CN101812868A - Independent stiff cable - Google Patents

Independent stiff cable Download PDF

Info

Publication number
CN101812868A
CN101812868A CN 200910166754 CN200910166754A CN101812868A CN 101812868 A CN101812868 A CN 101812868A CN 200910166754 CN200910166754 CN 200910166754 CN 200910166754 A CN200910166754 A CN 200910166754A CN 101812868 A CN101812868 A CN 101812868A
Authority
CN
China
Prior art keywords
cable
new
pile
steel
grade beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200910166754
Other languages
Chinese (zh)
Other versions
CN101812868B (en
Inventor
江德群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200910166754 priority Critical patent/CN101812868B/en
Publication of CN101812868A publication Critical patent/CN101812868A/en
Application granted granted Critical
Publication of CN101812868B publication Critical patent/CN101812868B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an independent stiff cable which is used as an internal structure of a building by the flexibility of the steel cable. The independent stiff cable solves the problem of instant collapse occurred at connections of new posts or old posts and new beams and large plate hanging positions during a strong earthquake, which is caused by only using reinforcing steel bars and steel plates in a traditional building. The scheme comprises the steps of: additionally adding twisting or shuttling steel cables in a steel structure of generally designed reinforcing steel bars and steel plates and the like and connecting all parts of the whole building; therefore, the anti-earthquake flexibility of the whole building is effectively enhanced. Or, a steel cable is used for connecting a new beam group and a new post group so that the foundation of old bridge pile becomes large, deep and stable enough. Or, the steel cable is used for connecting the new beam group and the new pile group so that the foundation of the old pile becomes vast enough. The leverage effect is added, thereby the bending degree of pipe pole bodies is controlled. The shocking energy is quickly dispersed, absorbed and conducted, thereby seismic intensity is greatly reduced to a zero-destructive power degree.

Description

Independent stiff cable
Technical field:
The present invention relates to be a kind of with " cable wire " as shockproof disconnected device of interior of building and utilization thereof.
As: first, be used in building and dam etc. usually and build thing, its structure RC is exactly a steel concrete, SC is exactly a steel reinforced concrete, SRC is exactly that the reinforcing bar reinforcing bar mixes soil.According to the present technology problem of giving birth to be: go through disorderly the pullling and return when squeezing rapidly of the high torsion of 3D angle high-frequency of violent earthquake, often make between the steel interior molecules,, and make part build thing living moment result of caving in through this violent torsional motion.Especially unsettled place, column beam joint place, or the long vast area floor of distance etc. caves in the soonest.Study carefully its error principle: a reinforcing bar or reinforcing bar, its characteristic are both after bending, must be softening through very high temperature, just can do no nocuity answer; If it is under normal temperature, strong when doing the action that cyclic bending replys again; Then must give birth to high temperature, the regeneration slight crack is eventually to dissociating.B steel plate or reinforcing bar building materials are all transported length and width and are limited, so cut into bits here and there before dispatching from the factory earlier; Do combination in the building site again; Its mode is nothing more than first overlapping reinforcing bar steel plate, again with the thin wire binding, or welding, or the locking of mat screw or the like. Then stay naked eyes unavoidably and be difficult to the flaw discovered; When meeting with macroseism, countless big or small slight cracks appear earlier in concrete, and allow acid rain have the pipeline of infiltration causticize steel to make it from the coarse to fine: so chemical change, and grow the powerful bulbs of pressure, and then push concrete structure, to strengthening and widening the rift, with the passing of time after the vicious circle, if meet with macroseism again, promptly moment collapses; Causing does not have the escape chance and injures and deaths.The present situation problem of second, just early stage bridge it " pier footing part ": because of finance, technology, equipment were owed foot at that time, or do not adopt sand as yet because of the riverbed and reach firmly, so its pile generally presents " short, shallow, little " phenomenon, nowadays the riverbed transfinites because of adopting sand, causes that to be faced with bridge pier exposed serious, must empty excessively if meet with torrent again, and shake old pile, must not prop up to fall eventually and form bridge cut-off, related numerously fall in the tumbling torrent with bridge people car is gone for ever; Bridge cut-off incidents such as Ru Houfeng, Li Gang, Pingdong go out not poor thoroughly, thereby seriously perplex the vast passerby of using, and shake local leadership, hinder local economic development ... etc.And the prior art field: be to be to peel off behind the pile epidermis welded reinforcement etc. earlier, however the welding high temperature explosive split, and destroy pile intensity, or pad is not enough to borrow power, cause and be difficult to load and come off So this " technology of the old bridge pier of reinforcement " is if " can't reach safety standard "; Then vertical very new bridge, " bridge pier is exposed and then give birth to the continuous expansion of displacement, and row danger emigrant " in; Only surplus undoubtedly " remove and rebuild " way.As new increase bridge etc., a seated connection one and is removed reconstruction.The third, with regard to the problem of cable car pile part: " be the pursuit on the visual field, must build on the thin and weak mountain Period, so pile earlier in the sky system is seated on the extremely harsh geological conditions, as the Great Wall; Because of reciprocations such as running or wind-force or earthquakes, cause pile " excessively to rock " phenomenons such as sloping soil again; And grow periphery basic native stone loose gradually landslide, and with the passing of time cause pile to lose support should be arranged, have in the end as the Taibei city cat cable T16 post, be forced to move bar with temporary transient solution landslide problem.
Background technology:
Cable wire contains common cable wire, stainless steel cable or zinc-plated electric pole cable wire etc., and in transportation, wall scroll monovolume length reaches more than the kilometer; Cable wire characteristic tool: " integrally formed non junction, the bending impact that gets arbitrarily volume easy construction in the wrong, the high torsion of ability high-frequency high reps high angle " etc.It must be at " wall scroll ", and " single seam ", " winding side or circle thing around ", the steel mesh reinforcement bundle of " or pass, through " its beam or post or floor etc., and link up or enclose around whole floor one; Then finish the task of " not allowing that individually the firm antidetonations of separation are built the thing structure alone ".This engineering effort: " be reinforcing bar and steel plate, forever institute can not reach ".Whether study carefully the experience macroseism and collapse suddenly, the core key is: " material at beam and column joint place, the bending torsional buckling of the high torsion of high angle high reps high-frequency in the time of whether resisting earthquake ".Just tough on its speciality as it " ligament " on our the bone joint.Now do following material test: glass bar, piece, bending is just cracked slightly at normal temperatures; But same composition weight, but through dissolve be pumped into thread, become the topknot shape again after, the vertical bending torsional buckling that meets with as the high torsion of high angle high reps high-frequency as the macroseism ", still can save from damage as before.Hence one can see that, same composition, and it is to the identical high torsion of high angle high-frequency, and the number of times when being fractureed, the area of deciding what is right and what is wrong with it just is inversely proportional to ".Still have, the inner anti-high voltage structures thing of high-speed tire is a cable wire; It faces for a long time, the situation of high pressure, high-frequency, high angle distortion; Build the thing internal state when never being second to macroseism.In like manner can demonstrate,prove, the speciality of cable wire should meet the demand of beam and column joint place it " tough " fully.Only engineering circle is still unmanned so far finds and carries out, and is unfortunate very.So be the guarantee broad masses security of the lives and property, and strengthen for the purpose of the national power; Wise and able government seemingly should promote this kind building method with all strength.
Summary of the invention:
First, to big or small building and dam aspect: promptly " all beams and the important joint of post; or the unsettled place of large tracts of land floor; in use cable wire before the grouting; shuttle back and forth in tendon, the side of net; or winding or pass one by one and preset in all multiple holes of steel plate or its gap make the whole image of building tightly be bundled by same cable wire; Make arbitrary position all be difficult to break away from separately or avalanche because of macroseism.Second, to old bridge pier post aspect: it is exposed to be that old bridge pier post is washed till the stone bone with hydrochloric acid earlier, secondly clean with water under high pressure, then twine earlier and make a circle in this pile week with cable wire, pass " in all multiple preset steel plate hole of the grade beam hole " more one by one or twine " tendon ", this new post and reach the n circle time, " old pile with new the new pile of beam " combined closely to break away from or to extend or move, reach complete stage by means of power and power transmission to desiring all not have to either direction; Be same as first and new beam combine with new pile as rule again, be in the milk at last and finish.The third, to the aspect of old cable car pile: it is identical with second that it makes rule.
Technical solution of the present invention is: Suo Duting is divided into " first, structure and second, method " two blocks.Be the present invention with " cable wire " as " structure " aspect within the beam of [four kinds of buildings] and post and the plate etc.; With and implement " method " (details step) aspect.So comprise: when use 1, when big or small building, 2 reservoirs, dam etc.; First 1., " structure " feature: the beam or post or the floor that lie in common design, steel mesh reinforcement, bundle or each shaped steel plate on, " additionally increase the cable wire of one or more; make eternal be attached to around the tendon, the gap or pass the steel plate hole or a side or as known various methods etc. of tiing knots at present, and be hidden in the concrete ".Effect: tie up to when meeting with macroseism, its can mat its not only long but also tough characteristic, and effectively solved: " simple reinforcing bar or each shaped steel plate it " joint gathers, or itself is too firm, in case when meeting with macroseism, " the easy disengaging in joint, or easily fractureed ", cause and build thing moment and cave in, to everybody's casualties " problem; This is before to have needed to be resolved hurrily and the difficult problem that can't solve.Second 1., " method " feature: the connection that lies in important beam, post, plate partly, must twine back and forth or through n bar or n circle with same cable wire; And " important post " should do the above winding of half-turn; Promptly twine around the steel plates such as tendon or H type or place side, or pass in the default hole of steel plate or as known various methods of tiing knots at present." beam or plate portion " then cable wire system is staggered is interspersed among steel mesh reinforcement, the bundle etc. or down.Make integral body build thing eventually, as by same cable wire bundling tightly, grouting at last.Effect: [vertical " reinforcing bar or steel plate " had no progeny by shake entirely, and remaining cable wire still can " hold out alone this broken build thing in not weighing down, so name Suo Duting ".Help common people's safe escape in macroseism.Because of having buried cable wire, and make its more anti-" behaviour for a long time " as inner layer of tire again; In like manner, it makes that to build thing shatter-proof cable wire, unexpected tear fracture].When 3, being the pier footing of the old short and small weakness of rescue; First 2., " structure " feature: be bridge floor outer on the both sides, downstream, planting not only deeply but also huge ground pile group and is being supported new grade beam group and a body of a bridge weight and a stabilization by it.And each new grade beam respectively is linked to " cable wire " respectively, on the independent one or both sides of each once visited place stake of same row; Effect: " old abutment plinth is become firmly by weakness "; As when disliking support force still not enough, the new pile of part must be increased to nearly bridge floor each angle cable wire of mat each point again, the new grade beam that tiltedly plays, " connect the support band and draw, help and weigh and consider in order to uphold justice ".Second is 2., " method " feature: a excavates table soil earlier, make the stake of whole once visited places partly to reach predetermined ground of new grade beam part exposed; B ends with the stone exposed bone that concentrated hydrochloric acid is washed till the pile skin again, and cleans with water jets under high pressure; C makes new grade beam with H shaped steel plate or tendon etc., twine old pile one by one with cable wire, and pass default each steel plate hole on the new grade beam or tendon or hole or winding or and place side, make each " new grade beam and old pile ", mat n bar cable wire twines n circle etc., and makes permanent binding; D and " old post opposite side " practice is also identical; Each does binding with two ends it " pile group top newly " to e each " new grade beam two ends " respectively, its practice and second 1., identical; The partly new grade beam of f must be exposed to newly side outside the pile group concrete, comprises the length and the hole of following required binding, and paints to wait and protect, with the usefulness of reservation bridge enlarging; Whole H shaped steel plate that presents single or multiple lift and be parallel to each other of g or steel mesh reinforcement etc., the new grade beam group that is formed is erected at respectively on the crown of pile group newly of both sides.If h is when disliking holding power still not enough, must with bridge each side new pile increase to a little less than bridge floor; Divide many oblique cable wires of length again, each a plurality of angle respectively, each links and is hung in each default hole that is fit to of new post and new grade beam, sees outside finishing below the back axle like as two groups or the above Cable stayed bridge; After the i grouting, and the backfill earthwork; Make and can't see arbitrary change below the bridge; Or only see the structure of tiltedly opening part.Usefulness: b makes the cement grip darker tighter, wide, tightly and not seeps water, and metal is not corroded, Gu can be durable in use.C makes whole junction, all ability macroseism and tear-proof.D makes between many bases, connects to a shatter-proof individuality.4, moving excessively the disappearing of the old pile of cable car wasted the aspect: first 3., " structure " feature: with old pile is Center stake, other increases (about 20 meters) far away new stake slightly more than, and do permanent prehensile or put side with " new grade beam " and with " cable wire " separately, etc. mode and linking between this once visited place stake and new pile, 1. identical with first to mode of connection.Usefulness: behind the new grade beam of mat increase new pile far away slightly and length slightly, can exempt former post it " agglomerate shakes phenomenon altogether "; And can produce lever usefulness, foot stops shaft by overflexing; And pressure ram limit topsoil stone; And increase the area that energy is shaken in diffusion, and make its vibration limits ability of minimizing, reach the microseism of not having injury eventually; And effectively protect environment soil stone stable, and do not give birth to landslide, do not jeopardize below resident's safety.Second 3., " method " feature: be new grade beam with the once visited place stake between do when combining, the method for its combination, a, b, c, i 2. is identical with second.Usefulness: the old post of winding of mat cable wire etc., economical simple and exempt to hurt the original structure of old post; And exempt fatigue and the cost and the time of moving bar; And anticorrosive, the eternal anti-macroseism of energy percolation-proof does not make the column beam joint place break away from because of macroseism ".
And the cable wire kind comprises: Stainless Steel rope, common cable wire, galvanized vanized steel cable, electric wire be with galvanized vanized steel cable etc., should be with regard to the needs of construction environment and change.
Description of drawings:
Fig. 1, by related art techniques known build thing floor structure of steel product profile view; 1 beam, 2 posts, 3 floors.
Fig. 2, for the present invention on the reinforcing bar of Fig. 1 or steel plate or the other structure chart of putting cable wire; Cable wire in 4 beams, cable wire in 5 posts, cable wire in the 6 floor bar nets.
Fig. 3, the plan view that the old pile of bridge or the old pile of cable car and new beam is combined with cable wire etc. for the present invention; 7 old piles, 8 new grade beam and preboring holes, 9 cable wires.
Fig. 4 is the plan view of the another kind of combination of Fig. 3; New grade beam of 10 steel plates and preboring hole, 11 cable wires, 12 old piles.
Fig. 5 sees 15 and the plan view when combining with cable wire when being all the H steel plate for beam column, preset hole on 13 steel plates.
The specific embodiment:
Below in conjunction with the drawings and specific embodiments the present invention is done further set forth in detail.
Shown in Fig. 2-5, be divided into four kinds and build thing: when 1, being used in big or small building and 2, dam, when lying in the configuration aspects of present original tendon, steel mesh reinforcement or steel plate; " additionally increase cable wire ", and make its tendon that is wound in post, or side by side or shuttle back and forth, or pass one by one and default in more than H shaped steel plate-girder, the post in the hole, or shuttle back and forth in " steel mesh reinforcement of floor " gap etc. in tendon, the steel mesh reinforcement of beam; And the cable connector number should reduce as far as possible, meets the cable connector place, must how to exempt from failure around two circles such as tendons; And all H shaped steel plates all must pass default hole, otherwise, probably in macroseism, break away from; If building site system is positioned at the salty wetland of high soda acid such as dam, bridge pier etc. again, should adopt zinc-plated or the stainless steel cable material with anticorrosion; Grouting is finished again at last.Its means purpose: lie in added cable wire in tendon, the steel plate after, must allow each position, distortion that tool is enough and deformation space; According to the mass-energy law that do not go out, should allow the concrete of the stressed back rest of building, floor, by the destruction of powderyization successively, and each position also rock alone, absorb seismic energy and produce plastic hinge to reach, with Stress Transfer to another unbroken beam, floorslab concrete; That is this part invention, allow and build composition deformation or each self-separation is rocked, or drop as powder; But never allow monoblock beam, post, floor, or totally build thing and do the moment avalanche; The cause personnel that must cause does not like that have escape time, and weighs or kill the people wounded.When 3, being used in the old short and small weak bridge pier aspect of rescue: a bridge floor outside on the both sides, downstream each in " a complete set of pipe foundation pile " mode, implant more than enough pile group newly enough deeply; B is exposed with the once visited place stake earlier, is washed till the stone exposed bone with hydrochloric acid again, removes spent acid again; C twines in each hole of preboring of stake of whole once visited place and new steel plate grade beam one by one with cable wire; D once visited place stake another side, or other once visited place stake presents parallel new grade beam group at last all as the method for c and make many new grade beams; E is with new grade beam group two ends and pile group binding newly, and it is identical with 1 that it links practice; If f is when disliking holding power still enough, must with both sides newly the pile group lengthening but do not surmount old bridge to nearly bridge floor.(exempting to hinder widening of day back axle) divides many oblique cable wire beams of length again, and a plurality of respectively angles respectively are linked between new peak pile and new each convenience point of grade beam, finishes below the back axle outward appearance like four groups of Cable stayed bridges; G is in the milk at last, and buries new grade beam and complete.Its means purpose: for strengthen deepening on the basis that makes the old bridge of bed rearrangement, and organize structure more and link jointly and supporting this old bridge bridge floor, to guarantee the body of a bridge and with bridge people safety.Exempt many bridges, do again because of the little minor issue of bridge pier is all discarded.This invention, estimate four advantage: a of tool absolute do not have destroy after, the traffic jam before the completion.B saves public funds more than 60%, reduces to squeeze and presses other public works budget.C saves the social evolution remains from damage.(as the Lugouqiao is important historic site, and reality should not destroyed by rush of water or be struck and ruin) d protects environment.(firing of new building materials, must produce flood tide CO2 discharging) 4, to old cable car pile aspect: as Taibei city cat cable T16, the most desirable embodiment: be that former stake is not moved, and as central point, peripheral other plays totally 3 of 40 centimeters dark 15 meters stakes of about diameter, and old post and 20 meters of the vertical calculating of new post separation, makes to be the radial arrangement of Y type, and joint linking portions such as old stake and new beam leave the practice on the ginseng.Its means purpose: former shaking force etc., because of many three with three beams, increase
Lever bend resistance and conduction are shared and are disperseed the energy-absorbing energy, and make into harmless fine motion; Guarantee native stone around the pile in fragile Ling Xian district.This invention is estimated three advantages of tool: 1 operation is many 10 months (this worker method, 2 months; Migration, 12 months); 2 save 2,700 ten thousand yuan of public funds; (3,200 ten thousand yuan-5,000,000 yuan) 3 must not move, the fixator of cable and shaft (saving money and time).
Though the present invention with preferred embodiment openly as above; but they are not to be used for limiting the present invention; anyly be familiar with this skill person; without departing from the spirit and scope of the invention; from when can doing various variations or retouching, so being as the criterion of should being defined with the application's claim protection domain of protection scope of the present invention.

Claims (9)

1. independent stiff cable, it is characterized in that: the beam or post or the floor that lie in common design, steel mesh reinforcement, bundle or each shaped steel plate on, additionally increase the cable wire of one or more, make eternal be attached to around the tendon, the gap or pass the steel plate hole or a side or as known various methods etc. of tiing knots at present, and be hidden in the concrete.
2. independent stiff cable according to claim 1 is characterized in that: described cable wire kind comprises Stainless Steel rope, common cable wire, galvanized vanized steel cable, electric wire with galvanized vanized steel cable etc., should be with regard to the needs of construction environment and change.
3. described independent stiff cable using method of claim 1: the connection that lies in important beam, post, plate partly must be twined or through n bar or n circle back and forth with same cable wire; And important post should be done the above winding of half-turn; Promptly twine around the steel plates such as tendon or H type or place side, or pass in the default hole of steel plate; Beam or plate portion then cable wire system staggered be interspersed among steel mesh reinforcement, the bundle etc. or down or as known various methods of tiing knots at present; And reinforcing bar, steel plate etc. are adopted welding or are not welded; Make integral body build thing eventually, as by same cable wire bundling tightly, grouting at last.
4. independent stiff cable is characterized in that: be bridge floor outer on the both sides, downstream, planting not only deeply but also huge ground pile group and is being supported new grade beam group and a body of a bridge weight and a stabilization by it; And each new grade beam respectively is linked to " cable wire " respectively, on the independent one or both sides of each once visited place stake of same row.
5. independent stiff cable according to claim 4 is characterized in that: described cable wire kind comprises Stainless Steel rope, common cable wire, galvanized vanized steel cable, electric wire with galvanized vanized steel cable etc., should be with regard to the needs of construction environment and change.
6. the described independent stiff cable using method of claim 4 a: a excavates earlier and shows soil, and predetermined ground of the new grade beam part that partly reaches of whole once visited places stake is exposed; B ends with the stone exposed bone that concentrated hydrochloric acid is washed till the pile skin again, and cleans with water jets under high pressure; C makes new grade beam with H shaped steel plate or tendon etc., twine old pile one by one with cable wire, and pass default each steel plate hole on the new grade beam or tendon or hole or winding or and place side or as known various methods of tiing knots at present, make each new grade beam and old pile, mat n bar cable wire twines n circle etc., and reinforcing bar, steel plate etc. are adopted welding or do not welded; And make permanent binding; D and the old post opposite side practice is also identical; Each does binding with the top of pile group newly at two ends respectively at e each new grade beam two ends; The partly new grade beam of f must be exposed to newly side outside the pile group concrete, comprises the length and the hole of following required binding, and paints to wait and protect, with the usefulness of reservation bridge enlarging; Whole H shaped steel plate that presents single or multiple lift and be parallel to each other of g or steel mesh reinforcement etc., the new grade beam group that is formed is erected at respectively on the crown of pile group newly of both sides; If h is when disliking holding power still not enough, must with bridge each side new pile increase to a little less than bridge floor; Divide many oblique cable wires of length again, each a plurality of angle respectively, each links and is hung in each default hole that is fit to of new post and new grade beam, sees outside finishing below the back axle like as two groups or the above Cable stayed bridge; After the i grouting, and the backfill earthwork; Make and can't see arbitrary change below the bridge; Or only see the structure of tiltedly opening part.
7. independent stiff cable, it is characterized in that: with old pile is Center stake, other increases more than one new pile far away slightly, and separately with new grade beam and with cable wire do permanent prehensile or put side or as known various methods of tiing knots at present, etc. mode and linking this once visited place stake with newly between pile.
8. independent stiff cable according to claim 7 is characterized in that: described cable wire kind comprises Stainless Steel rope, common cable wire, galvanized vanized steel cable, electric wire with galvanized vanized steel cable etc., should be with regard to the needs of construction environment and change.
9. described independent stiff cable using method of claim 7: be new grade beam with once visited place stake and new pile between do when combining, the method for its combination, a excavates table soil earlier, and predetermined ground of the new grade beam part that partly reaches of once visited place stake is exposed; B ends with the stone exposed bone that concentrated hydrochloric acid is washed till the pile skin again, and cleans with water jets under high pressure; C makes new grade beam with H shaped steel plate or tendon etc., twine old pile one by one with cable wire, and pass default each steel plate hole on the new grade beam or tendon or hole or winding or and place side or as known various methods of tiing knots at present, make each new grade beam and old pile, mat n bar cable wire twines n and encloses etc.; And must adopt welding or welding manner not between reinforcing bar or steel plate; Combining between the new grade beam of d and new pile, post should be done the above winding of half-turn; Promptly twine around the steel plates such as tendon or H type or place side, or pass in the default hole of steel plate.And adopt welding between reinforcing bar, steel plate or do not weld, and make permanent binding; After the e grouting, and the backfill earthwork; Make and can't see arbitrary change in appearance.
CN 200910166754 2009-08-11 2009-08-11 Independent stiff cable Expired - Fee Related CN101812868B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910166754 CN101812868B (en) 2009-08-11 2009-08-11 Independent stiff cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910166754 CN101812868B (en) 2009-08-11 2009-08-11 Independent stiff cable

Publications (2)

Publication Number Publication Date
CN101812868A true CN101812868A (en) 2010-08-25
CN101812868B CN101812868B (en) 2013-07-03

Family

ID=42620223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910166754 Expired - Fee Related CN101812868B (en) 2009-08-11 2009-08-11 Independent stiff cable

Country Status (1)

Country Link
CN (1) CN101812868B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216290A (en) * 2021-05-11 2021-08-06 上海市城市建设设计研究总院(集团)有限公司 Detachable subway station roof collapse prevention guy cable structure and construction method
CN113969641A (en) * 2021-11-02 2022-01-25 华煜建设集团有限公司 Slant shaped steel concrete column structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216290A (en) * 2021-05-11 2021-08-06 上海市城市建设设计研究总院(集团)有限公司 Detachable subway station roof collapse prevention guy cable structure and construction method
CN113969641A (en) * 2021-11-02 2022-01-25 华煜建设集团有限公司 Slant shaped steel concrete column structure

Also Published As

Publication number Publication date
CN101812868B (en) 2013-07-03

Similar Documents

Publication Publication Date Title
CN106012809B (en) Restorative procedure after a kind of steel fibrous composite material concrete combination column and its shake
CN105297617B (en) Double-column type swinging shock-insulation bridge pier structure system
CN103882803B (en) A kind of replaceable landscape configuration presstressed reinforcing steel Self-resetting power consumption bridge pier
CN105926764B (en) A kind of industrialization preprocessing regenerative structural system and its construction method
CN103711329B (en) The method of outer subsides steel reinforced concrete framework method ruggedized construction
CN107237402A (en) A kind of low damage Self-resetting assembly concrete two-way frame bean column node
CN105484152B (en) A kind of bridge pier of additional mild steel damper and cushion cap attachment structure
Sathiparan et al. Strengthening of adobe houses with arch roofs using tie-bars and polypropylene band mesh
CN105133793A (en) Space constraint multi-cavity pipe-in-pipe steel bar concrete huge column and construction method
Reyes et al. Out‐of‐plane shaking table tests of full‐scale historic adobe corner walls retrofitted with timber elements
CN109024881A (en) Self-resetting can assemble multistage beam accentric support steel frame after shake
CN101812868B (en) Independent stiff cable
JP5977177B2 (en) Seismic reinforcement method for retaining wall
CN104775649A (en) Shock-resistant steel-bar concrete structure side coal bunker
Park Improving the resistance of structures to earthquakes
CN110130214A (en) A kind of bridge pier, bridge structure, king-post and construction method
CN201826413U (en) Segmented-connection concrete and steel plate combined shear wall with supports
CN104452798B (en) Offshore wind turbine foundation structure and equipment and construction method of offshore wind turbine foundation equipment
CN206693242U (en) A kind of vertical bearing structure of suspension support beam in base pit engineering
Geiger et al. Earthbag technology–simple, safe, and sustainable
EP3577280A1 (en) Retaining wall with reinforced soil
CN205000555U (en) Huge post of multicavity guan zhongguan reinforced concrete of space restraint
CN212641248U (en) Side slope protection device for foundation building engineering
CN211113674U (en) Double-row column supporting structure of foundation pit
CN210507103U (en) Shock absorber with BRB and sliding device connected in series

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20140811

EXPY Termination of patent right or utility model