CN101845850A CN 201010205823 CN201010205823A CN101845850A CN 101845850 A CN101845850 A CN 101845850A CN 201010205823 CN201010205823 CN 201010205823 CN 201010205823 A CN201010205823 A CN 201010205823A CN 101845850 A CN101845850 A CN 101845850A
Authority
CN
China
Prior art keywords
column
beam main
reinforcing bar
main tendon
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010205823
Other languages
Chinese (zh)
Other versions
CN101845850B (en
Inventor
刘治国
翟雷
张桂敏
安凤杰
杨凯明
张辉
张静涛
刘自松
卢百华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201010205823XA priority Critical patent/CN101845850B/en
Publication of CN101845850A publication Critical patent/CN101845850A/en
Application granted granted Critical
Publication of CN101845850B publication Critical patent/CN101845850B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The invention relates to a stiff concrete frame structure, wherein a frame column is cast by a core column steel rib and a peripheral column reinforced concrete structure into a whole, concrete is cast in the core column steel rib, and studs vertical to a steel rib surface are distributed on the periphery of the core column steel rib and embedded and fixed in the column reinforced concrete structure through the studs; the steel bars of the column reinforced concrete structure comprise vertical bars, column stirrups and draw hooks, beam main bars at the upper parts of beam-column joints are divided into penetrating beam main bars and column-beam-winding main bars, and when the column-beam-winding main bars at the upper parts of the beam-column joints wind core column steel ribs in the frame columns, the column-beam-winding main bars are outwards bent according to the gradient of 1: 6; the upper beam main reinforcement penetrates through a preformed hole on the core column steel rib in the frame column, and the end part of the lower beam main reinforcement is anchored into the column reinforced concrete structure or is bent upwards. The invention solves the problems that the steel bars in the beam-column joint area of the steel rib-concrete structure are difficult to penetrate through the steel ribs of the core column, the concrete is inconvenient to pour and vibrate, and the pouring effect is poor, and can be widely applied to large-span multi-story high-rise frame structures.

Description

Strengthening concrete frame structure and job practices thereof
Technical field
The present invention relates to a kind of strengthening concrete frame structure and job practices thereof.
Background technology
The form of structure that current architecture configuration adopts usually is steel work or reinforced concrete structure, steel work exists steel using amount big, fire line is poor, shortcomings such as maintenance cost height, build for many high-rise long spans degree, because relative reinforced concrete member cross section, steel structure member cross section is less than normal, the structural entity stable problem is outstanding, and the structure of reinforced concrete workload is big, especially to many high-level structures, the structural element cross section is bigger than normal, cause dead load big, ground is had relatively high expectations, steel-concrete structure is except the advantage that steel work is arranged, the advantage that also possesses concrete structure, structure has excellent fireproof performance simultaneously.Be that many high-rise long spans degree is built structural form selection preferably, but, because the existence of reinforcing bar, the muscle problem of wearing of bean column node district reinforcing bar and the concrete blanking of steel concrete district and vibrate and become the obstacle of widespread adoption steel-concrete structure, the present invention aims to provide and solves bean column node district reinforcing bar and pass reinforcing bar, and the outside steel concrete technical scheme of building.
Summary of the invention
The purpose of this invention is to provide a kind of strengthening concrete frame structure and job practices thereof, solve the technical problem that the steel-concrete structure node area is passed the stem stem reinforcing bar; And the solution technical problem that steel-the concrete structure peripheral concrete is built.
For achieving the above object, the present invention adopts following technical scheme: a kind of strengthening concrete frame structure, form by frame column and Vierendeel girder, Vierendeel girder is a reinforced concrete beam, described reinforcing bar comprises beam main tendon and beam stirrup, beam main tendon comprises elongated muscle and non-elongated muscle, Vierendeel girder is connected the side or the top of frame column, be erected with floor on the Vierendeel girder, floor and Vierendeel girder are cast as one, and described frame column is built by stem stem reinforcing bar and peripheral post reinforced concrete structure and is one to be cast with concrete in the stem stem reinforcing bar, the periphery of stem stem reinforcing bar is furnished with the peg perpendicular to the reinforcing bar face, and passes through the peg build-in in the post reinforced concrete structure; The reinforcing bar of described post reinforced concrete structure comprises stud, tie muscle and drag hook, the beam main tendon on top, bean column node place is divided into and runs through beam main tendon and around the post beam main tendon, top when the post beam main tendon is walked around stem stem reinforcing bar in the frame column, outwards bend around the gradient of post beam main tendon by 1: 6; The beam main tendon that runs through on top passes preformed hole on the stem stem reinforcing bar in the frame column, and the end of the beam main tendon of bottom anchors in the post reinforced concrete structure or upwards bending.
Described frame column is insulated column or responde, and described stem stem reinforcing bar is square steel pipe or round steel pipe.
