CN101850833A - Swing arm type crane barge for mounting wind power equipment - Google Patents

Swing arm type crane barge for mounting wind power equipment Download PDF

Info

Publication number
CN101850833A
CN101850833A CN 201010180003 CN201010180003A CN101850833A CN 101850833 A CN101850833 A CN 101850833A CN 201010180003 CN201010180003 CN 201010180003 CN 201010180003 A CN201010180003 A CN 201010180003A CN 101850833 A CN101850833 A CN 101850833A
Authority
CN
China
Prior art keywords
pulley
barge
swing arm
wind power
power equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010180003
Other languages
Chinese (zh)
Other versions
CN101850833B (en
Inventor
李维越
吕宏
蔡元军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Huarui Heavy Industry Group Co Ltd
Original Assignee
Dalian Huarui Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Huarui Co Ltd filed Critical Dalian Huarui Co Ltd
Priority to CN 201010180003 priority Critical patent/CN101850833B/en
Publication of CN101850833A publication Critical patent/CN101850833A/en
Application granted granted Critical
Publication of CN101850833B publication Critical patent/CN101850833B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a swing arm type crane barge for mounting wind power equipment, which is characterized by comprising a barge body, wherein the center of the barge body is provided with a portal arm support; the portal arm support is composed of a left and a right truss upright posts, a truss cross beam and a pulley cross beam; the lower ends of the left and the right truss upright posts are hinged with a hinged support on the barge body; the upper parts of the left and the right truss upright posts are respectively connected with a front and a back decks of the barge body through a front and a back radius-changing mechanisms; the lower parts of the left and the right truss upright posts are provided with two sets of hoisting mechanisms, including winding machines; the hoisting mechanisms are provided with wire ropes; the wire ropes bypass two sets of fixed pulley blocks in the pulley cross beam to drive two sets of hook pulley blocks to vertically move; and both sides of the barge body are respectively provided with an impeller-type thruster and a skid mounted thruster. The invention has the characteristics of light weight and light draught, can be aground, and is suitable for operation and construction in intertidal zones.

Description

Swing arm type crane barge for mounting wind power equipment
Technical field
The present invention relates to the equipment installation of a kind of shoal water zone and use derrick barge, be particularly useful for intertidal belt wind electric equipment installation derrick barge.
Background technology
When intertidal belt wind electric equipment is installed, each parts of aerogenerator need be transported to the base position that is in the intertidal zone blower fan, carry out installation exercise again.At present the mobile weight-lifting equipment used of land is because of from great, the shallow special operation condition requirements such as easy depression in sandy beach, intertidal zone and fluctuation tide that are difficult to satisfy of paddling.And conventional crane ship is darker because of absorbing water, and the intertidal zone is its prohibited area, and nature can't set foot in.Therefore develop a kind of shallow draft, movably intertidal belt wind electric equipment to install with swing arm type crane barge be one of difficult problem of being badly in need of solution.
Summary of the invention
The objective of the invention is to, provide a kind of intertidal belt wind electric equipment to install and use swing arm type crane barge, carry out the shoal water zone navigation by the vane wheel propeller that adopts the barge both sides, adopt the sled formula propelling unit of four jiaos of barges to carry out the position adjustment in more shallow zone, swing by swing arm type crane horn frame more finally realizes the unloading of equipment components, the deck plane goods and materials are controlled, transportation, on-site installation construction.
Technical solution of the present invention is achieved in that
A kind of swing arm type crane barge for mounting wind power equipment, comprise and refute body, there is gantry jib in the central authorities of refuting body, gantry jib is made up of left and right truss upright-column, truss crossbeam and pulley crossbeam, it is characterized in that: the lower end of left and right sides truss upright-column is hinged with the hinged-support of refuting on the body, and the top of left and right sides truss upright-column is connected with the forward and backward deck of refuting body respectively by forward and backward luffing mechanism; In the bottom of left and right sides truss upright-column two cover lifting mechanisms are installed also, on the winch wherein steel rope are arranged, steel rope is walked around two groups of fixed pulley groups that are contained in the pulley crossbeam and is driven two groups of lifting hook pulley group vertical shifting; Vane type propelling unit and sled formula propelling unit then are housed respectively in the both sides of refuting body.
The two ends of described pulley crossbeam flexibly connect with the fixedly hinge that is welded in left and right sides truss upright-column respectively.
Luffing mechanism is made up of winch, pull bar and the assembly pulley that is fixed on the pull bar before described, and described winch is fixed on the deck of refuting body.
Described back luffing mechanism is made up of winch, pull bar and the assembly pulley that is fixed on the pull bar, described winch with refute the body deck on the slideway that is provided be connected by anchoring device.
Compared with prior art, advantage of the present invention is apparent, mainly shows:
1, in light weight, shallow draft, center of gravity is adjustable (no counterweight), can sit the beach, is applicable to intertidal zone operation and construction;
2, big, the deck all standing of hoisting crane service range, Self-loading ﹠ self-unloading, installation function;
3, short range is from navigating by water function, position self aligning function; The antiskid function;
4, wind loading rating is strong, safe and reliable, stable, efficient is high;
5, simple in structure, cost is low.
Description of drawings
Drawings attached 3 width of cloth of the present invention, wherein:
Fig. 1 barge of the present invention hangs wind-powered electricity generation fabricated section scheme drawing;
Barge scheme drawing when Fig. 2 gantry of the present invention jib is upright;
Fig. 3 is the birds-eye view of Fig. 1.
Among the figure: 1. refute body 2. gantry jibs 3. front jib lubbing mechanism 4. rear jib lubbing mechanism 5. lifting mechanisms 6. barge propulsion plants 7. gantry jib columns 8. truss crossbeams 9. pulley crossbeams 10. hoist engines 11. fixed block groups 12. steel wire ropes 13. lifting hook pulley groups 14. twisted axis 15 hoist engines 16. front amplitude draw-bar 17. assembly pulleys 18. slideways 19. anchoring devices 20. vane type propellers 21. sled formula propellers 22. drive units 23. transmission devices 24. impellers 25. drive units 26. crank runners 27. sled formula push rods 28. push rod degree of depth adjusting devices.
The specific embodiment
A kind of wind power equipment is installed and is used the oscillating type derrick barge, comprise and refute body 1, gantry jib 2, preceding luffing mechanism 3, back luffing mechanism 4, lifting mechanism 5, barge propelling unit 6, wherein gantry jib 2 is fixedly mounted on and refutes body 1 medium position, preceding changing-breadth system 3 connects the upper end of gantry jib column 7 from the barge foredeck, back changing-breadth system 4 connects the upper end of gantry jib column 7 from the barge aft deck, the front and back luffing mechanism cooperatively interacts, and drive gantry jib 2 and peace lifting mechanism 5 are thereon swung and realized that object moves forward and backward; Two cover lifting mechanisms 5 are installed on gantry jib 2, wherein the steel rope 12 on the winch 10 is walked around dead sheave group 11 and is driven lifting hook pulley groups 13 vertical shifting and come the handling object, refute body 1 both sides barge propelling unit 6 is installed, can short range drive the barge navigation and adjust the vessel position.
The integral structure of refuting body 1 satisfies water filling presses the storehouse and can reach the requirement that barge is sat basic skill or training's work, and there is the lateral bearing beam position, intermediate portion, and the twisted axis that satisfies the lower end of gantry jib column 7 supports requirement.
Gantry jib 2 connects truss crossbeam 8 by left and right sides column truss type 7, top and pulley crossbeam 9 is formed.Column truss type 7 bottoms in the left and right sides are equipped with the winch 10 of lifting mechanism respectively, and pulley crossbeam 9 inside are equipped with two groups of fixed pulley groups 11, and are connected with two groups of lifting hook pulley groups 13 that are suspended on the below respectively by steel rope 12; Pulley crossbeam 9 two ends are connected with fixedly twisted axis 14 on being welded on column truss type 7, when gantry jib is swung, pulley crossbeam 9 can be around this twisted axis swing, but two suspension hook group 13 teamworks simultaneously or the action that cooperatively interacts, realize respectively load lift and two suspension hooks between lateral offset, installation to bit function.
Luffing mechanism 3 or 4 all is made up of winch 15, pull bar 16 and the assembly pulley 17 that is fixed on the pull bar 16 on the forward and backward deck, when current luffing mechanism travels forward by the rope traction assembly pulley 17 on the winch 15, pull bar 16 also just drives gantry jib 2 and swings forward, at this moment, the assembly pulley 17 of back luffing mechanism 4 discharges, to remove constraint, realize gantry jib 2 swing forward to gantry jib 2; Vice versa; The demand of goods handling, shipment and sea engineering construction and installation is finished in deck and barge outside before, during and after the operating range that has so just guaranteed suspension hook group 13 covers.
The winch 15 of luffing mechanism is a packaged type on the aft deck, it with the deck on the slideway that is provided with 18 adopt anchoring devices 19 to be connected, when fabricated section bigger, before amplitude draw-bar 16, when steel rope 12 might interfere with lifting part, anchoring device 19 can be removed, the heel that winch is moved to gantry jib column 7 is fixed, to abdicate working space.
Barge propelling unit 6 is by the vane type propelling unit 20 that is applicable to the shoal water zone and be applicable to that more the sled formula propelling unit 21 of shoal water zone is formed:
Vane type propelling unit 20, it is arranged in the both sides on deck, drive four impellers 24 by the actuating device 22 that top, deck is installed by drivings device such as cone belt or chain 23, barge can vertically move, the impeller that drives 1 side can make barge turn round, and realizes short distance navigation and the installation seat in the plane adjustment requirement of barge at shallow water area.
Sled formula propelling unit 21, it is arranged in four bights, deck, push the seabed by the actuating devices of installing above deck such as electrical motor 25 to by crank runner 26 drive sled formula push rods 27, the seabed produces antagonistic force and promotes barge realization short distance navigation or fore-and-aft adjustment position, can satisfy horizontal position adjustment needs when actuating device horizontally rotates 90 °, thereby requirement is accurately adjusted in the installation site of satisfying barge; This propelling unit also comprises a cover sled formula push rod degree of depth setting device 28, by adjusting the degree of depth, can guarantee to prize formula push rod normal operation under the depth condition of certain limit, after the barge position is determined, respectively organize this device to the angle that needs by rotation, sled formula push rod can insert the seabed and play the fixedly effect of the slippage stake of barge.

Claims (4)

1. swing arm type crane barge for mounting wind power equipment, comprise and refute body (1), there is gantry jib (2) in the central authorities of refuting body (1), gantry jib (2) is made up of left and right truss upright-column (7), truss crossbeam (8) and pulley crossbeam (9), it is characterized in that: the lower end of left and right sides truss upright-column (7) is hinged with the hinged-support of refuting on the body (1), and the top of left and right sides truss upright-column (7) is connected with the forward and backward deck of refuting body (1) respectively by forward and backward luffing mechanism (3,4); The bottom that adds column (7) in purlin, the left and right sides also is equipped with two cover lifting mechanisms (5), winch (10) is wherein arranged, steel rope (12) is arranged on it, and steel rope (12) is walked around the two groups of fixed pulley groups (11) that are contained in the pulley crossbeam (9) and is driven two groups of lifting hook pulley groups (13) vertical shifting; Vane type propelling unit (20) and sled formula propelling unit (21) then are housed respectively in the both sides of refuting body (1).
2. wind power equipment swing arm type crane barge according to claim 1 is characterized in that the two ends of described pulley crossbeam (9) flexibly connect with the fixedly hinge (14) that is welded in left and right sides truss upright-column (7) respectively.
3. swing arm type crane barge for mounting wind power equipment according to claim 2, it is characterized in that described before luffing mechanism (3) form by winch (15), pull bar (16) and the assembly pulley (17) that is fixed on the pull bar (16), described winch (15) is fixed on the deck of refuting body (1).
4. swing arm type crane barge for mounting wind power equipment according to claim 2, it is characterized in that described back luffing mechanism (4) is made up of winch (15), pull bar (16) and the assembly pulley (17) that is fixed on the pull bar (16), described winch (15) with refute body (1) deck on the slideway (18) that is provided be connected by anchoring device (19).
CN 201010180003 2010-05-17 2010-05-17 Swing arm type crane barge for mounting wind power equipment Active CN101850833B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010180003 CN101850833B (en) 2010-05-17 2010-05-17 Swing arm type crane barge for mounting wind power equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010180003 CN101850833B (en) 2010-05-17 2010-05-17 Swing arm type crane barge for mounting wind power equipment

Publications (2)

Publication Number Publication Date
CN101850833A true CN101850833A (en) 2010-10-06
CN101850833B CN101850833B (en) 2013-01-23

Family

ID=42802554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010180003 Active CN101850833B (en) 2010-05-17 2010-05-17 Swing arm type crane barge for mounting wind power equipment

Country Status (1)

Country Link
CN (1) CN101850833B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985917A (en) * 2010-10-08 2011-03-16 中交第一航务工程局有限公司 Splitting installation and construction method of marine wind generating set and equipment thereof
CN108867644A (en) * 2018-08-05 2018-11-23 中建五局土木工程有限公司 The efficient plucking device of underwater steel-pipe pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0840360A (en) * 1994-07-29 1996-02-13 Mitsubishi Heavy Ind Ltd Crane barge with float
CN2393816Y (en) * 1999-08-30 2000-08-30 上海交通大学 Special apparatus for moving heavy equipment on seabeach
CN101402393A (en) * 2008-11-13 2009-04-08 大连理工大学 Special operation platform for mounting wind-driven generator
CN101513923A (en) * 2009-04-03 2009-08-26 上海电力设计院有限公司 Tidal zone wind power generating equipment construction hoisting method and tidal zone special engineering barge
CN201670343U (en) * 2010-05-17 2010-12-15 大连华锐股份有限公司 Swinging arm type lifting lighter for installing wind power equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0840360A (en) * 1994-07-29 1996-02-13 Mitsubishi Heavy Ind Ltd Crane barge with float
CN2393816Y (en) * 1999-08-30 2000-08-30 上海交通大学 Special apparatus for moving heavy equipment on seabeach
CN101402393A (en) * 2008-11-13 2009-04-08 大连理工大学 Special operation platform for mounting wind-driven generator
CN101513923A (en) * 2009-04-03 2009-08-26 上海电力设计院有限公司 Tidal zone wind power generating equipment construction hoisting method and tidal zone special engineering barge
CN201670343U (en) * 2010-05-17 2010-12-15 大连华锐股份有限公司 Swinging arm type lifting lighter for installing wind power equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985917A (en) * 2010-10-08 2011-03-16 中交第一航务工程局有限公司 Splitting installation and construction method of marine wind generating set and equipment thereof
CN101985917B (en) * 2010-10-08 2013-08-21 中交第一航务工程局有限公司 Splitting installation and construction method of marine wind generating set and equipment thereof
CN108867644A (en) * 2018-08-05 2018-11-23 中建五局土木工程有限公司 The efficient plucking device of underwater steel-pipe pile
CN108867644B (en) * 2018-08-05 2020-07-28 中建五局土木工程有限公司 High-efficient pull out device of steel-pipe pile under water

Also Published As

Publication number Publication date
CN101850833B (en) 2013-01-23

Similar Documents

Publication Publication Date Title
EP2952426B1 (en) Twin hull vessel with roll and pitch damping devices
CN103228530B (en) Floating structure operating system, floating structure, operation ship and floating structure operational method
CN202007400U (en) Marine foundation construction platform for jacket construction
CN110719886B (en) Motion compensated crane for use on a marine vessel
EP2724021B1 (en) A self-propelled offshore wind farm installation vessel, and method of installation used in the construction of an offshore wind turbine farm
US20110129303A1 (en) Foundation Construction Platform Used In a Beach or Offshore Areas
CN201236117Y (en) Pulling crane
CN102107720B (en) Marine fan integrated setting system
US20220128033A1 (en) Shallow draft, wide-base floating wind turbine without nacelle
KR20150084913A (en) Floatable transportation and installation structure for transportation and installation of a floating wind turbine, a floating wind turbine and method for transportation and installation of the same
WO2011072505A1 (en) Amphibious piling machine
CN103057672A (en) Platform for transportation and installation of offshore fan unit complete machine
JP2015511283A (en) Offshore wind farm (OWP) positioned stationary and methods and means for its assembly, transportation, installation and service
EP4114781A1 (en) Crane vessel for hoisting of an offshore wind turbine or component thereof
CN110949632A (en) Semi-submersible floating type fan foundation, fan and construction method of fan
NL2021129B1 (en) Process to place a wind turbine
CN209568440U (en) One kind turning over a guider
US20230399206A1 (en) Offshore wind turbine assembly vessel
CN201670343U (en) Swinging arm type lifting lighter for installing wind power equipment
CN101850833B (en) Swing arm type crane barge for mounting wind power equipment
CN103979081A (en) Heavy draught seaborne floating wind turbine integral installation work ship
EP2218671A1 (en) Device for transferring objects at sea
CN115538435A (en) Lifting amphibious piling ship
NL1014463C2 (en) Truss mast for carrying a wind turbine.
CN201406286Y (en) Amphibious crane and track structure thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: DALIAN HUARUI HEAVY INDUSTRY GROUP CO., LTD.

Free format text: FORMER OWNER: HUARUI CO., LTD., DALIAN

Effective date: 20120406

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120406

Address after: 116013 Bayi Road, Xigang District, Liaoning, China, No. 169, No.

Applicant after: Dalian Huarui Heavy Industry Group Co., Ltd.

Address before: 116013 Bayi Road, Xigang District, Liaoning, China, No. 169, No.

Applicant before: Huarui Co., Ltd., Dalian

C14 Grant of patent or utility model
GR01 Patent grant