CN101852845A - Integrated checking/counting device of intelligent electric energy meter - Google Patents

Integrated checking/counting device of intelligent electric energy meter Download PDF

Info

Publication number
CN101852845A
CN101852845A CN201010192285A CN201010192285A CN101852845A CN 101852845 A CN101852845 A CN 101852845A CN 201010192285 A CN201010192285 A CN 201010192285A CN 201010192285 A CN201010192285 A CN 201010192285A CN 101852845 A CN101852845 A CN 101852845A
Authority
CN
China
Prior art keywords
electric conductor
contact hole
binding post
electric energy
energy meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010192285A
Other languages
Chinese (zh)
Other versions
CN101852845B (en
Inventor
周克西
姜海岚
张国明
黄益峰
朱小弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAIYAN XINYUE ELECTRIC APPLIANCE CO Ltd
Original Assignee
HAIYAN XINYUE ELECTRIC APPLIANCE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAIYAN XINYUE ELECTRIC APPLIANCE CO Ltd filed Critical HAIYAN XINYUE ELECTRIC APPLIANCE CO Ltd
Priority to CN2010101922855A priority Critical patent/CN101852845B/en
Publication of CN101852845A publication Critical patent/CN101852845A/en
Application granted granted Critical
Publication of CN101852845B publication Critical patent/CN101852845B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a checking/counting function switching device of an intelligent electric energy meter. The device comprises a vertical cabinet and two meter frames, wherein the two meter frames are provided with an electricity meter, a pair of an electrician source binding posts, a pair of electric energy meter loop binding posts, a pair of electron source binding posts and a switching device respectively; an electrician source and an electron source are arranged in the vertical cabinet; the switching device comprises an insulating bottom plate and a conductor; and the conductor comprises a left conductor, a middle conductor and a right conductor which are separated from one another. The device has the advantages of reasonable structural design, capability of switching different functions conveniently and low cost.

Description

Integrated device is examined and determine/had good luck to a kind of intelligent electric energy meter
Technical field
The present invention relates to a kind of intelligent electric energy meter and examine and determine/have good luck integrated device.
Background technology
Along with the development of electric power and metering, electric-power metering and relevant departments are more and more higher to the demand and the cry of the electric energy meter calibrating apparatus of the electric energy meter calibration/function integration of having good luck, and its purpose mainly is to be convenient to equipment control, is convenient to data sharing.Electric energy meter calibration/the integrated device of having good luck is of electric energy meter calibrating apparatus, and it combines the have good luck all functions of device of electric energy meter calibrating apparatus and electric energy meter, is for electricity consumption measurement centre and the metrological supervision check the most general a kind of equipment that uses.And the electric energy meter calibration of routine in the prior art/have good luck integrated device as shown in Figure 1, be a kind of accurate integrative machine, on first dial framework, be fixed with a pair of first electrician source binding post 11A ', a pair of first electric energy meter circuit connection post 13A ', a pair of first electron source binding post 12A '.On second dial framework, be fixed with a pair of second electrician source binding post 11B ', a pair of second electric energy meter circuit connection post 13B ', a pair of second electron source binding post 12B '.Electrician source C1 ' and electron source C2 ' are installed on the clothes closet.One of the first electrician source binding post 11A ' is connected with electrician source C1 ', and one of another root and the second electrician source binding post 11B ' is connected, and another root of the second electrician source binding post 11B ' is connected with electrician source C1 '.One of the first electron source binding post 12A ' is connected with electron source C2 ', and one of another root and the second electron source binding post 12B ' is connected, and another root of the second electron source binding post 12B ' is connected with electron source C2 '.Be connected with the interior ammeter loop of first dial framework between the two first electric energy meter circuit connection post 13A '.Be connected with the interior ammeter loop of second dial framework between the two second electric energy meter circuit connection post 13B '.
Electrician source C1 ' mainly is made up of stepup transformer, current lifting device, pressure regulator, and the utility appliance of electrician source C1 ' is made up of stepper motor, measurement mutual inductor and a little electrons components and parts and electrical fuse.Electrician source C1 ' is used for output voltage, electric current.
Electron source C2 ' is by program-controlled derived digital signal, power amplifier and boost, current lifting device forms, and the utility appliance of electron source C2 ' comprises standard scale, central authorities' control power supply, keyboard, error checking instrument, Communications Interface Unit, relay array, measuring equipment or the like.Electron source C2 ' is used for output voltage, electric current, also may command frequency modulation rate, phase modulation position, output harmonic wave.
The output of electrician source C1 ' and electron source C2 ' electric weight is all according to the accuracy requirement and the stability requirement of national regulation.
The two stage mechanisms of prior art 48 epi-positions, must do certificate test simultaneously or have good luck test, and can not realize that a dial framework is done certificate test, another dial framework is done this function of test of having good luck, that is to say the all-in-one that is not standard, if the user purchases a calibrating installation and though the device of having good luck can be finished above two functions calibrating,, this obvious cost of equipment gets obviously to be increased, the hold facility area also obviously increase, thereby inadvisable.So have only and realize two dial frameworks when electric energy meter calibrating apparatus and examine and determine/have good luck test simultaneously respectively, and can two functions switch smoothly, save a large amount of loading, unloading table times, can greatly increase work efficiency, but realize that such function must have two cover power sources, from saving cost, an optional cover electronic power source, for inspection purpose, the precision index requirement is arranged; One cover electrician source, the usefulness of having good luck, index request is low.Such cost uses producer to bear.It is as follows that each big manufacturer adopts conventional solution two function switching methods at present: use universal switch or relay, require to reach 100A in view of the device output current is general.If adopt the universal switch method, generally need 4 pairs of contacts and connect, use as one pair of contact; And adopt the relay method, and be to consider device output stability and long term reliability, generally adopt single-contact magnetic latching relay, two and connect use.In principle, can reach the Design of device requirement.But still deposit the weak point of following several respects:
1, it is too many that current return increases the contact, just increased contact resistance simultaneously, to high-precision electric energy meter calibrating apparatus, will have a strong impact on precision and stability, also has carrying load ability.
2, additionally increased a large amount of connecting lines, and these connecting lines must be more than 20 squares, allow big electric current line, increase material cost, increase time cost, also increase technologic manufacture difficulty, influence attractive in appearance by 100A.
3, use the universal switch method, each switch needs the contact chip number:
6 (paying the contact) * 4 (contact also connects)=24,
Its length is considerable, and switching universal switch is not that common people can pull, and the operating personnel of equipment are generally in the majority with the women, its result can to and know, so very impracticable.
4, use the relay method, magnetic latching relay costs an arm and a leg, and also needs control module and working power, and cost is a big problem, and wiring is more.In use also there is integrity problem or the like, inadvisable.
Summary of the invention