The concrete of described post reinforced concrete structure is a self-compaction without vibration concrete, and the concrete coarse aggregate maximum particle diameter is less than 1/3 of the steel reinforced concrete topping, and is not more than 25mm.
Described tie muscle is encrypted along the frame column overall height, and described drag hook is around stem stem reinforcing bar circumferential distribution, and drawknot is on stud.
The body of wall horizontal reinforcement of described responde is around disconnecting to the side of responde, and with responde in the two-sided welding of reinforcing bar.
The beam main tendon on the top, bearing place of described Vierendeel girder is a row, two row or three rows.
When the beam main tendon on the top, bearing place of described Vierendeel girder or the beam main tendon of bottom were two rows, the non-elongated muscle of close beam center line distributed in beam center line bilateral symmetry.
Described frame column side is connected with stiffening plate or does not have, and its width is during greater than the breadth of section of Vierendeel girder, and the end haunch of Vierendeel girder is a haunched beam, and the beam main tendon in the haunched beam outside is walked around stud.
Construction sequence is as follows: step 1, the stone bolt that the preburied frame trestle is connected with patten.
Step 2, according to design drawing, unwrapping wire is determined the ground location of frame column.
Step 3 is according to the position of the definite frame column of unwrapping wire, in the stem stem reinforcing bar and the correction of floor mounted frame column.
Step 4 is according to the stud of working drawing and unwrapping wire fixed-site frame column.
Step 5, the bottom perfusion self-compaction without vibration concrete of stem stem reinforcing bar, after concrete strength reaches design strength, the concrete slag of cleaning bottom, proofread and correct the stud position according to the post sideline, carry out then the joint of stud is carried out mechanical connection and stud is carried out colligation.
Step 6, tie muscle and drag hook on the cover stud, tie muscle opening part is arranged along four jiaos of logical commentaries on classics of frame column.
Step 7, the joint of inspection stud, qualified back is temporary fixed upright straight with scaffold, and the tie muscle colligation from top to bottom that will package.
Step 8 installs the frame column template.
Step 9 is carried out the concreting of post reinforced concrete structure.
Step 10 is laid floor bottom mould.
Step 11 is worn bean column node place beam main tendon; Top when the post beam main tendon is walked around stem stem reinforcing bar in the frame column, outwards bend around the gradient of post beam main tendon by 1: 6; The beam main tendon that runs through on top passes preformed hole on the stem stem reinforcing bar in the frame column, and the end of the beam main tendon of bottom anchors in the post reinforced concrete structure or upwards bending.
Step 12 identifies stirrup spacing on beam main tendon, wear beam stirrup then on beam main tendon, and beam main tendon and beam stirrup are carried out colligation.
Step 13 installs the side form of Vierendeel girder at the Vierendeel girder design attitude.
Step 14, the off line reinforcing bar of colligation floor and floor online reinforcing bar.
Step 15, pouring frame beam and floorslab concrete.
Compared with prior art the present invention has following characteristics and beneficial effect: at first, frame column of the present invention adopts the strengthening concrete structure except the advantage that steel work is arranged, and also possesses the advantage of concrete structure, and structure has excellent fireproof performance simultaneously.
Secondly, the beam main tendon of the present invention by top, bean column node place is divided into and runs through beam main tendon and around the post beam main tendon, top when the post beam main tendon is walked around stem stem reinforcing bar in the frame column, outwards bend around the gradient of post beam main tendon by 1: 6; The beam main tendon that runs through on top passes preformed hole on the stem stem reinforcing bar in the frame column, the end of the beam main tendon of bottom anchor in the post reinforced concrete structure or upwards bending wait measure to solve the muscle problem of wearing of how rationally to wear bean column node district reinforcing bar, to guarantee good stress performance of node and quickening speed of application.Solve stiffness post bean column node reinforcing bar binding problem effectively, accelerated construction speed, reduced the waste of reinforcing bar again.
Secondly, the concrete of frame column of the present invention adopts self-compaction without vibration concrete, both solved the problem of concrete blanking difficulty, improved construction speed again, simultaneously without vibration technology has been guaranteed again that steel column does not touch because of external force and has been offset, and Surface Quality of Concrete has reached the effect of clear-water concrete.
The present invention has overcome the shortcoming of traditional structure form fireproof performance difference, has solved the technical problem that the steel-concrete structure node area is passed reinforcing bar; And the solution technical problem that steel-the concrete structure peripheral concrete is built.
The present invention can be widely used in large span multi-rise building structure.
Description of drawings
The present invention will be further described in detail below in conjunction with accompanying drawing.
Fig. 1 is that reinforcing bar of the present invention is the insulated column structural representation of box.
Fig. 2 is the insulated column structural representation of reinforcing bar of the present invention for annular.
Fig. 3 is insulated column and the Vierendeel girder node area schematic diagram of reinforcing bar of the present invention for annular.
Fig. 4 is that reinforcing bar of the present invention is the insulated column and the Vierendeel girder node area schematic diagram of box.
Fig. 5 is a responde structural representation of the present invention.
Fig. 6 is that the present invention has stiffening plate frame column and Vierendeel girder node area schematic diagram.
Reference numeral: 1-stem stem reinforcing bar, 2-peg, 3-post reinforced concrete structure, 4-stud, 5-tie muscle, 6-drag hook, 7-beam main tendon, 7.1-run through beam main tendon, 7.2-adds girt strip, 9-Vierendeel girder, 10-stiffening plate, 11-insulated column, 12-responde, 13-body of wall horizontal bar around post beam main tendon, 8-.
The specific embodiment
Embodiment is referring to Fig. 1~shown in Figure 6, certain engineering B1 layer is a structural transition layer, adopt strengthening concrete frame structure, form by frame column and Vierendeel girder 9, Vierendeel girder 9 is a reinforced concrete beam, described reinforcing bar comprises beam main tendon 7 and beam stirrup, beam main tendon 7 comprises elongated muscle and non-elongated muscle, Vierendeel girder 9 is connected the side or the top of frame column, be erected with floor on the Vierendeel girder 9, floor and Vierendeel girder 9 are cast as one, described frame column is built by stem stem reinforcing bar and peripheral post reinforced concrete structure and is one, be cast with concrete in the stem stem reinforcing bar 1, the periphery of stem stem reinforcing bar 1 is furnished with the peg 2 perpendicular to the reinforcing bar face, and passes through peg 2 build-ins in post reinforced concrete structure 3; The reinforcing bar of described post reinforced concrete structure 3 comprises stud 4, tie muscle 5 and drag hook 6, the beam main tendon 7 on top, bean column node place is divided into and runs through beam main tendon 7.1 and around post beam main tendon 7.2, top when post beam main tendon 7.2 is walked around stem stem reinforcing bar 1 in the frame column, outwards bend around the gradient of post beam main tendon 7.2 by 1: 6; The beam main tendon 7.1 that runs through on top passes preformed hole on the stem stem reinforcing bar 1 in the frame column, and the end of the beam main tendon 7 of bottom anchors in the post reinforced concrete structure 3 or upwards bending.Described frame column is insulated column 11 or responde 12, and described stem stem reinforcing bar 1 is square steel pipe or round steel pipe.The concrete of described post reinforced concrete structure 3 is a self-compaction without vibration concrete, and the concrete coarse aggregate maximum particle diameter is less than 1/3 of the steel reinforced concrete topping, and is not more than 25mm.Described tie muscle 5 is encrypted along the frame column overall height, and described drag hook 6 is around stem stem reinforcing bar 1 circumferential distribution, and drawknot is on stud 4.The body of wall horizontal reinforcement 13 of described responde 12 is around disconnecting to the side of responde 12, and with responde in reinforcing bar 1 two-sided welding.The beam main tendon 7 on the top, bearing place of described Vierendeel girder 9 is a row, two row or three rows.When the beam main tendon 7 on described top was a row, non-elongated muscle was Ln/4 from frame column, Vierendeel girder 9 or the outer peripheral development length of body of wall; When the beam main tendon 7 on top is two rows, going up most the non-elongated muscle of a row is higher value among Ln/3 and the Ln/4+La from frame column, Vierendeel girder 9 or the outer peripheral development length of body of wall, and second to arrange non-elongated muscle be Ln/4 from frame column, Vierendeel girder 9 or the outer peripheral development length of body of wall; When the beam main tendon 7 on top is three rows, the non-elongated muscle of the 3rd row is Ln/4 from frame column, Vierendeel girder 9 or the outer peripheral development length of body of wall, the non-elongated muscle of second row is a higher value among Ln/3 and the Ln/4+La from frame column, Vierendeel girder 9 or the outer peripheral development length of body of wall, going up most the non-elongated muscle of a row is higher value among Ln/3+La and the Ln/4+2La from frame column, Vierendeel girder 9 or the outer peripheral development length of body of wall, and specifically following the example of by the reinforced concrete construction standard of Ln and La got.When the beam main tendon 7 on the top, bearing place of described Vierendeel girder 9 or the beam main tendon 7 of bottom were two rows, the non-elongated muscle of close beam center line distributed in beam center line bilateral symmetry.Described frame column side is connected with stiffening plate 10 or does not have, and its width is during greater than the breadth of section of Vierendeel girder 9, and the end haunch of Vierendeel girder 9 is a haunched beam 8, and the beam main tendon 7 in haunched beam 8 outsides is walked around stud 4.
The sectional dimension of frame column is 1100 * 1100,900 * 900mm etc.; the strength grade of stem stem reinforcing bar-composite steel concrete column is C40; adopt self-compaction without vibration pea gravel concreten, the concrete coarse aggregate maximum particle diameter should be less than 1/3 of steel reinforced concrete topping, and should not be greater than 25mm.It is 25,28,32 and the reinforcing bar of  12,16 that stud adopts diameter, and stirrup and drag hook adopt 14@100(conversion layer tie muscle overall height to encrypt).
Vierendeel girder adopts the C30 concrete, and beam section is of a size of 1000 * 950,500 * 950,400 * 600,400 * 700 etc., and it is 18,20,22,25,28,32 or 12,14,16 or 8,10 that reinforcing bar adopts diameter.
Beam main tendon passes or walks around the stem stem reinforcing bar of frame column in the Vierendeel girder.
At the heavy in section Vierendeel girder, as 1000 * 950mm, no more than 10 of the every row of upper and lower beam main tendon, reinforcing bar is walked around in 4 in the outside, and middle 6 are passed reinforcing bar.
400 * 950mm Vierendeel girder, no more than 5 of the every row of upper and lower beam main tendon, 2 haunches in the outside are walked around the stem stem reinforcing bar, and 3 are passed the stem stem reinforcing bar.
The body of wall horizontal reinforcement 13 of responde 12 is around disconnecting to the side of responde 12, and with responde in reinforcing bar 1 two-sided welding 5d, d is the diameter of body of wall horizontal reinforcement 13.
Concrete construction sequence of the present invention is as follows: step 1, the stone bolt that the preburied frame trestle is connected with patten.
Step 2, according to design drawing, unwrapping wire is determined the ground location of frame column.
Step 3 is according to the position of the definite frame column of unwrapping wire, in the reinforcing bar 1 and the correction of floor mounted frame column.
Step 4 is according to the stud 4 of working drawing and unwrapping wire fixed-site frame column.
Step 5, the bottom perfusion self-compaction without vibration concrete of stem stem reinforcing bar 1, after concrete strength reaches design strength, the concrete slag of cleaning bottom, proofread and correct stud 4 positions according to the post sideline, carry out then the joint of stud 4 is carried out mechanical connection and stud 4 is carried out colligation; Stud 4, the joint in the same plane stagger by 50% and are not less than the diameter that 35d(d is a stud 4).
Step 6, tie muscle 5 and drag hook 6 on the cover stud, tie muscle 5 opening parts are arranged along four jiaos of logical commentaries on classics of frame column.
Step 7, check the joint of stud 4, adjust qualified back post spacing frame (fixedly reinforcing bar position can be had enough to meet the need use) is set on the top of frame column, and the spacing stirrup of 1~2 road post is set on the top of frame column, and spacing frame and spacing stirrup and stud colligation are firm.The topping cushion block after finishing, is set in the stud colligation, stud topping 30mm.Plastic washer is stuck on the tie muscle, spacing 600mm be used for the check box trestle whether have askew, turn round a phenomenon, temporary fixed upright straight after the passed examination, and tie muscle 5 colligation from top to bottom that will package with scaffold; During colligation tie muscle 5, on the stud 4 of frame column with chalk from concrete face 50mm, drawn tie muscle 5 spacings on request, tie muscle 5 colligation from top to bottom that will package then.The stud 4 of frame column is during with 5 colligations of tie muscle, and the corner adopts pocket to buckle colligation, middlely adopts the colligation of Eight characters button, and tie up button unnecessary tie up silk must be towards component inside.When beam main tendon 7 conflicted with the stud 4 of frame column, beam main tendon passed through from the inside of the stud 4 of frame column, and beam main tendon is by the stud 4 of frame column.
Step 8 installs the frame column template.
Step 9 is carried out the concreting of post reinforced concrete structure 3; Build in the process and note: tank car revolves at a high speed about jar 90s before the discharging; In the cast scope, can reduce to the greatest extent when building and build layering (lift height is taken as 1m), concrete action of gravity be given full play to, and do not destroyed concrete whole cohesiveness as far as possible.During concreting, use the hammer tapping template, play auxiliary flow and auxiliary closely knit effect.Self-compacting concrete is built to design height and can be stopped to build, and reexamines the concrete absolute altitude behind the 20min, builds again as absolute altitude is lower slightly, to guarantee to reach designing requirement again.Build finish after, cylinder adopts double-layer plastic cloth parcel, scatters and disappears to prevent that water from dividing, the maintenance of sprinkling water immediately after the final set uninterruptedly keeps moisture state.Be not subjected to displacement in order to ensure steel column, adopt tower crane to carry out concrete lifting, the even blanking of opposite side during concreting because of building.With the adz-eye hammer tapping template outside, improve concrete compactness.Be less than 14 days under the curing time, concrete surface and internal difference in temperature are less than 25 ℃.
Step 10 is laid floor bottom mould.
Step 11 is worn bean column node place beam main tendon 7; Top when post beam main tendon 7.2 is walked around stem stem reinforcing bar 1 in the frame column, outwards bend around the gradient of post beam main tendon 7.2 by 1: 6; The beam main tendon 7.1 that runs through on top passes preformed hole on the stem stem reinforcing bar 1 in the frame column, and the end of the beam main tendon 7 of bottom anchors in the post reinforced concrete structure 3 or upwards bending.
Step 12 identifies stirrup spacing on beam main tendon, wear beam stirrup then on beam main tendon 7, and beam main tendon 7 and beam stirrup are carried out colligation; The beam main tendon joint location: the beam main tendon on top is at span centre, and the beam main tendon on top is at the bearing place.This engineering B1 layer framework antidetonation grade is a secondary.Diameter 〉=16mm reinforcing bar adopts straight thread to connect I level joint.Beam main tendon anchorage length Lae: diameter is that 28mm and 32mm get 45d, and diameter is 18,20,22 and 25 to get 41d, and diameter is 16 to get 35d.
Step 13 installs the side form of Vierendeel girder 9 at the Vierendeel girder design attitude.
Step 14, the off line reinforcing bar of colligation floor and floor online reinforcing bar.
Step 15, pouring frame beam 9 and floorslab concrete.
In addition, the steel bar stress in the engineering adopts HPB235 level, HRB335 and HRB400 level steel, because the HRB335 level is identical with the outward appearance of HRB400 level steel, the mark of difference is not obvious.Therefore in construction, take strict effectively control measures, HRB335 and the former material of HRB400 level steel and semiproduct subregion are stacked, in order to avoid produce the phenomenon that HRB335 level and HRB400 level are used with in construction, guarantee construction quality.

Claims (9)

1. strengthening concrete frame structure, form by frame column and Vierendeel girder (9), Vierendeel girder (9) is a reinforced concrete beam, described reinforcing bar comprises beam main tendon (7) and beam stirrup, beam main tendon (7) comprises elongated muscle and non-elongated muscle, Vierendeel girder (9) is connected the side or the top of frame column, Vierendeel girder is erected with floor on (9), floor and Vierendeel girder (9) are cast as one, it is characterized in that: described frame column is built by stem stem reinforcing bar and peripheral post reinforced concrete structure and is one, the stem stem reinforcing bar is cast with concrete in (1), the periphery of stem stem reinforcing bar (1) is furnished with the peg (2) perpendicular to the reinforcing bar face, and passes through peg (2) build-in in post reinforced concrete structure (3); The reinforcing bar of described post reinforced concrete structure (3) comprises stud (4), tie muscle (5) and drag hook (6), the beam main tendon (7) on top, bean column node place is divided into and runs through beam main tendon (7.1) and around post beam main tendon (7.2), top when post beam main tendon (7.2) is walked around stem stem reinforcing bar (1) in the frame column, outwards bend around the gradient of post beam main tendon (7.2) by 1: 6; The beam main tendon (7.1) that runs through on top passes preformed hole on the stem stem reinforcing bar (1) in the frame column, and the end of the beam main tendon of bottom (7) anchors in the post reinforced concrete structure (3) or upwards bending.
2. strengthening concrete frame structure according to claim 1 is characterized in that: described frame column is insulated column (11) or responde (12), and described stem stem reinforcing bar (1) is square steel pipe or round steel pipe.
3. strengthening concrete frame structure according to claim 1; it is characterized in that: the concrete of described post reinforced concrete structure (3) is a self-compaction without vibration concrete; the concrete coarse aggregate maximum particle diameter is less than 1/3 of the steel reinforced concrete topping, and is not more than 25mm.
4. strengthening concrete frame structure according to claim 1 is characterized in that: described tie muscle (5) is encrypted along the frame column overall height, and described drag hook (6) is around stem stem reinforcing bar (1) circumferential distribution, and drawknot is on stud (4).
5. strengthening concrete frame structure according to claim 1 is characterized in that: the body of wall horizontal reinforcement (13) of described responde (12) is around disconnecting to the side of responde (12), and with responde in the two-sided welding of reinforcing bar (1).
6. strengthening concrete frame structure according to claim 1 is characterized in that: the beam main tendon (7) on the top, bearing place of described Vierendeel girder (9) is a row, two row or three rows.
7. strengthening concrete frame structure according to claim 1, it is characterized in that: when the beam main tendon (7) on the top, bearing place of described Vierendeel girder (9) or the beam main tendon (7) of bottom were two rows, the non-elongated muscle of close beam center line distributed in beam center line bilateral symmetry.
8. strengthening concrete frame structure according to claim 1, it is characterized in that: described frame column side is connected with stiffening plate (10) or does not have, its width is during greater than the breadth of section of Vierendeel girder (9), the end haunch of Vierendeel girder (9) is haunched beam (8), and the beam main tendon (7) in haunched beam (8) outside is walked around stud (4).
9. the job practices of strengthening concrete frame structure according to claim 1, it is characterized in that: construction sequence is as follows:
Step 1, the stone bolt that the preburied frame trestle is connected with patten;
Step 2, according to design drawing, unwrapping wire is determined the ground location of frame column;
Step 3 is according to the position of the definite frame column of unwrapping wire, in the stem stem reinforcing bar (1) and the correction of floor mounted frame column;
Step 4 is according to the stud (4) of working drawing and unwrapping wire fixed-site frame column;
Step 5, the bottom perfusion self-compaction without vibration concrete of stem stem reinforcing bar (1), after concrete strength reaches design strength, the concrete slag of cleaning bottom, proofread and correct stud (4) position according to the post sideline, carry out then the joint of stud (4) is carried out mechanical connection and stud (4) is carried out colligation;
Step 6, tie muscle (5) and drag hook (6) on the cover stud, tie muscle (5) opening part is arranged along four jiaos of logical commentaries on classics of frame column;
Step 7, the joint of inspection stud (4), qualified back is temporary fixed upright straight with scaffold, and tie muscle (5) colligation from top to bottom that will package;
Step 8 installs the frame column template;
Step 9 is carried out the concreting of post reinforced concrete structure (3);
Step 10 is laid floor bottom mould;
Step 11 is worn bean column node place beam main tendon (7); Top when post beam main tendon (7.2) is walked around stem stem reinforcing bar (1) in the frame column, outwards bend around the gradient of post beam main tendon (7.2) by 1: 6; The beam main tendon (7.1) that runs through on top passes preformed hole on the stem stem reinforcing bar (1) in the frame column, and the end of the beam main tendon of bottom (7) anchors in the post reinforced concrete structure (3) or upwards bending;
Step 12 identifies stirrup spacing on beam main tendon, wear beam stirrup then on beam main tendon (7), and beam main tendon (7) and beam stirrup are carried out colligation;
Step 13 installs the side form of Vierendeel girder (9) at the Vierendeel girder design attitude;
Step 14, off line reinforcing bar of colligation floor and floor online reinforcing bar;
Step 15, pouring frame beam (9) and floorslab concrete.
CN201010205823XA 2010-06-22 2010-06-22 Stiff concrete frame structure and construction method thereof Expired - Fee Related CN101845850B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010205823XA CN101845850B (en) 2010-06-22 2010-06-22 Stiff concrete frame structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010205823XA CN101845850B (en) 2010-06-22 2010-06-22 Stiff concrete frame structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN101845850A true CN101845850A (en) 2010-09-29
CN101845850B CN101845850B (en) 2012-08-22

Family

ID=42770645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010205823XA Expired - Fee Related CN101845850B (en) 2010-06-22 2010-06-22 Stiff concrete frame structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN101845850B (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155095A (en) * 2011-03-22 2011-08-17 中国十九冶集团有限公司 Arrangement method of steel rib concrete steel bars of large metallurgical industry factory building
CN102251669A (en) * 2011-05-26 2011-11-23 葛洲坝集团第二工程有限公司 Construction method for cylindrical thin-walled concrete wall template
CN102322101A (en) * 2011-06-30 2012-01-18 湖北弘毅建筑装饰工程有限公司 Construction method for formed steel reinforced concrete beam-column nodes
CN102619164A (en) * 2012-04-17 2012-08-01 上海市城市建设设计研究总院 Quake-proof reinforcing bar structure of pier column
CN102635239A (en) * 2012-05-15 2012-08-15 孟凡林 Method for anchoring welding wire-mesh reinforcement on floorslab bottom into support
CN102936957A (en) * 2012-11-20 2013-02-20 永升建设集团有限公司 Construction method for optimizing arrangement of steel bars in structural steel concrete structure
CN103331542A (en) * 2013-06-26 2013-10-02 张君迪 Construction mold of modularized building outer wall framework
CN103981897A (en) * 2014-05-29 2014-08-13 浙江省建工集团有限责任公司 Waterproof construction method of basement exterior wall stiffness pillar
CN104032953A (en) * 2014-06-12 2014-09-10 中国五冶集团有限公司 Construction method for template leaking stoppage in special-shaped SRC (Steel Reinforced Concrete) column node region
CN104032956A (en) * 2014-06-24 2014-09-10 天津二十冶建设有限公司 Construction method for connecting reinforced concrete beams with steel reinforced concrete columns
CN106149978A (en) * 2015-03-31 2016-11-23 天津市建工工程总承包有限公司 Steel framework post with joint type attachment means
CN106917451A (en) * 2017-03-21 2017-07-04 中国航空规划设计研究总院有限公司 The anti-seismic frame structure system and its construction method of a kind of one side corridor tier building
CN110162856A (en) * 2019-05-13 2019-08-23 南昌大学 A kind of beam stirrup intelligent generation method based on dynamo
CN110388053A (en) * 2019-07-03 2019-10-29 广西建工集团第二安装建设有限公司 Super thick concrete shear force wall outboard template reinforcement means
CN110593271A (en) * 2019-09-23 2019-12-20 中建一局集团建设发展有限公司 Node for enabling independent lattice column to penetrate through inner supporting beam and construction method of node
CN110984693A (en) * 2019-12-30 2020-04-10 重庆长赛新材料科技有限公司 Method for keeping alignment of upright post panels of enclosing wall during pouring
CN112459356A (en) * 2020-11-10 2021-03-09 苏州方正工程技术开发检测有限公司 Connecting node of wall sealing column and outer gutter of large-column-distance factory building
CN114277935A (en) * 2021-12-01 2022-04-05 中国建筑第二工程局有限公司 Steel structure stiff frame column and transfinite beam connecting structure and construction method thereof
CN115354759A (en) * 2022-07-26 2022-11-18 中国航空规划设计研究总院有限公司 Connecting joint of prefabricated steel reinforced concrete column and prefabricated reinforced concrete beam and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2860294B1 (en) * 1998-02-05 1999-02-24 黒沢建設株式会社 Column and beam joining method and joint structure
CN100999913A (en) * 2007-01-05 2007-07-18 华南理工大学 Node of steel tube concrete pole and steel reinforced concrete beam and processing method thereof
CN101333825A (en) * 2008-08-06 2008-12-31 北京首钢建设集团有限公司 High-rise building frame supported sectional steel concrete girder-like structural transfer floor construction method
CN201695572U (en) * 2010-06-22 2011-01-05 中国建筑第二工程局有限公司 Stiff concrete column and reinforced concrete frame beam mixed structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2860294B1 (en) * 1998-02-05 1999-02-24 黒沢建設株式会社 Column and beam joining method and joint structure
CN100999913A (en) * 2007-01-05 2007-07-18 华南理工大学 Node of steel tube concrete pole and steel reinforced concrete beam and processing method thereof
CN101333825A (en) * 2008-08-06 2008-12-31 北京首钢建设集团有限公司 High-rise building frame supported sectional steel concrete girder-like structural transfer floor construction method
CN201695572U (en) * 2010-06-22 2011-01-05 中国建筑第二工程局有限公司 Stiff concrete column and reinforced concrete frame beam mixed structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《建筑结构学报》 20100531 禹慧,李伟兴,程浩,万月荣 世博会主题馆预应力混凝土梁-钢骨变截面劲性柱节点设计及试验研究 第31卷, 第5期 2 *
《施工技术》 20071130 曹凤新 劲性结构框架柱裂缝处理与控制技术 第36卷, 第11期 2 *

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155095B (en) * 2011-03-22 2012-07-18 中国十九冶集团有限公司 Arrangement method of steel rib concrete steel bars of large metallurgical industry factory building
CN102155095A (en) * 2011-03-22 2011-08-17 中国十九冶集团有限公司 Arrangement method of steel rib concrete steel bars of large metallurgical industry factory building
CN102251669A (en) * 2011-05-26 2011-11-23 葛洲坝集团第二工程有限公司 Construction method for cylindrical thin-walled concrete wall template
CN102251669B (en) * 2011-05-26 2012-09-12 葛洲坝集团第二工程有限公司 Construction method for cylindrical thin-walled concrete wall template
CN102322101A (en) * 2011-06-30 2012-01-18 湖北弘毅建筑装饰工程有限公司 Construction method for formed steel reinforced concrete beam-column nodes
CN102619164A (en) * 2012-04-17 2012-08-01 上海市城市建设设计研究总院 Quake-proof reinforcing bar structure of pier column
CN102635239A (en) * 2012-05-15 2012-08-15 孟凡林 Method for anchoring welding wire-mesh reinforcement on floorslab bottom into support
CN102936957A (en) * 2012-11-20 2013-02-20 永升建设集团有限公司 Construction method for optimizing arrangement of steel bars in structural steel concrete structure
CN103331542B (en) * 2013-06-26 2015-04-01 张君迪 Construction mold of modularized building outer wall framework
CN103331542A (en) * 2013-06-26 2013-10-02 张君迪 Construction mold of modularized building outer wall framework
CN103981897B (en) * 2014-05-29 2016-06-29 浙江省建工集团有限责任公司 A kind of waterproof construction method of outer wall of basement stiffened column
CN103981897A (en) * 2014-05-29 2014-08-13 浙江省建工集团有限责任公司 Waterproof construction method of basement exterior wall stiffness pillar
CN104032953A (en) * 2014-06-12 2014-09-10 中国五冶集团有限公司 Construction method for template leaking stoppage in special-shaped SRC (Steel Reinforced Concrete) column node region
CN104032953B (en) * 2014-06-12 2016-03-02 中国五冶集团有限公司 Special-shaped SRC Column border node region template leak-blocking construction method
CN104032956A (en) * 2014-06-24 2014-09-10 天津二十冶建设有限公司 Construction method for connecting reinforced concrete beams with steel reinforced concrete columns
CN106149978A (en) * 2015-03-31 2016-11-23 天津市建工工程总承包有限公司 Steel framework post with joint type attachment means
CN106149978B (en) * 2015-03-31 2018-06-01 天津市建工工程总承包有限公司 Steel framework column with joint type attachment device
CN106917451A (en) * 2017-03-21 2017-07-04 中国航空规划设计研究总院有限公司 The anti-seismic frame structure system and its construction method of a kind of one side corridor tier building
CN110162856B (en) * 2019-05-13 2021-04-06 南昌大学 Intelligent beam stirrup generation method based on dynamo
CN110162856A (en) * 2019-05-13 2019-08-23 南昌大学 A kind of beam stirrup intelligent generation method based on dynamo
CN110388053A (en) * 2019-07-03 2019-10-29 广西建工集团第二安装建设有限公司 Super thick concrete shear force wall outboard template reinforcement means
CN110388053B (en) * 2019-07-03 2021-05-25 广西建工集团第二安装建设有限公司 Method for reinforcing outer side template of super-thick concrete shear wall
CN110593271A (en) * 2019-09-23 2019-12-20 中建一局集团建设发展有限公司 Node for enabling independent lattice column to penetrate through inner supporting beam and construction method of node
CN110984693A (en) * 2019-12-30 2020-04-10 重庆长赛新材料科技有限公司 Method for keeping alignment of upright post panels of enclosing wall during pouring
CN110984693B (en) * 2019-12-30 2021-06-08 重庆长赛新材料科技有限公司 Method for keeping alignment of upright post panels of enclosing wall during pouring
CN112459356A (en) * 2020-11-10 2021-03-09 苏州方正工程技术开发检测有限公司 Connecting node of wall sealing column and outer gutter of large-column-distance factory building
CN114277935A (en) * 2021-12-01 2022-04-05 中国建筑第二工程局有限公司 Steel structure stiff frame column and transfinite beam connecting structure and construction method thereof
CN115354759A (en) * 2022-07-26 2022-11-18 中国航空规划设计研究总院有限公司 Connecting joint of prefabricated steel reinforced concrete column and prefabricated reinforced concrete beam and construction method
CN115354759B (en) * 2022-07-26 2023-04-14 中国航空规划设计研究总院有限公司 Prefabricated steel reinforced concrete column-prefabricated reinforced concrete beam connecting joint and construction method

Also Published As

Publication number Publication date
CN101845850B (en) 2012-08-22

Similar Documents

Publication Publication Date Title
CN101845850B (en) Stiff concrete frame structure and construction method thereof
WO2017045223A1 (en) Prefabricated pier column member with steel-concrete composite structure
CN107989231A (en) A kind of Prefabricated concrete-filled steel tube frame-shear wall and its construction method
CN201695572U (en) Stiff concrete column and reinforced concrete frame beam mixed structure
CN102330432A (en) Panel-type framework prestressed anchor rod flexible support structure and construction method thereof
CN101984189B (en) Construction method of large steel concrete composite multi-terrace slope skewback
CN108035438A (en) A kind of concrete assembled frame structure system of high-strength high ductility and connection method
CN104480922B (en) Space truss formwork system and construction method thereof
CN202731939U (en) Long-span tunnel arch portion secondary lining rebar colligation structure based on skeleton beams
CN106049679A (en) Super high-rise steel reinforced concrete framework core barrel structural system and construction method
CN103046645A (en) Large span prefabricated monolithic casting structure and construction method
CN106223183A (en) Assembled concrete-filled rectangular steel tube combination truss bridge and construction method
CN206267309U (en) A kind of assembled steel concrete frame core wall structure system
CN108547311A (en) Isolated footing under a kind of prefabricated assembled profile steel concrete column
CN108775084A (en) Steel-concrete combines precast beam and prefabricated post connection structure and construction method
CN206090275U (en) Assembled rectangular concrete -filled steel tube makes up truss bridge
CN106930191A (en) A kind of cast-in-situ box girder hoop bracket system and its construction method
CN110409900A (en) Hybrid connection precast prestressed concrete circle warehouse structure
CN207919747U (en) A kind of high-strength high concrete assembled frame structure system of ductility
CN110080438A (en) A kind of incorporation basalt fibre regeneration concrete wall and apply method
CN201722813U (en) Confined masonry structure
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN206503378U (en) Newly-increased outrigger constructing structure
CN106499211B (en) Newly-increased outrigger frame Baogang anchor daraf(reciprocal of farad) structure
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120822

Termination date: 20150622

EXPY Termination of patent right or utility model