CN101832143B - Method for treating tunnel water leakage - Google Patents

Method for treating tunnel water leakage Download PDF

Info

Publication number
CN101832143B
CN101832143B CN2010101381727A CN201010138172A CN101832143B CN 101832143 B CN101832143 B CN 101832143B CN 2010101381727 A CN2010101381727 A CN 2010101381727A CN 201010138172 A CN201010138172 A CN 201010138172A CN 101832143 B CN101832143 B CN 101832143B
Authority
CN
China
Prior art keywords
tunnel
water
lining
groove
crack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010101381727A
Other languages
Chinese (zh)
Other versions
CN101832143A (en
Inventor
李国峰
母其章
唐各祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN COMMUNICATIONS INVESTMENT GROUP ROAD CONSTRUCTION Co.,Ltd.
Original Assignee
Yunnan Yunling Highway Maintenance & Greening Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Yunling Highway Maintenance & Greening Engineering Co Ltd filed Critical Yunnan Yunling Highway Maintenance & Greening Engineering Co Ltd
Priority to CN2010101381727A priority Critical patent/CN101832143B/en
Publication of CN101832143A publication Critical patent/CN101832143A/en
Application granted granted Critical
Publication of CN101832143B publication Critical patent/CN101832143B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to an anti-leakage method of an underground building structure, in particular to a method for treating diseases of tunnel water leakage, belonging to the technical field of building structure construction. The method comprises the following steps of: firstly carrying out chemical liquid grouting blockage around two-lining water leakage of a tunnel to generate sealing colloids at cracks of the building structure; then making a snakelike reciprocating tank on the two-lining surface of the tunnel, installing a titanium wire in the tank as an anode wire, installing a copper bar in the connecting position of the two-lining back of the tunnel and a soil body; and collecting anode/cathode wires to an electric seepage-proofing control box and connecting the anode/cathode wires with a central control box, and then energizing for generating low-voltage pulse charge so that ionized water moves to the cathode direction at the outer side of the tunnel. The invention is suitable for newly-established underground engineering, tunnel engineering and the traditional underground and tunnel engineering and has the advantages of low long-term comprehensive manufacturing cost and running cost and flexible and convenient installation engineering. The method has an obvious water-proofing and seepage-proofing effect under the conditions that a waterproofing plate has great reduction of function, a great deal of cracks and serious water seepage.

Description

A kind of method for the treatment of tunnel water leakage
Technical field
The present invention relates to the Antiseep method of a kind of underground building structure, particularly the method that the disease of tunnel percolating water is punished belongs to the building structure construction technical field.
Background technology
Tunnel percolating water is one of common disease in domestic and international tunnel, and tunnel percolating water shows as mainly that the arch leaks, abutment wall drops down water, constuction joint, deformation joint and distress in concrete percolating water, rises soil at the bottom of the tunnel etc.
The tradition of highway tunnel percolating water is administered, and is to determine resolution and select material according to the water source, type, position and the water leakage that leak.Generally reperfusion serosity polyurethane or the filling of ordinary Portland cement list liquid slurry are adopted in arch and abutment wall lining cutting cavity behind, lining cutting surface EXIT POINT adopts the slip casting shutoff, constuction joint percolating water is adopted ejectment or slip casting shutoff, the method that the wet stain on lining cutting surface adopts slip casting and smears water-repellent paint is carried out shutoff, to methods such as concrete weak part employing grouting reinforcings.Follow during punishment and go up afterwards earlier, arch back wall adopts cement grout shutoff big flood earlier, the principle that adopts chemical grout shutoff percolating water again and drip earlier.The common high pressure chemistry slip casting method for repairing and mending that adopts, be temporary transient or provisional leak stopping, recurrence frequency height, the anti-seepage effect instability can not forever solve leakage problem, simultaneously up hill and dale, because repeatedly slip-casting is repaired (structurally punching too much), cause the intensity of concrete structure to reduce, have side effects, thereby influence application life of structure.
1807, German Reuss professor found the sign of liquid flow in containing the pore structure at first in Russia's experiment.Nineteen thirty, Switzerland Ernst brother finds in containing the structure of pore, after applying electric charge between the both positive and negative polarity, and the principle that the water in the structure can be removed.According to these discoveries, produced multiple-pulse electricity antiseepage (MPS) technology subsequently.
Electricity antiseepage (MPS) system is a multiple-pulse electro osmosis waterproof technique most advanced and perfect in the world today, its principle is that the control device of MPS system produces a series of action of low-voltage pulse electric charge, electromagnetic field by the positive and negative electrode formation, affact on the hydrone in interior pore of structure and the slit, its ionization; The hydrone that is ionized moves towards the negative electrode direction that is installed in the structure outside, thereby the moisture of inside configuration is drained and exsiccation gradually.This technology has been used decades, mainly be used in waterproof, antiseepage, leak stopping and the dehumidify field of (as concrete, masonry structure) in the structure of underground building, and obtained success, demonstrated the remarkable ability of its impervious leakage-stopping, the anti-seepage effect of this technology has obtained sufficient proof in the famous engineering in Norway, Britain and Hong Kong.But this technology only is only applicable to the seepage prevention of pore in the structure, and for the serious seepage that the tunnel that has built up causes owing to complicated factor, regulation effect is unsatisfactory.
Because Yunnan geological structure complexity, more than any single seepage control technique all can not obtain effect preferably, and multiple-pulse electro osmosis waterproof technique application example in the tunnel antiseepage is less, therefore need grope rational job practices, just can reach best anti-seepage effect.
Summary of the invention
Technical problem to be solved by this invention provides a kind of tunnel and comprehensively punishes the seepage method, and long-term comprehensive cost of this method and running cost are low, and installing engineering is flexible, decline to a great extent in the splash guard function, have a large amount of cracks, under the infiltration serious situation, the waterproof, seepage control effect is obvious.
Solving the scheme that technical problem of the present invention adopts is: at first build at tunnel double-lining and carry out chemical liquids slip casting shutoff around leaking, produce the joint seal colloid at the place, crack of building structure; Build the surface at tunnel double-lining then and leave snakelike reciprocal groove, titanium metal wire is installed as anode line in the groove, link to each other position installation copper rod as cathode line at the tunnel double-lining back side with the soil body, the cloudy the two poles of the earth of sun line is aggregated into electric antiseepage control cabinet and is connected with central control cabinet, energising produces the action of low-voltage pulse electric charge, and the water that is ionized is moved towards the cathode direction outside the tunnel.
Concrete technical scheme of the present invention is: the water of polyurethane and pH6~7 is mixed into chemical grout, fills with the high-pressure slip-casting machine crack of will seeping water under the pressure of 20MP~30MP, and grouting at the end should continue pressure more than 20 minutes; Tunnel double-lining is built on the surperficial concrete and to be dug dark 2cm~2cm, and the stria of wide 0.5cm~1cm cleans up with clear water after ending groove; Install the slit of the groove of titanium metal wire with graphite and cement mixing slurry shutoff titanium metal wire and groove; It is that 1m at the bottom of the distance tunnel~2m place boring penetrates abutment wall and stretches into the soil body that the negative electrode copper rod is installed, and copper rod is tied with electrical insulating film at the position of tunnel double-lining.
When carrying out chemical liquids slip casting of the present invention, injected hole should be to tilt 30 °~45 ° with tunnel infiltration face, the both sides that are chosen in the crack of the perfusion point of injected hole, and the crack should be passed in the hole.
The present invention at first carries out the change filling of routine techniques, chemical grout polyurethane with can be during very short time (10 seconds) after water mixes rapid expansion, the generation colloid, colloid plays the joint sealing effect along crack movement.Electro osmosis antiseepage line system is installed in the tunnel is then carried out the tunnel antiseepage, after connecting the power supply transformation, central authorities' control cabinet is sent to electric antiseepage (MPS) control cabinet with 36 volts of low currents, electric current produces electron ion with the moisture content ionization in the concrete, electron ion flows to the negative electrode direction under the continuous promotion of electric current be the structure outside, do not flow backwards, make structure become dry state.The energy that the hydrone that is ionized moves can bear the water under high pressure effect greater than the energy of the siphonage power of pore in gravity and structure of water.As long as apply the positive negative pulse stuffing electric charge continuously, the water in the structure will move towards negative electrode one side (the structure outside) always, can form seal antiseepage barrier one, and punishment water or moisture infiltrate in the structure.The underground structure that has free flow water to ooze out is changed the interim sealing of filling earlier, carry out the installation of electric seepage control system again.Normal dry run needs 1-3 month, and in particular cases maximum 3 months, (seawater is faster than fresh water rate of drying).Method of the present invention can be punished for a long time and be produced new crack generation, and its punishment time of penetration can be for 50 years.
The invention has the beneficial effects as follows: by chemical liquids slip casting method and the combination of multiple-pulse electro osmosis waterproof technique, the long-term comprehensive cost and the running cost of tunnel antiseepage are reduced greatly, installing engineering is flexible; Decline to a great extent in the splash guard function, have a large amount of cracks, under the infiltration serious situation, the waterproof, seepage control effect is obvious.
The specific embodiment
Embodiment
(1) open fire slip casting mending-leakage
45 degree that tilt in the place of tunnel infiltration are holed, and the selection of boring slip casting point should be on the both sides in crack, and the crack should be passed in the hole, and concrete depth bounds can be determined according to the job site.After finishing, boring inserts Water slop injector, Water slop injector is connected with the high-pressure slip-casting machine, chemical grout polyurethane is filled with by the high-pressure slip-casting machine crack of will seeping water under the pressure of 20~30MP, the water pH of modulation chemical grout is 6~7, grouting at the end, continue pressure more than 20 minutes, guarantee the plumpness of being in the milk.
(2) bury electric antiseepage line system underground
According to the characteristics of works, determine the concrete circuit that electric seepage control system is installed, comprise the spacing between line and line, the layout radical of cathode rod.Arrange that circuit generally has two kinds of methods: horizontal and vertical, which kind of can determine according to practice of construction is on-the-spot specifically the area that generally seeps water is relatively concentrated not too greatly again and can be adopted the lateral arrangement circuit, vertically arranges circuit otherwise then adopt with.
On tunnel double-lining, slot; Dig dark 3cm on two lining concretes, the stria of wide 0.5cm cleans up with clear water after ending groove, and for the usefulness that anode line is installed, anode line can be used titanium metal wire, should consider flexible, not frangibility, advantages of high strength during with other materials.
Install the groove graphite-cement mixing slurry shutoff that conducts electricity very well of titanium metal wire.In the local boring of the 1m at the bottom of the tunnel that chooses the negative pole copper rod is installed, the length of cathode bar stretches into the soil body must penetrate abutment wall, guarantee with abutment wall behind water body and wet soil form the loop forever and determine, around the hole with sealing silk sealing.
Install central control cabinet, electrode line (titanium metal wire) with after negative line (line that is connected with copper rod) is compiled, is connected in the central control cabinet, central control cabinet is connected with power supply, finishes whole erection work.Last power-on makes it operate as normal, regularly the hygrometric degree; Should select the size of electric antiseepage central authorities control cabinet power according to the area that reality is punished seepage.General adjustment automatically below 1500 square metres, when surpassing 1500 squares, should be in addition with a chest control.Specifically see job site wiring length, the long power loss of circuit is no doubt bigger.
(3) move electric antiseepage (MPS) line system
The anti-penetration control system of device electricity in the tunnel, form with probe and lead, the body structure surface that is installed in infiltration according to designing requirement forms snakelike reciprocal anodal grid, make it produce a series of action of low-voltage pulse electric charge after the energising,, affact in the tunnel on the hydrone in the pore and slit by the electric field that positive and negative electrode constitutes, with the hydrone ionization, the hydrone that is ionized moves towards the negative electrode direction that is installed in the outside, tunnel, and the moisture of tunnel internal is drained and exsiccation gradually.As long as system keeps duty, water just moves towards the direction in the outside, tunnel always, and can not flow backwards enters the inboard, tunnel once more, and makes the tunnel keep permanent dry state, thereby solves the tunnel seepage problem.By the central control cabinet of in good time adjustment; The tunnel is kept dry state.

Claims (3)

1. the method for a treating tunnel water leakage is characterized in that: at first build to leak at tunnel double-lining and carry out chemical liquids slip casting shutoff on every side, produce the joint seal colloid at the place, crack of building structure; Build the surface at tunnel double-lining then and leave snakelike reciprocal groove, titanium metal wire is installed as anode line in the groove, link to each other position installation copper rod as cathode line at the tunnel double-lining back side with the soil body, the cloudy the two poles of the earth of sun line is aggregated into electric antiseepage control cabinet and is connected with central control cabinet, energising produces the action of low-voltage pulse electric charge, and the water that is ionized is moved towards the cathode direction outside the tunnel.
2. press the method for the described treating tunnel water leakage of claim 1, it is characterized in that: the water with polyurethane and pH6~7 is mixed into chemical grout, fill with the high-pressure slip-casting machine crack of will seeping water under the pressure of 20MP~30MP, grouting at the end should continue pressure more than 20 minutes; Tunnel double-lining is built on the surperficial concrete and to be dug dark 2cm~3cm, and the stria of wide 0.5cm~1cm cleans up with clear water after ending groove; Install the slit of the groove of titanium metal wire with graphite and cement mixing slurry shutoff titanium metal wire and groove; It is that 1m at the bottom of the distance tunnel~2m place boring penetrates abutment wall and stretches into the soil body that the negative electrode copper rod is installed, and copper rod is tied with electrical insulating film at the position of tunnel double-lining.
3. by the method for the described treating tunnel water leakage of claim 2, it is characterized in that: when carrying out chemical liquids slip casting, injected hole should be to tilt 30 °~45 ° with tunnel infiltration face, the both sides that are chosen in the crack of the perfusion point of injected hole, and injected hole should pass the crack.
CN2010101381727A 2010-04-02 2010-04-02 Method for treating tunnel water leakage Active CN101832143B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101381727A CN101832143B (en) 2010-04-02 2010-04-02 Method for treating tunnel water leakage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101381727A CN101832143B (en) 2010-04-02 2010-04-02 Method for treating tunnel water leakage

Publications (2)

Publication Number Publication Date
CN101832143A CN101832143A (en) 2010-09-15
CN101832143B true CN101832143B (en) 2011-09-07

Family

ID=42716337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101381727A Active CN101832143B (en) 2010-04-02 2010-04-02 Method for treating tunnel water leakage

Country Status (1)

Country Link
CN (1) CN101832143B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787851B (en) * 2011-05-20 2015-03-18 上海市电力公司 Leaking stoppage method for seam of duct piece of power cable tunnel
CN102808630B (en) * 2011-06-03 2015-06-17 上海市电力公司 Method for plugging power cable tunnel duct piece bolt hole
CN102393650B (en) * 2011-07-29 2013-06-05 中国人民解放军后勤工程学院 Device and method for intelligent control of electrical pulse water prevention
CN102536270B (en) * 2011-12-29 2013-12-25 中铁十六局集团北京轨道交通工程建设有限公司 Tunnel seepage protection method for soft soil stratum by existing shield method
CN105350556A (en) * 2015-11-10 2016-02-24 中交一航局第四工程有限公司 New material underground structure leakage stoppage construction technology
CN105484773A (en) * 2015-12-25 2016-04-13 武汉市政工程设计研究院有限责任公司 System plugging and draining structure for tunnel leakage treatment
CN105649223B (en) * 2016-01-11 2017-09-05 顾容天 Concrete electric permeates waterproof system
CN106801948A (en) * 2016-12-13 2017-06-06 华中科技大学 A kind of superstructure dehumidification system
CN108104845B (en) * 2017-12-14 2019-10-01 中国水利水电第六工程局有限公司 A kind of tunnel sealing stream device and seepage flow processing method
CN108951708B (en) * 2018-06-26 2020-12-18 山东大学 Comprehensive treatment method for underground engineering lining water leakage
TWI762990B (en) * 2020-08-05 2022-05-01 駿馳工程股份有限公司 Electric induction anti-seepage reinforcement method and system
CN114075833B (en) * 2020-08-19 2023-09-26 福建峻驰工程科技有限公司 Electric induction anti-seepage reinforcing method and system
CN113217014B (en) * 2021-05-24 2022-03-29 中铁隧道局集团有限公司 Permanent repair method for tunnel lining cracks by using UHPC material

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3815141A1 (en) * 1988-05-04 1989-11-16 Phoenix Ag ACTIVATED SEAL FOR PRESSURE PIPES
JP3827160B2 (en) * 2003-10-17 2006-09-27 パシフィックコンサルタンツ株式会社 Tunnel repair method
CN101021155A (en) * 2007-03-13 2007-08-22 柳自道 Tunnel double-lining protection draining structure
CN101285389A (en) * 2008-05-29 2008-10-15 中交第二公路勘察设计研究院有限公司 Submarine tunnel composite lining interlaminar water seepage longitudinal cross flow-proof construction method
CN101672187B (en) * 2009-08-13 2012-05-30 重庆市十八土鑫诚灌浆防水工程有限公司 Anti-seepage water treatment method

Also Published As

Publication number Publication date
CN101832143A (en) 2010-09-15

Similar Documents

Publication Publication Date Title
CN101832143B (en) Method for treating tunnel water leakage
US11072901B2 (en) Foundation for a structure
CN102162239B (en) Soft soil foundation treated by chemical-solution-combined injection electroosmosis method and construction method of soft soil foundation
CN105256788B (en) Blowing filling soft soil foundation consolidation process system and grid type vacuum preloading are combined the processing method of electro-osmosis method
CN101831903B (en) Method for treating soft foundation
WO2019227906A1 (en) Electro-osmosis treatment method for reducing moisture content of roadbed, and road structure
CN104929140A (en) Slope rapid seepage and drainage and self-reinforcement device and method
CN208533287U (en) A kind of road structure reducing roadbed moisture content
CN102094414A (en) Method for treating deep soft soil foundation by combining chemical electro-osmosis method and vacuum preloading method
CN103046513A (en) Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting
CN101845830A (en) Open caisson deviation rectification construction method
CN105453748A (en) Stereo totally-closed greening vacuum alkali removing device and application method thereof
CN114109442B (en) Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method
CN108118727A (en) Ground wall leads the cell wall post-reinforcing construction technology led after wall is implemented outside wall side wall
CN103726486A (en) Processing method for strengthening vacuum preloading soft foundation by direct-current electric field
CN109811759A (en) Faradaic reaction stake and preparation method thereof
CN204780952U (en) Side slope is oozed drainage fast and is reached from reinforcing apparatus
CN109339118A (en) A kind of basement bottom board leakage-resistant device and construction method
CN205224011U (en) A dull and stereotyped slip casting device of microorganism for reinforcing ground that can liquefy
WO2021212255A1 (en) Pneumatic fracturing technology-based "mobile electrode" electro-osmotic drainage consolidation treatment method and device
CN204475369U (en) One passes through the anti-settling jacking pipe structure of shallow earthing anti-floating
CN104594369B (en) Karst high pressure group hole replacement grouting method and its structure
CN107747317B (en) Soft rock foundation impervious wall groove bottom sediment treatment method and soft rock foundation impervious wall groove bottom structure
CN106988330B (en) Base pit engineering soft soil foundation is layered dewatering construction structure and construction method
CN105421498A (en) Foundation pit anti-seepage and settlement control method based on stereoscopic curtain-well group system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Guofeng

Inventor after: Mu Qizhang

Inventor after: Tang Guxiang

Inventor before: Li Guofeng

Inventor before: Mu Qizhang

Inventor before: Tang Gexiang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI GUOFENG MU QIZHANG TANG GEXIANG TO: LI GUOFENG MU QIZHANG TANG GUXIANG

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Xishan District 650032 in Yunnan province Kunming City Shui Road No. 101

Patentee after: Yunnan public voting construction group Co., Ltd

Address before: Xishan District 650032 in Yunnan province Kunming City Shui Road No. 101

Patentee before: Yunnan Yunling Highway Maintenance & Greening Engineering Co., Ltd.

CP01 Change in the name or title of a patent holder

Address after: Xishan District 650032 in Yunnan province Kunming City Shui Road No. 101

Patentee after: YUNNAN COMMUNICATIONS INVESTMENT GROUP ROAD CONSTRUCTION Co.,Ltd.

Address before: Xishan District 650032 in Yunnan province Kunming City Shui Road No. 101

Patentee before: YUNNAN GONGTOU CONSTRUCTION GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder