Tank with automatic draining, water cleaning systems
Technical field:
The present invention relates to a kind of tank of kitchen, a kind of specifically tank with automatic draining and automatic water purification function.
Background technology:
Tank is being played the part of important role in people's life; Even can be rated as the heart in kitchen; Along with science and technology grows with each passing hour, people have been transformed into " intelligence " of today, " environmental protection " novel water tank by original simple cleaning function to the instructions for use of kitchen basin.Common to all, our employed tank waste water all is directly to be discharged into sewer at present, in that nowadays the epoch of water scarcity have been caused very big waste.Along with severe shortage of water resource, drought is existing frequently all over the world, and water-saving theory is rooted in the hearts of the people day by day.Patent Office of the People's Republic of China is disclosed on December 1st, 2004, and notice of authorization number is " water economizer " of " CN2659870Y ", and it is whole for being the casing of L shape, is divided into erectting and keeping flat casing, keeps flat casing and is made as end water tank and holds concurrently and can place the base of object.On end water tank, be provided with a tank by a side of erectting casing, this tank is communicated with end water tank, and the bottom is provided with filter; On the casing to being provided with opening by tank; On erectting casing, be provided with another tank, this tank is communicated with through pipeline with end water tank, and the bottom is provided with filter; Erect the interior bottom of casing opposite side and be provided with water pump; Water pump one end is communicated with end water tank, and an end successively connects watering equipment through effluent treatment plant and water storage device, and end tank top is by erectting the switching device that casing one side is provided with the automatic switch water pump.This product can't carry out direct draining according to user's request and cross water purification, if purify with messy water, not only purifying water effect is bad, and can shorten the application life of filter greatly, so practicality is not high.
Summary of the invention:
The objective of the invention is to defective and deficiency, for people provide the automatic draining of a kind of ability, automatic water purification, make water resource be able to the tank of recycle to above-mentioned prior art.
For realizing that the technical scheme that above-mentioned purpose the present invention is taked is: this tank with automatic draining, water cleaning systems comprises the tank that is provided with panel and at least one cell body; Bottom at cell body is provided with draining valve; Be movably installed with the valve gap of band diaphragm seal in this draining valve, the bottom delivery port of draining valve is equipped with gutter, is embedded with the control panel of band touch-screen on the panel of said tank; Described tank installed beside has the water purification casing and presses the water purification gatherer certainly; The water purifier of interim water tank and a plurality of series connection is installed in the water purification casing, interim water tank through with water pump that control panel links to each other after, communicate with the input of water purifier; The output of water purifier presses the water purification gatherer to communicate after connecting one way valve with certainly; The electromagnetic valve of the two-bit triplet that links to each other with control panel is installed on the described gutter, and an output of this electromagnetic valve communicates with sewer pipe, and another output communicates with interim water tank.
Be in series with ultraviolet sterilizer on the input of said water purifier or the output.
Described interim water tank top is provided with the overflow pipe that communicates with sewer pipe.
In the described interim water tank level sensor is installed, the described pressure in the water purification gatherer certainly is equipped with water level sensor, and this level sensor all links to each other with the input of control panel with water level sensor.
Described draining valve below is hinged with Mention Dragon buckle; The column cap of this Mention Dragon buckle and valve gap bottom offsets; Described tank below is equipped with the motor that links to each other with control panel; Be provided with slide rail in the motor front side, be movably installed in the tooth bar on the slide rail and be fixed on the gears engaged on the motor output shaft, the movable end of described Mention Dragon buckle links to each other with tooth bar through rope.
The cell body water level sensor is installed in the described cell body, and this cell body water level sensor links to each other with the input of control panel.
The present invention presses key control through touch-screen; Can make automatic draining of tank and automatic water purification; Through a plurality of water purifiers and ultraviolet sterilizer the waste water of discharging in the tank is carried out reclaiming behind the multiple purifying, recycle, make full use of water resource; Reduce energy loss, have simple in structure, easy to operate advantage.For relative dirtier water, the value of utilizing once more is lower, can select direct draining, avoids influencing the cleaning water and the application life of water purifier.
Description of drawings:
Fig. 1 is a structural representation of the present invention;
Fig. 2 is that the A of Fig. 1 is to view;
Fig. 3 is that water route of the present invention connects sketch map;
Fig. 4 is the draining valve sectional view of valve gap when closing;
Fig. 5 is the draining valve sectional view of valve gap when opening;
Fig. 6 is a liquid crystal display sketch map of the present invention.
The specific embodiment:
Like Fig. 1, Fig. 2, shown in Figure 3; The present invention is a kind of tank with automatic draining, water cleaning systems; It comprises the tank that is provided with panel 4 and at least one cell body 3, and the present invention mainly selects for use the tank of double flute body to explain, is embedded with the control panel 5 of band touch-screen 5.1 on the panel 4 of said tank.Cell body water level sensor 2 is installed in cell body 3, and this cell body water level sensor 2 links to each other with the input of control panel 5.Described tank installed beside has water purification casing 7 and presses water purification gatherer 14 certainly, and the water purifier 9 of interim water tank 6 and a plurality of series connection is installed in water purification casing 7, and the present invention mainly selects three water purifiers 9 of series connection each other for use.Be provided with draining valve 1 in the bottom of each cell body 3; Delivery port is equipped with gutter 15 in the bottom of draining valve 1; Two gutters 15 join with electromagnetic valve 11 after the bottom is merged into one, and this electromagnetic valve 11 is the electromagnetic valve 11 of two-position three way, and its coil links to each other with the output of control panel 5.An output of described electromagnetic valve 11 communicates with sewer pipe 16 through conduit; Another output communicates with interim water tank 6; Promptly during these electromagnetic valve 11 no powers; Gutter 15 directly feeds sewer pipe 16 through electromagnetic valve 11, and when electromagnetic valve 11 energisings, gutter 15 communicates with interim water tank 6 through electromagnetic valve 11 backs.Said interim water tank 6 communicates with the input of water purifier 9 through water pump 8 backs that link to each other with control panel 5 outputs, and the output of water purifier 9 is connecting one way valve 12 backs and pressing water purification gatherer 14 to communicate certainly.When pump working, can the water in the interim water tank 6 be transported to water purifier 9 and purify, the clear water after the purification flows into from pressing water purification gatherer 14 through one way valve 12 backs.From pressing water purification gatherer 14 pressure, clear water is transported to the place that other need use through pipeline with self.Be in series with ultraviolet sterilizer 17 on the input of said water purifier 9 or the output, water quality carried out disinfection, can further promote effects of purification quality through ultraviolet ray.In the described interim water tank 6 level sensor 10 is installed; This level sensor 10 links to each other with the input of control panel 5; When the water level in the interim water tank 6 reaches assigned address, level sensor 10 with signal feedback in control panel 5, thereby 17 work of control of pump 8, ultraviolet sterilizer.Described interim water tank 6 tops are provided with the overflow pipe 6.1 that communicates with sewer pipe 16, and are slower when water pump 8 drainage speeds, when causing interim water tank 6 interior retainings too much, can directly enter sewer pipe 16 through overflow pipe 6.1.The described pressure certainly is equipped with water level sensor 13 in the water purification gatherer 14; This water level sensor 13 links to each other with the input of control panel 5; When the water level in pressing water purification gatherer 14 certainly is in the extreme higher position; Water level sensor 13 with signal feedback in control panel 5, thereby control electromagnetic valve 11, water pump 8 and ultraviolet sterilizer 17 quit work, and prevent from pressing in the water purification gatherer 14 retainings too much.
Like Fig. 4, shown in Figure 5, the top of described draining valve 1 is provided with the inner chamber 20 of band bottom through-hole, and the bottom centre of inner chamber 20 is installed with guide pin bushing 21.Above inner chamber 20, be movably installed with valve gap 18; The sidewall of this valve gap 18 offers drain hole 18.1; The upper end of valve gap 18 is a handle 18.2, can pinch upwards mentioning at valve gap 18 with hand, and the bottom of valve gap 18 is the movable column cap 18.3 that is interspersed in the guide pin bushing 21.Diaphragm seal 19 is installed on valve gap 18, when the diaphragm seal 19 and inner chamber 20 sidewalls of valve gap 18 are fitted that the drain hole 18.1 of valve gap 18 sidewalls is spaced apart with the bottom through-hole of inner chamber 20, the water in the cell body 3 can't be discharged from draining valve 1.Described draining valve 1 below is hinged with Mention Dragon buckle 22, and the column cap 18.3 of the movable end of this Mention Dragon buckle 22 and valve gap 18 bottoms offsets.Described tank below is equipped with the motor 24 that links to each other with control panel 5 outputs, is provided with slide rail 26 in motor 24 front sides, is movably installed in tooth bar 27 and gear 25 engagements that are fixed on motor 24 output shafts on the slide rail 26.Rope 23 is installed on the movable end of described Mention Dragon buckle 22; This rope 23 links to each other with tooth bar 27 after passing draining valve 1 sidewall; When therefore motor 24 drive tooth bars 27 moved backward, the movable end of Mention Dragon buckle 22 upwards straightened, and valve gap 18 is ejected; Cell body 3 is carried out draining, and motor 24 stops operating when tooth bar 27 arrival rear ends.When cell body water level sensor 2 detects the water emptying; With signal feedback in control panel 5, thereby control motor 24 backward rotation make tooth bar 27 reaches; The movable end of Mention Dragon buckle 22 also rotates thereupon; Valve gap 18 moves down at the action of gravity lower edge guide pin bushing 21 of self, fits until the diaphragm seal of valve gap 18 and the sidewall of inner chamber 20, and motor 24 stops operating when tooth bar 27 arrives front end.
As shown in Figure 6, there are left groove draining, right groove draining, whole three buttons of draining in the direct catchment on the touch-screen 5.1 of described control panel 5, and left groove water purification, right groove water purification, whole three buttons of water purification are arranged in the water purification race way.
When the water in the cell body 3 is messy, can select direct draining, when pressing the corresponding button on the direct catchment, control panel 5 can rotate by the corresponding motor 24 of control; Move after making tooth bar 27; The movable end that drives Mention Dragon buckle 22 upwards straightens, and valve gap 18 is ejected, and cell body 3 is carried out draining.Because electromagnetic valve 11 no powers, so the water that tank is discharged flows directly into sewer pipe 16, and motor 24 stops operating when tooth bar 27 arrival rear ends.When cell body 3 water level sensors detect the water emptying; With signal feedback in control panel 5, thereby control motor 24 backward rotation make tooth bar 27 reaches; The movable end of Mention Dragon buckle 22 also rotates thereupon; Valve gap 18 moves down at the action of gravity lower edge guide pin bushing 21 of self, fits until the diaphragm seal of valve gap 18 and the sidewall of inner chamber 20, and motor 24 stops operating when tooth bar 27 arrives front end.
When the water in the cell body 3 when comparatively clean, during recycle, can select the corresponding button on the water purification race way once more, this moment, control panel 5 can corresponding motor 24 work of control, made electromagnetic valve 11 energisings simultaneously.When motor 24 rotates, move after making tooth bar 27, the movable end that drives Mention Dragon buckle 22 upwards straightens, and valve gap 18 is ejected, and cell body 3 is carried out draining, and motor 24 stops operating when tooth bar 27 arrival rear ends.Because electromagnetic valve 11 energisings, so the water that tank is discharged can flow into interim water tank 6.When the water level in the interim water tank 6 reaches assigned address, level sensor 10 with signal feedback in control panel 5, thereby 17 work of control of pump 8, ultraviolet sterilizer.Water pump 8 is transported to clarifier 9 with the water in the interim tank 6 and carries out the multiple purifying sterilization with ultraviolet sterilizer 17, and the clear water after the processing is realized recycle through being transported to behind the one way valve 12 from pressing deposit in the water purification gatherer 14.When needs use clear water, press water purification gatherer 14 clear water to be carried in the past certainly with the pressure of self.When the water level in the interim water tank 6 was too high, water can directly enter sewer pipe 16 through the overflow pipe 6.1 of interim water tank 6 tops, therefore can avoid the water in the interim water tank 6 to flow to the room.When the water level in pressing water purification gatherer 14 certainly is in the extreme higher position; Water level sensor 13 with signal feedback in control panel 5; Thereby control electromagnetic valve 11, water pump 8 and ultraviolet sterilizer 17 quit work; The water that tank is discharged flows directly into sewer pipe 16, can prevent from pressing the reserves in the water purification gatherer 14 too much.When cell body 3 water level sensors detect the water emptying; With signal feedback in control panel 5, thereby control motor 24 backward rotation make tooth bar 27 reaches; The movable end of Mention Dragon buckle 22 also rotates thereupon; Valve gap 18 moves down at the action of gravity lower edge guide pin bushing 21 of self, fits until the diaphragm seal of valve gap 18 and the sidewall of inner chamber 20, and motor 24 stops operating when tooth bar 27 arrives front end.
Under power-off condition, also can manually pinch handle 18.2 on the valve gap 18 and upwards mention and carry out draining, again valve gap 18 is resetted after having arranged water, use as common tank.