress worm conveyor 11, hopper 10 is installed, front end connects delivery hose 13, and bearing 9 and handle 12 are installed in the top.
According to shown in Figure 3, the insulation push pedal is made up of push pedal 8 and bonding superincumbent polyurethane foam insulation layer 7, and push pedal 8 is connected with the push rod that has scale 16 usefulness nuts 21.
According to shown in Figure 4, freeze cores by the two and half dumbbell shape shells 17 that steel plate rolls, connect and compose with bolt 18 symmetries, an end is equipped with capping 20, and the other end top is equipped with the injection channel 19 of injecting the solid water emulsifier.
Natural gas pipeline for Φ=700m; After 1-2 hour, solid water emulsifier and pipeline wall and freeze wicking surface and freeze firmly bear the pipe internal pressure this moment at 0.5-1.0MPa; Effectively block the gas stream in the pipeline; Avoid long distance, replace operation for a long time, getting angry band oil gas becomes no oil gas and gets angry, and makes that pipeline welding is quick, safety, low cost carries out.

Claims (2)

1. large-diameter gas pipeline freeze temporary blocking method; It is characterized in that: calculate the distance L of large-diameter gas pipeline earlier apart from the welding heat affected zone of otch; Freeze core (5) to the dumbbell shaped that freezes in advance and put into, freeze core (5) by solid water emulsifier freezing processing in freezing cores apart from pipeline (1) otch L place; Again refrigerant (6) dry ice is divided in the pouch (4), and is fixed on,, insulation jacket (3) is fixed on pipeline (1) outer wall with take-up strap (2) in pipeline (1) outer wall parcel insulation jacket (3) corresponding to pipeline (1) outer wall that freezes core (5) position; The solid water emulsifier is poured in the hopper (10) of manually operated type helix transporting device, shaken the handle (12) of helix transporting device, the solid water emulsifier is injected in the slit of freezing between core (5) and the pipeline (1) through flow in pipes (19), the slit is filled up; Again in the outer end of freezing core (5), be fixed on refrigerant (6) on the thermal insulation layer (7) of insulation push pedal, push rod (16) is connected in the push pedal (8), with push rod (16) whole insulation push pedal with freeze the applying of core (5) front-end face; Solid water emulsifier in being injected into the slit of freezing between core (5) and the pipeline (1) and pipeline (1) wall and freeze core (5) when shallow freezing is firm take out push rod (16) and insulation push pedal, and can implement welding operation this moment.
2. equipment that freeze temporary blocking method as claimed in claim 1 uses; By manual helix transporting device, be incubated push pedal, freeze cores and form, it is characterized in that: manually helix transporting device has one to have the bearing (14) that becomes 30 °-45 ° tilt angle with Vertical direction and go up and place worm conveyor (11); Hopper (10) is installed in top at worm conveyor (11), and front end connects delivery hose (13), and bearing (9) and handle (12) are installed in the top; The diameter of insulation push pedal is formed with the push pedal (8) of gas pipeline (1) inwall Spielpassung and bonding superincumbent polyurethane foam insulation layer (7), and push pedal (8) is connected with nut (21) with the push rod that has scale (16); Freeze cores and connected and composed with bolt (18) symmetry by the two and half dumbbell shape shells (17) that steel plate rolls, an end is equipped with capping (20), and the other end top is equipped with the injection channel (19) of injecting the solid water emulsifier.
CN201010186534XA 2010-05-22 2010-05-22 Freeze temporary blocking method and device for large-diameter gas pipeline Expired - Fee Related CN101865348B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010186534XA CN101865348B (en) 2010-05-22 2010-05-22 Freeze temporary blocking method and device for large-diameter gas pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010186534XA CN101865348B (en) 2010-05-22 2010-05-22 Freeze temporary blocking method and device for large-diameter gas pipeline

Publications (2)

Publication Number Publication Date
CN101865348A CN101865348A (en) 2010-10-20
CN101865348B true CN101865348B (en) 2012-01-18

Family

ID=42957183

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010186534XA Expired - Fee Related CN101865348B (en) 2010-05-22 2010-05-22 Freeze temporary blocking method and device for large-diameter gas pipeline

Country Status (1)

Country Link
CN (1) CN101865348B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899877B (en) * 2014-03-25 2015-12-30 西南石油大学 A kind of oil transportation large pipeline implements the temporary blocking method of welding
CN105257945B (en) * 2015-10-27 2017-08-11 苏州泰盛新绿节能环保科技有限公司 A kind of water equipment living water operation maintaining method
CN110319294B (en) * 2019-07-12 2021-10-08 深圳市合众清洁能源研究院 Gas pipeline hydrate plugging and pipe replacing process
CN110440085B (en) * 2019-08-13 2021-06-08 西南石油大学 Temporary liquid nitrogen low-temperature blocking device suitable for gathering and transportation pipelines with multiple pipe diameters
CN112496593B (en) * 2020-11-20 2022-06-17 北京市燃气集团有限责任公司 Solder fill compositions and methods and applications

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4267699A (en) * 1979-02-21 1981-05-19 Bahrenburg Harry H Freeze isolation seal
US5608159A (en) * 1995-04-05 1997-03-04 Lucent Technologies Inc. Freeze seal and freeze clamp for cables, wires, optical fibers and the like
CN2818999Y (en) * 2005-04-15 2006-09-20 章铭德 Pipeline sealer
CN2930039Y (en) * 2006-11-27 2007-08-01 陈怀民 Spring pipeline blocking part
US7260942B2 (en) * 2004-09-27 2007-08-28 Alexander Shteinberg Method of sealing joints of pipelines and containers operating with cryogenic fluids

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4267699A (en) * 1979-02-21 1981-05-19 Bahrenburg Harry H Freeze isolation seal
US5608159A (en) * 1995-04-05 1997-03-04 Lucent Technologies Inc. Freeze seal and freeze clamp for cables, wires, optical fibers and the like
US7260942B2 (en) * 2004-09-27 2007-08-28 Alexander Shteinberg Method of sealing joints of pipelines and containers operating with cryogenic fluids
CN2818999Y (en) * 2005-04-15 2006-09-20 章铭德 Pipeline sealer
CN2930039Y (en) * 2006-11-27 2007-08-01 陈怀民 Spring pipeline blocking part

Also Published As

Publication number Publication date
CN101865348A (en) 2010-10-20

Similar Documents

Publication Publication Date Title
CN101865348B (en) Freeze temporary blocking method and device for large-diameter gas pipeline
CN102192382B (en) Method for temporarily plugging refrigeration of small-diameter oil-gas pipeline
AU2017397725B2 (en) Method for dynamic water feeding and hole sealing using high water-absorbent resin
CN103899877B (en) A kind of oil transportation large pipeline implements the temporary blocking method of welding
AU2015299588B2 (en) Freezing cross-cut coal cutting method based on hydraulic seam-cutting
CN111119829B (en) Coal bed permeability increasing method utilizing liquid nitrogen cold impact and phase change gas circulation damage
CN105066804A (en) Mine water stemming bag and application of mine water stemming bag in borehole blockage
CN201875353U (en) Temporary freezing and plugging device for filling-capable natural gas pipeline
CN102966309A (en) High-pressure grinding material jet flow drill carriage device
CN103498687A (en) Device and method for hole sealing of grouting anchor rod
CN107605441B (en) Device and method for introducing liquid nitrogen into open hole well
CN201221659Y (en) Gas non-stop transporting first-aid repairing apparatus with gas of steel plastic composite pipeline
CN110006805B (en) Carbon dioxide blasting impact penetration integrated test device and test method thereof
CN103470913B (en) The linkage structure of metglass Steel Lining rubber and plastic submerged pipeline and making connecting means
CN104089148B (en) Heat-preservation die and heat-preservation construction method for ultra-low temperature pipeline
CN206988683U (en) A kind of explosion-proof pipe plugging erecting device
CN206846178U (en) A kind of LNG conveyance conduits straight tube leakage-stopping instrument
CN205824481U (en) A kind of pipeline pressure guiding pipe root plugging device
CN203925396U (en) A kind of coal bed gas extraction hole sealing device
CN104101081A (en) Cooling water anti-freezing device for construction instrument in cold environment and anti-freezing method
FR2917776A1 (en) TUNNEL COATING TIGHTS AND METHOD OF MAINTAINING THE SKIRT OF A TUNNELIER.
CN209927684U (en) Carbon dioxide blasting impact infiltration integrated test device
CN106015828A (en) Root sealing device for pressure guiding pipe of pipeline
CN206377397U (en) A kind of LNG conveyance conduits straight tube bottom leakage leak stoppage tool
US2164625A (en) Concrete pipe and method of producing same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120118

Termination date: 20130522