CN101823805A - Sewage split-flow treatment equipment - Google Patents

Sewage split-flow treatment equipment Download PDF

Info

Publication number
CN101823805A
CN101823805A CN200910113898A CN200910113898A CN101823805A CN 101823805 A CN101823805 A CN 101823805A CN 200910113898 A CN200910113898 A CN 200910113898A CN 200910113898 A CN200910113898 A CN 200910113898A CN 101823805 A CN101823805 A CN 101823805A
Authority
CN
China
Prior art keywords
water
sewage
pipe
shunting
bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910113898A
Other languages
Chinese (zh)
Inventor
赵艳平
覃祖智
王志军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200910113898A priority Critical patent/CN101823805A/en
Publication of CN101823805A publication Critical patent/CN101823805A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The invention relates to sewage split-flow treatment equipment capable of performing split-flow and treatment respectively on water pollutants in sewage, chemical molecules of water pollution, sump oil microbial precipitates in water and noxious substances in a direction which is different from a water direction. The sewage split-flow treatment equipment can greatly reduce the investment cost for treating the sewage and long-term operating cost, and greatly improve the sewage treatment quality to reach the standard for discharge effectively for a long time.

Description

Sewage split-flow treatment equipment
One, technical field:
The present invention relates to a kind of dirt matter in the sewage be separated with water " sewage split-flow treatment equipment " shunting and handle respectively to different directions.
Two, technical background:
Known sewage pollution source has: the nature generation, that industry produces, the agricultural generation, people produce in living, because all contaminations matter and microorganism and water are miscible in one, make various throw outs, floating matter, suspended substance, heavy metal, dirty molecule and other objectionable impurities and the microorganism etc. that produce in the sewage form sewage.But the existing sewage treatment process that uses all adopts sewage miscellaneous comprehensive treating process mode, and it is big to form floor space, input cost and sewage disposal running cost height, and water quality after treatment often forms not qualified discharge.
Three, summary of the invention:
Have in the sewage split-flow treatment equipment: 1 equipment chassis, 2 elementary sewage sump oil splitters, 3 shunting hydromagnetic retaining pump chambers, the dirty molecule splitter of 4 water, 5 water pump accumulators, the heterogeneous shunting water purifying kits of 6 four posts, 7 contents such as escaper, the dirty garbage drying withdrawer of 8 water, 9 tubing systems of purifying waste water are formed.
1, equipment chassis: be positioned at the sewage split-flow treatment equipment below, be divided into one in front and one in back two on dirty garbage drying withdrawer chassis of water and sewage separation purifying processor chassis.The dirty garbage drying withdrawer of water chassis: be positioned at the dirty garbage drying withdrawer of the anterior water of sewage split-flow treatment equipment below, it by: (1) chassis, (2) windlass gantry fixed support two portions are formed.(1) chassis: be rectangle hollow angle steel shape, in the carrier frame left side, be provided with the horizontal title of a foundation dish, be straight-bar shape angle steel shape, be provided with a chassis card in the chassis left side top, for rectangle tabular, be provided with a step-down gear base at chassis face upper forepart, be the rectangular slab bulk, on four jiaos of bases, respectively be provided with the bolt hole of a controllable pitch.On the chassis face at step-down gear base rear, be provided with a motor bedplate, be the rectangular slab bulk, but respectively be provided with a roll adjustment bolt hole at four jiaos of places of motor bedplate.Respectively be provided with a chassis supporting leg below four jiaos on the chassis, be column shape angle steel shape, respectively be provided with a brace in the supporting leg both sides, be straight-bar shape angle steel shape, below the chassis front end left part, have additional a chassis supporting leg, be column shape angle steel shape, be provided with a brace at the supporting leg rear, respectively be provided with a bolt hole in the bottom of right supporting leg of chassis front end and middle left branch leg.(2) windlass gantry fixed support: be positioned at right two of the dirty garbage drying treater of water chassis front end supporting leg top one the first from left, be square oblique angle hollow angle steel shape, about respectively be provided with a diagonal angle in two gantry fixed supports and intersect brace, be straight-bar shape angle steel shape, about top and bottom on the column of two fixed support front ends respectively be provided with a bolt hole.Sewage separation purifying processor chassis: be positioned at below, sewage separation purifying processor bottom, sewage split-flow treatment equipment rear portion, be rectangle hollow angle steel shape, in the framework on chassis, be provided with the horizontal title of many foundation dish, be straight-bar shape angle steel shape, be provided with a plurality of equidistant bolts hole horizontal deserving to be called, below four jiaos of carrier frame and the left and right sides, respectively be provided with equidistant chassis supporting leg, be column shape angle steel shape, respectively be provided with one in the supporting leg both sides and tiltedly draw title, be straight-bar shape angle steel shape, on the framework on right side, chassis, be respectively equipped with a plurality of water intaking joint door gap, be square tapered hollow shape.
2, elementary sewage sump oil splitter: the middle part that is positioned at sewage split-flow treatment equipment, be divided into and be elementary shunting of sewage and sump oil shunting two portions up and down, it by: (1) shunting body, (2) sewage import, (3) sewage diversion trench, (4) cleanser, (5) elementary sewage separation bed, the dirty relief outlet of (6) water, (7) sump oil diffluence pass, (8) buffering dividing plate, (9) shunting water out, (10) venting port, (11) shunting body top cover etc. are formed.(1) shunting body: be positioned at sewage separation purifying processor chassis front upper, be three-dimensional rectangle hollow container shaped, respectively be provided with mouth mouth edge, a limit on inboard four limits of port, shunting body top, be long strip shape band iron shape, on the mouth edge, be provided with a plurality of equidistant bolts hole, below the left side, be provided with a cleanser water pipe channel hole in body rear wall top ports, be circular hollow form, below the right wall top ports of body edge, be provided with a sewage import, be the rectangle hollow form, the right wall of shunting body below the sewage import, respectively be provided with a sewage diversion trench support on antetheca and the rear wall inboard, be U-shaped hollow angle steel shape, on support, be provided with a plurality of equidistant bolts hole, the avatar of support is that the low early and high after diversion trench that makes is provided with certain gradient on support, respectively be provided with lower bracket on the cleanser at the Liang Jiaochu of the inboard right wall of body below the diversion trench support and the anterior angle place of left wall, be the rectangular slab bulk, on support, respectively be provided with a bolt hole, the avatar of cleanser support is: the support at body inner left wall anterior angle place is a upper bracket, the support at two jiaos of places of right wall is a lower bracket, is an oblique support that is provided with certain angle.On body Zuo Bi below the lower bracket on the cleanser and right wall inboard, respectively be provided with the horizontal up and down title support of an elementary minute fluidized bed, be straight-bar shape angle steel shape, be provided with a plurality of equidistant bolts hole on two horizontal title supports up and down, the avatar of elementary shunting bedrest is: the horizontal title support on the wall of a body left side is a upper bracket, horizontal title support on the right wall is a lower bracket, it is a shunting bedrest that is provided with certain angle, make the branch fluidized bed on support, form an elementary sewage separation bed that is provided with a slope shape, edge at the bottom of shunting body bottom outside four limits are provided with body, be long strip shape band iron shape, be provided with a plurality of equidistant bolts hole on edge, the end, bolt hole is consistent with the screw on the chassis.(2) sewage import: be positioned at the right wall top ports of splitter body along the below, be the rectangle hollow form, be provided with a flowing water mouth edge in inboard, sewage import base, in U-shaped hollow notch-like, be provided with a sewage director in the sewage import outside, for rectangle hollow box-like, be provided with a sewage at the director front end and draw adapter, be circular hollow tubular, be provided with a sewage above the transverse tube middle part and reclaim and draw adapter drawing to take over, be circular hollow tubular, draw at backwater and take over front end and be provided with a coupling bend, be the round hollow tubular, draw the adapter front end at sewage and be provided with a waste pipe flange terminal pad.(3) sewage diversion trench: be positioned on the diversion trench support that is located at sewage import side-lower, the water conservancy diversion cell body is a rectangle dustpan shape, the back ledge and the outside, the right and left ledge top at diversion trench respectively are provided with diversion trench groove edge, on the groove edge, be provided with a plurality of equidistant bolts hole, bolt hole is consistent with the screw on its support, be provided with a following mouth of a river at the diversion trench front end, be the rectangle hollow form.(4) elementary sewage separation bed cleanser: be positioned on the cleanser support that is located at the diversion trench below, be the vertical hollow tubular of rectangle, it is by two transverse tubes and three vertical tubes combine one on the other, be provided with a block head at cleanser upper lateral tube right-hand member, be the stifled shape of circle plug, be provided with one at the block head head end and be connected and fixed plate, be the rectangular slab bulk, on retaining plate, be provided with a bolt hole.Respectively be provided with a water pipe block head at two ends, the cleanser lower transverse tubule left and right sides, be the stifled shape of circle plug, respectively be provided with one at left and right sides block head head end and be connected and fixed plate, be the rectangular slab bulk, on retaining plate, be provided with a bolt hole, left end at the cleanser upper lateral tube is provided with a cleanser water pipe coupling bend, be the round tubulose, above the upper lateral tube coupling bend, be provided with a cleaning organ pipe and draw adapter, be circular hollow tubular, draw adapter and stretch out the body place by the cleanser water pipe channel hole that is located at body rear wall top, be provided with one on the top of drawing adapter and draw adapter joint door, the bottom of lower transverse tubule and three vertical tubes is provided with a plurality of equidistant spout holes on cleanser, is circular hollow form.