Technical matters to be solved by this invention is to overcome existing above-mentioned deficiency in the prior art, and provides a kind of reasonable in design, difference in functionality easy switching, intelligent electric energy meter that cost is low to examine and determine/have good luck integrated device.
The present invention solves the problems of the technologies described above the technical scheme that is adopted: integrated device is examined and determine/had good luck to a kind of intelligent electric energy meter, comprises first dial framework, second dial framework and clothes closet; No. 1 ammeter, No. 2 ammeters are installed in first dial framework ... the n ammeter, No. 1 ammeter, No. 2 ammeters ... the n ammeter is connected successively, and n is an integer; N+1 ammeter, n+2 ammeter are installed in second dial framework ... the m ammeter, n+1 ammeter, n+2 ammeter ... the m ammeter is connected successively, and m is an integer; Electrician source and electron source are installed in the clothes closet; On first dial framework, be fixed with a pair of first electrician source binding post, a pair of first electric energy meter circuit connection post, a pair of first electron source binding post successively, on second dial framework, be fixed with a pair of second electrician source binding post, a pair of second electric energy meter circuit connection post, a pair of second electron source binding post successively; One of the first electrician source binding post is connected with the electrician source, and one of another root and the second electrician source binding post is connected, and another root of the second electrician source binding post is connected with the electrician source; One of the first electron source binding post is connected with electron source, and one of another root and the second electron source binding post is connected, and another root of the second electron source binding post is connected with electron source; One of the first electric energy meter circuit connection post is connected with No. 1 ammeter, and another root is connected with the n ammeter; One of the second electric energy meter circuit connection post is connected with the n+1 ammeter, and another root is connected with the m ammeter; It is characterized in that: also comprise switching device shifter, described switching device shifter comprises first switching device shifter and second switching device shifter;
First switching device shifter comprises first insulating base and first electric conductor, and first electric conductor is fixed on first insulating base; Described first electric conductor comprises the first left side electric conductor spaced apart from each other, the first middle electric conductor and the first right side electric conductor; On described first insulating base, have the first electrician source contact hole, the first electric energy meter loop contact hole and the first electron source contact hole, the first electrician source contact hole is connected with electric conductor in the middle of first with the first left side electric conductor respectively, the first electric energy meter loop contact hole is connected with electric conductor in the middle of first, and the first electron source contact hole is connected with electric conductor in the middle of first with the first right side electric conductor respectively; The first electrician source binding post is positioned at the first electrician source contact hole, and it cooperates with electric conductor in the middle of the first left side electric conductor and first; The first electric energy meter circuit connection post is positioned at the first electric energy meter loop contact hole, and it cooperates with electric conductor in the middle of first; The first electron source binding post is positioned at the first electron source contact hole, and it cooperates with electric conductor in the middle of the first right side electric conductor and first;
Second switching device shifter comprises second insulating base and second electric conductor, and second electric conductor is fixed on second insulating base; Described second electric conductor comprises the second left side electric conductor spaced apart from each other, the second middle electric conductor and the second right side electric conductor; On described second insulating base, have the second electrician source contact hole, the second electric energy meter loop contact hole and the second electron source contact hole, the second electrician source contact hole is connected with electric conductor in the middle of second with the second left side electric conductor respectively, the second electric energy meter loop contact hole is connected with electric conductor in the middle of second, and the second electron source contact hole is connected with electric conductor in the middle of second with the second right side electric conductor respectively; The second electrician source binding post is positioned at the second electrician source contact hole, and it cooperates with electric conductor in the middle of the second left side electric conductor and second; The second electric energy meter circuit connection post is positioned at the second electric energy meter loop contact hole, and it cooperates with electric conductor in the middle of second; The second electron source binding post is positioned at the second electron source contact hole, and it cooperates with electric conductor in the middle of the second right side electric conductor and second.
First switching device shifter of the present invention can move along the orientation of the first electrician source binding post, the first electric energy meter circuit connection post, the first electron source binding post, and has two extreme positions; When first switching device shifter moves to one of them extreme position, the a pair of first electrician source binding post contacts with the first left side electric conductor, the a pair of first electron source binding post contacts with electric conductor in the middle of first, and a pair of electric energy meter circuit connection post contacts with electric conductor in the middle of first; When first switching device shifter moves to another extreme position, the a pair of first electrician source binding post contacts with electric conductor in the middle of first, the a pair of first electron source binding post contacts with the first right side electric conductor, and a pair of first electric energy meter circuit connection post contacts with electric conductor in the middle of first.
Second switching device shifter of the present invention can move along the orientation of the second electrician source binding post, the second electric energy meter circuit connection post, the second electron source binding post, and has two extreme positions; When second switching device shifter moves to one of them extreme position, the a pair of second electrician source binding post contacts with the second left side electric conductor, the a pair of second electron source binding post contacts with electric conductor in the middle of second, and a pair of electric energy meter circuit connection post contacts with electric conductor in the middle of second; When first switching device shifter moves to another extreme position, the a pair of second electrician source binding post contacts with electric conductor in the middle of second, the a pair of second electron source binding post contacts with the second right side electric conductor, and a pair of second electric energy meter circuit connection post contacts with electric conductor in the middle of first.
Electric conductor is divided into two that separate in the middle of of the present invention first, and the described second middle electric conductor is divided into two that separate.
The first electrician source contact hole of the present invention, the first electron source contact hole, the first electric energy meter loop contact hole, the second electrician source contact hole, the second electron source contact hole, the second electric energy meter loop contact hole are mounting hole.
The present invention has the groove with the first electrician source contact hole, one arc hole face coupling on the first left side electric conductor, have the groove with another arc hole face coupling of the first electrician source contact hole on electric conductor in the middle of first; On the first right side electric conductor, have the groove that mates with the first electron source contact hole, one arc hole face, on electric conductor in the middle of first, have groove with another arc hole face coupling of the first electron source contact hole; On electric conductor in the middle of first, also have hole with the first electric energy meter loop contact hole coupling;
On the second left side electric conductor, have the groove that mates with the second electrician source contact hole, one arc hole face, on electric conductor in the middle of second, have groove with another arc hole face coupling of the second electrician source contact hole; On the second right side electric conductor, have the groove that mates with the second electron source contact hole, one arc hole face, on electric conductor in the middle of second, have groove with another arc hole face coupling of the second electron source contact hole; On electric conductor in the middle of second, also have hole with the second electric energy meter loop contact hole coupling.
The first electrician source binding post of the present invention, the first electron source binding post, the first electric energy meter circuit connection post, the second electrician source binding post, the second electron source binding post, the second electric energy meter circuit connection post are cylindrical.
First electric conductor of the present invention and first insulator adopt seccotine to be adhesively fixed, and described second electric conductor and second insulator adopt seccotine to be adhesively fixed.
The first electrician source binding post of the present invention, the first electron source binding post, the first electric energy meter circuit connection post, the second electrician source binding post, the second electron source binding post, the second electric energy meter circuit connection, first electric conductor, second electric conductor all are made of copper.
First insulating base of the present invention and second insulating base all adopt the epoxy plate material to make.
The present invention compared with prior art has following positive effect: 1, reasonable in design; 2, adopt the present invention to need not to use under the situation of relay or universal switch and carry out two big functions switchings smoothly, the cost of the separated time of Jian Shaoing and complexity simultaneously, not only cabling is attractive in appearance but also calibrating and any easy switching of the function of having good luck, production cost is low, the special high precision that also guarantees calibrating, can reduce cost more than 8000 yuan, and adopt copper material binding post and copper electric conductor to make electric conductivity reliable and stable.
Description of drawings
Fig. 1 is the connection diagram of prior art.
Fig. 2 is the structural representation of the embodiment of the invention.
Fig. 3 is the connection diagram between several critical elements of the embodiment of the invention.
Fig. 4 is the sectional structure synoptic diagram of first switching device shifter.
Fig. 5 be Fig. 4 C-C to the sectional structure synoptic diagram.
Fig. 6 is the sectional structure synoptic diagram of second switching device shifter.
Fig. 7 be Fig. 6 D-D to the sectional structure synoptic diagram.
Embodiment
The invention will be further described below in conjunction with accompanying drawing and by embodiment.
Embodiment:
Referring to Fig. 2~Fig. 7, the present invention includes the first dial framework A, the second dial framework B and clothes closet C.
Ammeter A1, No. 2 ammeter A2 are installed in the first dial framework A No. 1 ... No. 24 ammeter A24, No. 1 ammeter A1, No. 2 ammeter A2 ... No. 24 ammeter A24 connects successively.Ammeter B25, No. 26 ammeter B26 are installed in the second dial framework B No. 25 ... No. 48 ammeter B48, No. 25 ammeter B25, No. 26 ammeter B26 ... No. 48 ammeter B48 connects successively.On the first dial framework A, be fixed with a pair of first electrician source binding post 11A, a pair of first electric energy meter circuit connection post 13A, a pair of first electron source binding post 12A.On the second dial framework B, be fixed with a pair of second electrician source binding post 11B, a pair of second electric energy meter circuit connection post 13B, a pair of second electron source binding post 12B.Electrician source C1 and electron source C2 are installed on the clothes closet C.One of the first electrician source binding post 11A is connected with electrician source C1, and one of another root and the second electrician source binding post 11B is connected, and another root of the second electrician source binding post 11B is connected with electrician source C1.One of the first electron source binding post 12A is connected with electron source C2, and one of another root and the second electron source binding post 12B is connected, and another root of the second electron source binding post 12B is connected with electron source C2.One of the first electric energy meter circuit connection post 13A is connected with No. 1 ammeter A1, and another root is connected with No. 24 ammeter A24.One of the second electric energy meter circuit connection post 13B is connected with No. 25 ammeter B25, and another root is connected with No. 48 ammeter B48.
Equipment such as standard scale C3, control module C4, current lifting device C5, stepup transformer C6, relay control unit C7 also have been installed in clothes closet C, and the structure of each equipment, function, annexation are prior art among the clothes closet C, repeat no more.Ammeter loop in the first dial framework A and the second dial framework B also is a prior art.
The first switching device shifter 2A is sleeved on the first electrician source binding post 11A, the first electric energy meter circuit connection post 13A, the first electron source binding post 12A, and the first switching device shifter 2A can be along the orientation move left and right of binding post.The first switching device shifter 2A comprises the first insulating base 23A and the first electric conductor 22A, and the first electric conductor 22A is adhesively fixed on the first insulating base 23A with seccotine.The first insulating base 23A adopts the epoxy plate material to make, and the first electric conductor 22A is made of copper.
On the first insulating base 23A, have a pair of first electrician source contact hole 211A, a pair of first electric energy meter loop contact hole 213A and a pair of first electron source contact hole 212A.The first electrician source contact hole 211A, the first electric energy meter loop contact hole 213A and the first electron source contact hole 212A are mounting hole.The first electrician source contact hole 211A, the first electric energy meter loop contact hole 213A and the first electron source contact hole 212A are arranged in order.The first electrician source binding post 11A is positioned at the first electrician source contact hole 211A, and the first electric energy meter circuit connection post 13A is positioned at the first electric energy meter loop contact hole 213A, and the first electron source binding post 12A is positioned at the first electron source contact hole 212A.The equal in length of the first electron source contact hole 212A and the first electrician source contact hole 211A, the length of the first electric energy meter loop contact hole 213A is more than or equal to the first electron source contact hole 212A.
The first electric conductor 22A comprises the first left side electric conductor 221A, the first middle electric conductor 223A and the first right side electric conductor 222A, and the electric conductor 223A and the first right side electric conductor 222A are spaced from each other in the middle of the first left side electric conductor 221A, first, do not contact.Have the groove 2211A that mates with the first electrician source contact hole 211A, one arc hole face on the first left side electric conductor 221A, the first left side electric conductor 221A is connected with the first electrician source contact hole 211A by groove 2211A; And on electric conductor 223A in the middle of first, having the groove 2231A that mates with another arc hole face of the first electrician source contact hole 211A, the first middle electric conductor 223A is connected with the first electrician source contact hole 211A by groove 2231A.Have the groove 2221A that mates with the first electron source contact hole 212A, one arc hole face on the first right side electric conductor 222A, the first right side electric conductor 222A is connected with the first electron source contact hole 212A by groove 2221A; And on electric conductor 223A in the middle of first, having the groove 2232A that mates with another arc hole face of the first electron source contact hole 212A, the first middle electric conductor 223A is connected with the first electron source contact hole 212A by groove 2232A.On electric conductor 223A in the middle of first, also have hole 2233A with first electric energy meter loop contact hole 213A coupling.Electric conductor 223A is divided into two that separate in the middle of first, does not contact between two, and wherein a slice contacts with one first electric energy meter circuit connection post 13A, and another sheet contacts with another root first electric energy meter circuit connection post 13A.
Each root binding post and its corresponding contact hole can relatively move.
The first electrician source binding post 11A cooperates with the first left side electric conductor 221A by groove 2211A, cooperates by electric conductor 223A in the middle of the groove 2231A and first.The first electric energy meter circuit connection post 13A cooperates by electric conductor 223A in the middle of the hole 2233A and first.The first electron source binding post 12A cooperates with the first right side electric conductor 222A by groove 2221A, cooperates by electric conductor 223A in the middle of the groove 2232A and first.Concrete fit system is such: the first electric energy meter circuit connection post 13A contacts with electric conductor 223A in the middle of first all the time; When the first switching template 2A is moved to the left to extreme position, then the first electrician source binding post 11A contacts with groove 2231A, the first electrician source binding post 11A and the first electric energy meter circuit connection post 13A are connected, and the first electron source binding post 12A contacts with groove 2221A, and a pair of first electron source binding post 12A is conducted by the first right side electric conductor 222A; Switch the template 2A extreme position that moves right when first, then the first electron source binding post 12A contacts with groove 2232A, the first electron source binding post 12A and the first electric energy meter circuit connection post 13A are connected, and the first electrician source binding post 11A contacts with groove 2211A, and a pair of first electrician source binding post 11A is conducted by the first left side electric conductor 221A.
Principle of work: by the first switching device shifter 2A left and right sides translation being realized the switching between the different electrical power.When being moved to the left to extreme position, then the first electrician source binding post 11A and the first electric energy meter circuit connection post 13A are connected, and a pair of first electron source binding post 12A is conducted by the first right side electric conductor 222A, keep electron source C2 to form the loop simultaneously when realizing electrician source C1 output, so that realize the electron source output of other ammeter, and a pair of first electron source binding post 12A is as not conducting at this moment, and then electron source C2 can't form the loop, thereby can't realize electron source C2 output simultaneously.Then principle is opposite when the first switching device shifter 2A moves right extreme position.
The second switching device shifter 2B is sleeved on the second electrician source binding post 11B, the second electric energy meter circuit connection post 13B, the second electron source binding post 12B, and the second switching device shifter 2B can be along the orientation move left and right of binding post.The second switching device shifter 2B comprises the second insulating base 23B and the second electric conductor 22B, and the second electric conductor 22B is adhesively fixed on the second insulating base 23B with seccotine.The second insulating base 23B adopts the epoxy plate material to make, and the second electric conductor 22B is made of copper.
On the second insulating base 23B, have two couples second electrician source contact hole 211BB, two couples of second electric energy meter loop contact hole 213BB and two couples second electron source contact hole 212BB.The second electrician source contact hole 211B, the second electric energy meter loop contact hole 213B and the second electron source contact hole 212B are mounting hole.The second electrician source contact hole 211B, the second electric energy meter loop contact hole 213B and the second electron source contact hole 212B are arranged in order.The second electrician source binding post 11B is positioned at the second electrician source contact hole 211B, and the second electric energy meter circuit connection post 13B is positioned at the second electric energy meter loop contact hole 213B, and the second electron source binding post 12B is positioned at the second electron source contact hole 212B.The equal in length of the second electron source contact hole 212B and the second electrician source contact hole 211B, the length of the second electric energy meter loop contact hole 213B is more than or equal to the second electron source contact hole 212B.
The second electric conductor 22B comprises the second left side electric conductor 221B, the second middle electric conductor 223B and the second right side electric conductor 222B, and the electric conductor 223B and the second right side electric conductor 222B are spaced from each other in the middle of the second left side electric conductor 221B, second, do not contact.Have the groove 2211B that mates with the second electrician source contact hole 211B, two arc hole faces on the second left side electric conductor 221B, the second left side electric conductor 221B is connected with the second electrician source contact hole 211B by groove 2211B; And on electric conductor 223B in the middle of second, having the groove 2231B that mates with other two arc hole faces of the second electrician source contact hole 211B, the second middle electric conductor 223B is connected with the second electrician source contact hole 211B by groove 2231B.Have the groove 2221B that mates with the second electron source contact hole 212B, two arc hole faces on the second right side electric conductor 222B, the second right side electric conductor 222B is connected with the second electron source contact hole 212B by groove 2221B; And on electric conductor 223B in the middle of second, having the groove 2232B that mates with other two arc hole faces of the second electron source contact hole 212B, the second middle electric conductor 223B is connected with the second electron source contact hole 212B by groove 2232B.On electric conductor 223B in the middle of second, also have hole 2233B with second electric energy meter loop contact hole 213B coupling.Electric conductor 223B is divided into two that separate in the middle of second, does not contact between two, and wherein two contact with two second electric energy meter circuit connection post 13B, other two contact with other two second electric energy meter circuit connection post 13B.
Each root binding post and its corresponding contact hole can relatively move.
The second electrician source binding post 11B cooperates with the second left side electric conductor 221B by groove 2211B, cooperates by electric conductor 223B in the middle of the groove 2231B and second.The second electric energy meter circuit connection post 13B cooperates by electric conductor 223B in the middle of the hole 2233B and second.The second electron source binding post 12B cooperates with the second right side electric conductor 222B by groove 2221B, cooperates by electric conductor 223B in the middle of the groove 2232B and second.Concrete fit system is such: the second electric energy meter circuit connection post 13B contacts with electric conductor 223B in the middle of second all the time; When the second switching template 2B is moved to the left to extreme position, then the second electrician source binding post 11B contacts with groove 2231B, the second electrician source binding post 11B and the second electric energy meter circuit connection post 13B are connected, and the second electron source binding post 12B contacts with groove 2221B, and a pair of second electron source binding post 12B is conducted by the second right side electric conductor 222B; Switch the template 2B extreme position that moves right when second, then the second electron source binding post 12B contacts with groove 2232B, the second electron source binding post 12B and the second electric energy meter circuit connection post 13B are connected, and the second electrician source binding post 11B contacts with groove 2211B, and a pair of second electrician source binding post 11B is conducted by the second left side electric conductor 221B.
Principle of work: by the second switching device shifter 2B left and right sides translation being realized the switching between the different electrical power.When being moved to the left to extreme position, then the second electrician source binding post 11B and the second electric energy meter circuit connection post 13B are connected, and a pair of second electron source binding post 12B is conducted by the second right side electric conductor 222B, keep electron source C2 to form the loop simultaneously when realizing electrician source C1 output, so that realize the electron source output of other ammeter, and a pair of second electron source binding post 12B is as not conducting at this moment, and then electron source C2 can't form the loop, thereby can't realize electron source C2 output simultaneously.Then principle is opposite when the second switching device shifter 2B moves right extreme position.

Claims (10)

1. integrated device is examined and determine/had good luck to an intelligent electric energy meter, comprises first dial framework, second dial framework and clothes closet; No. 1 ammeter is installed to the n ammeter in first dial framework, No. 1 ammeter is connected successively to the n ammeter, and n is an integer; The n+1 ammeter is installed to the m ammeter in second dial framework, the n+1 ammeter is connected successively to the m ammeter, and m is an integer; Electrician source and electron source are installed in the clothes closet; On first dial framework, be fixed with a pair of first electrician source binding post, a pair of first electric energy meter circuit connection post, a pair of first electron source binding post successively, on second dial framework, be fixed with a pair of second electrician source binding post, a pair of second electric energy meter circuit connection post, a pair of second electron source binding post successively; One of the first electrician source binding post is connected with the electrician source, and one of another root and the second electrician source binding post is connected, and another root of the second electrician source binding post is connected with the electrician source; One of the first electron source binding post is connected with electron source, and one of another root and the second electron source binding post is connected, and another root of the second electron source binding post is connected with electron source; One of the first electric energy meter circuit connection post is connected with No. 1 ammeter, and another root is connected with the n ammeter; One of the second electric energy meter circuit connection post is connected with the n+1 ammeter, and another root is connected with the m ammeter; It is characterized in that: also comprise switching device shifter, described switching device shifter comprises first switching device shifter and second switching device shifter;
First switching device shifter comprises first insulating base and first electric conductor, and first electric conductor is fixed on first insulating base; Described first electric conductor comprises the first left side electric conductor spaced apart from each other, the first middle electric conductor and the first right side electric conductor; On described first insulating base, have the first electrician source contact hole, the first electric energy meter loop contact hole and the first electron source contact hole, the first electrician source contact hole is connected with electric conductor in the middle of first with the first left side electric conductor respectively, the first electric energy meter loop contact hole is connected with electric conductor in the middle of first, and the first electron source contact hole is connected with electric conductor in the middle of first with the first right side electric conductor respectively; The first electrician source binding post is positioned at the first electrician source contact hole, and it cooperates with electric conductor in the middle of the first left side electric conductor and first; The first electric energy meter circuit connection post is positioned at the first electric energy meter loop contact hole, and it cooperates with electric conductor in the middle of first; The first electron source binding post is positioned at the first electron source contact hole, and it cooperates with electric conductor in the middle of the first right side electric conductor and first;
Second switching device shifter comprises second insulating base and second electric conductor, and second electric conductor is fixed on second insulating base; Described second electric conductor comprises the second left side electric conductor spaced apart from each other, the second middle electric conductor and the second right side electric conductor; On described second insulating base, have the second electrician source contact hole, the second electric energy meter loop contact hole and the second electron source contact hole, the second electrician source contact hole is connected with electric conductor in the middle of second with the second left side electric conductor respectively, the second electric energy meter loop contact hole is connected with electric conductor in the middle of second, and the second electron source contact hole is connected with electric conductor in the middle of second with the second right side electric conductor respectively; The second electrician source binding post is positioned at the second electrician source contact hole, and it cooperates with electric conductor in the middle of the second left side electric conductor and second; The second electric energy meter circuit connection post is positioned at the second electric energy meter loop contact hole, and it cooperates with electric conductor in the middle of second; The second electron source binding post is positioned at the second electron source contact hole, and it cooperates with electric conductor in the middle of the second right side electric conductor and second.
2. integrated device is examined and determine/had good luck to intelligent electric energy meter according to claim 1, it is characterized in that: described first switching device shifter can move along the orientation of the first electrician source binding post, the first electric energy meter circuit connection post, the first electron source binding post, and has two extreme positions; When first switching device shifter moves to one of them extreme position, the a pair of first electrician source binding post contacts with the first left side electric conductor, the a pair of first electron source binding post contacts with electric conductor in the middle of first, and a pair of electric energy meter circuit connection post contacts with electric conductor in the middle of first; When first switching device shifter moves to another extreme position, the a pair of first electrician source binding post contacts with electric conductor in the middle of first, the a pair of first electron source binding post contacts with the first right side electric conductor, and a pair of first electric energy meter circuit connection post contacts with electric conductor in the middle of first.
3. integrated device is examined and determine/had good luck to intelligent electric energy meter according to claim 1, it is characterized in that: described second switching device shifter can move along the orientation of the second electrician source binding post, the second electric energy meter circuit connection post, the second electron source binding post, and has two extreme positions; When second switching device shifter moves to one of them extreme position, the a pair of second electrician source binding post contacts with the second left side electric conductor, the a pair of second electron source binding post contacts with electric conductor in the middle of second, and a pair of electric energy meter circuit connection post contacts with electric conductor in the middle of second; When first switching device shifter moves to another extreme position, the a pair of second electrician source binding post contacts with electric conductor in the middle of second, the a pair of second electron source binding post contacts with the second right side electric conductor, and a pair of second electric energy meter circuit connection post contacts with electric conductor in the middle of first.
4. examine and determine/have good luck integrated device according to claim 2 or 3 described intelligent electric energy meters, it is characterized in that: electric conductor is divided into two that separate in the middle of described first, and the described second middle electric conductor is divided into two that separate.
5. examine and determine/have good luck integrated device according to claim 2 or 3 described intelligent electric energy meters, it is characterized in that: the described first electrician source contact hole, the first electron source contact hole, the first electric energy meter loop contact hole, the second electrician source contact hole, the second electron source contact hole, the second electric energy meter loop contact hole are mounting hole.
6. examine and determine/have good luck integrated device according to claim 2 or 3 described intelligent electric energy meters, it is characterized in that: on the first left side electric conductor, have the groove that mates with the first electrician source contact hole, one arc hole face, on electric conductor in the middle of first, have groove with another arc hole face coupling of the first electrician source contact hole; On the first right side electric conductor, have the groove that mates with the first electron source contact hole, one arc hole face, on electric conductor in the middle of first, have groove with another arc hole face coupling of the first electron source contact hole; On electric conductor in the middle of first, also have hole with the first electric energy meter loop contact hole coupling;
On the second left side electric conductor, have the groove that mates with the second electrician source contact hole, one arc hole face, on electric conductor in the middle of second, have groove with another arc hole face coupling of the second electrician source contact hole; On the second right side electric conductor, have the groove that mates with the second electron source contact hole, one arc hole face, on electric conductor in the middle of second, have groove with another arc hole face coupling of the second electron source contact hole; On electric conductor in the middle of second, also have hole with the second electric energy meter loop contact hole coupling.
7. examine and determine/have good luck integrated device according to claim 2 or 3 described intelligent electric energy meters, it is characterized in that: the described first electrician source binding post, the first electron source binding post, the first electric energy meter circuit connection post, the second electrician source binding post, the second electron source binding post, the second electric energy meter circuit connection post are cylindrical.
8. examine and determine/have good luck integrated device according to claim 2 or 3 described intelligent electric energy meters, it is characterized in that: described first electric conductor and first insulator adopt seccotine to be adhesively fixed, and described second electric conductor and second insulator adopt seccotine to be adhesively fixed.
9. examine and determine/have good luck integrated device according to claim 2 or 3 described intelligent electric energy meters, it is characterized in that: the described first electrician source binding post, the first electron source binding post, the first electric energy meter circuit connection post, the second electrician source binding post, the second electron source binding post, the second electric energy meter circuit connection, first electric conductor, second electric conductor all are made of copper.
10. examine and determine/have good luck integrated device according to claim 2 or 3 described intelligent electric energy meters, it is characterized in that: described first insulating base and second insulating base all adopt the epoxy plate material to make.
CN2010101922855A 2010-06-03 2010-06-03 Integrated checking/counting device of intelligent electric energy meter Expired - Fee Related CN101852845B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101922855A CN101852845B (en) 2010-06-03 2010-06-03 Integrated checking/counting device of intelligent electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101922855A CN101852845B (en) 2010-06-03 2010-06-03 Integrated checking/counting device of intelligent electric energy meter

