CN105257945B - A kind of water equipment living water operation maintaining method - Google Patents
A kind of water equipment living water operation maintaining method Download PDFInfo
- Publication number
- CN105257945B CN105257945B CN201510701845.8A CN201510701845A CN105257945B CN 105257945 B CN105257945 B CN 105257945B CN 201510701845 A CN201510701845 A CN 201510701845A CN 105257945 B CN105257945 B CN 105257945B
- Authority
- CN
- China
- Prior art keywords
- branch pipe
- relief tube
- relief
- water
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/10—Means for stopping flow from or in pipes or hoses
- F16L55/103—Means for stopping flow from or in pipes or hoses by temporarily freezing liquid sections in the pipe
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25C—PRODUCING, WORKING OR HANDLING ICE
- F25C1/00—Producing ice
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Pipe Accessories (AREA)
- Thermotherapy And Cooling Therapy Devices (AREA)
Abstract
The invention discloses a kind of water equipment living water operation maintaining method, comprise the following steps:The first pipe joint and the first relief tube are installed in running water drilling on branch pipe between branch pipe isolating valve, and total pipeline, and first pressure table and the first relief valve are set on the first relief tube;The second pipe joint, the second relief tube are installed in running water drilling on branch pipe between branch pipe isolating valve, and equipment, and second pressure table and the second relief valve are set on the second relief tube;To installing refrigerating plant on the branch pipe between the first relief tube and the second relief tube, examination freezing is carried out, the current of branch pipe are gradually blocked, and monitor the pressure value of first pressure table and second pressure table in refrigerating process, until frost cutout completely.By the above-mentioned means, water equipment living water operation maintaining method of the present invention, can quickly it be safeguarded when branch pipe separates defective valve, operating efficiency is high, it is to avoid the bursting by freezing of branch pipe or explosion problem, security are higher.
Description
Technical field
The present invention relates to water equipment area of maintenance, more particularly to a kind of water equipment living water operation maintaining method.
Background technology
Because the equipment component in enterprise needs continual use water, total pipeline is set not cut off the water supply, but as a certain equipment is bad
The maintenance that to cut off the water supply, and it does not have branch pipe isolating valve, or branch pipe isolating valve, to be broken yet can not carry out the closing of branch pipe, is protecting
In the case of demonstrate,proving other equipment water, it must just use waterpipe to freeze operation and the water of branch pipe before valve is freezed to change valve.
Waterpipe freezing operation is a kind of technology invented after having liquid nitrogen, but is to lean on technology in common operating process
The experience of personnel has freezing excessively and freezing pipeline hypertonia causes the feelings of frost crack pipe or pipeline burst come what is completed
Condition, causes enterprise passively to stop production and causes heavy economic losses and security incident.
The content of the invention
The present invention solves the technical problem of provide a kind of water equipment living water operation maintaining method, it is to avoid water pipe
Freezing cracking, improves convenience and security that running water is safeguarded.
In order to solve the above technical problems, one aspect of the present invention is:A kind of water equipment running water is provided to make
Industry maintaining method, the band water for branch pipe isolating valve, safeguards that branch pipe, which is set, to be connected between total pipeline and equipment, and branch pipe isolating valve, is set
Put on branch pipe, comprise the following steps:
The first pipe joint and the first relief tube are installed in running water drilling on branch pipe between branch pipe isolating valve, and total pipeline,
First pressure table and the first relief valve are set on the first relief tube;
The second pipe joint, the second relief tube are installed in running water drilling on branch pipe between branch pipe isolating valve, and equipment, the
Second pressure table and the second relief valve are set on two relief tubes;
According to the normal temperature bearing capacity of branch pipe material therefor and freezing bearing capacity, the first relief valve of adjustment and the second pressure release
The pressure release value of valve;
To installing refrigerating plant on the branch pipe between the first relief tube and the second relief tube, examination freezing is carried out, is gradually blocked
The current of branch pipe, and the pressure value of first pressure table and second pressure table in refrigerating process is monitored, until frost cutout completely;
Branch pipe isolating valve, and equipment are safeguarded or changed, the first relief tube is then removed and the second relief tube is gone forward side by side
The closure of the pipe joint of row first and the second pipe joint;
Refrigerating plant is released, is normally worked after after branch pipe defrosting.
In a preferred embodiment of the present invention, the end of first relief tube is provided with the first header tank.
In a preferred embodiment of the present invention, the end of second relief tube is provided with the second header tank.
In a preferred embodiment of the present invention, first pipe joint connection be arranged on branch pipe and the first relief tube it
Between.
In a preferred embodiment of the present invention, second pipe joint connection be arranged on branch pipe and the second relief tube it
Between.
The beneficial effects of the invention are as follows:A kind of water equipment living water operation maintaining method that the present invention is pointed out, branch pipe every
Can quickly it be safeguarded during disconnected defective valve, operating efficiency is high, without closing total pipeline, it is ensured that the use water of other equipment, keeps away
Exempt from bursting by freezing or the explosion problem of branch pipe, reduce the urgent prediction scheme measure that bursting by freezing or explosion problem of the enterprise to branch pipe are used
And the manpower and materials spent are put into, security is higher, enterprise is obtained preferable effect in the case where spending seldom fund
Really.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment
Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for
For those of ordinary skill in the art, on the premise of not paying creative work, it can also obtain other according to these accompanying drawings
Accompanying drawing, wherein:
Fig. 1 is a kind of structural representation of preferred embodiment of water equipment living water operation maintaining method one of the invention.
Embodiment
The technical scheme in the embodiment of the present invention will be clearly and completely described below, it is clear that described implementation
Example is only a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, this area is common
All other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected
Enclose.
Referring to Fig. 1, the embodiment of the present invention includes:
A kind of water equipment living water operation maintaining method, the band water for branch pipe isolating valve, 3 safeguards that branch pipe 2, which is set, to be connected to
Between total pipeline 1 and equipment 4, branch pipe isolating valve, 3 is arranged on branch pipe 2, is comprised the following steps:
The first pipe joint and the first pressure release are installed in running water drilling on branch pipe 2 between branch pipe isolating valve, 3 and total pipeline 1
Pipe 5, sets first pressure table 51 and the first relief valve 52 on the first relief tube 5, and the first pipe joint connection is arranged on branch
Between the relief tube 5 of pipe 2 and first, pressure release is carried out to freezing leading portion, the end of first relief tube 5 is provided with the first header tank
53, carry out the recovery of pressure release liquid;
The second pipe joint, the second relief tube 6 are installed in running water drilling on branch pipe between branch pipe isolating valve, 3 and equipment 4,
Second pressure table 61 and the second relief valve 62 are set on second relief tube 6, and the end of second relief tube 6 is provided with the second collection
Water tank 63, carries out the recovery of pressure release liquid, the second pipe joint connection is arranged between the relief tube 6 of branch pipe 2 and second, to cold
Freeze back segment and carry out pressure release;
According to the normal temperature bearing capacity of the material therefor of branch pipe 2 and freezing bearing capacity, the first relief valve 52 and second is adjusted
The pressure release value of relief valve 62, it is to avoid pressure is excessive and burst in branch pipe 2;
To installing refrigerating plant 7 on the branch pipe 2 between the first relief tube 5 and the second relief tube 6, examination freezing is carried out, gradually
The current of branch pipe 2 are blocked, and monitor the pressure value of first pressure table 51 and second pressure table 61 in refrigerating process, it is to avoid pressure mistake
Height, stops freezing if necessary, adjusts and continues to freeze after the pressure release value of the first relief valve 52 and the second relief valve 62, until complete ice
Freeze cutout, it is to avoid the bursting by freezing problem of branch pipe 2;
Branch pipe isolating valve, 3 and equipment 4 are safeguarded or changed, the first relief tube 5 and the second relief tube 6 is then removed
And carry out the closure of the first pipe joint and the second pipe joint;
Refrigerating plant 7 is released, is normally worked after after the defrosting of branch pipe 2.
In summary, a kind of water equipment living water operation maintaining method for pointing out of the present invention, operating efficiency is high, it is to avoid cold
The problem of Cracking of branch pipe 2 during jelly, the security of maintenance process is higher, reduces the loss of enterprise.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair
Equivalent structure or equivalent flow conversion that bright description is made, or directly or indirectly it is used in other related technology necks
Domain, is included within the scope of the present invention.
Claims (3)
1. a kind of water equipment living water operation maintaining method, the band water for branch pipe isolating valve, safeguards that branch pipe is connected to total pipeline
Between equipment, branch pipe isolating valve, is arranged on branch pipe, it is characterised in that comprised the following steps:
The first pipe joint and the first relief tube are installed in running water drilling on branch pipe between branch pipe isolating valve, and total pipeline, the
First pressure table and the first relief valve are set on one relief tube, and the first pipe joint connection is arranged on branch pipe and the first relief tube
Between;
The second pipe joint, the second relief tube are installed in running water drilling on branch pipe between branch pipe isolating valve, and equipment, are let out second
Second pressure table and the second relief valve be set in pressure pipe, the second pipe joint connection be arranged on branch pipe and the second relief tube it
Between;
According to the normal temperature bearing capacity of branch pipe material therefor and freezing bearing capacity, the first relief valve of adjustment and the second relief valve
Pressure release value;
To installing refrigerating plant on the branch pipe between the first relief tube and the second relief tube, examination freezing is carried out, branch pipe is gradually blocked
Current, and the pressure value of first pressure table and second pressure table in refrigerating process is monitored, until frost cutout completely;
Branch pipe isolating valve, and equipment are safeguarded or changed, the first relief tube and the second relief tube is then removed and carries out the
The closure of one pipe joint and the second pipe joint;
Refrigerating plant is released, is normally worked after after branch pipe defrosting.