(5) elementary sewage separation bed: be positioned on the shunting bedrest that is located at the cleanser below, dividing fluidized bed bed body is conical surface body hollow dustpan shape, the both sides side wall is tubaeform hypotenuse shape, it is by elementary minute fluidized bed bed body, divide fluidized bed shunting water diversion trench and divide fluidized bed bed surface three parts to form, between minute hypotenuse inboard, fluidized bed the right and left side wall bottom, be provided with a branch flowing water diversion trench bottom land, be shape at the bottom of the conical surface body plate, at the bottom of being provided with a branch fluidized bed bed above the diversion trench bottom land, be conical surface body net bottom shape, at the bottom of the front end at the bottom of minute fluidized bed bed is provided with one section plane bed, for square taper tabular, side wall behind the none on the netted bed rear end at the end, for rectangle tabular, ledge after being provided with a diversion trench on the diversion trench bottom land below the front end at the bottom of minute fluidized bed, for rectangle tabular, with to be the boundary at the bottom of minute fluidized bed bed be divided into two parts up and down with elementary minute fluidized bed body inside, top is divided into sewage separation bed bed body, the bottom is divided into shunting bed diversion trench, up and down two portions different avatars be: divide at the bottom of the fluidized bed bed be netted shape bed at the bottom of, the bed mouth at the bed end is to the splitter right side, and divide fluidized bed diversion trench bottom land is that domatic shape is tabular, the diversion trench notch is to the splitter left side, respectively be provided with an edge of bed on minute fluidized bed the right and left side wall top and the outside, side wall top, back, be long strip shape band iron shape, about respectively be provided with a bedside below two edge of beds and claim, be straight-bar shape angle steel shape, on back side wall group edge, be provided with a plurality of equidistant bolts hole, screw is consistent with the screw of its upper bracket, on minute fluidized bed bed mouth limit, be provided with a plurality of equidistant bolts hole, screw is consistent with the screw of its lower bracket, be provided with a following mouth of a river at a minute fluidized bed diversion trench front end, be the rectangle hollow form, netted bed at elementary minute fluidized bed is provided with a branch fluidized bed bed surface at the end, be a minute fluidized bed bed bodily form drainage shunting shape, on bottom surface at the bottom of minute fluidized bed bed surface bottom lower bed, in, under middle part and both sides respectively be provided with a mesh gim peg, be the cylindrical bolt shape.(the bed surface patent is declared separately).(6) the dirty relief outlet of water: the middle and upper part that is positioned at the elementary minute right wall of fluidized bed bed mouth front end shunting bedrest top body, be the rectangle hollow form, join with a minute fluidized bed bed mouth front end, on the dirty relief outlet of water base, be provided with the dirty discharging current tank of the water mouth of a slope shape bottom surface, be U-shaped tank shape, be provided with a plurality of equidistant bolts hole on the bottom, mouth limit of blowdown notch inboard, bolt hole is consistent with the screw on dividing the fluidized bed lower bracket.On the body wall of the outside sewage separation body of the dirty relief outlet of water, be provided with a blowdown flow diverter, for rectangle oblique top hollow box-like, the dirty relief outlet of water is enclosed in the blowdown flow diverter, below the blowdown flow diverter, be provided with a square cone flow diverter bottom, below the flow diverter bottom, be provided with a flow diverter blowdown and draw adapter, be square top and round bottom cone-shaped hollow tubular, be provided with a flange terminal pad drawing to take on the mouth of pipe of bottom.(7) sump oil splitter: be positioned at middle and upper part, the sewage sump oil shunting body antetheca outside, be horizontal long strip shape hollow form, on sump oil diffluence pass outer lower end none blowdown hydraulic fluid port edge, be long strip shape band iron shape, on the splitter body wall of the sump oil diffluence pass outside, be provided with a blowdown oil flow diverter, for rectangle box-like, mouth at the bottom of blowdown flow diverter bottom of right side is provided with a blowdown flow diverter, be square top and round bottom cone-shaped hollow form, below end mouth, be provided with a blowdown and draw adapter, be circular hollow tubular, be provided with a flange terminal pad drawing to take on the bottom nozzle.(8) buffering dividing plate: be positioned at elementary sewage sump oil device splitter and divide the fluidized bed below, for vertical rectangle tabular, be provided with three altogether, the rear end of front and back two block buffering dividing plates joins with the rear wall of shunting body, respectively being provided with a flowing water water channel at former and later two front ends that cushion dividing plates is three-dimensional rectangle hollow form, form the buffering dividing plate of two half shapes, be provided with a buffering dividing plate equally in the centre of former and later two buffering dividing plates, different is provided in a side of this front end that cushions dividing plate of intermediary is to be connected with the antetheca of shunting body, be provided with a flowing water water channel in its rear end, be three-dimensional rectangle hollow form, also formed the buffering dividing plate of a half shape.(9) shunting water out: be positioned at sewage sump oil splitter rear wall bottom left side, for rectangle hollow form and shunting hydromagnetic accumulator communicate.(10) venting port: be positioned at sewage sump oil shunting body rear wall top ports the right along cleanser water pipe channel hole, below, be circular hollow form, on the rear wall of the outside of venting port shunting body, be provided with an exhaust and draw adapter, be circular hollow tubular, be provided with vapor pipe flange terminal pad drawing to take on the top ports.(11) shunting body top cover: be positioned at sewage sump oil splitter body top ports along the top, for rectangular slab lid shape, be provided with a plurality of equidistant bolts hole on the edge on top cover four limits, bolt hole is consistent along last bolt hole with the body mouth.
3, shunting hydromagnetic accumulator: be positioned at sewage sump oil splitter rear, top, sewage split-flow treatment equipment chassis, be three-dimensional rectangle hollow container shaped, it is made up of: (1) accumulator, (2) magnetization filter plate, (3) discharge water joint door, (4) accumulator top cover, (5) lift pump, (6) lift pump buoyancy control valve, (7) venting port etc.(1) accumulator: (antetheca of accumulator is the rear wall of sewage sump oil splitter body, be the shared spacer wall of one two device chamber) respectively be provided with an accumulator mouth edge in port inboard, accumulator wall top, be long strip shape band iron shape, on the mouth edge, be provided with a plurality of equidistant bolts hole, respectively be provided with former and later two equidistant magnetization filter plate pickup groove seats in the full wall of device inboard, the accumulator left and right sides, be vertical U-lag shape, respectively be provided with a bolt hole on top, groove seat both sides, be provided with a horizontal valve seat of lift pump buoyancy control valve on the accumulator rear wall left side, be the rectangular slab bulk, on valve seat, be provided with the bolt hole of standing valve.(2) magnetization filter plate: be positioned at the pickup groove seat that is located at accumulator front and back magnetization filter plate, for three-dimensional rectangle tabular, respectively be provided with a bolt hole (patent of magnetization filter plate is declared separately) (3) on top, magnetizing plate both sides and pick and place water joint door: be positioned at accumulator Zuo Bi bottom postmedian, be circular water pipe joint door shape.(4) accumulator top cover: be positioned at the accumulator top ports along the top, for rectangle tabular, be provided with a lift pump base on the back part of top cover left side, be the rectangular slab bulk, but before and after the base both sides, respectively be provided with the bolt hole of a roll adjustment, on the top cover of the right of water pump base, be provided with a buoyancy control valve power line access opening, be circular hollow form, on the top cover of water pump base rear, be provided with a water pump drinking-water pipe pipe hole, be circular hollow form, be provided with a venting port on the right, the place ahead, accumulator top cover middle part.(5) lift pump: be positioned on the lift pump base that is located on the accumulator top cover, be provided with a drinking-water pipe in lift pump the place ahead, be circular hollow tubular, drinking-water pipe stretches in the accumulator of below by the access opening that is located on the top cover mouth, above lift pump, be provided with a pumping line, be circular hollow tubular, lead in the sewage molecule splitter at rear.(6) lift pump buoyancy control valve: be positioned on the control valve seat that is located on the accumulator rear wall, be closed anti-water power buoyancy control valve.(7) venting port: be positioned at and be located on the accumulator top cover, be circular hollow form, above venting port, be provided with an exhaust and draw adapter, be circular hollow tubular, draw to take on the top ports in exhaust and be provided with a flange terminal pad.
4, the dirty molecule splitter of water: being divided into is the dirty molecule shunting of water and scintilla shunting the two poles of the earth, this by: (1) molecule shunting body, (2) divide flowing water diversion trench, (3) cleanser, the dirty molecule of (4) water to divide fluidized bed and scintilla to divide fluidized bed, (5) drainage to claim plate, (6) water dirt molecule relief outlet, (7) venting port, (8) splitter body top cover etc. to form.(1) shunting body, be positioned at the rear of the middle part shunting hydromagnetic accumulator of equipment chassis top sewage split-flow treatment equipment, be three-dimensional rectangle hollow container shaped, on inboard four limits of port, shunting body top, be provided with an internal orifice mouth edge, be long strip shape band iron shape, on the mouth edge, be provided with a plurality of equidistant bolts hole, be provided with a branch flowing water on the right of below shunting body antetheca mouth edge and draw adapter, be circular hollow tubular, take over the front end port and be provided with a coupling bend drawing, be the round hollow tubular, the left side is provided with a venting port below the wall port edge before body, be circular hollow form, the left side is provided with a cleanser water pipe channel hole below shunting body rear wall mouth edge, be circular hollow form, body antetheca below shunting body shunting water draws adapter, rear wall and right wall are provided with a branch flowing water diversion trench support, be U-shaped hollow angle steel shape, on support, be provided with a plurality of equidistant bolts hole, the avatar of diversion trench support is: a right high left side is low to be a diversion trench support that is provided with certain slope, the anterior angle place of Liang Jiaochu and left wall respectively is provided with lower bracket on the cleanser before and after the right wall of shunting body below the diversion trench support, be the rectangular slab bulk, respectively be provided with a bolt hole on the support, the avatar of cleanser support is: the support at anterior angle place, the left side is a upper bracket in the shunting body, and the support at two jiaos of places is a lower bracket before and after the right, it is an oblique support that is provided with certain angle, respectively be provided with the horizontal up and down title support that a molecule divides fluidized bed on shunting body Zuo Bi and the right wall below the lower bracket on the cleanser, be long straight-bar shape angle steel shape, be provided with a plurality of equidistant bolts hole on the horizontal title support up and down, molecule divides the avatar of fluidized bed to be: the horizontal title support on splitter body inner left wall is a upper bracket, horizontal title support on splitter body inner right wall is a lower bracket, it is a slope shape shunting bedrest that is provided with certain angle, two jiaos of places, splitter body inner right wall front and back and antetheca anterior angle place respectively are provided with lower bracket on the cleanser below dirty molecule shunting bedrest, be the rectangular slab bulk, on support, respectively be provided with a bolt hole, its avatar divides the fluidized bed cleanser identical with top dirty molecule, below lower bracket on the cleanser, be provided with a scintilla shunting bedrest, its structure is identical with molecule shunting bedrest with form, at molecule shunting body front and rear wall middle part and the right and left, respectively be provided with a drainage and claim the board slot seat, be vertical U-lag shape, on both sides, top, groove seat top, respectively be provided with a bolt hole, be provided with a water outlet in molecule shunting body rear wall bottom, be circular hollow form, be provided with a drainage water in the outside of water outlet and draw adapter, be circular hollow tubular, draw to take on the port of top at discharge water and be provided with a flange terminal pad, edge at the bottom of body bottom outside four limits are provided with a body, be long strip shape band iron shape, be provided with a plurality of equidistant bolts hole on edge, the end, bolt hole is consistent with the screw on the chassis.(2) divide the flowing water diversion trench: be positioned at and be located at shunting body upper end and divide flowing water to draw on the diversion trench support of taking over the below, the diversion trench cell body is a rectangle dustpan shape, respectively be provided with water conservancy diversion ledge edge on the diversion trench ledge top and the outside, ledge top, back, be long strip shape band iron shape, on the group edge of diversion trench, be provided with a plurality of equidistant bolts hole, bolt hole is consistent with the bolt hole on its support, on at the bottom of the front slot of ledge behind the diversion trench, be provided with a shunting crenel frid that laterally divides flowing water, be the rectangular slab bulk, minute flowing water crenel frid two ends and about respectively be provided with a shunting moisture flow crenel between two ledges, be vertical rectangle hollow form, equidistant respectively to be provided with a shunting moisture flow crenel be vertical rectangle hollow form at minute middle part of flowing water crenel frid and middle part the right and left, front end at diversion trench is provided with a following mouth of a river, be the rectangle hollow form, (3) cleanser: be divided into molecule and divide fluidized bed cleanser and scintilla to divide two up and down of fluidized bed cleansers, molecule divides the fluidized bed cleanser to be positioned to be located on the cleanser support of diversion trench below, scintilla divides the fluidized bed cleanser to be positioned to be located on the support of the scintilla cleanser that dirty molecule divides the fluidized bed below, molecule divides the fluidized bed cleanser identical with elementary sewage separation bed cleanser with the structure of scintilla shunting cleanser, what institute's difference divided that fluidized bed cleanser upper lateral tube rear end establishes at molecule is a water pipe Y-junction, what scintilla divided that the rear end of fluidized bed cleanser upper lateral tube establishes is a water pipe coupling bend, between Y-junction and coupling bend, be provided with a cleanser draw water receiving pipe up and down the cleanser water pipe join.(4) molecule divides fluidized bed and scintilla to divide fluidized bed: they lay respectively at and are located at molecule and divide fluidized bed cleanser below and scintilla to divide on the shunting bedrest below the fluidized bed cleanser, their bed structure is identical with elementary sewage separation bed bed structure, different bed surface internal structure difference (dividing fluidized bed bed surface patent to declare separately) (5) drainages of just shunting claim plate: be positioned at scintilla and divide the fluidized bed below, top, body bottom is provided with three drainages in left, center, right altogether and claims plate, be rectangle dividing plate shape, claim plate the right and left top respectively to be provided with a bolt hole at drainage.The dirty molecule relief outlet of (drainage claims the plate patent to declare separately) (6) water: the dirty molecule relief outlet of water is divided into and is two sewage draining exits up and down, they lay respectively at molecule and divide fluidized bed and scintilla to divide the middle and upper part of fluidized bed front end shunting body, be two one on the other of rectangle hollow forms, join with two branch fluidized bed bed mouth front ends up and down, respectively be provided with a flowing water notch on two dirty molecule relief outlet bases up and down, be U-shaped tank shape, on the bottom, mouth limit of two blowdown notch inboards up and down, be provided with a plurality of equidistant bolts hole, bolt hole divides the bolt hole on the fluidized bed lower bracket consistent with them, on the external wall of outside splitter of two dirty molecule relief outlets up and down, be provided with a blowdown flow diverter, for microscler oblique top hollow box-like, two dirty molecule relief outlets are enclosed in the flow diverter up and down simultaneously, below dirty molecule blowdown flow diverter, be provided with a square top and round bottom conical lower portion, be the cone-shaped hollow form, below the flow diverter bottom, be provided with a blowdown and draw adapter, be circular hollow tubular, be provided with a flange terminal pad drawing to take on the port of bottom.(7) venting port: be positioned at and be located at shunting body antetheca top ports, be circular hollow form, on the body wall of the venting port outside, be provided with an exhaust and draw adapter, be circular hollow tubular, be provided with vapor pipe flange terminal pad on the top ports of adapter drawing along the below.(8) shunting body top cover: be positioned to be located at and shunt the body top ports along the top, for rectangular slab lid shape, be provided with a plurality of equidistant bolts hole on the edge on top cover four limits, bolt hole is consistent along last bolt hole with shunting body mouth.
5, water pump accumulator: be positioned at the dirty molecule splitter of sewage split-flow treatment equipment chassis upper center water rear, be three-dimensional rectangle hollow container shaped, by: (1) accumulator body, (2) row water intaking joint door, (3) body top cover, (4) water pump, (5) inlet mouth, (6) water pump buoyancy control valve etc. are formed.(1) accumulator body: respectively be provided with a gas port edge in port inboard, accumulator body wall top, be long strip shape band iron shape, on the mouth edge, be provided with a plurality of equidistant bolts hole, the middle part is provided with a water pump buoyancy control valve valve seat below the wall port edge of a body left side, be the rectangular slab bulk, on valve seat, be provided with the standing valve bolt hole, be provided with water-in in body antetheca bottom, be circular hollow form, being provided with in the water-in outside, water draws adapter, be circular hollow tubular, draw to take on the port of top in water inlet and be provided with a flange terminal pad.Edge at the bottom of body bottom outside four limits respectively are provided with a body is long strip shape band iron shape, is provided with a plurality of equidistant bolts hole on edge, the end, and bolt hole is consistent with the bolt hole on the chassis.(2) row's water intaking joint door: be positioned at accumulator body left side wall center bottom, be circular water pipe joint door.(3) body top cover: be positioned at and be located at accumulator body top ports bead top, for rectangle tabular, be provided with a plurality of equidistant bolts hole on body top cover four limits, bolt hole is consistent along last screw with mouth, above the top cover left part, be provided with a lift pump base, for rectangle tabular, but be provided with the roll adjustment bolt hole on the limit of base, on the top cover of the place ahead of water pump base, be provided with a water pump drinking-water pipe pipe hole, be circular hollow form, be provided with a water pump buoyancy control valve power line line hole on top cover the right, be circular hollow form.(4) water pump: be positioned on the water pump base that is located on the top cover, be provided with a water pump drinking-water pipe in the place ahead of water pump, be circular hollow tubular, on the port of the upper end of drinking-water pipe, be provided with a flange terminal pad, drinking-water pipe extend into downwards in the water pump accumulator by the pore that is located on the top cover, above water pump, be provided with a rising pipe, be circular hollow tubular, be provided with a flange terminal pad in the lower end of rising pipe, above the flange terminal pad, be provided with a water pipe joint door, above water pipe joint door, be provided with a Discharging bent-tube, Discharging bent-tube leads to shunting water purifying kits (5) inlet mouth: be positioned at the top cover middle part, be the rectangle hollow form, on inlet mouth, be provided with a netted air-inlet cover.(6) water pump buoyancy by-pass valve control is positioned at and is provided with on the vertical control valve seat of body inner right wall, is closed anti-water power buoyancy control valve.
6, the heterogeneous shunting water purifying kits of four posts: be positioned at sewage split-flow treatment equipment chassis top postmedian, it by: (1) plane fixed support, (2) shunting water purifying kits two portions are formed.(1) plane fixed support: be positioned at water pump accumulator rear, be three-dimensional rectangle hollow angle steel shape, establish a planar frame earlier, be rectangle hollow angle steel shape, below four jiaos of frameworks, respectively be provided with a supporting leg, be column shape angle steel shape, between four supporting leg bottoms, respectively be provided with a supporting leg and connect horizontal title, be straight-bar shape angle steel shape, connect horizontal deserving to be called at four supporting legs and be provided with a plurality of equidistant bolts hole, bolt hole is consistent with the bolt hole on the equipment chassis, is provided with a horizontal pane face on framework, for rectangular planes tabular, middle part and rear portion the right and left at the frame face respectively are provided with a shunting water purifying kits pilot hole, be circular hollow form, be provided with a water pump water outlet pipeline through hole, be circular hollow form at the middle front part of frame face.The heterogeneous shunting water purifying kits of (2) four posts: be positioned at accumulator rear planar frame pilot hole, form by two on the equipment left side and former and later two four cylindrical containers of equipment the right, for cylindrical hollow container-like, respectively be provided with outer, a bottom in each cylinder bottom outside, be square vertical bar shape, on edge, the end, be provided with a plurality of equidistant bolts hole, screw is consistent with the screw on the equipment chassis, middle part, bottom and top in the cylinder outside respectively are provided with an individual hoop, for circular banded, respectively be provided with one in each cylinder body wall bottom equipment lateral direction and pick and place water joint door, be circular water pipe joint door, about each, respectively be provided with a paddle hole on the square body body wall on the relative cylinder bottom, be circular hollow form, respectively be provided with one in the outside of each paddle hole and draw adapter, be circular hollow tubular, draw to take on the port of top at each and all be provided with a flange terminal pad, in each cylinder body paddle hole above respectively be provided with backing dish in the porous, for circular alveolar disk planar, in porous, be provided with heterogeneous minute flowing water above the backing dish and purify the filter screen device, it is made up of a plurality of single-phase filter screen devices, be circular basin shape (dividing flowing water to purify filter screen device patent declares separately), on each column top port, respectively be provided with a flange terminal pad, be circular discoid, above the cylinder port, respectively be provided with a cylinder top cover, be circular basin-shape, on top cover, respectively be provided with a paddle hole, be circular hollow form, the outside at each paddle hole, respectively be provided with one and draw adapter, be circular hollow tubular, draw to take on the port of top at each and respectively be provided with a flange terminal pad, respectively be provided with a flange terminal pad in each top cover dish mouth outside, be circular hollow plate-like, purifying treatment top cover Inlet and outlet water at rear, shunting water purifying kits the right draws takes over the back, be provided with a Discharging bent-tube, be circular hollow tubular, bend pipe leads in the escaper.
7, the escaper of purifying waste water: be positioned at the heterogeneous shunting water purifying kits of top four posts rear, sewage split-flow treatment equipment chassis, it by: (1) escaper body, (2) body top cover, (3) lift pump etc. are formed.(1) escaper body: be three-dimensional rectangle hollow container shaped, in the wall port of escaper top, respectively be provided with a mouth edge, be long strip shape band iron shape, on the mouth edge, be provided with a plurality of equidistant bolts hole, be provided with the discharge outlet of purifying waste water in escaper rear wall bottom, be circular hollow form, be provided with a discharge water in the discharge outlet outside and draw adapter, be circular hollow tubular, take over the middle part and be provided with one and draw and take over pipeline joint door drawing, be provided with a flange terminal pad drawing to take on the port of top, be provided with an intake in body You Bi bottom, be circular hollow form, be provided with a water intaking joint door in the intake outside, edge at the bottom of the outside, four limits, body bottom respectively is provided with a body, be vertical bar shaped band iron shape, the end along on be provided with a plurality of equidistant bolts hole (2) body top cover: be positioned at and be located at escaper body top port mouth along the top, for rectangle tabular, on edge, body top cover four limit, be provided with a plurality of equidistant bolts hole, bolt hole is consistent along screw with the body mouth, be provided with a lift pump base on the top cover right side, be the rectangular slab bulk, but respectively be provided with the roll adjustment bolt hole, on the top cover in water pump base the place ahead on the base both sides, be provided with a water pump drinking-water pipe access opening, be circular hollow form, be provided with an air inlet port, be the rectangle hollow form in the top cover left side, on inlet mouth, be provided with an inlet mouth mouth mask, for rectangle netted.(3) lift pump: be positioned on the base that is located at lift pump on the escaper body top cover, be provided with a drinking-water pipe in the place ahead of lift pump, be circular hollow tubular, be provided with a flange terminal pad in the drinking-water pipe rear end, be circular hollow plate-like, above lift pump, be provided with a pumping line, be circular hollow tubular, on the port of rising pipe bottom, be provided with a flange terminal pad, be circular hollow plate-like, above ring flange, be provided with a water outlet tube coupling door, be provided with a rising pipe bend pipe above the joint door, Discharging bent-tube and hydraulic pipe join.
8, the dirty garbage drying withdrawer of water: be positioned at the dirty garbage drying withdrawer of water: be positioned at the dirty garbage drying withdrawer of water chassis dish, it by: the dirty rubbish drainage of (1) water returnable, (2) lift pump, the dirty garbage drying tipping bucket of (3) water device, (4) portalframe windlass, the dirty garbage drying tipping bucket of (5) water device track etc. are formed.(1) the dirty rubbish drainage of water returnable: the place ahead that is positioned at the anterior elementary sewage sump oil splitter of sewage split-flow treatment equipment, be rectangle water tank container shape, below drainage returnable bottom, be provided with a container chassis support, be rectangle hollow angle steel shape, the right and left respectively is provided with a horizontal title at the chassis overhang middle part, is straight-bar shape angle steel shape, below four jiaos of chassis overhangs, respectively be provided with a supporting leg, be circular hollow tubular.Be provided with row's intake in the right body wall of drainage returnable bottom, be circular hollow form, on the body wall of row's intake outside, be provided with a water shoot, be circular hollow tubular, on the port of water shoot top, be provided with a draining tube coupling door, be provided with a container cap on body top, drainage withdrawer left side, be the rectangular slab bulk, be provided with a water pump base in the container cap front portion, be the rectangular slab bulk, but respectively be provided with the roll adjustment bolt hole on water pump base both sides, on the body top cover of water pump base the place ahead, be provided with a water pump drinking-water pipe pore, be circular hollow form, reclaim the right side, top at drainage and be provided with a container mouth, be the rectangle hollow form, respectively be provided with a mouth limit and enclosing the edge on the mouth of the limit, back of container mouth and on the mouth of the right and left limit, be U-shaped hollow ledge shape, above the front end of front wall top, be provided with a track and connect bearing, be the long shape square steel wedged bottom shape that claims, respectively be provided with one in front and one in back two bolts hole (2) lift pump on the track connection bearing end flat: be positioned on the water pump base that is located at the dirty rubbish drainage of water withdrawer body top cover left side, be provided with a drinking-water pipe in lift pump the place ahead, be circular hollow tubular, on the port of drinking-water pipe rear end, be provided with a flange terminal pad, be circular hollow plate-like, above water pump, be provided with a pumping line, be circular hollow tubular, on the rising pipe bottom nozzle, be provided with a flange terminal pad, be circular hollow plate-like, be provided with a water pipe joint door on rising pipe above the ring flange, be provided with a waste pipe above water pipe joint door, waste pipe and the import of equipment sewage are drawn to take over and are joined.(3) the dirty garbage drying tipping bucket of water device: be positioned at the edge of enclosing that is located on the dirty rubbish drainage of the water withdrawer top ports, for rectangle hollow duckbilled container-like, on the two lateral wall bodies of rear end, mummification tipping bucket device bottom, respectively be provided with fixedly pulling seat of a wireline, be the flat shell-like of square tapered hollow, fixedly respectively be provided with fixedly lock pin of a wireline in the pulling seat at wireline, be square taper side channel cotter pilotage shape, the right and left respectively is provided with a rail wheel below the centre before mummification tipping bucket device bottom, be the circular rail colyliform, be provided with a dirty rubbish notch of water that stretches out to the front upper place at mummification tipping bucket device front end, be skewed slot shape duckbill, above mummification tipping bucket tank metastomium, be provided with a tipping bucket device top cover, be the half elliptic convex, be provided with the dirty rubbish import of a water at the top cover rear, be the rectangle hollow form, respectively be provided with ventilation opening on mummification tipping bucket device both sides group body top, be the rectangle hollow form, on ventilation opening, be provided with the air port guard, for rectangle netted, mouth at the bottom of being provided with one at the bottom of the inner device of mummification tipping bucket device, be the rectangle hollow form, on end mouth, be provided with a water strainer collet, be shape at the bottom of the rectangle porous plate, above collet, be provided with a permeable filtration bottom surface, be rectangle filter plate shape, above permeable filtration bottom surface, be provided with albarium and filter water layer.(4) portalframe windlass: be positioned at and be located on the fixed support of the dirty mummification withdrawer of water chassis front end windlass gantry, be three-dimensional rectangle hollow doorframe shape, establish right two root posts of a first from left earlier, be long column shape channel-section steel shape, notch is inside, above the middle and lower part of two root posts and column bottom, respectively be provided with a bolt hole, bolt hole is consistent with the bolt hole on the anchor of gantry, respectively be provided with gantry tracks positioned bolt at left and right sides gantry pillar middle part, be spiral shell button shape in the circular hollow, below column top, portalframe the right, be provided with a circular axle bed, below column top, the portalframe left side, be provided with an axis hole, be circular hollow form, in axis hole, be provided with an axle sleeve, be circular hollow sliding sleeve shape, about portalframe, be provided with a major axis in the axle bed of two root posts and the axle sleeve, be the circular shaft shape, stretch out to the left the axis hole of the left end of major axis from the column of the portalframe left side, respectively be provided with a wireline spool at the major axis two ends of inboard, portalframe top, be I-shaped hollow spool-like, about be provided with wireline on two roller bearings, be provided with a wireline spool on the major axis that outside the left side, portalframe top, stretches out, be I-shaped hollow spool-like, on roller bearing, be provided with wireline, on the step-down gear base that is located at below the wireline spool of the outside, the portalframe left side on the chassis, be provided with a speed reduction unit, for vertical rectangle flat box-like, on the speed reduction unit power output shaft, be provided with a wireline spool, be I-shaped hollow spool-like, (5) the dirty garbage drying tipping bucket of water device track: be positioned at the back lower place, two root posts middle part about portalframe, be slope support shape channel-section steel shape, the track notch is inside, help at track bottom, left and right sides kerve and to be provided with a positioning and fixing plate, be the rectangular slab bulk, about respectively be provided with a bolt hole before and after on two retaining plates, each bolt is consistent with its support screw mutually, about two track tops, respectively be provided with a location keyhole, be circular hollow form, on the track top notch that in the middle part of the portalframe left and right pillar, stretches out forward, respectively be provided with a rail groove and end the row baffle plate, be the square plate bulk.
9, tubing system: be positioned at sewage split-flow treatment equipment right side and top, it by: (1) blow-off line, (2) gas exhaust duct, (3) three parts such as reuse water pipeline of purifying waste water are formed.(1) blow-off line: the blowdown flow diverter below that is positioned at elementary sewage sump oil splitter and molecule splitter, be circular hollow tubular, be responsible for the rear portion at blow-off pipe and be provided with a bend pipe, be the round hollow tubular, on the port of bend pipe top, be provided with a flange terminal pad, be circular hollow plate-like, be provided with a blowdown wash-down water at the rear of bend pipe and draw adapter, be circular hollow tubular, draw the adapter rear end in flushing and be provided with a water pipe joint door, be responsible for the middle part at blow-off pipe and be provided with a Y-tube interface, be circular hollow tubular, on the Y-tube interface, be provided with a flange terminal pad, be circular hollow plate-like, above the flange terminal pad, be provided with a blow-off pipe, be circular hollow tubular, on the port of the two ends up and down of blow-off pipe, respectively be provided with a flange terminal pad, be circular hollow plate-like, be responsible for the front portion at blow-off pipe and be provided with a blow-off pipe pipeline joint door, saving in front of the door at the blow-off pipe pipeline, the portion left side is provided with a threeway mouth of pipe, on the threeway mouth of pipe, be provided with a flange terminal pad, be circular hollow plate-like, be provided with a blowdown bend pipe in flange terminal pad front, on the two-port of blowdown bend pipe, respectively be provided with a flange terminal pad, be circular hollow plate-like, above drawing adapter joint door, the dirty rubbish drainage of water returnable lift pump is provided with a sewage recovery tube, be circular hollow tubular, the sewage recovery tube is circular hollow tubular, and sewage recovery tube upper end and sewage import are drawn the sewage of taking over the top and reclaimed to draw to take over and join.(2) vapor pipe: be positioned at the sewage split-flow treatment equipment top, be circular hollow tubular, draw in the exhaust of elementary sewage sump oil splitter and to take over rear and the exhaust of shunting hydromagnetic accumulator and draw above the adapter, be provided with a vapor pipe cruciform joint, on four mouths of pipe of vapor pipe cruciform joint, respectively be provided with a flange terminal pad, be circular hollow plate-like, above the comb cruciform joint, be provided with a vapor pipe, be circular hollow tubular, on the vapor pipe lower port, be provided with a flange terminal pad, be circular hollow plate-like, draw to take between the place ahead in the rear of vapor pipe cruciform joint and the exhaust of molecule splitter and be provided with a vapor pipe, on the port of vapor pipe rear and front end, respectively be provided with a flange terminal pad, be circular hollow plate-like.(3) the hydraulic pipe pipeline of purifying waste water: be positioned at above purify waste water escaper lift pump top and sewage separation device top and the dirty garbage drying tipping bucket of the water device, it is the reuse main pipe line of purifying waste water, be circular hollow tubular, above the escaper lift pump water outlet tube coupling door of purifying waste water, be provided with a hydraulic pipe, be circular hollow tubular, be provided with a water pipe Y-junction at the hydraulic pipe rear portion, be T font hollow tubular, be provided with a water pipe at the Y-junction rear, be circular hollow tubular, this root hydraulic pipe leads to the water pipe network, be provided with a water pipe joint door in Y-junction the place ahead, the place ahead at water pipe joint door is provided with a hydraulic pipe, on hydraulic pipe, be provided with a water pipe Y-junction, be T font hollow tubular, below Y-junction, be provided with a wash-down water bend pipe, be circular hollow tubular, be provided with a cleanser Y-junction on the top of bend pipe, one of Y-junction terminates to molecule and divides fluidized bed cleanser and scintilla to divide fluidized bed cleanser water pipe joint door, the following blow-off pipe that terminates to of bend pipe is responsible for rear flushing tube coupling door, be provided with a hydraulic pipe in the place ahead of hydraulic pipe Y-junction, be circular hollow tubular, being provided with a hydraulic pipe on hydraulic pipe disconnects by tough joint, be provided with a water pipe Y-junction at the hydraulic pipe front end, be T font hollow tubular, below the water pipe Y-junction, be provided with a coupling bend, be the round hollow tubular, the lower end of bend pipe elementary sewage separation bed cleanser draws adapter joint door and joins, be provided with a bend pipe in hydraulic pipe Y-junction the place ahead, lead to port top, the dirty mummification tipping bucket of water device top, be the round hollow tubular, above the port of the lower end of bend pipe, be provided with a water pipe joint door.
Four, description of drawings:
1 sewage split-flow treatment equipment chassis, adapter and valve are drawn in 2 drainings, 3 escapers of purifying waste water, 4 treater plane fixed supports, 5 cleaner top cover Inlet and outlet waters draw adapter, 6 cleaner top terminal port flange terminal pads, 7 top cover flange terminal pads, 8 cleaner top covers, 9 cleaner top cover Inlet and outlet waters draw adapter, 10 cleaner top covers, 11 top cover flange terminal pads, 12 cleaner top terminal port flange terminal pads, 13 cleaner top cover Inlet and outlet waters draw adapter, the dirty molecule splitter of 14 water, 15 blowdown flow diverter oblique tops, 16 blowdown flow diverters, adapter and flange terminal pad are drawn in 17 water inlets, adapter is drawn in 18 exhausts, 19 vapor pipes, adapter is drawn in 20 exhausts, adapter is drawn in 21 exhausts, 22 sewage inducer, 23 blowdown flow diverter oblique tops, 24 blowdown flow diverters, 25 sewage draw adapter, 26 sewage recovery tube, 27 sump oils are discharged flow diverter, 28 blowdown bend pipes, the tube coupling door is cleaned in 29 water deliverys, 30 sewage tube coupling doors, 31, the dirty mummification tipping bucket of water device, 32 wireline spools, 33 portalframe major axis, 34 wireline, 35 portalframes, 36 track tops and end andante, 37 tracks, 38 gantry fixed supports, 39 fixed supports tiltedly draw title, the dirty garbage drying drainage of 40 water withdrawer chassis, 41 ventilation openings, 42 track supports, the edge is enclosed on 43 mouthfuls of limits, the dirty rubbish drainage of 44 water withdrawer, 45 drainings joint door, 46 withdrawer chassis, 47 wireline are pulling seat fixedly, 48 blow-off pipes, 49 elementary sewage sump oil splitters and shunting hydromagnetic accumulator, 50 blow-off pipes are responsible for, 51 row's water intaking joint doors, 52 supporting legs tiltedly draw title, 53 supporting legs, adapter is drawn in 54 flushings, 55 water pump accumulators, 56 row's water intaking valves, 57 shunting water purifying kits, 58 row's water intaking joint doors, 59 shunting water purifying kits, 60 row's water intaking joint doors, 61 row's water intaking joint doors, 62 supporting legs tiltedly draw title, 63 supporting legs, 64 lift pump drinking-water pipes, 65 top covers, 66 body mouth edges, 67 lift pump bases, 68 lift pumps, 69 lift pump rising pipes, 70 hydraulic pipes, 71 hydraulic pipe Y-junctions, 72 water delivery tube coupling doors, 73 cleaner Discharging bent-tubes, 74 lift pump Discharging bent-tubes, 75 lift pumps, 76 washpipes, 77 hydraulic pipe Y-junctions, 78 cleansers joint door, 79 cleansers draw adapter, 80 body mouth edges, 81 body top covers, 82 hydraulic pipes are by tough joint, 83 cleansers and upper lateral tube, 84 cleansers erect the lattice pipe, 85 cleanser lower transverse tubules, 86 water inlet pipes, 87 lift pump Discharging bent-tubes, 88 lift pumps, 89 vapor pipe cruciform joint, 90 vapor pipes, 91 hydraulic pipe Y-junctions, 92 cleansers draw adapter, 93 diversion trench pit edges, 94 diversion trench supports, 95 diversion trenchs, 96 body top covers, 97 cleansers, 98 body mouth edges, 99 cleanser retaining plates, 100 cleanser upper brackets, 101 shunting bed cradles, 102 fens fluidized bed edge of beds, 103 cleanser retaining plates, 104 cleanser lower brackets, 105 fens fluidized bed bed bodies, 106 fens fluidized bed bed surfaces, 107 fens fluidized bed bed mouths, ledge behind 108 fens fluidized bed diversion trenchs, 109 top covers and lift pump base, plate in 110 dash plates, 111 dash plate header boards, 112 body front and rear walls, 113 water outlets, 114 magnetization filter plate pickup grooves, analyse before the 115 magnetization filter plates, 116 magnetization filter plate pickup grooves, plate behind the 117 magnetization filter plates, 118 lift pump drinking-water pipes, 119 ends, are along bolt, 120 ends, are along bolt, 121 drainages claim the plate pickup groove, 122 drainages claim the plate right panel, 123 drainages claim the plate pickup groove, 124 draw the pipe connecting flange terminal pad, 125 draw the pipe connecting flange terminal pad, 126 drinking-water pipes, 127 accumulator top covers and lift pump base, 128 ends, are along bolt, 129 ends, are along bolt, 130 intake-outlets, backing dish in 131 porous, 132 intake-outlets, backing dish in 133 porous, 134 ends, are along bolt, 135 treaters and top cover, 136 supporting legs tiltedly draw title, 137 supporting legs, 138 wireline spools, 139 gantry pillars, 140 wireline spools, 141 wireline, 142 lift pumps, 143 speed reduction units, 144 wireline spools, 145 support inclined-planes, 146 diversion trench groove edges, 147 diversion trenchs, 148 diversion trench supports, 149 cleanser retaining plates, 150 cleanser upper brackets, edge of bed behind 151 fens fluidized beds, 152 shunting bed cradles, 153 shunting bedside claim, 154 fens fluidized bed bed body diversion trench line of delimitation, 155 cleansers draw adapter, 156 diversion trench water outlets, 157 cleanser retaining plates, 158 cleanser upper brackets, edge of bed behind 159 fens fluidized beds, 160 shunting bed cradles, 161 fens fluidized bed bed bodies and diversion trench line of delimitation 162 diversion trenchs, the outlet of 163 tanks, 164 drainages claim plate left side plate, 165 drainages claim the plate pickup groove, 166 water outlets, 167 fens fluidized bed lower brackets, 168 sewage draining exit groove edges, 169 cleanser lower brackets, 170 cleanser retaining plates, 171 cleansers, 172 diversion trenchs, 173 fens fluidized bed lower brackets, 174 sewage draining exit groove edges, 175 cleanser lower brackets, 176 cleanser retaining plates.
Fig. 1, the outside primary structure explanation of expression sewage split-flow treatment equipment
Fig. 2, the inner primary structure explanation of expression sewage split-flow treatment equipment.
Fig. 3, primary structure explanation is looked outside on an expression sewage split-flow treatment equipment left side.
Fig. 4, primary structure explanation is looked outside on the expression sewage split-flow treatment equipment right side.
Fig. 5, expression cleanser, branch fluidized bed and the explanation of the dirty relief outlet private side of water TV structure.
Therefore the device that the many places same structure is arranged in this equipment omits repeat specification no longer one by one to some extent in specification sheets.
Five, concrete detailed rules for the implementation:
At first the branch fluidized bed bed surfaces 106 in the elementary sewage sump oil splitter 49 are packed into the netted bed of branch fluidized bed bed body 105 at the end, bottom the mesh gim peg on the bottom surface at the bottom of the bed surface 106 bottom lower bed and the bed end, fixedly connected.Minute back edge of bed of fluidized bed bed body 105 is put on the shunting bed cradle 100, and dividing fluidized bed bed mouth 107 to put in the sewage draining exit groove edge on the body lower bracket, (see among Fig. 5 167 and 168) fixedlys connected with support with bolt.Bottom plate 99 and 103 on the cleanser 97 of minute fluidized bed 105 is put on cleanser upper bracket 100 and the lower bracket 104, connected with bolting.Cleanser drawn take over 92 and fixedly connected with cleanser 97 usefulness coupling bends.To draw with coupling bend and pick out elementary sewage sump oil splitter body rear wall 112 outsides, and load onto to draw and take over joint door (see among Fig. 2 72).Diversion trench 95 being housed on the diversion trench support 94 (see among Fig. 5 148) fixedlys connected with support with bolt.Top cover 96 is put the body mouth along on 98, with bolt and body mouth along fixedlying connected.Magnetization filter plate header board 115 is put in the magnetization filter plate pickup groove of shunting in the hydromagnetic accumulator 49 114, used bolting.Plate 117 is put in the magnetization filter plate pickup groove 116 after will magnetizing filter plate, uses bolting.The mouth that top cover 109 is put shunting hydromagnetic accumulator 49 is along last, with bolt with top cover and body mouth along fixedlying connected.Lift pump 88 is put on the lift pump base of shunting on the hydromagnetic accumulator top cover 109, connected with bolting.Drinking-water pipe 118 bottoms are extend into from the drinking-water pipe access opening of top cover 109 in the accumulator 49 of below, the flange terminal pad of drinking-water pipe 118 upper end is connected with water pump 88 water outlet flanges connects, use bolting.The elementary sewage sump oil splitter and the shunting hydromagnetic accumulator 49 that install are put the front upper on chassis 1, fixedly connected with the chassis with bolt 119.Claiming plate left side plate 164 to be housed in drainage the drainage of below in the dirty molecule splitter 14 of water claims to use bolting in the plate pickup groove 165, claims drainage plate right panel 122 to be housed in drainage and claim to use bolting in plate pickup groove 121 and 123.Divide the bed surface of fluidized bed to put netted bed in the branch fluidized bed bed body 161 scintilla at the end, bottom an end, fixedly connected (see among Fig. 2 106) with the mesh gim peg on the bottom surface at the bottom of the lower bed of bed surface bottom.Divide fluidized bed bed body 161 back edge of beds 159 to be housed on the body upper bracket 160 scintilla, dividing the fluidized bed bed sewage draining exit groove that mouth is put bed body lower bracket 167 tops, fixedly connected with bolt and last lower bracket 160,167 along in 168.Divide the last bottom plate 157 and 170 of fluidized bed cleanser 171 to put respectively on the cleanser on the lower bracket 158 and 69 scintilla, connect with bolting.Cleanser drawn take over 155 usefulness elbows and be connected with cleanser 171, cleanser draws the top of adapter 155 and Y-junction lower interface that molecule divides fluidized bed cleanser 83 connect fixing (see among Fig. 2 79).Divide the fluidized bed bed surface to put netted bed in the branch fluidized bed bed body 154 molecule at the end, bottom mesh gim peg on the bottom surface at the bottom of the lower bed of bed surface bottom and bed, fixedly connected (see among Fig. 2 106) molecule is divided in the back edge of bed of fluidized bed bed body 154 151 to put on the bed body upper bracket 152, dividing the fluidized bed bed sewage draining exit groove that mouth is put bed body lower bracket 173 tops, fixedly connected with 173 with last lower bracket 152 with bolt along in 174.Divide the last bottom plate 149 and 176 of fluidized bed cleanser 83 to put respectively on the cleanser on the lower bracket 150 and 175 molecule, connect with bolting, by water pipe by the Y-junction intermediary interface of tough joint and cleanser 83 connect fixing (see among Fig. 2 79) cleanser 31 take over that interface connects fixing on the Y-junction of 79 bottom and cleanser 83, to draw adapter 79 with coupling bend and pick out the body 14 rear walls outside, load onto to draw and take over joint door 78, diversion trench 147 is housed on the water inlet pipe 86 below diversion trench supports 148, connects with bolting.Body top cover 81 is housed in body 14 vertical body mouths along last, connects with bolting.With the dirty molecule splitter 14 of the water that installs, put plant tray 1 top, the rear portion of shunting hydromagnetic accumulator 49 is fixedly connected with bolt 120.The flange terminal pad of rising pipe 87 lower ends of lift pump 88 and the water outlet flange terminal pad of lift pump 88 are connected, use bolting, load onto water outlet tube coupling door, the flange terminal pad of rising pipe 87 vertical flange terminal pads and water inlet pipe 86 is connected, use bolting, the flange terminal pad of the flange terminal pad of the lower interface of vapor pipe cruciform joint 89 and cruciform joint front port is drawn the exhaust of taking over 20 flange terminal pad and elementary sewage sump oil splitter with shunting magnetization retaining exhaust respectively draw and take over 21 flange terminal pad and connect, use bolting.The exhaust of the flange terminal pad of vapor pipe 19 rear ends and the dirty molecule splitter of water 14 front ends drawn take over 18 flange terminal pad and connect, use bolting, the flange terminal pad and the vapor pipe cruciform joint 89 rear port flange terminal pads of vapor pipe 19 front ends are connected, connect with bolting.The flange terminal pad of interface on the flange terminal pad of vapor pipe 90 lower ends and the vapor pipe cruciform joint 89 is connected, connect with bolting.The mouth that water pump accumulator top cover 1217 is housed in water pump accumulator 55 bodies top mouthful connects with bolting along last.Lift pump accumulator 55 is put the dirty molecule splitter of water rear on the chassis 1, lift pump 75 drinking-water pipes 126 are put in the accumulator from the drinking-water pipe access opening of top cover 127, the pump mouth flange terminal pad of flange terminal pad on drinking-water pipe 126 top ports and water pump 75 front ends is connected, and bolting connects.The water outlet that pipe connecting flange terminal pad 125 and molecule splitter 14 rear wall bottoms are drawn in the water inlet of water pump accumulator 55 antetheca bottoms is drawn pipe connecting flange terminal pad 124 and is connected, and connects with bolting.Use bolt 128 to be fixedlyed connected with chassis 1 in edge, 55 ends of water pump accumulator again.The plane fixed support 4 of treater 57,59 and 135 is installed the postmedian that is put on the chassis 21, be connected and fixed with bolt and chassis.Former and later two purifying processors 135 of the left side and former and later two purifying processors 57 of the right with four posts flowing water purification in heterogeneous minute weight device, 59, four posts are successively below the plane of treater plane fixed support 4, protrude upward by fixed the hole on the support plane, be housed on the chassis 1, with former and later two purifying processors 135 of the left side ... the Inlet and outlet water of bottom draws pipe connecting flange terminal pad and former and later two purifying treatment devices 57 of the right, the water inlet of 59 bottoms is drawn the pipe connecting flange terminal pad and is connected, use bolting, again with bolt with four column purification treaters 57,59,135 ... fixedly connected with the chassis.Each is organized a plurality of single-phase purification filter screen devices be respectively charged into according to the order of sequence in each shunting water purifying kits, load onto four top covers 8,10,135 ... connect with bolting.Inlet and outlet water on former and later two treater top covers of the equipment left side is drawn pipe connecting flange dish 9 connect, connect with bolting.Lift pump 75 rising pipes 74 lower ends are stretched out downwards from the rising pipe access opening on the treater planar bracket plane, connect dish with the flange terminal pad of rising pipe 74 lower ends and the flange on the pump outlet and connect and connect, connect with bolting.The flange terminal pad of rising pipe 74 upper ends and the Inlet and outlet water on treater 57 top covers 10 are drawn pipe connecting flange terminal pad 13 connect, use bolting.The top cover 65 of the escaper 3 of purifying waste water is housed in the escaper mouth along connecting with bolting on 66.With the rear that the escaper 3 of purifying waste water is put 1 top, chassis shunting water purifying kits 4, fixedly connected with the chassis with bolt.Lift pump 68 is housed on the water pump chassis 67 connects with bolting.The lower end of the drinking-water pipe 64 of water pump 68 is put in the escaper 3 by the water pipe channel hole on the top cover 65, flange terminal pad on drinking-water pipe 64 tops and water pump 68 pump mouth flange terminal pads are connected, use bolting, the flange terminal pad of rising pipe 69 bottoms of water pump 68 and the water outlet flange terminal pad of water pump 68 are connected, connect with bolting.With the bottom of the rising pipe 73 of purifying processor 59 top covers 8, the water pipe channel hole from escaper 3 top covers 65 is put in the escaper, and flange terminal pad on rising pipe 64 top openings and water pump 68 pump mouth flange terminal pads are connected, and uses bolting.The flange terminal pad of rising pipe 69 bottoms of water pump 68 and the water law dirt terminal pad that goes out of water pump 68 are connected, connect with bolting.The bottom of the rising pipe 73 of purifying processor 59 top covers 8 is put in the escaper 3 from the water pipe channel hole on escaper 3 top covers 65, pipe connecting flange terminal pad 5 is drawn in flange terminal pad on rising pipe 73 tops and 8 water outlets of purifying processor top cover connect, use bolting.With the row of equipment joint door 51,56,58,60, the 61 water pipe pipe collar joints of fetching water, respectively with shunting hydromagnetic accumulator 49, water pump accumulator 55, purifying processor 57,59,135 ... row's intake pipe of escaper 3 is connected and fixed.The place ahead that sewage separation purifying processor 1 is put on the dirty garbage drying withdrawer of water chassis 40, drainage withdrawer 46 is kept flat in the chassis 40, drainage withdrawer 44 is installed on its chassis 46, two wireline spools 32 about on portalframe 35 major axis 33 and 138 are installed to left front and right part of major axis 33 respectively, fixedly connected with axle 33 with the pivot pin key, the left end of major axis 33 is installed in the gantry pillar 35 vertical axle beds, the right-hand member of major axis is passed from gantry pillar 138 vertical axle sleeves, wireline spool 140 is installed to major axis 33 right-hand members, fixedly connected with major axis with pin key.The axle bed of major axis 33 by portalframe 35 columns is connected with 138 column axle sleeves, formed a portalframe.Two root posts 35 and 138 bottoms about portalframe are put respectively about chassis 40 front ends top on two gantry fixed supports 38, use bolt to fixedly connected respectively with the chassis fixed support.The positioning bolt hole on portalframe 35 left and right sides tracks 37 tops is put respectively on the pilot pin at gantry pillar 35 and 139 middle parts, fixedlyed connected with portalframe with bolt.With the two ends, the left and right sides that the bottom of left and right sides track 37 is put track support 42 respectively, use the front and back bolting on both sides to connect.Dirty mummification tipping bucket device 31 of water and the dirty mummification of water are turned over two rail wheels about the device bottom front, put 44 vertical mouthfuls of limits of the dirty rubbish drainage withdrawer of water simultaneously and enclose along in the rail groove of main left and right sides track 37 in 43 and before the withdrawer top, with the wireline 34 on two wireline rolling wheels 32 about portalframe 35 upper ends and 138 and 141 end with wireline fixedly lock pin respectively with the wireline of water dirt mummification tipping bucket 31 back lower place the right and lefts fixedly pulling seat 47 fixedly connected.Lift pump 142 is put on the water pump pedestal of top, drainage withdrawer 44 left sides, connected with bolting.The lower end of drinking-water pipe is transferred in the withdrawer from the water pipe channel hole that withdrawer 44 limits cover, flange terminal pad on the port of drinking-water pipe upper end and the flange terminal pad on the lift pump pump mouth are connected, use bolting.Flange terminal pad on the waste pipe 26 lower end ports of water pump 142 tops and the flange terminal pad on the pump outlet are connected, use bolting.Waste pipe 26 top water pipe coupling bends and sewage drawn take over 25 and be connected and fixed.Speed reduction unit 143 is put on the speed reduction unit base of chassis 40 left upper portion, connected with bolting.The wireline spool 144 usefulness axle keys of speed reduction unit 143 are fixedlyed connected with the power output shaft of speed reduction unit 143, the wireline 141 of wireline spool 140 is adorned volume with speed reduction unit wireline spool 144 be connected.Flange terminal pad on flange terminal pad on the blow-off pipe 28 upper end ports and the blowdown flow diverter 24 lower end ports is connected, connect with bolting.The flange terminal pad of blowdown main pipe line 50 bend pipes upper end and the flange terminal pad on blowdown flow diverter 16 lower port are connected, connect with bolting.Flange terminal pad on flange terminal pad on the blowdown bend pipe 28 upper end ports and the sump oil discharge flow diverter 27 lower end ports is connected, connect with bolting.Flange terminal pad on the blowdown bend pipe 28 lower end product and blow-off pipe 50 person in charge's upper forepart left side flange terminal pads are connected, connect with bolting.The rising pipe 69 upper end water pipe Y-junctions 71 of lift pump 68 tops are connected and fixed with hydraulic pipe 70, water pipe threeway 77 joints with washpipe 76 top front ends and hydraulic pipe 70 are connected and fixed, the water pipe joint door 78 that draws adapter 79 with Y-junction on the washpipe 76 and cleanser is connected and fixed, the water pipe joint door that draws adapter 54 with flushing is fixedlyed connected with the washpipe 76 bottom mouths of pipe, Y-junction 91 with hydraulic pipe 70, the water pipe joint door that draws adapter 92 by coupling bend and cleanser is connected and fixed, and has so far realized the purpose of design of sewage split-flow treatment equipment.

Claims (2)

1. sewage split-flow treatment equipment, the structure that makes the branch fluidized bed bed body that dirt in the sewage and water shunts that it is characterized in that being adopted, divide fluidized bed bed surface contour structures, lower angle structure on the shunting bedrest, divide fluidized bed cleanser pipeline configuration, lower angle structure on the cleanser support, the utilization structure of shunting hydromagnetic filter plate, the structure of the dirty relief outlet of water and branch fluidized bed are connected and fixed structure, the syndeton of the dirty relief outlet of blowdown flow diverter and water, purifying processor body structure, sewage separation device body internal structure, molecule splitter body internal structure, sump oil shunting mode structure, the dirty garbage drying tipping bucket of water device body structure, the dirty rubbish drainage of water withdrawer structure, the hydraulic pipe pipeline draws the mode that connects in succession.
2. sewage split-flow treatment equipment according to claim 1, it is characterized in that the sewage diversion trench structure that adopted, the sewage director draws to be taken over and sewage diversion trench structure, elementary sewage separation device body external structure, molecule splitter body external structure, portalframe and chassis structure, shunting water purifying kits external structure, the equipment pipe frame mode, the exterior design frame mode of sewage split-flow treatment equipment.
CN200910113898A 2009-03-03 2009-03-03 Sewage split-flow treatment equipment Pending CN101823805A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910113898A CN101823805A (en) 2009-03-03 2009-03-03 Sewage split-flow treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910113898A CN101823805A (en) 2009-03-03 2009-03-03 Sewage split-flow treatment equipment

Publications (1)

Publication Number Publication Date
CN101823805A true CN101823805A (en) 2010-09-08

Family

ID=42688005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910113898A Pending CN101823805A (en) 2009-03-03 2009-03-03 Sewage split-flow treatment equipment

Country Status (1)

Country Link
CN (1) CN101823805A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331790A (en) * 2017-12-25 2019-10-15 温州市一都建设有限公司 A kind of heat insulation layer mechanism used for building exterior wall of anti-mud blocking

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331790A (en) * 2017-12-25 2019-10-15 温州市一都建设有限公司 A kind of heat insulation layer mechanism used for building exterior wall of anti-mud blocking

Similar Documents

Publication Publication Date Title
CN101293722B (en) Municipal sewage treatment system and equipment built on river
CN105753166B (en) Horizontal drowned flow-two-stage oxygenation vertical subsurface flow wetland sewage disposal system and method
CN107899298A (en) A kind of anticlogging sewage-treatment plant
CN101811800A (en) Domestic sewage treatment device
CN105502729B (en) A kind of water treatment facilities
CN205527957U (en) Integration lake water purifies suspension aeration equipment
CN207391119U (en) The check dam of purifying river water
CN107215999A (en) A kind of automatic collection and treatment device of river course oil slick
CN207822630U (en) A kind of anticlogging sewage-treatment plant
CN101823805A (en) Sewage split-flow treatment equipment
CN105152472B (en) A kind of rainwater enters the osmosis type eco-embankment of river contamination control
CN201648104U (en) Sleeve filtering device for sewage recycling
CN206736004U (en) A kind of sewage-treatment plant with filtering function
CN206767808U (en) A kind of CT types integral water purifier
CN105347562B (en) Waterworks water treatment facilities with water intaking filter
CN108793613A (en) A kind of combined type sewage treatment equipment
CN205473093U (en) Water filtration equipment with water distribution aeration function
CN113651502A (en) Natural water body integrated purification system
CN205313237U (en) Area water intaking filter equipment's integrated water purification system
CN205773757U (en) A kind of multiple sewage disposal device
CN205313216U (en) Artifical rapid infiltration layer sewage treatment system
CN209957527U (en) Domestic sewage treatment system
CN105347531B (en) A kind of integrated water treatment equipment of band water intaking filter
CN107963737A (en) A kind of domestic sewage processing system
CN217780873U (en) Combined artificial wetland treatment device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
DD01 Delivery of document by public notice

Addressee: Zhao Yanping

Document name: Notification of before Expiration of Request of Examination as to Substance

DD01 Delivery of document by public notice

Addressee: Zhao Yanping

Document name: Notification that Application Deemed to be Withdrawn

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100908