Publications (2)

Publication Number Publication Date
CN101852845A true CN101852845A (en) 2010-10-06
CN101852845B CN101852845B (en) 2013-05-01

Family

ID=42804421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101922855A Expired - Fee Related CN101852845B (en) 2010-06-03 2010-06-03 Integrated checking/counting device of intelligent electric energy meter

Country Status (1)

Country Link
CN (1) CN101852845B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104076318A (en) * 2014-04-18 2014-10-01 国家电网公司 Debugging inspection bench of smart electric meter and debugging inspection method
CN106443552A (en) * 2016-07-27 2017-02-22 国网重庆市电力公司电力科学研究院 Line and method for simulating operation environment of metering box to switch power supply phases

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0360511A2 (en) * 1988-09-19 1990-03-28 General Electric Company Electric energy metering
CN2704051Y (en) * 2002-04-23 2005-06-08 江苏林洋电子有限公司 Three-phase multifunctional electric energy meter counting device
DE102005025108B3 (en) * 2005-06-01 2006-07-20 Ostmeier, Hubert, Dipl.-Ing. Device for testing protection, measuring or counting devices as component of medium or high voltage equipment has pole strip which can be attached on this device, whereby pole strip exhibits several pole openings arranged one behind other
CN201021936Y (en) * 2007-08-03 2008-02-13 重庆电力科学试验研究院 Integrated device for power meter calibration and operation pressure resistance
CN201716407U (en) * 2010-06-03 2011-01-19 海盐新跃电器有限公司 Detecting/reading integral device for intelligent electric energy meter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0360511A2 (en) * 1988-09-19 1990-03-28 General Electric Company Electric energy metering
CN2704051Y (en) * 2002-04-23 2005-06-08 江苏林洋电子有限公司 Three-phase multifunctional electric energy meter counting device
DE102005025108B3 (en) * 2005-06-01 2006-07-20 Ostmeier, Hubert, Dipl.-Ing. Device for testing protection, measuring or counting devices as component of medium or high voltage equipment has pole strip which can be attached on this device, whereby pole strip exhibits several pole openings arranged one behind other
CN201021936Y (en) * 2007-08-03 2008-02-13 重庆电力科学试验研究院 Integrated device for power meter calibration and operation pressure resistance
CN201716407U (en) * 2010-06-03 2011-01-19 海盐新跃电器有限公司 Detecting/reading integral device for intelligent electric energy meter

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《上海电力学院学报》 20020630 沈滢 单相电能表多功能走字试验装置的应用实践 全文 1-10 第18卷, 第2期 *
《仪表技术》 20100531 李震虹等 多功能电能表全自动程控走字试验装置的一种方案设计 全文 1-10 , 第5期 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104076318A (en) * 2014-04-18 2014-10-01 国家电网公司 Debugging inspection bench of smart electric meter and debugging inspection method
CN106443552A (en) * 2016-07-27 2017-02-22 国网重庆市电力公司电力科学研究院 Line and method for simulating operation environment of metering box to switch power supply phases
CN106443552B (en) * 2016-07-27 2019-03-01 国网重庆市电力公司电力科学研究院 A kind of analog measurement case running environment carries out the separate switching route of electricity consumption and method

Also Published As

Publication number Publication date
CN101852845B (en) 2013-05-01

Similar Documents

Publication Publication Date Title
CN207650253U (en) A kind of Multifunctional measuring special junction box
CN103809018A (en) Electric energy metering device and method
CN106443561B (en) Integral inspection method and device for electric energy metering device with voltage of 35kV or below
CN103018599A (en) Method for three-phase detection of errors of three-phase electronic transformer of gas insulated switchgear (GIS)
CN109471047A (en) A kind of Portable Automatic measuring device for alterating and direct current source calibration
CN110794207A (en) Three-phase manganin sampling alternating current guide rail meter
CN104833940A (en) Method and device for detecting error of multi-transformation ratio voltage transformer
CN2932394Y (en) Metering device with a wide current measuring range
CN101852845B (en) Integrated checking/counting device of intelligent electric energy meter
CN106249192B (en) Metering equipment field operation detecting system
CN201716407U (en) Detecting/reading integral device for intelligent electric energy meter
CN202217015U (en) Three-phase electric energy metering device
CN201435305Y (en) Current and voltage transformer module
CN203658571U (en) Switching wiring circuit for double-loop ammeter detection instrument
CN206353174U (en) A kind of furnace transformer secondary current test device
CN202886585U (en) On-line test device for voltage/current transformer
CN202119811U (en) Miniature intelligent electric energy meter
CN202256430U (en) Novel guide rail type installed single-phase electric energy meter and installation device thereof
CN102866378A (en) Voltage or current transformer on-line test device and voltage or current transformer on-line test method
CN207502591U (en) Current sensing means
CN212483689U (en) Automatic change electric instrument precision testing arrangement
CN201955466U (en) Multifunctional electric apparatus parameter test instrument
CN201716408U (en) Intelligent electric energy meter verification/running function switching device
CN209418291U (en) A kind of modularization current-carrying mutual inductor
CN108878115B (en) 10kV column-mounted high-voltage integrated metering device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130501

Termination date: 20150603

EXPY Termination of patent right or utility model