2. water equipment living water operation maintaining method according to claim 1, it is characterised in that first relief tube
End is provided with the first header tank.
3. water equipment living water operation maintaining method according to claim 1, it is characterised in that second relief tube
End is provided with the second header tank.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510701845.8A CN105257945B (en) | 2015-10-27 | 2015-10-27 | A kind of water equipment living water operation maintaining method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510701845.8A CN105257945B (en) | 2015-10-27 | 2015-10-27 | A kind of water equipment living water operation maintaining method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105257945A CN105257945A (en) | 2016-01-20 |
CN105257945B true CN105257945B (en) | 2017-08-11 |
Family
ID=55097772
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510701845.8A Active CN105257945B (en) | 2015-10-27 | 2015-10-27 | A kind of water equipment living water operation maintaining method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105257945B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110805514A (en) * | 2019-11-21 | 2020-02-18 | 大唐迪庆香格里拉电力开发有限公司 | Pressure relief and drainage device for top cover of horizontal mixed-flow water turbine |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101865348A (en) * | 2010-05-22 | 2010-10-20 | 西南石油大学 | Freeze temporary blocking method and device for large-diameter gas pipeline |
JP4938479B2 (en) * | 2007-02-01 | 2012-05-23 | 株式会社水道技術開発機構 | Gas shutoff method for gas piping |
CN204717218U (en) * | 2015-06-29 | 2015-10-21 | 孙耕 | Freeze temporary blocking device |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57195989A (en) * | 1981-05-28 | 1982-12-01 | Nippon Kokan Kk | Method of detecting condition of freezing of liquid in pipe |
JP2000065281A (en) * | 1998-08-18 | 2000-03-03 | Hitachi Plant Eng & Constr Co Ltd | Determining method for ice plug completion in piping freezing construction method |
-
2015
- 2015-10-27 CN CN201510701845.8A patent/CN105257945B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4938479B2 (en) * | 2007-02-01 | 2012-05-23 | 株式会社水道技術開発機構 | Gas shutoff method for gas piping |
CN101865348A (en) * | 2010-05-22 | 2010-10-20 | 西南石油大学 | Freeze temporary blocking method and device for large-diameter gas pipeline |
CN204717218U (en) * | 2015-06-29 | 2015-10-21 | 孙耕 | Freeze temporary blocking device |
Also Published As
Publication number | Publication date |
---|---|
CN105257945A (en) | 2016-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209801147U (en) | control system for preventing cavitation of supercharging device and gas supply system | |
CN105257945B (en) | A kind of water equipment living water operation maintaining method | |
CN102235722B (en) | Explosionproof control method for multi-connected air conditioning unit during refrigerant recovery | |
CN203500770U (en) | Ice blockage device used for pipeline blockage | |
CN203820812U (en) | Device for repairing copper cooling stave of blast furnace | |
CN102954346B (en) | Cryogenic insulation mobile storage tank safety system | |
CN202251120U (en) | High-temperature fan with cooling system | |
CN204514558U (en) | A kind of tube bundle heat exchanger quick leak-checking instrument | |
CN202166245U (en) | Matching test device for air-conditioner capillary | |
CN201787270U (en) | Floating pipeline quick-repair joint | |
CN207880217U (en) | The cold-resistant high resistance to compression PVC pipe of one kind | |
CN205024169U (en) | Adopt regenerator of nitrogen gas to get heat facility | |
CN205859477U (en) | Defroster for impulse piping system | |
CN203474826U (en) | Anti-freezing device of water sprinkling pipe at top of blast furnace | |
CN205191198U (en) | Liquid chlorine steel bottle filling connecting line | |
CN203231022U (en) | Rapid drainage leaking stoppage tool | |
CN204716144U (en) | Durable type petroleum pipe coupling | |
CN204298333U (en) | Coal mine gas backflow vacuum regulator | |
CN100460747C (en) | Natural gas unloading system pipe network improving and released cold quantity utilizing technology | |
CN207036569U (en) | A kind of pipe-line system gas pressure test system of petrochemical industry station project | |
CN204756428U (en) | Output device of liquid argon storage tank | |
CN205048164U (en) | Instrument supply gas drive air supply pipe | |
CN203656467U (en) | Alarming line die for installation of prefabricated direct burial insulation pipe | |
CN204853971U (en) | Waterway system's frostproofing structure | |
CN204345255U (en) | Unload liquid-phase tube thread control device in a kind of LNG skid station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |