CN101812836A - Construction platform of hydraulic plug board on sea - Google Patents

Construction platform of hydraulic plug board on sea Download PDF

Info

Publication number
CN101812836A
CN101812836A CN200910014451A CN200910014451A CN101812836A CN 101812836 A CN101812836 A CN 101812836A CN 200910014451 A CN200910014451 A CN 200910014451A CN 200910014451 A CN200910014451 A CN 200910014451A CN 101812836 A CN101812836 A CN 101812836A
Authority
CN
China
Prior art keywords
hydraulic
plug board
steel pipe
sea
construction platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910014451A
Other languages
Chinese (zh)
Inventor
何富荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200910014451A priority Critical patent/CN101812836A/en
Publication of CN101812836A publication Critical patent/CN101812836A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention relates to a construction platform of a hydraulic plug board on the sea, comprising a prepared hole, a steel tube and a pedal plate which are all on the hydraulic plug board. The steel tube penetrates through the prepared hole on the hydraulic plug board, the pedal plate is mounted on the steel tube to form an integral body with the steel tube. The invention has the characteristics of integral body capable of resisting impact from various wind waves, no damage to an operating table, raw material saving, very convenient assembly and disassembly, high construction speed, low construction cost, and the like, and can be broadly applied to dam construction of the hydraulic plug board on the sea, the lake and the river.

Description

Construction platform of hydraulic plug board on sea
One, technical field
The present invention relates to the marine engineering operating platform, particularly a kind of marine water conservancy plate operation platform.
Two, background technology
In the hydraulic plug board on sea construction project, finish that slip casting is stitched admittedly and work such as top assembling reinforcement, cast-in-place cap, at first mounting platform.Existing marine plate engineering adopts the building scaffold of land use to construct, and thisly landly exists following shortcoming or deficiency with scaffold: 1. owing to be subjected to the impact of marine stormy waves, installation work is very difficult; 2. be easy to again after installing be washed out, 3. be difficult to guarantee safe construction by stormy waves; 3. exist potential safety hazard.
Three, summary of the invention
The technical problem to be solved in the present invention provides a kind of construction platform of hydraulic plug board on sea, adopt with hydraulic sheeting and form integrative-structure, the shortcoming or the deficiency that had both overcome or avoided existing in the above-mentioned prior art, safety is firm again, the slip casting of finishing smoothly the hydraulic plug board on sea engineering fast admittedly seam, assembling reinforcement, supporting template, beat construction task such as concrete cap-beam.
Construction platform of hydraulic plug board on sea of the present invention comprises hydraulic sheeting, steel pipe and foot rest.Described hydraulic sheeting is provided with preformed hole, and steel pipe passes the preformed hole on the hydraulic sheeting, and foot rest is installed on the steel pipe, forms an integral body with hydraulic sheeting.
Wherein, described foot rest is the frame type member, is fixed on the steel pipe that passes hydraulic sheeting preformed hole both sides.Preformed hole on the described hydraulic sheeting is positioned at the top of hydraulic sheeting.Described foot rest is made framework, framework upper berth welding steel expanded metals, steel plate bar or reinforcing bar by steel pipe or angle steel weldering.Described foot rest and steel pipe are fixed together by connector.Described connector is platform buckle, bolt or the member that is easy to fixing and dismounting.
The present invention compared with prior art has following advantage or beneficial effect:
1, the safety and stability performance is good, traditional platform is difficult to keep stable under sea beat, adopts marine plate operation platform because it is to be tightened to an integral body by steel pipe insertion concrete plate holes two ends with connector and foot rest can resist the damage that the impact of various stormy waves can not cause operating desk.
2, saved material consumption, adopt traditional platform from ground to the operating table surface, need use a large amount of steel pipes to form framework, and adopt the steel pipe of marine plate operation platform from ground to the operating table surface all to be cancelled, can save a large amount of steel pipes, also avoid steel pipe support to be washed out the loss that causes by stormy waves.
3, installation and dismounting are all very convenient, and the whole operation platform has only the such three kinds of things of the steel pipe, foot rest and the connector that insert in the preformed hole, and installation and dismounting are all very simple, help improving speed of application, reduce construction cost.
Four, description of drawings
Fig. 1 is a kind of structural representation of the present invention
Fig. 2 is for pressing hydraulic sheeting preformed hole structural representation shown in Figure 1
Fig. 3 is for pressing plan structure schematic diagram shown in Figure 1
Structural representation when Fig. 4 inserts steel pipe for pressing preformed hole shown in Figure 1
Five, the specific embodiment:
Referring to Fig. 1-Fig. 4, a kind of construction platform of hydraulic plug board on sea comprises a kind of construction platform of hydraulic plug board on sea, comprises hydraulic sheeting, steel pipe and foot rest.Hydraulic sheeting 5 is provided with preformed hole 1, and steel pipe 2 passes the preformed hole 1 on the hydraulic sheeting, and foot rest 4 is installed on the steel pipe 2, forms an integral body with hydraulic sheeting 5.
Foot rest 4 is the frame type member, is fixed on the steel pipe 2 that passes hydraulic sheeting 5 preformed holes 1 both sides.Preformed hole 1 on the hydraulic sheeting is positioned at the top of hydraulic sheeting 5.Foot rest 4 is made framework, framework upper berth welding steel expanded metals, steel plate bar or reinforcing bar by steel pipe or angle steel weldering.Foot rest 4 is fixed together by connector 3 with steel pipe 2.Connector 3 is for platform buckle, bolt or be easy to the fixing member that reaches dismounting.
Dismantling connector 3 after construction finishes regains foot rests 4 and inserts steel pipe 2 usefulness cement mortar and block after the preformed hole 1 whole engineering and promptly accuse and finish.

Claims (6)

1. a construction platform of hydraulic plug board on sea comprises hydraulic sheeting, steel pipe and foot rest, it is characterized in that described hydraulic sheeting is provided with preformed hole, and steel pipe passes the preformed hole on the hydraulic sheeting, and foot rest is installed on the steel pipe, forms an integral body with hydraulic sheeting.
2. construction platform of hydraulic plug board on sea according to claim 1 is characterized in that described foot rest is the frame type member, is fixed on the steel pipe that passes hydraulic sheeting preformed hole both sides.
3. construction platform of hydraulic plug board on sea according to claim 1 and 2 is characterized in that the preformed hole on the described hydraulic sheeting is positioned at the top of hydraulic sheeting.
4. construction platform of hydraulic plug board on sea according to claim 1 and 2 is characterized in that described foot rest makes framework, framework upper berth welding steel expanded metals, steel plate bar or reinforcing bar by the weldering of steel pipe or angle steel.
5. construction platform of hydraulic plug board on sea according to claim 1 and 2 is characterized in that described foot rest and steel pipe are fixed together by connector.
6. construction platform of hydraulic plug board on sea according to claim 1 or 5 is characterized in that described connector is platform buckle, bolt or the member that is easy to fixing and dismounting.
CN200910014451A 2009-02-23 2009-02-23 Construction platform of hydraulic plug board on sea Pending CN101812836A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910014451A CN101812836A (en) 2009-02-23 2009-02-23 Construction platform of hydraulic plug board on sea

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910014451A CN101812836A (en) 2009-02-23 2009-02-23 Construction platform of hydraulic plug board on sea

Publications (1)

Publication Number Publication Date
CN101812836A true CN101812836A (en) 2010-08-25

Family

ID=42620192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910014451A Pending CN101812836A (en) 2009-02-23 2009-02-23 Construction platform of hydraulic plug board on sea

Country Status (1)

Country Link
CN (1) CN101812836A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168418A (en) * 2011-03-22 2011-08-31 毕承会 Construction method of offshore elevated platform
CN107627079A (en) * 2017-09-26 2018-01-26 浙江中南建设集团钢结构有限公司 Large Diameter Pipeline steel pipe runs through plate processing method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB609428A (en) * 1946-03-14 1948-09-30 Ernest Goodall Malthouse Improvements in or relating to scaffolds and gantries
JPS6250507A (en) * 1985-08-28 1987-03-05 Taisei Corp Offshore scaffold
CN2166178Y (en) * 1993-08-03 1994-05-25 张鸿勋 Gangboard stand of scaffold and its dust-proof life net combined apparatus
CN2336042Y (en) * 1998-07-23 1999-09-01 金美华 Scaffold board
CN2683755Y (en) * 2004-02-25 2005-03-09 肖冰 Treadle of false work
CN2911009Y (en) * 2006-01-23 2007-06-13 中国海洋石油总公司 One-leg three-pile simple platform suitable for developing medium-small oil fields in sea
CN201377087Y (en) * 2009-02-23 2010-01-06 何富荣 Marine hydropower insert plate construction scaffold

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB609428A (en) * 1946-03-14 1948-09-30 Ernest Goodall Malthouse Improvements in or relating to scaffolds and gantries
JPS6250507A (en) * 1985-08-28 1987-03-05 Taisei Corp Offshore scaffold
CN2166178Y (en) * 1993-08-03 1994-05-25 张鸿勋 Gangboard stand of scaffold and its dust-proof life net combined apparatus
CN2336042Y (en) * 1998-07-23 1999-09-01 金美华 Scaffold board
CN2683755Y (en) * 2004-02-25 2005-03-09 肖冰 Treadle of false work
CN2911009Y (en) * 2006-01-23 2007-06-13 中国海洋石油总公司 One-leg three-pile simple platform suitable for developing medium-small oil fields in sea
CN201377087Y (en) * 2009-02-23 2010-01-06 何富荣 Marine hydropower insert plate construction scaffold

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钟启华: "立交桥工程中帽梁施工支架的使用分析", 《中国科技信息》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168418A (en) * 2011-03-22 2011-08-31 毕承会 Construction method of offshore elevated platform
CN102168418B (en) * 2011-03-22 2012-07-25 毕承会 Construction method of offshore elevated platform
CN107627079A (en) * 2017-09-26 2018-01-26 浙江中南建设集团钢结构有限公司 Large Diameter Pipeline steel pipe runs through plate processing method
CN107627079B (en) * 2017-09-26 2019-05-07 浙江中南建设集团钢结构有限公司 Large Diameter Pipeline steel pipe runs through plate processing method

Similar Documents

Publication Publication Date Title
CN201826519U (en) Building template
CN203393848U (en) Connection node structure of reinforced concrete column and steel I-beam
CN201546227U (en) Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall
CN103452126B (en) Light combined hanging box with recyclable baseplate steels and construction technology thereof
CN101906754A (en) Rigid connection method for steel beam and concrete pier
CN201713827U (en) Fan base structure of offshore wind power station
CN101876174A (en) Foundation structure of marine wind electric field fan
CN205502025U (en) Stagnant water stake is gone along with sb. to guard him to foundation ditch and shaped steel encloses connection structure between purlin
CN101225663A (en) Steel boxed cofferdam and recovery method thereof
CN101812836A (en) Construction platform of hydraulic plug board on sea
CN213682129U (en) Deep foundation pit unilateral die carrier
CN201377087Y (en) Marine hydropower insert plate construction scaffold
CN205839701U (en) Concrete formwork complexes at a kind of expansion joint
CN104594389A (en) Post-cast strip external wall plugging structure with elastic water stoppers
CN201686983U (en) Double-seam steel sheet pile
CN103882840B (en) A kind of surge shaft Cast-in-place concrete assembling falsework and mounting method thereof
CN203238651U (en) Fixing and leveling structure for installing offshore wind turbine jacket foundation
CN202298649U (en) Buttress structure with longitudinal beams
CN211621660U (en) Anti-pulling base is strengthened in installation of transmission tower
CN211037798U (en) Aluminum-wood combined template system for basement
CN208088266U (en) There is the simple wellhead structure of support
CN207405876U (en) A kind of firm banking for column component
CN201137155Y (en) Underwater temporary support pile joint
CN201526048U (en) Anchor-type metal foundation
CN201245926Y (en) I-shaped beam fastener

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100825