CN101846535B - 蒸汽发生器汽水失配量的测量方法 - Google Patents
蒸汽发生器汽水失配量的测量方法 Download PDFInfo
- Publication number
- CN101846535B CN101846535B CN2009101193903A CN200910119390A CN101846535B CN 101846535 B CN101846535 B CN 101846535B CN 2009101193903 A CN2009101193903 A CN 2009101193903A CN 200910119390 A CN200910119390 A CN 200910119390A CN 101846535 B CN101846535 B CN 101846535B
- Authority
- CN
- China
- Prior art keywords
- steam
- water
- flow
- actual
- steam generator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
本发明公开了一种核电站用蒸汽发生器汽水失配量的测量方法,该方法包括以下按步骤:(1) 测量进入蒸汽发生器的给水温度T FW和给水流量m FWM,得到实际流量m FW;(2) 确定水转变为蒸汽所需的热功率P W;(3) 确定反应堆一回路产生的热功率P S;(4) 确定汽水失配量(P W-P S)。本发明通过校正蒸汽发生器的实际给水流量,改流量汽水失配量为热功率失配量,这样从根本上避免了蒸汽由温度压力变化引起的流量测量不准确,减少了测量误差,提高了核电站的安全形和可靠性。整个测量方法实际操作是仅需要准确测量给水流量m FWM和温度T FW即可,需要测量参数少,操作方便,准确性和可行性高。
Description
技术领域
本发明涉及一种汽水流量测量方法,具体涉及核电站用蒸汽发生器汽水失配量的测量方法。
背景技术
核电站蒸汽发生器汽水失配量是核电安全的控制非常重要的参数,目前核电站蒸汽发生器汽水失配量常用的测量方法为:首先,测量蒸汽发生器的实际给水量。然后,测量蒸汽发生器蒸汽流量。最后再用前者减去后者得到汽水失配量。由于蒸汽发生器内的压力时常变化,导致测得的蒸汽发生器蒸汽流量偏差较大,使得最后得到的汽水失配量有较大偏差,从而误触发设备动作。
发明内容
本发明的目的是提供一种蒸汽发生器汽水失配量的测量方法,该方法将汽水流量失配量转换为能量失配量,提高了核电站的安全性和可靠性。
实现本发明目的的技术方案:一种蒸汽发生器汽水失配量的测量方法包括以下按步骤:(1)测量进入蒸汽发生器的给水温度TFW和给水流量mFWM,得到实际流量mFW;(2)根据步骤(1)得到的mFW确定水转变为蒸汽所需的热功率PW;(3)确定反应堆一回路产生的热功率PS;(4)确定汽水失配量(PW-PS)。
步骤(1)中的实际给水流量mFW,通过下面的公式得到:
其中:mFWM——为测量得到的给水流量,kg/s;
mFW——为经过校正后的实际给水流量,kg/s;
cρ0——常数,1.17784;
cρ1——常数,-1.45×10-4;
cρ2——常数,-3.08×10-6;
TFW——实际给水温度,K;
步骤(2)中水转变为蒸汽所需的热功率PW,通过下式得到:
其中:Pw——水转变为蒸汽所需的百分比功率,%;
mFW——经过校正后的实际给水流量,kg/s;
K——常数,0.1844;
TFW——实际给水温度,K;
步骤(3)中反应堆一回路产生的热功率PS,通过下面的公式得到:
Ps=(N+0.167×n)
其中:Ps——反应堆一回路产生的百分比功率,%;
N——反应堆百分比功率,%;
n—-运行主泵数量;
本发明的有益效果:(1)校正了蒸汽发生器的实际给水流量,改流量汽水失配量为热功率失配量,这样从根本上避免了蒸汽由温度压力变化引起的流量测量不准确,减少了测量误差,提高了核电站的安全性和可靠性;(2)整个测量方法实际操作是仅需要准确测量给水流量mFWM和温度TFW即可,需要测量参数少,操作方便,准确性和可行性高。
具体实施方式
下面结合具体实施例来详细说明本测量方法。
一种蒸汽发生器汽水失配量的测量方法,它包括以下步骤:
(1)测量进入蒸汽发生器的给水温度TFW和给水流量mFWM,得到实际流量mFW。
用孔板流量计测量给水流量mFWM,由温度仪表读出实际给水温度TFW。根
据公式如(1)计算实际给水流量mFW。
其中:mFWM——为测量得到的给水流量,kg/s;
mFW——为经过校正后的实际给水流量,kg/s;
cρ0——常数,1.17784;
cρ1——常数,-1.45×10-4;
cρ2——常数,-3.08×10-6;
TFW——实际给水温度,K;
(2)确定水转变为蒸汽所需的热功率PW
水转变为蒸汽所需的热功率PW可由下式计算得到:
其中:Pw——水转变为蒸汽所需的百分比功率,%;
mFW——经过校正后的实际给水流量,kg/s;
K——常数,0.1844;
TFW——实际给水温度,K;
(3)确定反应堆一回路产生的热功率PS
反应堆热功率和一回路主泵运行产生的热功率经过蒸汽发生器传递给二回路介质,即为二回路主给水变成蒸汽所能获得的热量。
Ps=(N+0.167×n) (3)
