CN101829704A - Method for processing aluminum alloy composite pipe - Google Patents

Method for processing aluminum alloy composite pipe Download PDF

Info

Publication number
CN101829704A
CN101829704A CN 201010179221 CN201010179221A CN101829704A CN 101829704 A CN101829704 A CN 101829704A CN 201010179221 CN201010179221 CN 201010179221 CN 201010179221 A CN201010179221 A CN 201010179221A CN 101829704 A CN101829704 A CN 101829704A
Authority
CN
China
Prior art keywords
pipe
composite
blank
sleeve
core rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010179221
Other languages
Chinese (zh)
Inventor
陈啸
彭俊芳
曹显华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU YATAL ALUMINUM CO Ltd
Original Assignee
JIANGSU YATAL ALUMINUM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU YATAL ALUMINUM CO Ltd filed Critical JIANGSU YATAL ALUMINUM CO Ltd
Priority to CN 201010179221 priority Critical patent/CN101829704A/en
Publication of CN101829704A publication Critical patent/CN101829704A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a method for preparing an aluminum alloy composite pipe, which comprises the following steps of: 1, extruding a fusion casting aluminum ingot to form a sleeve; 2, peeling the fusion casting aluminum ingot to form an internal core rod; 3, sleeving the internal core rod into the sleeve by adopting a hot interference method to form an extruded blank; 4, extruding the prepared extruded blank to form a composite blank pipe through a reverse extruder; and 5, drawing the prepared composite blank pipe to form the composite pipes of various specifications. The composite pipe is prepared by the processes of extruding the sleeve with large outside diameter, then peeling the outside diameter of the fusion casting ingot, sleeving the core rod into the sleeve by adopting the hot interference method to form the extruded blank, reversely extruding the extruded blank, drawing the composite blank pipe and the like. The preparation method has the advantages of low equipment investment, simple operation, easy control and uniform directional strength.

Description

A kind of processing method of aluminum alloy composite pipe
Technical field
The present invention relates to a kind of processing method of aluminium-alloy pipe, belong to the manufacture field of non-ferrous metal tubing.
Background technology
Ratio-frequency welded tube technology is adopted in the multiple tube preparation of aluminum current compo pipe mostly, equipment investment is big, at present common ratio-frequency welded tube equipment price is substantially millions of, add that production line of corollary equipment needs up to ten million, complex process comprises that composite blank is rolling, rolling, unreel, aligning, crop, cut weldering, super kink, deburring, plate becomes the plate body ultrasonic examination, moulding, the electric induction welding, weld seam supersonic detection, post-weld annealed, air cooling, water-cooled, sizing, flying shear, the water flushing, Pipe Cutting, flatten experiment, aligning, tack, hydrostatic test, coating, step such as tie up, and production joint place intensity a little less than.
Summary of the invention:
Technical problem to be solved by this invention is at above-mentioned the deficiencies in the prior art, and a kind of small investment is provided, aluminium alloy compound tube preparation method simple to operate.
Technical scheme of the present invention is:
A kind of preparation method of aluminum alloy composite pipe comprises the steps:
The first step is crushed to sleeve pipe with the founding aluminium ingot
In second step, internal core rod is made in the peeling of founding aluminium ingot;
The 3rd step, be inserted in plug after sleeve pipe added thermal expansion, the stress after shrinking by cooling is fixed pipe box and plug;
In the 4th step, the Compound Extrusion blank that makes oppositely is extruded into compound base pipe: concrete steps are for installing extrusion die, blank preheating, blank filling, extrusion modling;
The 5th goes on foot, and the compound base pipe that makes is drawn into the multiple tube of all size.
Beneficial effect: this multiple tube is by pushing big external diameter sleeve pipe, plug is inserted in sleeve pipe makes extrusion billet adopting heat to be full of method after the peeling of melting ingot casting external diameter then, oppositely push again, make after the operations such as drawing, can make the inside and outside different multiple tube of two-layer alloying component, this preparation method capital equipment is that a pipe box firing equipment, two extruders, one are pulled a cart, equipment investment is far below large-scale production line of high-frequency welded tube, main production stage is sleeve pipe, extruding, drawing, fairly simple, easily control, intensity each to evenly.
Description of drawings
Fig. 1 is a schematic flow sheet of the present invention.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing.
The first step, the melting bar is squeezed into sleeve pipe: concrete steps are that installation mold, bar are preheated to 500 ℃, bar filling, extrusion modling;
Second step, the founding aluminium ingot is carried out the external diameter railway carriage by engine lathe make internal core rod, the mean outside diameter of internal core rod must be greater than about sleeve pipe mean inside diameter 0.2mm
The 3rd step, will overlap effective net belt type resistance furnace or walk formula stove heating be expanded to 400 ℃ after, be inserted in plug, by the stress after the cooling contraction pipe box and plug are fixedly made compound bar billet;
The 4th step, the extrusion billet that makes is preheated to 460 ℃ after filling advance ingot-containing tube, the part of installation mold and mould is threaded a needle, push compound base pipe;
The 5th goes on foot, and the compound base pipe that makes is taken the lead fill in drawing mould, starts the multiple tube of pulling a cart to be drawn into all size.
This multiple tube is by pushing big external diameter sleeve pipe, make extrusion billet with adopting the method for expanding with heat and contract with cold that plug is inserted in sleeve pipe after the peeling of melting ingot casting external diameter then, oppositely push, making after the operations such as drawing.

Claims (1)

1. the processing method of an aluminum alloy composite pipe is characterized in that, comprises the steps:
The first step is crushed to sleeve pipe with the founding aluminium ingot;
In second step, internal core rod is made in the peeling of founding aluminium ingot;
In the 3rd step, be full of method by heat and internal core rod is inserted in sleeve pipe makes extrusion billet;
In the 4th step, the extrusion billet that makes is extruded into compound base pipe by indirect extrusion machine;
The 5th goes on foot, and the compound base pipe that makes is drawn into the multiple tube of all size.
CN 201010179221 2010-05-21 2010-05-21 Method for processing aluminum alloy composite pipe Pending CN101829704A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010179221 CN101829704A (en) 2010-05-21 2010-05-21 Method for processing aluminum alloy composite pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010179221 CN101829704A (en) 2010-05-21 2010-05-21 Method for processing aluminum alloy composite pipe

Publications (1)

Publication Number Publication Date
CN101829704A true CN101829704A (en) 2010-09-15

Family

ID=42714003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010179221 Pending CN101829704A (en) 2010-05-21 2010-05-21 Method for processing aluminum alloy composite pipe

Country Status (1)

Country Link
CN (1) CN101829704A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102407299A (en) * 2011-11-28 2012-04-11 苏州有色金属研究院有限公司 Device for casting aluminum alloy composite round ingot blanks
CN102441585A (en) * 2011-11-28 2012-05-09 苏州有色金属研究院有限公司 Preparation method of aluminium alloy composite pipe
CN103203382A (en) * 2012-01-11 2013-07-17 富泰华工业(深圳)有限公司 Aluminum shaping system and aluminum shaping method adopting it
CN103689006A (en) * 2014-01-06 2014-04-02 清流县鸿翔农庄农业发展有限公司 Method for preventing gerbera jamesonii bolus pests by melaleuca ahemifolia oil
CN103982711A (en) * 2014-05-26 2014-08-13 江苏亚太轻合金科技股份有限公司 Corrosion-resisting aluminum alloy composite pipe and processing method thereof
CN105170691A (en) * 2015-08-21 2015-12-23 扬州瑞斯乐复合金属材料有限公司 Manufacturing method of composite metal circular pipe
CN105722615A (en) * 2013-08-23 2016-06-29 瓦卢瑞克图沃斯巴西股份公司 Process for producing multilayer pipe having metallurgical bond by drawing, and multilayer pipe produced by the method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2088631U (en) * 1991-06-12 1991-11-13 无锡县金城散热管厂 Double-metal combined tube
US6050301A (en) * 1997-07-23 2000-04-18 The Furukawa Electric Co., Ltd. Al alloy composite tube for refrigerant passages and method for producing the same
CN1367050A (en) * 2002-03-04 2002-09-04 大连铁道学院 Production method of composite bimetal pipe
CN1850383A (en) * 2006-04-30 2006-10-25 重庆大学 Magnesium-aluminium bimetal composite pipe/bar

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2088631U (en) * 1991-06-12 1991-11-13 无锡县金城散热管厂 Double-metal combined tube
US6050301A (en) * 1997-07-23 2000-04-18 The Furukawa Electric Co., Ltd. Al alloy composite tube for refrigerant passages and method for producing the same
CN1367050A (en) * 2002-03-04 2002-09-04 大连铁道学院 Production method of composite bimetal pipe
CN1850383A (en) * 2006-04-30 2006-10-25 重庆大学 Magnesium-aluminium bimetal composite pipe/bar

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102407299A (en) * 2011-11-28 2012-04-11 苏州有色金属研究院有限公司 Device for casting aluminum alloy composite round ingot blanks
CN102441585A (en) * 2011-11-28 2012-05-09 苏州有色金属研究院有限公司 Preparation method of aluminium alloy composite pipe
CN103203382A (en) * 2012-01-11 2013-07-17 富泰华工业(深圳)有限公司 Aluminum shaping system and aluminum shaping method adopting it
CN105722615A (en) * 2013-08-23 2016-06-29 瓦卢瑞克图沃斯巴西股份公司 Process for producing multilayer pipe having metallurgical bond by drawing, and multilayer pipe produced by the method
CN105722615B (en) * 2013-08-23 2020-10-23 瓦卢瑞克图沃斯巴西股份公司 Method for producing a multilayer tube with a metallurgical bond by drawing and multilayer tube produced by the method
CN103689006A (en) * 2014-01-06 2014-04-02 清流县鸿翔农庄农业发展有限公司 Method for preventing gerbera jamesonii bolus pests by melaleuca ahemifolia oil
CN103982711A (en) * 2014-05-26 2014-08-13 江苏亚太轻合金科技股份有限公司 Corrosion-resisting aluminum alloy composite pipe and processing method thereof
CN105170691A (en) * 2015-08-21 2015-12-23 扬州瑞斯乐复合金属材料有限公司 Manufacturing method of composite metal circular pipe

Similar Documents

Publication Publication Date Title
CN101829704A (en) Method for processing aluminum alloy composite pipe
CN102226486B (en) CuAl bimetallic composite pipe and die extrusion molding method thereof
CN108856441B (en) Pipe thermal medium internal pressure forming method based on molten glass
CN103920734B (en) Mold for extruding and forming in aluminium bag magnesium multiple tube semisolid preparation method and method
CN110293149B (en) Manufacturing device and manufacturing method of bimetal composite capillary
CN105499304A (en) Semi-solid forming method of composite pipe
CN102107232A (en) Method for manufacturing steel-copper composite welded tube
CN104390071A (en) Socket type electrically-fused pipe fitting for large-caliber pipe and production method thereof
CN105397427A (en) Production method for corrosion-resisting aluminum alloy high-frequency welded tube
CN102641936A (en) Tubing bulging device and method using internal heating and pressing
CN109807272B (en) Aluminum steel bimetal component thixotropic soft core composite forging forming method
CN101219449A (en) Semi-automatic production method of integrally arcuate stainless steel round blank crystallizer water jacket
CN107504309A (en) High sealing is seamless hot melt set and preparation method thereof and application method
CN103982711A (en) Corrosion-resisting aluminum alloy composite pipe and processing method thereof
CN103586382A (en) Method and device for manufacturing double axle tube blanks at one time in a local electric upsetting mode
CN102441585A (en) Preparation method of aluminium alloy composite pipe
CN103111482B (en) Preparation method of magnesium alloy seamless pipe and extrusion die thereof
CN105537363A (en) Molding device and method for heat expansion of aluminum alloy hollow part
KR101579080B1 (en) Themethod of clad pipe for coupling to the heat-sealing manner to the pipe of the different material
CN107414326B (en) A kind of crystallizer foot roll surface overlaying technique and clamping workpiece tooling
JP6578054B2 (en) Injection stack molding equipment for polymer piping
WO2009030099A1 (en) Bending resistance cu-al pipe connector, producing method thereof and special core bar
CN109092898B (en) Plastic processing method for long high-performance magnesium alloy seamless pipe
CN106825271B (en) The processing method that heavy caliber thick wall squeezes cast pipe mold flaring
CN106563931B (en) A kind of production method of header

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100915