CN101812856A - Production process of steel pile structure of cutter suction dredger - Google Patents
Production process of steel pile structure of cutter suction dredger Download PDFInfo
- Publication number
- CN101812856A CN101812856A CN 201010122943 CN201010122943A CN101812856A CN 101812856 A CN101812856 A CN 101812856A CN 201010122943 CN201010122943 CN 201010122943 CN 201010122943 A CN201010122943 A CN 201010122943A CN 101812856 A CN101812856 A CN 101812856A
- Authority
- CN
- China
- Prior art keywords
- welding
- groove
- pipe
- moulding bed
- butt joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Arc Welding In General (AREA)
Abstract
The invention discloses a production process of the steel pile structure of a cutter suction dredger. The production process comprises the following steps: blanking boards, preparing a jig, machining and bending, performing sectionalized assembly of round tubes, performing integral-type assembling, measuring pin holes, positioning and installing, coating, removing the jig, etc. the invention has the advantages of high production precision, convenient preparation and good operational effect.
Description
Technical field:
The present invention relates to a kind of production process of steel pile structure of cutter suction dredger.
Background technology:
The cutter suction dredger stern is provided with two location piling bars, wherein main piling bar is mounted on the shiftable track chassis, its position is in the middle of the ship stern, 42 meters of main piling bar total lengths, body thickness of slab specification is respectively DH36 (25mm, 30mm, 40mm, 50mm, 60mm), three pin holes are arranged on the pile body in addition, and existing processes generally is difficult to satisfy Design Requirement Drawing.
Summary of the invention:
The object of the present invention is to provide a kind of production process of steel pile structure of cutter suction dredger of making precision height, easy to make, good working effect.
Technical solution of the present invention is:
A kind of production process of steel pile structure of cutter suction dredger is characterized in that: comprise the following steps:
(1) plate cutting: according to the drawing requirement, select the pretreated plate cutting of DH36, blank size is the most size of no surplus, and cutting stock precision is strict controlled in below the 1mm, the diagonal error is also below 1mm, hold successfully simultaneously during the groove blanking, the pipe crimping longitudinal weld longitudinal seam is " X " groove, and root 2mm is stayed in the centre, " v " font formula is adopted in the tube and tube butt joint, so the sheet material positive and negative is noted in blanking, reverse side is opened 30 ° of groove roots and is stayed the 2mm surplus, considers that thickness of slab difference position holds the transition groove successfully to scooping out;
(2) moulding bed is made: moulding bed is that bottom L125 angle steel supports, and top is that the semi arch template of Numerical control cutting R800mm is formed, and it is fixed that the moulding bed center line adopts laser transit to get, error control 0.5mm;
(3) machine volume circle: machine will be noted the positive and negative of sheet material, adds man-hour center of circle degree and is controlled in the 0.5mm, and the roll bending butt joint is " X " font groove, and root 2mm is stayed in the centre, positive CO
2Capping is welded in welding automatically, electric current 180-200A, and voltage 24-26V, gas flow 20-25L/min carries out preheating to groove and both sides, 150 ℃-200 ℃ of preheat temperatures before the welding; Reverse side carbon arc air gouging back chipping goes out CO backward
2Welding is carried out ultrasonic testing/ ultrasonic examination after every section pipe welding finishes, and in time reprocess at defective place;
(4) pipe segmentation assembling: pipe segmentation assembling is meant the pipe of identical wall thickness is winched on the moulding bed, allows it fit fully with the moulding bed template and docks moulding, and per two sections pipes should place 2mm welding allowance for shrinkage in the butt joint; Slope type adopts reverse side " v " font groove to stay root 2mm; Outside carbon plane back chipping goes out white, and longitudinal weld longitudinal seam answers anchor to open below the 300mm, and CO is adopted in butt joint
2Or SMAW; When adopting SMAW, welding rod must cure 1 hour through 350 ℃-430 ℃ before using, put into 100-150 ℃ of insulating box then, ready access upon use, before the welding groove and both sides are carried out preheating, preheat temperature 150-200 ℃, be incubated with the rock wool blanket after welding is finished, after the insulation slow cooling, carry out straightness accuracy and proofread and correct;
(5) integral assembling: adopt segmentation assembling scheme to carry out integral assembling; The long 42m of pile body, the long 40m of pipe, precision control is adopted every 10 meters and is drawn wire to cooperate the firer to proofread and correct; Then with pile crown member welding assembly;
(6) pin hole measure, location and installation: pin hole full stake welding finish and concentricity, straight line degree measurement after the assay was approved, carry out measurement and positioning and install; With the pipe upper surface is datum, vertically draws chalk line to make pipe range direction straight line, rules with straight steel ruler flow control one pin hole position with the tube head benchmark in addition, draws the symmetrical holes of symmetrical end face after the perforate with weight, uses the position of finding out second and third hole with quadrat method.
(7) application: carry out painting work after pile body work is all over, the inner mechanical grinding method that adopts of pile body eliminates rust, and surface cleanness is the Sa2.0 level, paints then;
(8) tread flaking: break away from moulding bed after pile body paint finishes, something that gives the game away is mended mill.
The present invention makes precision height, easy to make, good working effect.
The invention will be further described below in conjunction with embodiment.
The specific embodiment:
A kind of production process of steel pile structure of cutter suction dredger comprises the following steps:
(1) plate cutting: according to the drawing requirement, select the pretreated plate cutting of DH36, blank size is the most size of no surplus, and cutting stock precision is strict controlled in below the 1mm, the diagonal error is also below 1mm, hold successfully simultaneously during the groove blanking, the pipe crimping longitudinal weld longitudinal seam is " X " groove, and root 2mm is stayed in the centre, " v " font formula is adopted in the tube and tube butt joint, so the sheet material positive and negative is noted in blanking, reverse side is opened 30 ° of groove roots and is stayed the 2mm surplus, considers that thickness of slab difference position holds the transition groove successfully to scooping out;
(2) moulding bed is made: moulding bed is that bottom L125 angle steel supports, and top is that the semi arch template of Numerical control cutting R800mm is formed, and it is fixed that the moulding bed center line adopts laser transit to get, error control 0.5mm;
(3) machine volume circle: machine will be noted the positive and negative of sheet material, adds man-hour center of circle degree and is controlled in the 0.5mm, and the roll bending butt joint is " X " font groove, and root 2mm is stayed in the centre, positive CO
2Capping is welded in welding automatically, electric current 180-200A, and voltage 24-26V, gas flow 20-25L/min carries out preheating to groove and both sides, 150 ℃-200 ℃ of preheat temperatures before the welding; Reverse side carbon arc air gouging back chipping goes out CO backward
2Welding is carried out ultrasonic testing/ ultrasonic examination after every section pipe welding finishes, and in time reprocess at defective place;
(4) pipe segmentation assembling: pipe segmentation assembling is meant the pipe of identical wall thickness is winched on the moulding bed, allows it fit fully with the moulding bed template and docks moulding, and per two sections pipes should place 2mm welding allowance for shrinkage in the butt joint; Slope type adopts reverse side " v " font groove to stay root 2mm; Outside carbon plane back chipping goes out white, and longitudinal weld longitudinal seam answers anchor to open below the 300mm, and CO is adopted in butt joint
2Or SMAW; When adopting SMAW, welding rod must cure 1 hour through 350 ℃-430 ℃ before using, put into 100-150 ℃ of insulating box then, ready access upon use, before the welding groove and both sides are carried out preheating, preheat temperature 150-200 ℃, be incubated with the rock wool blanket after welding is finished, after the insulation slow cooling, carry out straightness accuracy and proofread and correct;
(5) integral assembling: adopt segmentation assembling scheme to carry out integral assembling; The long 42m of pile body, the long 40m of pipe, precision control is adopted every 10 meters and is drawn wire to cooperate the firer to proofread and correct; Then with pile crown member welding assembly;
(6) pin hole measure, location and installation: pin hole full stake welding finish and concentricity, straight line degree measurement after the assay was approved, carry out measurement and positioning and install; With the pipe upper surface is datum, vertically draws chalk line to make pipe range direction straight line, rules with straight steel ruler flow control one pin hole position with the tube head benchmark in addition, draws the symmetrical holes of symmetrical end face after the perforate with weight, uses the position of finding out second and third hole with quadrat method.
(7) application: carry out painting work after pile body work is all over, the inner mechanical grinding method that adopts of pile body eliminates rust, and surface cleanness is the Sa2.0 level, paints then;
(8) tread flaking: break away from moulding bed after pile body paint finishes, something that gives the game away is mended mill.
Claims (1)
1. a production process of steel pile structure of cutter suction dredger is characterized in that: comprise the following steps:
(1) plate cutting: according to the drawing requirement, select the pretreated plate cutting of DH36, blank size is the most size of no surplus, and cutting stock precision is strict controlled in below the 1mm, the diagonal error is also below 1mm, hold successfully simultaneously during the groove blanking, the pipe crimping longitudinal weld longitudinal seam is " X " groove, and root 2mm is stayed in the centre, " v " font formula is adopted in the tube and tube butt joint, so the sheet material positive and negative is noted in blanking, reverse side is opened 30 groove roots and is stayed the 2mm surplus, considers that thickness of slab difference position holds the transition groove successfully to scooping out;
(2) moulding bed is made: moulding bed is that bottom L125 angle steel supports, and top is that the semi arch template of Numerical control cutting R800mm is formed, and it is fixed that the moulding bed center line adopts laser transit to get, error control 0.5mm;
(3) machine volume circle: machine will be noted the positive and negative of sheet material, adds man-hour center of circle degree and is controlled in the 0.5mm, and the roll bending butt joint is " X " font groove, and root 2mm is stayed in the centre, positive CO
2Capping is welded in welding automatically, electric current 180-200A, and voltage 24-26V, gas flow 20-25L/min carries out preheating to groove and both sides, 150 ℃-200 ℃ of preheat temperatures before the welding; Reverse side carbon arc air gouging back chipping goes out CO backward
2Welding is carried out ultrasonic testing/ ultrasonic examination after every section pipe welding finishes, and in time reprocess at defective place;
(4) pipe segmentation assembling: pipe segmentation assembling is meant the pipe of identical wall thickness is winched on the moulding bed, allows it fit fully with the moulding bed template and docks moulding, and per two sections pipes should place 2mm welding allowance for shrinkage in the butt joint; Slope type adopts reverse side " v " font groove to stay root 2mm; Outside carbon plane back chipping goes out white, and longitudinal weld longitudinal seam answers anchor to open below the 300mm, and CO2 or SMAW are adopted in butt joint; When adopting SMAW, welding rod must cure 1 hour through 350 ℃-430 ℃ before using, put into 100-150 ℃ of insulating box then, ready access upon use, before the welding groove and both sides are carried out preheating, preheat temperature 150-200 ℃, be incubated with the rock wool blanket after welding is finished, after the insulation slow cooling, carry out straightness accuracy and proofread and correct;
(5) integral assembling: adopt segmentation assembling scheme to carry out integral assembling; The long 42m of pile body, the long 40m of pipe, precision control is adopted every 10 meters and is drawn wire to cooperate the firer to proofread and correct; Then with pile crown member welding assembly;
(6) pin hole measure, location and installation: pin hole full stake welding finish and concentricity, straight line degree measurement after the assay was approved, carry out measurement and positioning and install; With the pipe upper surface is datum, vertically draws chalk line to make pipe range direction straight line, rules with straight steel ruler flow control one pin hole position with the tube head benchmark in addition, draws the symmetrical holes of symmetrical end face after the perforate with weight, uses the position of finding out second and third hole with quadrat method.
(7) application: carry out painting work after pile body work is all over, the inner mechanical grinding method that adopts of pile body eliminates rust, and surface cleanness is the Sa2.0 level, paints then;
(8) tread flaking: break away from moulding bed after pile body paint finishes, something that gives the game away is mended mill.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101229433A CN101812856B (en) | 2010-03-05 | 2010-03-05 | Production process of steel pile structure of cutter suction dredger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101229433A CN101812856B (en) | 2010-03-05 | 2010-03-05 | Production process of steel pile structure of cutter suction dredger |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101812856A true CN101812856A (en) | 2010-08-25 |
CN101812856B CN101812856B (en) | 2011-09-21 |
Family
ID=42620212
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101229433A Expired - Fee Related CN101812856B (en) | 2010-03-05 | 2010-03-05 | Production process of steel pile structure of cutter suction dredger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101812856B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775432A (en) * | 2014-01-10 | 2015-07-15 | 中交第三航务工程局有限公司南京分公司 | Manufacturing and mounting process of pile frame of pile driving barge |
CN107825083A (en) * | 2017-11-30 | 2018-03-23 | 南通蓝岛海洋工程有限公司 | A kind of wedge bracket structure construction technology |
CN110421320A (en) * | 2019-08-06 | 2019-11-08 | 招商局重工(深圳)有限公司 | A kind of positioning piling bar welding procedure of cutter suction dredger |
CN113997022A (en) * | 2021-11-22 | 2022-02-01 | 沪东中华造船(集团)有限公司 | Method for manufacturing crane base of heavy crane ship and crane base |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1767097A1 (en) * | 1989-11-01 | 1992-10-07 | О.С.Крючков | Dredge |
JPH10159125A (en) * | 1996-11-27 | 1998-06-16 | Honmagumi:Kk | Dredging device |
CN201202127Y (en) * | 2008-04-22 | 2009-03-04 | 孟锦华 | Self-propelled trailing suction hopper dredger steel pile trolley positioning system |
CN201296941Y (en) * | 2008-09-27 | 2009-08-26 | 中交天津港航勘察设计研究院有限公司 | Cutter-suction dredger single-steel-pile trolley and three-cable combination positioning system |
CN101591923A (en) * | 2009-06-18 | 2009-12-02 | 上海交通大学 | Cutter suction dredger dual-yoke formula heavy steel pile chassis |
-
2010
- 2010-03-05 CN CN2010101229433A patent/CN101812856B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1767097A1 (en) * | 1989-11-01 | 1992-10-07 | О.С.Крючков | Dredge |
JPH10159125A (en) * | 1996-11-27 | 1998-06-16 | Honmagumi:Kk | Dredging device |
CN201202127Y (en) * | 2008-04-22 | 2009-03-04 | 孟锦华 | Self-propelled trailing suction hopper dredger steel pile trolley positioning system |
CN201296941Y (en) * | 2008-09-27 | 2009-08-26 | 中交天津港航勘察设计研究院有限公司 | Cutter-suction dredger single-steel-pile trolley and three-cable combination positioning system |
CN101591923A (en) * | 2009-06-18 | 2009-12-02 | 上海交通大学 | Cutter suction dredger dual-yoke formula heavy steel pile chassis |
Non-Patent Citations (1)
Title |
---|
《江苏船舶》 20031030 王剑峰等 1364kW斗轮挖泥船定位桩台车系统制作工艺 第20卷, 第05期 2 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104775432A (en) * | 2014-01-10 | 2015-07-15 | 中交第三航务工程局有限公司南京分公司 | Manufacturing and mounting process of pile frame of pile driving barge |
CN104775432B (en) * | 2014-01-10 | 2017-12-29 | 中交第三航务工程局有限公司南京分公司 | A kind of pile driving barge pile frame makes and mounting process |
CN107825083A (en) * | 2017-11-30 | 2018-03-23 | 南通蓝岛海洋工程有限公司 | A kind of wedge bracket structure construction technology |
CN110421320A (en) * | 2019-08-06 | 2019-11-08 | 招商局重工(深圳)有限公司 | A kind of positioning piling bar welding procedure of cutter suction dredger |
WO2021022664A1 (en) * | 2019-08-06 | 2021-02-11 | 招商局重工(深圳)有限公司 | Positioning steel pile welding process of cutter suction dredger |
CN113997022A (en) * | 2021-11-22 | 2022-02-01 | 沪东中华造船(集团)有限公司 | Method for manufacturing crane base of heavy crane ship and crane base |
Also Published As
Publication number | Publication date |
---|---|
CN101812856B (en) | 2011-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102416554B (en) | Technology for making pile legs of wind power installation ship | |
CN107201718B (en) | A kind of main longitudinal grider preparation method of steel structure bridge | |
CN101812856B (en) | Production process of steel pile structure of cutter suction dredger | |
CN107401175B (en) | A kind of method of construction of the upper guide pipe support of six pile leaders frame | |
CN103184766B (en) | Large steel structure and manufacturing method thereof | |
CN108867623A (en) | A kind of manufacture craft of offshore wind power foundation steel-pipe pile | |
CN109648269B (en) | Construction process of lifting leg pile of marine life platform | |
EP2427299B1 (en) | Method for manufacturing a door frame, welding arrangement and structure of a door frame | |
CN106884498A (en) | A kind of special-shaped box column and its processing technology | |
CN102728980B (en) | Method for limiting and positioning octagonal spud leg in folding process | |
CN102874379B (en) | Manufacture method of offshore riprap leveling ship | |
CN110695616A (en) | Steel structure box column processing technology | |
CN102489947B (en) | Bottom chord tube manufacturing process of girder of steel tube concrete truss beam bridge | |
CN110421320A (en) | A kind of positioning piling bar welding procedure of cutter suction dredger | |
CN108031957B (en) | Welding manufacturing method of weather-proof all-welded steel structure stiffening beam suspension bridge | |
CN105414907A (en) | Building technology for pile leg of self-elevating wind power vessel | |
CN105057855A (en) | Erecting welding technological method for single-upper-ring type large segmented stand ring with sole plates | |
CN202099719U (en) | Steel truss bridge | |
CN103481022B (en) | A kind of Pier Formwork manufacture method | |
CN103203589A (en) | Manufacturing method of pre-baking aluminium cell shell | |
CN108396863A (en) | A kind of steel structure member and its manufacture craft | |
CN109290741A (en) | A kind of longitudinal seam welding technique for large-scale wind electricity tower | |
JP2014226723A (en) | Manufacturing method for steel-pipe pile | |
CN102390002A (en) | Automatic submerged-arc welding method for large insertion-type adapting pipe on cone | |
CN108894580A (en) | A kind of building technology of flare tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110921 Termination date: 20130305 |