其中,N——该核电站反应堆百分比功率,99%;
n——运行主泵数量,4;
(4)确定汽水失配量(PW-PS)
最后的汽水失配量计算表现为(PW-PS),其中PW为实际给水流量温度到产生蒸汽所需要的功率,PS为一回路所能产生的功率。若(PW-PS)为负数,则代表一回路产生的热量过多,蒸汽发生器内蒸汽量大于给水,有造成蒸汽发生器液位降低的风险,达到一定限值后,需要触发自动功能如降低一回路功率。这样,就可以通过测量进入蒸汽发生器的功率、蒸汽发生器主给水温度压力、流量、蒸汽发生器内部的压力对汽水失配量进行计算。
当前机组状态下,主给水温度222℃,流量410×4千克/秒,根据公式(2)算出的变成饱和蒸汽状态所需热功率PW为99.4%,根据公式(3)算出一回路所能产生的功率为99.5%,汽水失配量(PW-PS)为-0.1%。
Claims (2)
1.一种蒸汽发生器汽水失配量的测量方法,其特征在于,该方法包括以下按步骤:(1)测量进入蒸汽发生器的给水温度TFW和给水流量mFWM,得到实际流量mFW;(2)根据步骤(1)得到的mFW确定水转变为蒸汽所需的热功率PW;(3)确定反应堆一回路产生的热功率PS;(4)确定汽水失配量(PW-PS);
步骤(1)中的实际给水流量mFW,通过下面的公式得到:
其中:mFWM——为测量得到的给水流量,kg/s;
mFW——为经过校正后的实际给水流量,kg/s;
cρ0——常数,1.17784;
cρ1——常数,-1.45×10-4;
cρ2——常数,-3.08×10-6;
TFW——实际给水温度,K;
步骤(2)中水转变为蒸汽所需的热功率PW,通过下式得到:
其中:Pw——水转变为蒸汽所需的百分比功率,%;
mFW——经过校正后的实际给水流量,kg/s;
K——常数,0.1844;
TFW——实际给水温度,K;
步骤(3)中反应堆一回路产生的热功率PS,通过下面的公式得到:
Ps=(N+0.167×n)
其中:Ps——反应堆一回路产生的百分比功率,%;
N—反应堆百分比功率,%;
n——运行主泵数量。
2.根据权利要求1所述的一种蒸汽发生器汽水失配量的测量方法,其特征在于,步骤(1)中的给水流量mFWM采用孔板流量计进行测量。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101193903A CN101846535B (zh) | 2009-03-25 | 2009-03-25 | 蒸汽发生器汽水失配量的测量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101193903A CN101846535B (zh) | 2009-03-25 | 2009-03-25 | 蒸汽发生器汽水失配量的测量方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101846535A CN101846535A (zh) | 2010-09-29 |
CN101846535B true CN101846535B (zh) | 2011-12-28 |
Family
ID=42771228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101193903A Active CN101846535B (zh) | 2009-03-25 | 2009-03-25 | 蒸汽发生器汽水失配量的测量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101846535B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103808433B (zh) * | 2012-11-14 | 2017-12-26 | 中国广核集团有限公司 | 核电站热功率测量漂移的监测方法 |
CN104332193B (zh) * | 2013-07-22 | 2016-12-28 | 中国核动力研究设计院 | 一种基于数字化技术的蒸汽发生器水位测量方法 |
CN111166155B (zh) * | 2018-11-12 | 2022-03-15 | 九阳股份有限公司 | 蒸汽加热式烹饪器具的烹饪控制方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5237816A (en) * | 1983-05-23 | 1993-08-24 | Solar Turbines Incorporated | Steam generator control systems |
CN1274162A (zh) * | 2000-06-21 | 2000-11-22 | 北京和利时系统工程股份有限公司 | 一种核电站压水反应堆堆芯功率测量方法 |
CN1680787A (zh) * | 2004-11-22 | 2005-10-12 | 北京山鑫海达科技发展有限公司 | 热扩散式热流量计和热量计及其测量方法 |
US7040095B1 (en) * | 2004-09-13 | 2006-05-09 | Lang Fred D | Method and apparatus for controlling the final feedwater temperature of a regenerative rankine cycle |
