CN101830648A - Method for thermally stewing carbon steel slag - Google Patents

Method for thermally stewing carbon steel slag Download PDF

Info

Publication number
CN101830648A
CN101830648A CN 201010188932 CN201010188932A CN101830648A CN 101830648 A CN101830648 A CN 101830648A CN 201010188932 CN201010188932 CN 201010188932 CN 201010188932 A CN201010188932 A CN 201010188932A CN 101830648 A CN101830648 A CN 101830648A
Authority
CN
China
Prior art keywords
stewing
minutes
feedwater
heat
steel slag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010188932
Other languages
Chinese (zh)
Inventor
孟兆海
郭金山
冯少伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN 201010188932 priority Critical patent/CN101830648A/en
Publication of CN101830648A publication Critical patent/CN101830648A/en
Pending legal-status Critical Current

Links

Landscapes

  • Furnace Details (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention relates to a method for thermally stewing carbon steel slag. The method comprises the following steps in turn: 1, filling high-temperature waste steel slag of 1,000 to 1,600 DEG C into a thermal stewing pool, placing the steel slag in the thermal stewing pool for 8 to 10 minutes, covering an upper cover on the thermal stewing pool, continuously spraying water to the steel slag by using a water spray device of the upper cover at water supply flow of 19 to 21m<3>/h for 145 to 155 minutes, and thermally stewing the steel slag for 25 to 35 minutes by using self heat steam after the water supply is finished; 2, supplying water to the steel slag at the water supply flow of 24 to 26m<3>/h for 170 to 190 minutes, continuously spraying water to the steel slag, and thermally stewing the steel slag for 50 to 60 minutes by using heat steam after the water supply is finished; and 3, supplying water to the steel slag at the water supply flow of 15 to 21m<3>/h for 50 to 60 minutes, continuously spraying water to the steel slag, and thermally stewing the steel slag for 60 +/- 2 minutes by using waste heat after the water supply is finished. The method for thermally stewing the carbon steel slag has the advantages of small water spray amount and shorter water spray period.

Description

The stewing processing method of a kind of carbon steel slag heat
Technical field
The present invention relates to the stewing treatment process of superloy slag heat.
Background technology
Slag heat is stewing to be present domestic state-of-the-art slag treatment process, and the stewing method of the heat that present domestic steel mill adopts has: tray hot application water quenching, slag case hot application method, drum process etc.The stewing technology of applicant processing factory carbon steel slag heat, that the high temperature steel slag that each steel mill is transported to the slag field is packed in the stewing pond of heat, slag is added a cover after the even heat in the pond, the water injector that utilizes the stewing pond of heat to cover, interrupted water spray, make slag stewing lower in the steaming of vapours, produce physics, chemical change, reach the crisp broken and physics of slag, the purpose of chemical breakdown.The technology of fetching water in the stewing operation of slag heat is the key link that whole slag is handled line.The stewing process for producing line of carbon steel slag heat adopts is the first unit of establishing China capital smelting construction project six steps that the stewing feedwater of heat are divided into six steps of contracting Co., Ltd and providing facture of fetching water: the about 260t of every pond dress quantity of slag; A stewing cycle of heat is 12 hours, and the amount of fetching water is 180m 3This technology of fetching water is because the stewing cycle of heat is long, and have enough to meet the need not open in the stewing pond of heat, has approximately 40% the direct entrucking of carbon steel slag to efflux, and the goods yard is usually accumulation also.Slag water content after heat is stewing is extremely inhomogeneous, and top is excessively wet, bottom overdrying even red slag, processes to next procedure and brings very big difficulty.
Summary of the invention
The present invention is intended to overcome the above-mentioned deficiency of the stewing processing method of existing carbon steel slag heat, provides the carbon steel slag heat that a kind of injection flow rate is little, the water spray cycle is short stewing processing method.
The stewing processing method of this carbon steel slag heat comprises following step successively:
The first step
1000~1600 ℃ the 290t high temperature steel slag that is no less than is packed in the stewing pond of heat, slag was placed 8~10 minutes in the stewing pond of heat, treat in the stewing pond of heat everywhere steel slag temperature basic evenly after, close the lid in the stewing pond of heat, utilize the water injector of loam cake, continue water spray, feedwater flow is set at 19~21m 3/ h, utilizes the vapours heat that self produces to boil in a covered pot over a slow fire 25~35 minutes at 145~155 minutes feedwater time after feedwater finishes.
Second step
When fetching water, feedwater flow is set at 24~26m 3/ h, the feedwater time is 170~190 minutes, continues water spray.After finishing, feedwater utilizes stewing 50~60 minutes of hot steam heat.
The 3rd step
When fetching water, feedwater flow is set at 15~21m 3/ h, the feedwater time is 50~60 minutes, (according to the feedwater flow and the time equalization in first and second step, the maintenance slag water ratio is constant) continues water spray.After finishing, feedwater utilizes stewing 60 ± 2 minutes of waste heat heat.
Take off to cover behind the stewing end cycle of heat and slag tap, the carbon steel slag after the stewing processing of heat is discharged the blanking bin of packing into from the stewing pond of heat enter the magnetic separation system processing.
To choose following value effect better the flow of water and feedwater time and stewing time of heat in the stewing processing method of this carbon steel slag heat:
The first step
Feedwater flow is set at 20m 3/ h, the feedwater time is 150 minutes, utilizes the hot steam heat that self produces to boil in a covered pot over a slow fire after feedwater finishes 30 minutes.
Second step
When fetching water, feedwater flow is set at 25m 3/ h, the feedwater time is 180 minutes, continues water spray.After finishing, feedwater utilizes stewing 60 minutes of hot steam heat.
The 3rd step
When fetching water, feedwater flow is set at 20m 3/ h, the feedwater time is 60 minutes, continues water spray.After finishing, feedwater utilizes stewing 60 minutes of waste heat heat.
The stewing processing method of this carbon steel slag heat changed for six steps into three steps, had reduced the hot stewing cycle, had improved disposal ability.Simple to operate, alleviated the operative employee's that fetches water labour intensity; The bulk slag is basic crisp broken, and slag Pulverization ratio (≤200mm steel-making slag powder) reaches more than 90%; Slag processing rate height, slag, steel separate thoroughly, and the steel scrap rate of recovery is also high; Slag water ratio 8%~15% after heat is stewing, and moisture distribution is more even, has alleviated the dust pollution of slag in the magnetic separation system.Every pond dress quantity of slag is increased to 300t by 260t, has increased treatment capacity, has improved processing power; A stewing cycle of heat was reduced to 9 hours by 12 hours, and the stewing cycle of heat shortens 3 hours, has accelerated hot stewing pond turnover rate; The amount of fetching water is by 180m 3Be reduced to 145m 3, having reduced energy consumption, ton slag water consumption is used 0.21m less 3But, the about 630t of water saving every day, can save 80 the whole year surplus ten thousand yuan.
Embodiment
Describe the specific embodiment that this carbon steel slag heat is boiled in a covered pot over a slow fire processing method in detail below in conjunction with embodiment, but the mode of specifically executing of the stewing processing method of this carbon steel slag heat is not limited to following embodiment.
Embodiment
What present embodiment was handled is carbon steel slag, and the dress quantity of slag in the stewing pond of heat is 300t.
The stewing processing method of this carbon steel slag heat comprises following step successively:
The first step
The high temperature steel slag of 1000~1600 ℃ of about 300t is packed in the stewing pond of 2# heat, and slag was placed 10 minutes in the stewing pond of heat, treat in the stewing pond of heat everywhere steel slag temperature basic evenly after, close the lid in the stewing pond of heat, utilize the water injector of loam cake, continue water spray, feedwater flow is set at 20m 3/ h, the feedwater time is 150 minutes, utilizes stewing 30 minutes of vapours heat after feedwater finishes.
Second step
Feedwater flow is set at 25m 3/ h, the feedwater time is 180 minutes, continues water spray.After finishing, feedwater utilizes stewing 60 minutes of hot steam heat.
The 3rd step
Feedwater flow is set at 20m 3/ h, the feedwater time is 60 minutes, continues water spray.After finishing, feedwater utilizes stewing 60 minutes of waste heat heat.
Take off lid behind the stewing end cycle of heat and slag tap, the carbon steel slag after the stewing processing of heat is discharged from the stewing pond of heat, the blanking bin of packing into enters magnetic separation system and processes.

Claims (2)

1. superloy slag heat is boiled in a covered pot over a slow fire treatment process, and it comprises following sequential steps:
The first step
1000~1600 ℃ the 290t high temperature steel slag that is no less than is packed in the stewing pond of heat, and slag was placed 8~10 minutes in the stewing pond of heat, closed the lid in the stewing pond of heat, utilized the water injector of loam cake, continued water spray, and feedwater flow is set at 19~21m 3/ h, utilizes the vapours heat that self produces to boil in a covered pot over a slow fire 25~35 minutes at 145~155 minutes feedwater time after feedwater finishes;
Second step
When fetching water, feedwater flow is set at 24~26m 3/ h, the feedwater time is 170~190 minutes, continues water spray; After finishing, feedwater utilizes stewing 50~60 minutes of hot steam heat;
The 3rd step
When fetching water, feedwater flow is set at 15~21m 3/ h, the feedwater time is 50~60 minutes, continues water spray, utilizes stewing 60 ± 2 minutes of waste heat heat after feedwater finishes.
2. carbon steel slag heat according to claim 1 is boiled in a covered pot over a slow fire processing method, it is characterized in that: the stewing time of the flow of water and feedwater time and heat is chosen following value:
The first step
Feedwater flow is set at 20m 3/ h, the feedwater time is 150 minutes, utilizes the hot steam heat that self produces to boil in a covered pot over a slow fire after feedwater finishes 30 minutes;
Second step
When fetching water, feedwater flow is set at 25m 3/ h, the feedwater time is 180 minutes, continues water spray, utilizes stewing 60 minutes of hot steam heat after feedwater finishes;
The 3rd step
When fetching water, feedwater flow is set at 20m 3/ h, the feedwater time is 60 minutes, continues water spray, utilizes stewing 60 minutes of waste heat heat after feedwater finishes.
CN 201010188932 2010-05-28 2010-05-28 Method for thermally stewing carbon steel slag Pending CN101830648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010188932 CN101830648A (en) 2010-05-28 2010-05-28 Method for thermally stewing carbon steel slag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010188932 CN101830648A (en) 2010-05-28 2010-05-28 Method for thermally stewing carbon steel slag

Publications (1)

Publication Number Publication Date
CN101830648A true CN101830648A (en) 2010-09-15

Family

ID=42714891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010188932 Pending CN101830648A (en) 2010-05-28 2010-05-28 Method for thermally stewing carbon steel slag

Country Status (1)

Country Link
CN (1) CN101830648A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956033A (en) * 2010-10-13 2011-01-26 山西太钢不锈钢股份有限公司 Method for improving pulverization and recovery rate of steel slag
CN103397120A (en) * 2013-07-26 2013-11-20 首钢京唐钢铁联合有限责任公司 Hot braising method for phosphorus removed slag and carbon removed slag
CN108913826A (en) * 2018-07-19 2018-11-30 武钢集团昆明钢铁股份有限公司 A method of f-CaO in the stewing resolution steel slag of immersion heat
CN111926128A (en) * 2020-08-05 2020-11-13 首钢京唐钢铁联合有限责任公司 Steel slag hot-braising water-cooling control method
CN112679118A (en) * 2020-12-28 2021-04-20 日照钢铁控股集团有限公司 Steel slag micro powder with weak slow-setting characteristic and production method thereof
CN114276031A (en) * 2022-01-04 2022-04-05 江苏省沙钢钢铁研究院有限公司 Preparation method of steel slag for road engineering

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101220399A (en) * 2008-01-29 2008-07-16 济南鲍德炉料有限公司 Technique for heating liquid steel scoria

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101220399A (en) * 2008-01-29 2008-07-16 济南鲍德炉料有限公司 Technique for heating liquid steel scoria

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956033A (en) * 2010-10-13 2011-01-26 山西太钢不锈钢股份有限公司 Method for improving pulverization and recovery rate of steel slag
CN103397120A (en) * 2013-07-26 2013-11-20 首钢京唐钢铁联合有限责任公司 Hot braising method for phosphorus removed slag and carbon removed slag
CN103397120B (en) * 2013-07-26 2015-07-08 首钢京唐钢铁联合有限责任公司 Hot braising method for phosphorus removed slag and carbon removed slag
CN108913826A (en) * 2018-07-19 2018-11-30 武钢集团昆明钢铁股份有限公司 A method of f-CaO in the stewing resolution steel slag of immersion heat
CN111926128A (en) * 2020-08-05 2020-11-13 首钢京唐钢铁联合有限责任公司 Steel slag hot-braising water-cooling control method
CN112679118A (en) * 2020-12-28 2021-04-20 日照钢铁控股集团有限公司 Steel slag micro powder with weak slow-setting characteristic and production method thereof
CN112679118B (en) * 2020-12-28 2022-08-23 日照钢铁控股集团有限公司 Steel slag micro powder with weak slow-setting characteristic and production method thereof
CN114276031A (en) * 2022-01-04 2022-04-05 江苏省沙钢钢铁研究院有限公司 Preparation method of steel slag for road engineering

Similar Documents

Publication Publication Date Title
CN101830648A (en) Method for thermally stewing carbon steel slag
CN104071993B (en) The device of a kind of microwave light-calcined magnesite, rhombspar and method
CN202626140U (en) Oil wet meal desolventizing system and vertical evaporative desolventizer
CN103602828B (en) Method and device for producing zinc alloy used for hot dipping by using zinc slag
CN103710048B (en) Synthetic gas coproduction device for semi-dry coke quenching
CN202898362U (en) Partially chilled dry pulverized coal or coal water slurry gasification system
CN103469045A (en) Laterite nickel ore microwave low-temperature smelting device
CN102443661A (en) Hot stewing one-step water spraying method of converter steel slag
CN103642515A (en) Low-temperature dry-distillation oil-extraction process of small-granule oil shale
CN103276123A (en) Method for cooling stainless steel slag
CN101417866B (en) Solid thermal steel slag residual heat self-solution treatment method in pressure
CN101475998B (en) Hot steel slag cracking method
CN102161484A (en) Zero-coal-consumption activated carbon production process and production device used in same
CN103773404B (en) A kind of Combined type multiplex produces material fast charring equipment and its carbonizing method
CN202304314U (en) Turntable-type low-rank coal microwave quality improvement equipment
CN104651554B (en) A kind of steel slag cracking granulating method
CN104419432A (en) Novel dry semi-coke quenching device used in internally-heated vertical open-web carbonization furnace
CN101560403A (en) Oil shale dry-process coking method and water spraying structure of gas retort
CN106431023B (en) A kind of inexpensive activating process method of Boron Slag
CN206316130U (en) The system for handling house refuse
CN204529942U (en) A kind of vertical sleeping combined type medium-frequency heating prepares the device of VN alloy
CN201495202U (en) Automatic drying and coking machine of coal bars
CN205687861U (en) A kind of sewage coke quenching water gas stove
CN201704086U (en) Waste heat utilization device of calcium carbonate calcining kiln
CN206918977U (en) Magnesium metal smelt reducing slag waste-heat recovery device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100915