CN101831890B - Blending construction method of blended gravelly soil for dam watertight core - Google Patents

Blending construction method of blended gravelly soil for dam watertight core Download PDF

Info

Publication number
CN101831890B
CN101831890B CN2010101820692A CN201010182069A CN101831890B CN 101831890 B CN101831890 B CN 101831890B CN 2010101820692 A CN2010101820692 A CN 2010101820692A CN 201010182069 A CN201010182069 A CN 201010182069A CN 101831890 B CN101831890 B CN 101831890B
Authority
CN
China
Prior art keywords
tape machine
sealing
blending
gravel
clay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010101820692A
Other languages
Chinese (zh)
Other versions
CN101831890A (en
Inventor
兰芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 5 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 5 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 5 Engineering Co Ltd filed Critical China Gezhouba Group No 5 Engineering Co Ltd
Priority to CN2010101820692A priority Critical patent/CN101831890B/en
Publication of CN101831890A publication Critical patent/CN101831890A/en
Application granted granted Critical
Publication of CN101831890B publication Critical patent/CN101831890B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a bending construction method of blended gravelly soil for a dam watertight core. In the method, clay of qualified blending raw materials is supplied to an aggregate bin, and grave blending stones are supplied by a finished product stock dump; the batchings of both the clay and the grave blending stones are dynamically metered and controlled by an electronic belt scale through a vibration feeder to strictly control the blending proportion; the batching is finished by the vibration feeder, and a belt conveyer is used for mixing for multiple times and naturally stockpiling; when supplying the materials, a digging and loading machine is used for digging and loading to ensure that the soil and the stones are sufficiently mixed, and the mixing quality is high. The method can prevent a blending material from being repeatedly ground before supplying, is convenient for controlling the mechanical property index of the soil material, reduces the fuel oil consumption of vehicles and the exhaust emission, saves the labor force, improves the construction efficiency, reduces the building of construction tributary roads, reduces the total life cycle cost, has convenient and fast recovery, is beneficial to high-intensity filling construction, has flexible production, material preparation and supplying region adjustment and continuous production and material supply and meets the requirement of a short-time superstrong peak.

Description

A kind of blending construction method of blended gravelly soil for dam watertight core
Technical field
The present invention relates to a kind of blending construction method of blended gravelly soil for dam watertight core.
Background technology
The core-wall of core wall rockfill dam is mixed gravel soil, and total amount is about hundreds of incomparably, and mix proportions is counted clay material with weight portion: gravel material=65:35.
The blending constructure scheme is generally to tile to stand adopts the blending scheme, is promptly paved blending during upright adopting by the horizontal alternating layers of dump truck in the fusion field.Clay material and gravel material all adopt dump truck transportation, layering stone in proportion, the flat material of bulldozer, the upright method of adopting uniform mixing of excavator.Control layer thickness in the process for preparation, and moisture content is adjusted in accordance with regulations.During stone, first graveling material.With attacking and occupying the method discharging, with retreating the method discharging, the haul vehicle travels on gravel material all the time, to avoid the direct compacting of tire to the earth material layer during clay material of shop during the graveling material.The stockpile top layer is a clay material.The configuration field is provided with drainage system, and stockpile adopts rainproof measure.Configuration is divided into four districts, gets the raw materials ready, storing, exploitation, recycles.
This form of construction work makes mechanical performance index be difficult to control because of vehicle for rolling repeatedly of earth material, and the fuel consume of vehicle is big, the toxic emission height, and efficient is lower, and labor waste is bigger, and material supply is not gone up during the high strength construction.
Summary of the invention
Technical problem to be solved by this invention provides a kind of blending construction method of blended gravelly soil for dam watertight core, can so that control earth material mechanical performance index, the efficiency of construction height adapts to superpower in short-term peak requirements.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of blending construction method of blended gravelly soil for dam watertight core may further comprise the steps:
1) is sent to the clay material aggregate bin by first sealing-tape machine after the fragmentation of clay material autoclase indigenous equipment, the clay material aggregate bin is divided into the clay material oscillating feeder, give clay material sealing-tape machine feed by the clay material oscillating feeder, on the clay material sealing-tape machine, be provided with electronic belt scale, measure to the clay material sealing-tape machine by 65% weight portion mix proportions and prepare burden;
2) the next gravel material in gravel material stockyard is given gravel material sealing-tape machine feed through the gravel material oscillating feeder, is provided with electronic belt scale on the gravel material sealing-tape machine, measures to the gravel material sealing-tape machine by 35% weight portion mix proportions and prepares burden;
3) blend composition behind the two-stage batching is sent to the rocking arm stacker by second sealing-tape machine, is finished cloth and is stored up in the stockyard by the rocking arm stacker;
Obtain to mix gravel soil finished product material through above-mentioned steps.
A kind of blending construction method of blended gravelly soil for dam watertight core provided by the invention, the clay material of qualified fusion raw material is fed into aggregate bin, mixes gravel material by finished product stockyard feed, all through vibra feeder, by electronic belt scale dynamic measuring control batching, strict control mix proportions.
Through the vibra feeder batching, repeatedly mix, store up naturally through sealing-tape machine again, dig installation during feed and dig dress, soil, building stones are fully mixed, the mixing quality height.Avoid being rolled repeatedly before the admixture feed, be convenient to control the mechanical performance index of earth material.
Reduced the fuel consume of vehicle, reduced toxic emission, labor savings has increased efficiency of construction, reduces the construction tributary path and builds.Reduce overall life cycle cost; Back production is convenient, is beneficial to the high strength filling construction; Produce, get the raw materials ready, the feed zone adjustment is flexible, it is continuous producing feed, adapts to superpower in short-term peak requirements.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples:
Fig. 1 is the process chart of job practices of the present invention.
The specific embodiment
Mix gravel soil among the present invention and adopt sealing-tape machine blending scheme.A kind of blending construction method of blended gravelly soil for dam watertight core may further comprise the steps:
1) clay material is transported to the fusion field from borrow pit by automobile, after the material feeding hole is by 1 fragmentation of hack equipment, be sent to clay material aggregate bin 12 by first sealing-tape machine 2, clay material aggregate bin 12 is divided into clay material oscillating feeder 3, by clay material oscillating feeder 3 to clay material sealing-tape machine 4 feed, on the clay material sealing-tape machine 4 electronic belt scale is installed, is measured to clay material sealing-tape machine 4 batchings by 65% weight portion mix proportions;
2) gravel material is done interior gravel material oscillating feeder (5) to gravel material sealing-tape machine (6) feed by mixing gravel material system of processing gravel material stockyard (13) setly, gravel material sealing-tape machine (6) is gone up electronic belt scale is installed, and measures to gravel material sealing-tape machine 6 batchings by 35% weight portion mix proportions;
3) blend composition behind the two-stage batching is sent to rocking arm stacker 11 by second sealing-tape machine 7,8,9,10, finishes cloth by rocking arm stacker 11 at last and stores up in the stockyard (14).Mixing gravel finished product material feed adopts and to dig installing and get the material feed in admixture finished product stockyard (14) fully.Obtain to mix gravel soil finished product material through above-mentioned steps.
Clay material and gravel material are all through oscillating feeder, and by electronic belt scale dynamic measuring control batching, mix proportions is controlled in strictness.Qualified fusion raw material is prepared burden through vibra feeder, repeatedly mixes, stores up naturally through sealing-tape machine again, digs installation during feed and digs dress, soil, building stones is fully mixed, the mixing quality height.Avoid being rolled repeatedly before the admixture feed, be convenient to control the mechanical performance index of earth material.Reduce the fuel consume of vehicle, reduce toxic emission, labor savings has improved efficiency of construction, reduces the construction tributary path and builds.Reduce overall life cycle cost; Back production is convenient, is beneficial to the high strength filling construction; Produce, get the raw materials ready, the feed zone adjustment is flexible, it is continuous producing feed, adapts to superpower in short-term peak requirements.

Claims (1)

1. blending construction method of blended gravelly soil for dam watertight core is characterized in that may further comprise the steps:
1) clay material aggregate bin (12) is sent to by first sealing-tape machine (2) in the broken back of clay material autoclase indigenous equipment (1), clay material aggregate bin (12) is divided into clay material oscillating feeder (3), give clay material sealing-tape machine (4) feed by clay material oscillating feeder (3), on clay material sealing-tape machine (4), be provided with electronic belt scale, measure to clay material sealing-tape machine (4) by 65% weight portion mix proportions and prepare burden;
2) gravel material stockyard (13) next gravel material is given gravel material sealing-tape machine (6) feed through gravel material oscillating feeder (5), on gravel material sealing-tape machine (6), be provided with electronic belt scale, measure to gravel material sealing-tape machine (6) by 35% weight portion mix proportions and prepare burden;
3) blend composition behind the two-stage batching is sent to rocking arm stacker (11) by second sealing-tape machine (7,8,9,10), is finished cloth and is stored up in the stockyard (14) by rocking arm stacker (11);
Obtain to mix gravel soil finished product material through above-mentioned steps.
CN2010101820692A 2010-05-25 2010-05-25 Blending construction method of blended gravelly soil for dam watertight core Expired - Fee Related CN101831890B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101820692A CN101831890B (en) 2010-05-25 2010-05-25 Blending construction method of blended gravelly soil for dam watertight core

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101820692A CN101831890B (en) 2010-05-25 2010-05-25 Blending construction method of blended gravelly soil for dam watertight core

Publications (2)

Publication Number Publication Date
CN101831890A CN101831890A (en) 2010-09-15
CN101831890B true CN101831890B (en) 2011-10-05

Family

ID=42716089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101820692A Expired - Fee Related CN101831890B (en) 2010-05-25 2010-05-25 Blending construction method of blended gravelly soil for dam watertight core

Country Status (1)

Country Link
CN (1) CN101831890B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297684A (en) * 2015-10-24 2016-02-03 江南水利水电工程公司 Superlarge-particle-size gravel-doped soil rock-fill dam core wall
CN106812118A (en) * 2017-02-22 2017-06-09 中国水利水电第五工程局有限公司 One kind is for mixing gravel earth material Gradation Control method
CN109944248A (en) * 2019-04-15 2019-06-28 中国电建集团贵阳勘测设计研究院有限公司 A kind of gravel earth material stacker lower hopper priming apparatus and technique
CN110016916A (en) * 2019-04-15 2019-07-16 中国电建集团贵阳勘测设计研究院有限公司 A kind of gravel earth material belt feeder end priming apparatus and technique
CN115301103B (en) * 2022-08-08 2023-08-25 中国水利水电第五工程局有限公司 High-earth dam uneven gravel-earth material mixing system and screening method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5454668A (en) * 1994-05-25 1995-10-03 Baroid Technology, Inc. Flood barrier and a method for forming a flood barrier
CN100335723C (en) * 2005-11-30 2007-09-05 中水东北勘测设计研究有限责任公司科学研究院 Casting construction method for asphalt concrete anti-infiltration core wall of earth rockfill dam
CN1908315A (en) * 2006-08-17 2007-02-07 中国葛洲坝水利水电工程集团有限公司 Rapid construction method for stone dam rolling asphalt concrete cutoff core wall
CN101538839A (en) * 2009-03-26 2009-09-23 中国水利水电第七工程局有限公司 Method for constructing highly plastic clay core wall

Also Published As

Publication number Publication date
CN101831890A (en) 2010-09-15

Similar Documents

Publication Publication Date Title
CN101831890B (en) Blending construction method of blended gravelly soil for dam watertight core
CN101008316B (en) Phosphogypsum cementing and post-filling mining method and pulping technology thereof
CN1112958C (en) Self walking soil processing machine
CN102152400B (en) Continuous mixing system for preparing impervious soil and control method
CN112814732A (en) Preparation of mixed ground paste of barren rock and tailings and pump sending filling device
CN104711976B (en) A kind of construction refuse regenerated aggregate complex carrier stake and preparation method thereof
CN104696008B (en) Method for filling underground stope with gravels in cemented filling manner
CN1221333C (en) Recycled material and mixing machinery
CN103590851A (en) Underground waste-rock concrete preparation, pumping and filling system and method
CN107020692A (en) It is a kind of to prepare curable native complete set of equipments
JPWO2019016859A1 (en) Production control system of improved soil using rotary crushing and mixing equipment.
CN105110669A (en) Method for comprehensive utilization of stone wastes
CN112359848A (en) Construction method for backfilling fertilizer groove by using solidified soil
CN201033459Y (en) Concrete emergency repair working vehicle
CN105297684A (en) Superlarge-particle-size gravel-doped soil rock-fill dam core wall
CN101270563A (en) Plaster sprayer for road
CN1190302C (en) Method for producing in continuous installation a compacted rolled concrete composition reinforced with fibres, and continuous installation therefor
CN101653765B (en) Method for adjusting gradation of gravel earth material
CN216965402U (en) Construction waste recycling screening production system
RU2290513C1 (en) Method for backfilling vertical course of coal mine
CN213563585U (en) Intensive stabilized soil stirring complete equipment
CN203614129U (en) Underground waste rock concrete preparation, pumping and filling system
CN114133191A (en) C50 high-performance concrete prepared from mixed sand and used for T beam pouring
CN201221362Y (en) Concrete injecting machine agitator
CN201423717Y (en) Mobile asphalt cold recycling concrete macadam mixing plant

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111005