-
2009
- 2009-03-25 CN CN2009101193903A patent/CN101846535B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5237816A (en) * | 1983-05-23 | 1993-08-24 | Solar Turbines Incorporated | Steam generator control systems |
CN1274162A (zh) * | 2000-06-21 | 2000-11-22 | 北京和利时系统工程股份有限公司 | 一种核电站压水反应堆堆芯功率测量方法 |
US7040095B1 (en) * | 2004-09-13 | 2006-05-09 | Lang Fred D | Method and apparatus for controlling the final feedwater temperature of a regenerative rankine cycle |
CN1680787A (zh) * | 2004-11-22 | 2005-10-12 | 北京山鑫海达科技发展有限公司 | 热扩散式热流量计和热量计及其测量方法 |
Non-Patent Citations (4)
Title |
---|
姚彦贵等.核电蒸汽发生器热工水力静态特性计算分析研究.《能源技术》.2007,第28卷(第02期),第63页至第69页. * |
宋世葭.计算核反应堆堆芯功率的热平衡试验.《核动力工程》.2002,第23卷(第02期),第82页至第86页. * |
张冰等.基于ANFIS的蒸汽发生器水位实时控制系统的设计.《南京航空航天大学学报》.2003,第35卷(第04期),第370页至第373页. * |
张晓峰等.给水流量控制系统流量测量偏差的分析.《核科学与工程》.2005,第25卷(第03期),第226页至第230页. * |
Also Published As
Publication number | Publication date |
---|---|
CN101846535A (zh) | 2010-09-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100578236C (zh) | 基于量热法的兆瓦级微波功率测量系统 | |
CN101846535B (zh) | 蒸汽发生器汽水失配量的测量方法 | |
CN104515566B (zh) | 汽包液位测量装置、系统及方法 | |
CN101865867A (zh) | 一种实时计算煤质元素和工业成分的方法 | |
CN103871522A (zh) | 一种基于数字化技术的稳压器水位测量方法 | |
CN103335589A (zh) | 无缝线路钢轨温度应力传感节点的标定方法 | |
CN107784156A (zh) | 核动力装置蒸汽排放系统参数的计算方法 | |
CN109613429B (zh) | 一种压水堆蒸汽发生器模型时间常数测试系统与方法 | |
CN107887043A (zh) | 一种反应堆功率系数测量方法 | |
CN104373926A (zh) | 一种船舶锅炉水位控制系统 | |
CN103903661A (zh) | 一种用于事故后稳压器水位测量系统和方法 | |
CN102435334B (zh) | 一种变压器绕组温度测量方法 | |
KR20180114959A (ko) | 원자로 냉각재 시스템 배관 온도 분배 측정 시스템 | |
CN103728055B (zh) | 一种火电机组锅炉炉膛出口烟气能量的实时估计方法 | |
CN103697958B (zh) | 燃煤机组汽包出口饱和蒸汽质量流量的实时计量方法 | |
CN104200061A (zh) | 一种第三代核电站压水堆堆芯功率计算方法 | |
CN109442465B (zh) | 煤粉锅炉瞬时给粉量的拟合样本选取及计量方法 | |
CN106033496B (zh) | 蒸汽发生器设计裕度计算方法 | |
CN104332193B (zh) | 一种基于数字化技术的蒸汽发生器水位测量方法 | |
JP6139175B2 (ja) | 反応度温度係数推定装置及び方法 | |
CN103468860B (zh) | 一种转炉煤气热值计量装置和计量方法 | |
CN102734785A (zh) | 电站锅炉省煤器泄露判断方法 | |
CN109404071B (zh) | 一种压水堆蒸汽发生器模型时间常数的辨识方法 | |
Jiang et al. | A data reconciliation based approach to accuracy enhancement of operational data in power plants | |
CN109964124A (zh) | 用于确定气体混合物的热值和/或沃泊指数的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |