CN101801091B - Method and device for allocating resources in OFDM/MIMO system - Google Patents

Method and device for allocating resources in OFDM/MIMO system Download PDF

Info

Publication number
CN101801091B
CN101801091B CN201010102666XA CN201010102666A CN101801091B CN 101801091 B CN101801091 B CN 101801091B CN 201010102666X A CN201010102666X A CN 201010102666XA CN 201010102666 A CN201010102666 A CN 201010102666A CN 101801091 B CN101801091 B CN 101801091B
Authority
CN
China
Prior art keywords
resource
user
cell
resource group
arrowband
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010102666XA
Other languages
Chinese (zh)
Other versions
CN101801091A (en
Inventor
彭木根
李莉
杨常青
王文博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Comba Network Systems Co Ltd
Original Assignee
Beijing University of Posts and Telecommunications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Posts and Telecommunications filed Critical Beijing University of Posts and Telecommunications
Priority to CN201010102666XA priority Critical patent/CN101801091B/en
Publication of CN101801091A publication Critical patent/CN101801091A/en
Application granted granted Critical
Publication of CN101801091B publication Critical patent/CN101801091B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method and a device for scheduling resources in an OFDM/MIMO system. In the method and the device, cell users are divided into cell edge users or cell center users and the resources are allocated to the cell edge users and the cell center users. The method comprises the following steps of: dividing time-frequency resources into a first resource group and a second resource group and dividing the first resource group and the second resource group into a plurality of resource blocks; configuring master resources and auxiliary resources in the first resource group for the cells and configuring the master resources and the auxiliary resources in the second resource group for the cells according to the plurality of resource blocks; and allocating the master resources in the first resource group and the second resource group to the cell edge users and allocating the auxiliary resources in the first resource group and the second resource group to the cell center users. Through the method and the device, interference among the cells is avoided, simultaneously the service requirements of the users on delay requirement, bandwidth and the like are met and the communication quality of the cell edge users is improved.

Description

The method and apparatus of resource allocation in a kind of OFDM/MIMO system
Technical field
The present invention relates to communication technical field, the method and apparatus of resource allocation in the particularly a kind of OFDM/MIMO system.
Background technology
OFDM (Orthogonal Frequency Division Multiplex, OFDM) technology has advantages such as the spectrum efficiency of raising, the decline of contrary frequency selectivity or narrow band interference, becomes one of transmission technology of next generation wireless communication system.
MIMO (Multiple Input Multiple Output, multiple-input and multiple-output) technology based on many antennas not only can improve power system capacity, can also be used to improve simultaneously the reliability of channel, reduces BLER (Block Error Rate, bLock error rate).Through sustainable development and research in recent years; The MIMO technology that reaches its maturity has become one of key technology of wireless communication field; And will be applied to B3G/4G (Beyond 3 Generation/4 Generation, ultra 3 g mobile communication system/four third-generation mobile communication systems) and other wireless communication system.
Under the situation of OFDM/MIMO communication system identical networking, the nonorthogonality of neighbor cell running time-frequency resource will cause presence of intercell interference inevitably, and the user's communications quality that presence of intercell interference possibly cause being in cell edge region is seriously influenced.
In the prior art, running time-frequency resource is limited and divides the interference of evading the minizone through soft-frequency reuse and/or soft time-multiplexed technology.
The soft-frequency reuse technology be with system can with frequency range be divided into some part, different neighbor cells and select the primary band of different subcarriers set as this sub-district, the auxilliary frequency range of remaining this sub-district of conduct.The boss's carrier wave on the primary band is used in the cell edge terminal communication, and the auxilliary subcarrier on the auxilliary frequency range is used in the center of housing estate terminal communication.Adjust the power on boss's carrier wave and the auxiliary son carrier waves simultaneously, make that the transmitting power on boss's carrier wave is bigger, the transmitting power of auxiliary son carrier waves is less.The cardinal principle and the soft-frequency reuse of soft time-multiplexed technology are similar, difference be soft time-multiplexed be to use the method for mutually disjoint time period to reduce interference through the neighbor cell edge termination.
Can know that from top analysis one of soft frequency/time-multiplexed most crucial steps is to limit the scope of resource of neighbor cell fringe region use through the method for divide resource.Soft frequency/time-multiplexed resource division operation has the advantage that realizes simply and can effectively evade presence of intercell interference.
But also there is following problem in soft frequency/time-multiplexed resource division:
On the one hand; Because soft frequency/time-multiplexed being employed in respectively on single frequency domain and the single time-domain carry out resource division; Make the available bandwidth or the up duration section of fringe region receive restriction to a great extent, cause the flexibility of resource allocation to reduce greatly; On the other hand, if exist part in the system, then might cause QoS (Quality of Service, service quality) to be met to bandwidth or the relatively harsher user of delay requirement.
In addition; In wireless communication system; The communication quality of Cell Edge User not only receives the influence of presence of intercell interference; Also can exist because translational speed is too fast, building blocks, the long-time Block Error Rate, the packet loss that cause with communication environment factors such as the distance of base station are excessive are too high, or problem such as number of retransmissions is too much.And if the problems referred to above of Cell Edge User only utilize the optimization of running time-frequency resource and restriction possibly can't solve, the communication quality of Cell Edge User has much room for improvement.
Summary of the invention
In view of this, the invention provides the method and apparatus of resource allocation in a kind of OFDM/MIMO system, when evading presence of intercell interference, satisfied the service needed of user, improved the communication quality of Cell Edge User at aspects such as delay requirement and bandwidth.
In order to achieve the above object; The invention provides the method for resource allocation in a kind of OFDM/MIMO system; Community user is divided into Cell Edge User or Cell Center User, is said Cell Edge User and said Cell Center User Resources allocation, said method comprising the steps of:
Running time-frequency resource is divided into the first resource group and the second resource group, and said first resource group and the said second resource group are divided into a plurality of Resource Block; Wherein, said first resource group and the said second resource group overlap on time domain, on frequency domain, take different frequency domain resource; Divide the said first resource group respectively and the said second resource group is a n Resource Block, n is the number of said sub-district, and continuously, n Resource Block is continuous on time domain in the said second resource group on frequency domain for n Resource Block in the said first resource group;
Based on said a plurality of Resource Block is primary resource and the auxilliary resource of cell configuration in the said first resource group, is primary resource and the auxilliary resource of cell configuration in the said second resource group; Wherein, For a Resource Block in the said cell allocation first resource group as the primary resource of said sub-district in the said first resource group; The primary resource of distributing in each sub-district first resource group does not overlap mutually, and the individual Resource Block of residue (n-1) in the said first resource group is as the auxilliary resource of said sub-district; For a Resource Block in the said cell allocation second resource group as the primary resource of said sub-district in the said second resource group; The primary resource of distributing in each sub-district second resource group does not overlap mutually, and the individual Resource Block of residue (n-1) in the said second resource group is as the auxilliary resource of said sub-district;
Said primary resource in said first resource group and the said second resource group is distributed to said Cell Edge User, give said Cell Center User the said auxilliary resource allocation in said first resource group and the said second resource group.
Preferably, the reference signal receiving intensity RSRP according to the community user measurement and report is divided into said Cell Edge User and said Cell Center User with said community user; Obtain the translational speed of said community user and the type of service of support; The frequency bandwidth that takies according to said community user type of service requires said Cell Edge User is divided into arrowband Cell Edge User and broadband cell edge customer, and said Cell Center User is divided into arrowband Cell Center User and broadband cell central user;
Said said primary resource in the said first resource group and the said second resource group is distributed to said Cell Edge User, specifically comprises:
When said Cell Edge User is the arrowband Cell Edge User; According to QoS of customer QoS priority said arrowband Cell Edge User is sorted; With the height of said QoS priority be followed successively by in proper order said arrowband Cell Edge User distribute in the said second resource group primary resource piece along time shaft by near to resource far away, and travel through said arrowband Cell Edge User; If there is the arrowband Cell Edge User of unallocated resource, the arrowband Cell Edge User of said unallocated resource is blocked processing;
When said Cell Edge User is the broadband cell edge customer; According to user moving speed said broadband cell edge customer is sorted; Height with said user moving speed is followed successively by the resource that said broadband cell edge customer distributes primary resource piece in the said first resource group in proper order, and travels through said broadband cell edge customer; If there is the broadband cell edge customer of unallocated resource, the broadband cell edge customer of said unallocated resource is blocked processing.
Preferably, give said Cell Center User, specifically comprise the said auxilliary resource allocation in said first resource group and the said second resource group:
When said Cell Center User is the arrowband Cell Center User:
According to said QoS priority said arrowband Cell Center User is sorted, with the height of said QoS priority be followed successively by in proper order said arrowband Cell Center User distribute in the said second resource group auxilliary Resource Block along time shaft by near to resource far away; Travel through said arrowband Cell Center User,, judge whether primary resource in the said second resource group that residue is not assigned with if there is the said arrowband Cell Center User of unallocated resource,
When judged result for not the time, the arrowband Cell Center User of said unallocated resource is blocked processing; When judged result when being; For the arrowband Cell Center User of said unallocated resource distribute in the said second resource group that said residue is not assigned with the primary resource piece along time shaft by near to resource far away; Travel through the arrowband Cell Center User of said unallocated resource; Primary resource assigns in the said second resource group that said residue is not assigned with, and when having the arrowband Cell Center User of said unallocated resource, and the arrowband Cell Center User of said unallocated resource is blocked processing;
When said Cell Center User is the broadband cell central user:
According to user moving speed said broadband cell central user is sorted, be followed successively by the resource that said broadband cell central user is distributed auxilliary Resource Block in the said first resource group in proper order with the height of user moving speed; Travel through said broadband cell central user,, judge whether primary resource in the said first resource group that residue is not assigned with if there is the said broadband cell central user of unallocated resource,
When judged result for not the time, the broadband cell central user of said unallocated resource is blocked processing; When judged result when being; For the broadband cell central user of said unallocated resource is distributed primary resource in the said first resource group that said residue is not assigned with; Travel through the broadband cell central user of said unallocated resource; And primary resource assigns in the said first resource group that is not assigned with when said residue, and when having the broadband cell central user of said unallocated resource, the broadband cell central user of said unallocated resource is blocked processing.
Preferably, be said Cell Edge User and said Cell Center User Resources allocation, also comprise afterwards:
The priority list of the defeated rule of multi-antenna transmitting is set in advance, and the corresponding target door limit value that triggers the defeated rule of said multi-antenna transmitting; Add up said Cell Edge User in the communication quality average behavior of scheduling of resource in the cycle; When said user's communications quality average behavior reached preset threshold value less than the number of times of said corresponding target door limit value, said Cell Edge User was selected the defeated rule of the corresponding said multi-antenna transmitting of said target door limit value.
The present invention also provides the device of resource allocation in a kind of OFDM/MIMO system, and community user is divided into Cell Edge User or Cell Center User, is said Cell Edge User and said Cell Center User Resources allocation, and said device comprises:
Divide module, be used for running time-frequency resource is divided into the first resource group and the second resource group, and said first resource group and the said second resource group are divided into a plurality of Resource Block;
Configuration module is used for said a plurality of Resource Block of obtaining according to said division Module Division, is primary resource and the auxilliary resource of cell configuration in the said first resource group, is primary resource and the auxilliary resource of cell configuration in the said second resource group;
Resource distribution module is used for the said primary resource in said first resource group and the said second resource group is distributed to said Cell Edge User, gives said Cell Center User with the said auxilliary resource allocation in said first resource group and the said second resource group;
Wherein, said division module specifically is used for, and dividing running time-frequency resource is said first resource group and the said second resource group, and wherein, said first resource group and the said second resource group overlap on time domain, on frequency domain, take different frequency domain resource; Divide the said first resource group respectively and the said second resource group is a n Resource Block, n is the number of said sub-district, and continuously, n Resource Block is continuous on time domain in the said second resource group on frequency domain for n Resource Block in the said first resource group;
Said configuration module specifically is used for; For a Resource Block in the said cell allocation first resource group as the primary resource of said sub-district in the said first resource group; The primary resource of distributing in each sub-district first resource group does not overlap mutually, and the individual Resource Block of residue (n-1) in the said first resource group is as the auxilliary resource of said sub-district; For a Resource Block in the said cell allocation second resource group as the primary resource of said sub-district in the said second resource group; The primary resource of distributing in each sub-district second resource group does not overlap mutually, and the individual Resource Block of residue (n-1) in the said second resource group is as the auxilliary resource of said sub-district.
Preferably, said division module also is used for, and according to the reference signal receiving intensity RSRP of community user measurement and report said community user is divided into said Cell Edge User and said Cell Center User; Obtain the translational speed of said community user and the type of service of support; The frequency bandwidth that takies according to said community user type of service requires said Cell Edge User is divided into arrowband Cell Edge User and broadband cell edge customer, and said Cell Center User is divided into arrowband Cell Center User and broadband cell central user;
Said resource distribution module specifically comprises distribution sub module, judges submodule and processing sub;
When said Cell Edge User is the arrowband Cell Edge User; According to QoS of customer QoS priority said arrowband Cell Edge User is sorted, said distribution sub module according to the height of said QoS priority be followed successively by in proper order said arrowband Cell Edge User distribute in the said second resource group primary resource piece along time shaft by near to resource far away; After traveling through said arrowband Cell Edge User; Said judgement submodule judges whether to exist the arrowband Cell Edge User of unallocated resource; When judged result when being, said processing sub is blocked processing to the arrowband Cell Edge User of said unallocated resource;
When said Cell Edge User is the broadband cell edge customer; According to user moving speed said broadband cell edge customer is sorted, said distribution sub module is followed successively by the resource that said broadband cell edge customer distributes primary resource piece in the said first resource group in proper order according to the height of said user moving speed; After traveling through said broadband cell edge customer; Said judgement submodule judges whether to exist the broadband cell edge customer of unallocated resource; When judged result when being, said processing sub is blocked processing to the broadband cell edge customer of said unallocated resource.
Preferably, said resource distribution module specifically comprises distribution sub module, judges submodule and processing sub;
When said Cell Center User is the arrowband Cell Center User:
According to said QoS priority said arrowband Cell Center User is sorted, said distribution sub module according to the height of said QoS priority be followed successively by in proper order said arrowband Cell Center User distribute in the said second resource group auxilliary Resource Block along time shaft by near to resource far away; Travel through said arrowband Cell Center User, if there is the said arrowband Cell Center User of unallocated resource, said judgement submodule judges whether to exist the primary resource of the said second resource group that residue is not assigned with,
When judged result for not the time, said processing sub is blocked processing to the arrowband Cell Center User of said unallocated resource; When judged result when being, said distribution sub module be the arrowband Cell Center User of said unallocated resource distribute the second resource group that said residue is not assigned with the primary resource piece along time shaft by near to resource far away; Travel through the arrowband Cell Center User of said unallocated resource; Primary resource assigns in the second resource group that said residue is not assigned with; And when having the arrowband Cell Center User of said unallocated resource, said processing sub is blocked processing to the arrowband Cell Center User of said unallocated resource;
When said Cell Center User is the broadband cell central user:
According to user moving speed said broadband cell central user is sorted, said distribution sub module is followed successively by the resource that said broadband cell central user is distributed auxilliary Resource Block in the said first resource group in proper order according to the height of user moving speed; Travel through said broadband cell central user, if there is the said broadband cell central user of unallocated resource, said judgement submodule judges whether to have primary resource in the said first resource group that residue is not assigned with,
When judged result for not the time, said processing sub is blocked processing to the broadband cell central user of said unallocated resource; When judged result when being, said distribution sub module is the primary resource that the broadband cell central user of said unallocated resource is distributed the said first resource group that said residue is not assigned with; Travel through the broadband cell central user of said unallocated resource; Primary resource assigns in the first resource group that said residue is not assigned with; And when having the broadband cell central user of said unallocated resource, said processing sub is blocked processing to the broadband cell central user of said unallocated resource.
Preferably, said device comprises that also many antenna rules are selected module, is used to said Cell Edge User and selects the defeated rule of suitable multi-antenna transmitting, specifically comprises:
Submodule is set, is used for being provided with in advance the priority list of the defeated rule of multi-antenna transmitting, and the corresponding target door limit value that triggers the defeated rule of said multi-antenna transmitting; The statistics submodule is used to add up said Cell Edge User in the communication quality average behavior of scheduling of resource in the cycle; The chooser module is used for when said user's communications quality average behavior reaches preset threshold value less than the number of times of said corresponding target door limit value, selects the defeated rule of the corresponding said multi-antenna transmitting of said target door limit value.
With the prior art contrast, technical scheme provided by the invention has the following advantages:
For Cell Edge User distributes said primary resource; For Cell Center User distributes said auxilliary resource; When evading presence of intercell interference, satisfied the service needed of user at aspects such as delay requirement and bandwidth, solved the problem that existing soft frequency and soft time-multiplexed technology exist when resource division and resource allocation; And, further improved the communication quality of Cell Edge User according to the average behavior selection multi-antenna transmitting transmission scheme of Cell Edge User in dispatching cycle.
Description of drawings
In order to be illustrated more clearly in the present invention or technical scheme of the prior art; To do simple the introduction to the accompanying drawing of required use in the present invention or the description of the Prior Art below; Obviously, the accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
The schematic flow sheet of the method for a kind of resource allocation that Fig. 1 provides for the embodiment of the invention one;
The schematic flow sheet of the method for a kind of resource allocation that Fig. 2 provides for the embodiment of the invention two;
Fig. 3 is that a kind of running time-frequency resource in the embodiment of the invention is divided the pattern sketch map;
Fig. 4 is that the major-minor running time-frequency resource in each sub-district is divided the pattern sketch map in the embodiment of the invention;
The schematic flow sheet of the method for a kind of resource allocation that Fig. 5 provides for the embodiment of the invention three;
The structural representation of the device of a kind of resource allocation that Fig. 6 provides for the embodiment of the invention.
Embodiment
To combine the accompanying drawing among the present invention below, the technical scheme among the present invention is carried out clear, complete description, obviously, described embodiment is a part of embodiment of the present invention, rather than whole embodiment.Based on the embodiment among the present invention, the every other embodiment that those of ordinary skills are obtained under the prerequisite of not making creative work belongs to the scope that the present invention protects.
The embodiment of the invention one provides the method for resource allocation in a kind of OFDM/MIMO system; Community user is divided into Cell Edge User or Cell Center User; For said Cell Edge User and said Cell Center User Resources allocation, as shown in Figure 1, may further comprise the steps:
Step s101 is divided into the first resource group and the second resource group with running time-frequency resource, and said first resource group and the said second resource group are divided into a plurality of Resource Block;
Step s102 is primary resource and the auxilliary resource of cell configuration in the said first resource group according to said a plurality of Resource Block, is primary resource and the auxilliary resource of cell configuration in the said second resource group;
Step s103 distributes to said Cell Edge User with the said primary resource in said first resource group and the said second resource group, gives said Cell Center User with the said auxilliary resource allocation in said first resource group and the said second resource group.
The method of resource allocation in the OFDM/MIMO system that the application of the invention embodiment proposes; Running time-frequency resource is divided, be cell configuration primary resource and auxilliary resource, and distribute said primary resource for Cell Edge User; For Cell Center User distributes said auxilliary resource; When evading presence of intercell interference, satisfied the service needed of user at aspects such as delay requirement and bandwidth, improved the communication quality of Cell Edge User.
The embodiment of the invention two provides the method for resource allocation in a kind of OFDM/MIMO system, is applied in the OFDM/MIMO system, and certainly, in practical application, this method can also be applied in other communication systems, gives unnecessary details no longer one by one.
As shown in Figure 2, this method may further comprise the steps:
Step s201 divides running time-frequency resource.
In embodiments of the present invention, network equipment is divided running time-frequency resource, and network equipment can or can be realized other network equipments that running time-frequency resource is divided for the base station.Running time-frequency resource is the two-dimentional running time-frequency resource that a scheduling of resource cycle and system available bandwidth are formed, and the two-dimentional running time-frequency resource in the scheduling cycle T is divided, and the time shaft origin of coordinates that two-dimentional running time-frequency resource is set is the starting point of dispatching cycle.
Concrete; In a cell group; According to the customer service type requirement of bandwidth is divided into narrow-band user and broadband user with the user, and the type of service that narrow-band user is set requires the narrower bandwidth of CU, the bandwidth that broadband user's type of service requires the user to occupy broad.When carrying out the running time-frequency resource division; Add up interior narrow-band user of cell group and broadband user's quantity respectively; Be designated as M1 and M2 respectively, according to narrow-band user and the required frequency bandwidth ratio that takies of broadband user in narrow-band user and broadband user's the quantity estimation cell group.For example; Narrow-band user can be set take identical bandwidth BW 1; The identical BW2 of the bandwidth that the broadband user need take; Estimate then that narrow-band user with the required frequency bandwidth ratio that takies of broadband user is in the cell group (M1 * BW1): (M2 * BW2), and running time-frequency resource is divided into the first resource group and the second resource group according to this frequency bandwidth ratio; Wherein, the first resource group and the second resource group overlap on time domain, on frequency domain, take different frequency domain resource.
Further; The quantity of broadband user and narrow-band user according to the narrow-band user of each sub-district in the cell group and broadband user's quantity, is estimated the bandwidth demand of each sub-district to Resource Block in the first resource group and the second resource group in interior each sub-district of statistics cell group; The first resource group is divided into n Resource Block; The second resource group is divided into n Resource Block, and wherein, n is the number of sub-district in the cell group.Wherein, n Resource Block is continuous on frequency domain in the first resource group, on time domain, only takies wherein time interval; N resource is continuous on time domain in the second resource group, and it is interval on frequency domain, only to take a certain bin width.Wherein, Estimate the bandwidth demand of each sub-district according to narrow-band user and broadband user's in each sub-district quantity to Resource Block in the first resource group and the second resource group; Can adopt narrow-band user and the required same method of frequency bandwidth ratio that takies of broadband user in the above-mentioned estimation cell group, give unnecessary details no longer one by one at this.
It is understandable that according to the division of said method to running time-frequency resource, running time-frequency resource is divided into 2 resource groups, altogether 2n Resource Block.For example, when the number n=3 of sub-district in the cell group, the division pattern of the two-dimentional running time-frequency resource that scheduling of resource cycle and system's available bandwidth are formed can be referring to shown in Figure 3.
Through narrow-band user in the cell group and the required frequency bandwidth ratio that takies of broadband user running time-frequency resource is divided into the first resource group and the second resource group; And each sub-district respectively is divided into n Resource Block to the bandwidth demand of Resource Block in the first resource group and the second resource group with the first resource group and the second resource group; Guaranteed reasonably to community user carries out resource allocation, reduced community user and divide the improper too high problem of user's blocking rate that causes because of running time-frequency resource.
What need further specify is; In embodiments of the present invention; The first resource group and the shared frequency bandwidth ratio of the second resource group in the cell group, and each sub-district is that narrow-band user and broadband user's quantity is estimated in dividing into groups according to this dispatching cell to the bandwidth demand of Resource Block in the first resource group and the second resource group.Certainly; Can also adopt other method that running time-frequency resource is divided, for example, can be according to the correlated performance parameter of community user in the last dispatching cycle; Blocking rate like the user; Parameters such as the resource ratio that is not assigned with are provided with in this dispatching cycle the bandwidth demand of Resource Block in the first resource group that the shared frequency bandwidth ratio of the first resource group and the second resource group in the cell group and each sub-district take and the second resource group.Other methods that can reasonably carry out the running time-frequency resource division are protection scope of the present invention equally.
Step s202 is the major-minor running time-frequency resource of each cell configuration in the cell group, and the transmitting power of major-minor running time-frequency resource is set.
From the first resource group and the second resource group, respectively select a primary resource that satisfies the Resource Block of this bandwidth of cell demand as this sub-district; The primary resource that distributes for different districts in the cell group does not overlap mutually, and other (2n-2) individual Resource Block are as the auxilliary resource of this sub-district.
In cellular mobile system; When the big or small n of cell group got representative value 3, it is as shown in Figure 4 that the major-minor running time-frequency resource in each sub-district is divided pattern, wherein; The main running time-frequency resource of the grid respective cell of shading sign (slanted bar, netted and point-like), the auxilliary running time-frequency resource of white background grid respective cell.As can be seen from Figure 4, under the two-dimentional running time-frequency resource pattern that above-mentioned running time-frequency resource is divided and time-frequency resource allocating obtains, the employed main running time-frequency resource in any three adjacent sub-districts does not overlap mutually, thereby has reduced the annoyance level of minizone.
Be the major-minor running time-frequency resource of each cell allocation in cell group, and the transmitting power of major-minor running time-frequency resource is set.Concrete; The transmitting power of the major-minor running time-frequency resource in sub-district can be set according to user's channel situation; For example; The transmitting power that the good sub-district of channel condition can be set is lower than the transmitting power of the sub-district of bad channel conditions, and the higher transmitting power of main running time-frequency resource use is set, and auxilliary running time-frequency resource uses lower transmitting power.
Step s203 obtains in the sub-district customer service type to the requirement of bandwidth, user's translational speed and RSRP (Reference Signal Received Power, Reference Signal Received Power) information.
The translational speed of obtaining the user is specially the user moving speed information that base station measurement obtains that receives;
Obtain RSRP and be specially this sub-district RSRP information that receives user's measurement and report, and according to user's RSRP information the user is divided into Cell Center User and Cell Edge User, concrete division details repeats no more at this;
In addition; Obtain the requirement of user business type to bandwidth; And be narrow-band user and broadband user further to the demand of bandwidth with ID according to the customer service type; And the type of service that narrow-band user is set requires the narrower bandwidth of CU, the bandwidth that broadband user's type of service requires the user to occupy broad.
Step s204 carries out resource allocation to Cell Edge User.
Cell Edge User is divided into arrowband Cell Edge User and broadband cell edge customer according to type of service to the demand of bandwidth, respectively to arrowband Cell Edge User and broadband cell edge customer Resources allocation.
(1) is arrowband Cell Edge User Resources allocation.
Concrete; Require order from high to low according to service delay; Cell Edge User to the arrowband sorts, and is followed successively by Cell Edge User according to delay requirement sequencing from high to low and distributes the second resource group to support in the piece of main source along time shaft by near to resource far away.Wherein, The time shaft origin of coordinates of two dimension running time-frequency resource is the starting point of dispatching cycle; The resource that the arrowband Cell Edge User that delay requirement is the highest distributes is the nearest resource of the second resource group primary resource piece middle distance time shaft; The resource that the inferior high arrowband Cell Edge User of delay requirement distributes is the nearest resource of the unappropriated second resource group primary resource piece middle distance time shaft, all arrowband Cell Edge User in the traversal sub-district.
Concrete, as to distribute the second resource group primary resource piece for the arrowband Cell Edge User according to delay requirement resource, and all arrowband Cell Edge User in the traversal sub-district have following two kinds of possible situation:
When a, the arrowband Cell Edge User in the sub-district all are assigned with the resource of the second resource group primary resource piece, accomplish resource allocation process to the Cell Edge User of arrowband.At this moment, the resource of the second resource group primary resource piece all is assigned to the arrowband Cell Edge User, perhaps has the resource of the remaining second resource group primary resource piece not to be assigned with.
B; Resource at the second resource group primary resource piece all is assigned to the arrowband Cell Edge User; And when still having the arrowband Cell Edge User of unallocated primary resource in the sub-district; This arrowband Cell Edge User is blocked, and no longer is arrowband Cell Edge User Resources allocation in this dispatching cycle, accomplishes the resource allocation process to the Cell Edge User of arrowband;
(2) be broadband cell edge customer Resources allocation.
Concrete; Translational speed order from high to low according to the user; Cell Edge User to the broadband sorts; And be followed successively by Cell Edge User according to user's translational speed sequencing from high to low and distribute the resource in the first resource group primary resource piece, all broadband cell edge customers in the traversal sub-district.
The resource of distributing the first resource group primary resource piece for the broadband cell edge customer according to user's translational speed, and all broadband cell edge customers in the traversal sub-district have following two kinds of possible situation:
A, the broadband cell edge customer in the sub-district have all distributed the resource of the first resource group primary resource piece, accomplish the resource allocation process to the Cell Edge User in broadband.At this moment, the resource of the first resource group primary resource piece all is assigned to the broadband cell edge customer, perhaps has the resource of the remaining first resource group primary resource piece not to be assigned with.
B; Be assigned with in the resource of the first resource group primary resource piece and finish; And when still having the broadband cell edge customer of unallocated primary resource in the sub-district; This broadband cell edge customer is blocked, and no longer is this broadband cell edge customer Resources allocation in this dispatching cycle, accomplishes the resource allocation process to the Cell Edge User in broadband.
Step s205 carries out resource allocation to Cell Center User.
Same, Cell Center User can be divided the demand of bandwidth according to type of service, and Cell Center User is divided into arrowband Cell Center User and broadband cell central user, and respectively to arrowband Cell Center User and broadband cell central user Resources allocation.
(1) is arrowband Cell Center User Resources allocation.
Concrete; Require order from high to low according to service delay; Cell Center User to the arrowband sorts; And be followed successively by Cell Center User according to delay requirement sequencing from high to low and distribute in this auxilliary source of second resource group money, sub-district piece along time shaft by near to resource far away all arrowband Cell Center User in the traversal sub-district.
When the arrowband Cell Center User in the sub-district has all distributed the resource of the auxilliary Resource Block of the second resource group, accomplish resource allocation process to the arrowband Cell Center User.At this moment, the resource of the auxilliary Resource Block of the second resource group is all distributed to the arrowband Cell Center User, and the second resource group that perhaps has residue not to be assigned with is assisted the resource of Resource Block.
Resource at the auxilliary Resource Block of the second resource group is all distributed to the arrowband Cell Center User, and when still having the arrowband Cell Center User of unallocated resource in the sub-district, execution in step s206.
(2) be broadband cell central user Resources allocation.
Concrete; Translational speed order from high to low according to the user; The broadband cell central user is sorted; And be followed successively by the broadband cell central user according to translational speed sequencing from high to low and distribute the resource in this auxilliary source of first resource group money, sub-district piece, all broadband cell central user in the traversal sub-district.
When the broadband cell central user in the sub-district has all been distributed the resource of the auxilliary Resource Block of the first resource group, accomplish resource allocation process to the Cell Edge User in broadband.At this moment, the resource of the auxilliary Resource Block of the first resource group is all distributed to the broadband cell central user, and the first resource group that perhaps has residue not to be assigned with is assisted the resource of Resource Block.
Resource at the auxilliary Resource Block of the first resource group is all distributed to the broadband cell central user, and when still having the broadband cell central user of unallocated resource in the sub-district, execution in step s206.
Step s206 judges whether the resource of the primary resource piece that residue is not assigned with, when judged result when being, execution in step s207; Otherwise flow process finishes.
Judge whether the resource of the second resource group primary resource piece that residue is not assigned with, when judged result when being, give the arrowband Cell Center User with the resource allocation of the second resource group primary resource piece that is not assigned with; Or judge whether the resource of the first resource group primary resource piece that residue is not assigned with, when judged result when being, give the broadband cell central user with the resource allocation of the first resource group primary resource piece that is not assigned with.
When judging the resource that does not remain the second resource group primary resource piece that is not assigned with, the Cell Center User that is not assigned with resource among the step s205 is blocked processing, no longer the Cell Center User Resources allocation that is not assigned with resource in this dispatching cycle.
Step s207 gives Cell Center User with the primary resource piece resource allocation that residue is not assigned with.
Concrete, divide two kinds of situation to discuss:
(1) for the arrowband Cell Center User of unallocated resource.
When judgement has the resource of the second resource group primary resource piece that residue is not assigned with; Be followed successively by Cell Center User according to delay requirement sequencing from high to low and distribute in the unappropriated second resource group primary resource piece of residue along time shaft by near to resource far away the arrowband Cell Center User of all unallocated resources in the traversal sub-district.
When the arrowband of all unallocated resources Cell Center User all is assigned with the resource of the residue second resource group primary resource piece, accomplish resource allocation process to the Cell Center User of arrowband.
When being assigned with, the resource that remains the second resource group primary resource piece finishes; And when still having the arrowband Cell Center User of resource to be allocated in the sub-district; This arrowband Cell Center User is blocked, and no longer is this arrowband Cell Edge User Resources allocation in this dispatching cycle.
(2) for the broadband cell central user of unallocated resource.
When judgement has the resource of the first resource group primary resource piece that residue is not assigned with; Be followed successively by Cell Center User according to translational speed sequencing from high to low and distribute the resource in the unappropriated first resource group primary resource piece of residue, all are not assigned with the broadband cell central user of resource in the traversal sub-district.
When the broadband cell central user of all unallocated resources has all been distributed the resource that remains the first resource group primary resource piece, accomplish resource allocation process to the Cell Center User in broadband.
When being assigned with, the resource that remains the first resource group primary resource piece finishes; And when still having the broadband cell central user of resource to be allocated in the sub-district; Treating the broadband cell central user of Resources allocation and block, no longer is this broadband cell edge customer Resources allocation in this dispatching cycle.
Above-mentionedly distribute two kinds of situation of remaining primary resource piece resource not need to take place simultaneously for the arrowband Cell Center User of unallocated resource and broadband cell central user; When if the arrowband Cell Center User all has been assigned with the resource of the auxilliary Resource Block of the second resource group in step s205, need not to distribute for the arrowband Cell Center User again the resource of remaining primary resource.
In addition; Need to prove; In embodiments of the present invention, Cell Edge User preferentially uses the resource of the second resource group primary resource piece, and Cell Center User uses the resource of the auxilliary Resource Block of the second resource group and the primary resource that is not assigned with; In the interference of evading the minizone, satisfy the delay requirement and the bandwidth requirement that bandwidth occupancy are required low user, improved the quality of communication.
Among the above-mentioned steps s204-s207; Can also add up the ratio of user's in the sub-district blocking rate and the resource that is not assigned with; In next dispatching cycle; Other parameters such as ratio of the resource that can utilize user's in this dispatching cycle blocking rate and not be assigned with are divided two-dimentional running time-frequency resource, thereby the user carries out resource allocation in the reasonable sub-district, status, improves user's communications quality in the sub-district.
Accomplish Cell Edge User and Cell Center User distributed primary resource and auxilliary resource respectively after; The average behavior of statistics Cell Edge User in dispatching cycle; User's average behavior can be user BLER; And be standard with user's statistical average performance, for the user selects suitable many antenna scheme, further body improves the communication quality of Cell Edge User.
The method of resource allocation in the OFDM/MIMO system that the application of the invention embodiment proposes; For Cell Edge User distributes primary resource; For Cell Center User distributes auxilliary resource; When evading presence of intercell interference, satisfied the service needed of user at aspects such as delay requirement and bandwidth, improved the communication quality of Cell Edge User.
In the above-described embodiments, be delay requirement and the bandwidth demand that Cell Edge User distribution running time-frequency resource has satisfied the user according to the customer service type to the requirement of bandwidth and user's translational speed, improved the communication performance of Cell Edge User.In the OFDM/MIMO system, the method for stating in the use is after Cell Edge User distributes running time-frequency resource, can also select suitable many antenna scheme to improve the communication quality of Cell Edge User for the user according to the statistical average performance of Cell Edge User.
The embodiment of the invention three also provides the method for resource allocation in a kind of OFDM/MIMO system; Be applied in the OFDM/MIMO communication system to improve the communication quality of Cell Edge User; Wherein, adjust many antenna scheme to improve the communication quality of Cell Edge User according to the statistical average performance of Cell Edge User.
As shown in Figure 5, this method may further comprise the steps:
Step s501 is provided with the priority list of multi-antenna transmitting transmission scheme in advance, and the target door limit value is set.
The priority list of multiple alternative multi-antenna transmitting transmission scheme is set in advance, is used for the multi-antenna transmitting transmission scheme of selecting certain priority when pre-conditioned satisfying; The target door limit value is set, through the size of the statistical average performance of Cell Edge User in dispatching cycle relatively, as the trigger condition of the many antenna scheme of selection with the target door limit value of setting.
When the statistical average performance of Cell Edge User in dispatching cycle during less than the target door limit value that is provided with; Timer adds up to the number of times that satisfies this trigger condition; Timer compares the hop threshold of number of times that adds up and setting; The number of times that adds up when timer is selected the multi-antenna transmitting transmission scheme of current correspondence during greater than hop threshold.Wherein, the value of target door limit value and hop threshold can be set according to the channel conditions of reality.
For example, the priority list that the multi-antenna transmitting transmission scheme is set is as shown in table 1, and the many antenna scheme that have three kinds of priority to successively decrease in the table 1 have combined reliability and to two factors of interference effect of peripheral cell when the prioritization of many antenna scheme.
The priority list of table 1 multi-antenna transmitting transmission scheme
Priority The multi-antenna transmitting transmission scheme Reliability Interference effect to peripheral cell
1 Multiplexing entirely Low Identical with single antenna
2 SFBC or STBC In Identical with single antenna
3 Beam shaping High Stronger
In embodiments of the present invention, as the performance standard of selecting the multi-antenna transmitting transmission scheme, respective cell inward flange user's average behavior BLER is provided with target door limit value 0<BLER through the average behavior BLER of statistics sub-district inward flange user in this dispatching cycle Th1<BLER Th2, through target door limit value BLER ThCompare with the average behavior BLER of user in dispatching cycle, as the trigger condition of multi-antenna transmitting transmission scheme.
Timer Counter_1~Counter_3 is set to be used for satisfying certain trigger condition continuously (like BLER<BLER Th1) number of times add up, and the number of times and the hop threshold N1~N3 of Counter_1~Counter_3 accumulative total compared, to select suitable multi-antenna transmitting transmission scheme.
Certainly, the size of target door limit value and hop threshold can be looked actual channel condition and selected, when channel condition is better, and target door limit value BLER Th1And BLER Th2Value can suitably reduce, when channel variation is slow, can suitably reduce the value of hop threshold N1~N3.
Need to prove,, only need corresponding target door limit value, counter and the isoparametric number of hop threshold of increasing when alternative multi-antenna transmitting transmission scheme quantity is 4,5 or more for a long time.For example, when having 5 multi-antenna transmitting transmission schemes, target door limit value 0<BLER is set Th1<BLER Th2<BLER Th3<BLER Th4, and 5 timers and 5 hop threshold are set, the multi-antenna transmitting transmission scheme is selected.
Step s502, initiation parameter.
Initialization Index=1, Counter_1=0, Counter_2=0, Counter_3=0, wherein, Index is selectable multi-antenna transmitting transmission scheme corresponding sequence number.
Through counter is set the number of times that satisfies trigger condition is added up; And when the number of times of Counter_1 accumulation greater than the number of times of hop threshold N1, Counter_2 accumulation greater than the number of times of hop threshold N2, Counter_3 accumulation during greater than hop threshold N3; Index is upgraded, avoided the frequent saltus step that causes because of the environment acute variation.
Need to prove; Initialization procedure to Index and Counter_1~Counter_3 was only carried out when first dispatching cycle, T began; The multi-antenna transmitting transmission scheme of Cell Edge User is selected in accomplishing first dispatching cycle of T; Got into when next dispatching cycle, T carried out the selection of multi-antenna transmitting transmission scheme; Need not each parameter is carried out initialization, the value of parameter I ndex and Counter_1~Counter_3 circulates in next dispatching cycle for accomplishing the value of T after dispatching cycle for the first time according to the method described above.
Step s503, the average BLER of statistics Cell Edge User i in dispatching cycle T i
Step s504 judges BLER iWhether less than BLER Th1, be execution in step s505 then, otherwise execution in step s508.
Whether step s505 judges Counter_1 greater than N1, is execution in step s506 then, otherwise execution in step s507.
Step s506 is provided with Index=1, empties counter Counter_2 and Counter_3.
When judging Counter_1 greater than N1, Index=1 is set, the Counter_1 value remains unchanged; Empty counter Counter_2=0, Counter_3=0, and select the corresponding multi-antenna transmitting transmission scheme of Index=1 item in many antenna tabulations; Execution in step s515 gets into next dispatching cycle.
Step s507, the Counter_1 counter adds 1.
When judging that Counter_1 is not more than N1; The Counter_1 counter is set to be added 1 time; The Index value remains unchanged, and the value of Counter_2 and Counter_3 remains unchanged, and and select the corresponding multi-antenna transmitting transmission scheme of Index item in the tabulation of many antennas; Execution in step s515 gets into next dispatching cycle.
Step 508 is judged BLER iWhether less than BLER Th2, be execution in step 509 then, otherwise jump to step 512.
Because target door limit value 0<BLER is set in advance Th1<BLER Th2, judging BLER iBe not less than BLER Th1The time, judge BLER again iWhether less than BLER Th2, execution in step s508.
Whether step 509 judges Counter_2 greater than N2, is execution in step 510 then, otherwise jumps to step 511.
Step 510 is provided with Index=2, empties counter Counter_1 and Counter_3.
When judging Counter_2 greater than N2, Index=2 is set, the Counter_2 value remains unchanged; Empty counter Counter_1=0, Counter_3=0, and select the corresponding multi-antenna transmitting transmission scheme of Index=2 item in many antenna tabulations; Execution in step s515 gets into next dispatching cycle.
Step 511, the Counter_2 counter adds 1.
When judging that Counter_2 is not more than N1; The Counter_2 counter is set to be added 1 time; The Index value remains unchanged, and the value of Counter_1 and Counter_3 remains unchanged, and selects the corresponding multi-antenna transmitting transmission scheme of Index item in many antenna tabulations; Execution in step s515 gets into next dispatching cycle.
Whether step 512 judges Counter_3 greater than N3, is execution in step 513 then, otherwise jumps to step 514.
Step 513 is provided with Index=3, empties counter Counter_1 and Counter_2.
When judging Counter_3 greater than N3, Index=3 is set, the Counter_3 value remains unchanged; Empty counter Counter_1=0, Counter_2=0, and select the corresponding multi-antenna transmitting transmission scheme of Index=3 item in many antenna tabulations; Execution in step s515 gets into next dispatching cycle.
Step 514, the Counter_3 counter adds 1.
When judging that Counter_3 is not more than N1; The Counter_3 counter is set to be added 1 time; The Index value remains unchanged, and the value of Counter_1 and Counter_2 remains unchanged, and selects the corresponding multi-antenna transmitting transmission scheme of Index item in many antenna tabulations; Execution in step s515 gets into next dispatching cycle.
Step 515 is provided with edge customer i and uses many antenna scheme list priority to be the multi-antenna transmitting transmission scheme that the Index item is corresponding, and jumps to following one-period and carry out the step that video resource is divided.
In following one-period, the user is carried out the multi-antenna transmitting transmission scheme when selecting; Step s501 and step s502 need not to carry out; In following one-period, accomplish to after the Cell Edge User Resources allocation; Direct execution in step s503, (value of Index and Counter_1~Counter_3) is all got the parameter value after the completion in this dispatching cycle to each relevant parameter, and between adjacent two dispatching cycles, circulates.
The method of scheduling of resource in the OFDM/MIMO system that the application of the invention embodiment proposes; The major-minor resource of each cell configuration, and for Cell Edge User distributes said primary resource, for Cell Center User distributes said auxilliary resource; When evading presence of intercell interference; Satisfied the service needed of user, and selected the multi-antenna transmitting transmission scheme, further improved the communication quality of Cell Edge User according to the average behavior of Cell Edge User in dispatching cycle at aspects such as delay requirement and bandwidth.
The embodiment of the invention also provides the device of resource allocation in a kind of OFDM/MIMO system, and community user is divided into Cell Edge User or Cell Center User, and as shown in Figure 6 for Cell Edge User and Cell Center User Resources allocation, this device comprises:
Divide module 10, be used for running time-frequency resource is divided into the first resource group and the second resource group, and the first resource group and the second resource group are divided into a plurality of Resource Block;
Configuration module 20 is used to divide module 10 and divides a plurality of Resource Block that obtain, and is primary resource and the auxilliary resource of cell configuration in the first resource group, is primary resource and the auxilliary resource of cell configuration in the second resource group;
Resource distribution module 30; Be used for configuration module 20 for being primary resource and the auxilliary resource of cell configuration in the first resource group; Be primary resource and the auxilliary resource of cell configuration in the second resource group; Primary resource in the first resource group and the second resource group is distributed to Cell Edge User, give Cell Center User the auxilliary resource allocation in the first resource group and the second resource group.
Wherein,
Divide module 10 and specifically be used for, dividing running time-frequency resource is the first resource group and the second resource group, and wherein, the first resource group and the second resource group overlap on time domain, on frequency domain, take different frequency domain resource; Dividing the first resource group and the second resource group respectively is n Resource Block, and n is the number of sub-district, and n Resource Block is continuous on frequency domain in the first resource group, and n resource is continuous on time domain in the second resource group;
Configuration module 20 specifically is used for; For a Resource Block in the cell allocation first resource group as the primary resource of sub-district in the first resource group; The primary resource of distributing in each sub-district first resource group does not overlap mutually, and the individual Resource Block of residue (n-1) in the first resource group is as the auxilliary resource of sub-district; For a Resource Block in the cell allocation second resource group as the primary resource of sub-district in the second resource group, the primary resource of distributing in each sub-district second resource group does not overlap mutually, the individual Resource Block of residue (n-1) in the second resource group is as the auxilliary resource of sub-district.
Wherein, divide module 10 and also be used for, community user is divided into Cell Edge User and Cell Center User according to the reference signal receiving intensity RSRP of community user measurement and report; Obtain the translational speed of community user and the type of service of support; The frequency bandwidth that takies according to the community user type of service requires Cell Edge User is divided into arrowband Cell Edge User and broadband cell edge customer, and Cell Center User is divided into arrowband Cell Center User and broadband cell user;
Resource distribution module 30 specifically comprises distribution sub module 31, judges submodule 32 and processing sub 33;
When Cell Edge User is the arrowband Cell Edge User; According to QoS of customer QoS priority the arrowband Cell Edge User is sorted, distribution sub module 31 according to the height of QoS priority be followed successively by in proper order the arrowband Cell Edge User distribute in the second resource group primary resource piece along time shaft by near to resource far away; Behind the traversal arrowband Cell Edge User, judge that submodule 32 judges whether to exist the arrowband Cell Edge User of unallocated resource, when judged result when being, the arrowband Cell Edge User of 33 pairs of unallocated resources of processing sub blocks processing;
When Cell Edge User is the broadband cell edge customer; According to user moving speed the broadband cell edge customer is sorted, distribution sub module 31 is followed successively by the resource that the broadband cell edge customer distributes primary resource piece in the first resource group in proper order according to the height of user moving speed; Behind the traversal broadband cell edge customer, judge that submodule 32 judges whether to exist the broadband cell edge customer of unallocated resource, when judged result when being, the broadband cell edge customer of 33 pairs of unallocated resources of processing sub blocks processing.
Wherein, resource distribution module 30 specifically comprises distribution sub module 31, judges submodule 32 and processing sub 33;
When Cell Center User is the arrowband Cell Center User:
According to QoS priority the arrowband Cell Center User is sorted, distribution sub module 31 according to the height of QoS priority be followed successively by in proper order the arrowband Cell Center User distribute in the second resource group auxilliary Resource Block along time shaft by near to resource far away; If traversal arrowband Cell Center User when having the arrowband Cell Center User of unallocated resource, judges that submodule 32 judges whether to exist the primary resource of the second resource group that residue is not assigned with,
When judged result for not the time, the arrowband Cell Center User of 33 pairs of unallocated resources of processing sub blocks processing; When judged result when being, the primary resource piece that distribution sub module 31 is distributed the second resource group that residue is not assigned with for the arrowband Cell Center User of unallocated resource along time shaft by near to resource far away; Travel through the arrowband Cell Center User of unallocated resource; Primary resource assigns in the second resource group that residue is not assigned with; And when having the arrowband Cell Center User of unallocated resource, the arrowband Cell Center User of 33 pairs of unallocated resources of processing sub blocks processing;
When Cell Center User is the broadband cell central user:
According to user moving speed the broadband cell central user is sorted, distribution sub module 31 is followed successively by the resource that the arrowband Cell Center User distributes auxilliary Resource Block in the first resource group in proper order according to the height of user moving speed; If traversal broadband cell central user when having the broadband cell central user of unallocated resource, judges that submodule 32 judges whether to have primary resource in the first resource group that residue is not assigned with,
When judged result for not the time, the broadband cell central user of 33 pairs of unallocated resources of processing sub is blocked processing; When judged result when being, distribution sub module 31 is distributed the primary resource of the first resource group that residue is not assigned with for the broadband cell central user of unallocated resource; Travel through the broadband cell central user of unallocated resource; Primary resource assigns in the first resource group that residue is not assigned with; And when having the broadband cell central user of unallocated resource, the broadband cell central user of 33 pairs of unallocated resources of processing sub is blocked processing.
Preferably, device comprises that also many antenna rules are selected module 40, is used to Cell Edge User and selects the defeated rule of suitable multi-antenna transmitting, specifically comprises:
Submodule 41 is set, is used for being provided with in advance the priority list of the defeated rule of multi-antenna transmitting, and the corresponding target door limit value that triggers the defeated rule of multi-antenna transmitting; Statistics submodule 42 is used to add up Cell Edge User in the communication quality average behavior of scheduling of resource in the cycle; Chooser module 43 is used for when user's communications quality average behavior reaches preset threshold value less than the number of times of corresponding target door limit value, the defeated rule of multi-antenna transmitting that the select target threshold value is corresponding.
The device of resource allocation in the OFDM/MIMO system that the application of the invention embodiment proposes; The major-minor resource of each cell configuration, and for Cell Edge User distributes primary resource, for Cell Center User distributes said auxilliary resource; When evading presence of intercell interference; Satisfied the service needed of user, and selected the multi-antenna transmitting transmission scheme, further improved the communication quality of Cell Edge User according to the average behavior of Cell Edge User in dispatching cycle at aspects such as delay requirement and bandwidth.
Through the description of above execution mode, those skilled in the art can be well understood to the present invention and can realize by the mode that software adds essential general hardware platform, can certainly pass through hardware, but the former is better execution mode under a lot of situation.Based on such understanding; The part that technical scheme of the present invention contributes to prior art in essence in other words can be come out with the embodied of software product; This computer software product is stored in the storage medium, comprise some instructions with so that a station terminal equipment (can be mobile phone, personal computer; Server, the perhaps network equipment etc.) carry out the described method of each embodiment of the present invention.
The above only is a preferred implementation of the present invention; Should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the principle of the invention; Can also make some improvement and retouching, these improvement and retouching also should be looked protection scope of the present invention.

Claims (8)

1. the method for resource allocation in the OFDM/MIMO system is characterized in that, community user is divided into Cell Edge User or Cell Center User, is said Cell Edge User and said Cell Center User Resources allocation, said method comprising the steps of:
Running time-frequency resource is divided into the first resource group and the second resource group, and said first resource group and the said second resource group are divided into a plurality of Resource Block; Wherein, said first resource group and the said second resource group overlap on time domain, on frequency domain, take different frequency domain resource; Divide the said first resource group respectively and the said second resource group is a n Resource Block, n is the number of said sub-district, and continuously, n Resource Block is continuous on time domain in the said second resource group on frequency domain for n Resource Block in the said first resource group;
Based on said a plurality of Resource Block is primary resource and the auxilliary resource of cell configuration in the said first resource group, is primary resource and the auxilliary resource of cell configuration in the said second resource group; Wherein, For a Resource Block in the said cell allocation first resource group as the primary resource of said sub-district in the said first resource group; The primary resource of distributing in each sub-district first resource group does not overlap mutually, and the individual Resource Block of residue (n-1) in the said first resource group is as the auxilliary resource of said sub-district; For a Resource Block in the said cell allocation second resource group as the primary resource of said sub-district in the said second resource group; The primary resource of distributing in each sub-district second resource group does not overlap mutually, and the individual Resource Block of residue (n-1) in the said second resource group is as the auxilliary resource of said sub-district;
Said primary resource in said first resource group and the said second resource group is distributed to said Cell Edge User, give said Cell Center User the said auxilliary resource allocation in said first resource group and the said second resource group.
2. the method for claim 1 is characterized in that, said said primary resource in the said first resource group and the said second resource group is distributed to said Cell Edge User, also comprises before:
Reference signal receiving intensity RSRP according to the community user measurement and report is divided into said Cell Edge User and said Cell Center User with said community user; Obtain the translational speed of said community user and the type of service of support; The frequency bandwidth that takies according to said community user type of service requires said Cell Edge User is divided into arrowband Cell Edge User and broadband cell edge customer, and said Cell Center User is divided into arrowband Cell Center User and broadband cell central user;
Said said primary resource in the said first resource group and the said second resource group is distributed to said Cell Edge User, specifically comprises:
When said Cell Edge User is the arrowband Cell Edge User; According to QoS of customer QoS priority said arrowband Cell Edge User is sorted; With the height of said QoS priority be followed successively by in proper order said arrowband Cell Edge User distribute in the said second resource group primary resource piece along time shaft by near to resource far away, and travel through said arrowband Cell Edge User; If there is the arrowband Cell Edge User of unallocated resource, the arrowband Cell Edge User of said unallocated resource is blocked processing;
When said Cell Edge User is the broadband cell edge customer; According to user moving speed said broadband cell edge customer is sorted; Height with said user moving speed is followed successively by the resource that said broadband cell edge customer distributes primary resource piece in the said first resource group in proper order, and travels through said broadband cell edge customer; If there is the broadband cell edge customer of unallocated resource, the broadband cell edge customer of said unallocated resource is blocked processing.
3. method as claimed in claim 2 is characterized in that, gives said Cell Center User with the said auxilliary resource allocation in said first resource group and the said second resource group, specifically comprises:
When said Cell Center User is the arrowband Cell Center User:
According to said QoS priority said arrowband Cell Center User is sorted, with the height of said QoS priority be followed successively by in proper order said arrowband Cell Center User distribute in the said second resource group auxilliary Resource Block along time shaft by near to resource far away; Travel through said arrowband Cell Center User,, judge whether primary resource in the said second resource group that residue is not assigned with if there is the said arrowband Cell Center User of unallocated resource,
When judged result for not the time, the arrowband Cell Center User of said unallocated resource is blocked processing; When judged result when being; For the arrowband Cell Center User of said unallocated resource distribute in the said second resource group that said residue is not assigned with the primary resource piece along time shaft by near to resource far away; Travel through the arrowband Cell Center User of said unallocated resource; Primary resource assigns in the said second resource group that said residue is not assigned with, and when having the arrowband Cell Center User of said unallocated resource, and the arrowband Cell Center User of said unallocated resource is blocked processing;
When said Cell Center User is the broadband cell central user:
According to user moving speed said broadband cell central user is sorted, be followed successively by the resource that said broadband cell central user is distributed auxilliary Resource Block in the said first resource group in proper order with the height of user moving speed; Travel through said broadband cell central user,, judge whether primary resource in the said first resource group that residue is not assigned with if there is the said broadband cell central user of unallocated resource,
When judged result for not the time, the broadband cell central user of said unallocated resource is blocked processing; When judged result when being; For the broadband cell central user of said unallocated resource is distributed primary resource in the said first resource group that said residue is not assigned with; Travel through the broadband cell central user of said unallocated resource; And primary resource assigns in the said first resource group that is not assigned with when said residue, and when having the broadband cell central user of said unallocated resource, the broadband cell central user of said unallocated resource is blocked processing.
4. the method for claim 1 is characterized in that, is said Cell Edge User and said Cell Center User Resources allocation, also comprises afterwards:
The priority list of the defeated rule of multi-antenna transmitting is set in advance, and the corresponding target door limit value that triggers the defeated rule of said multi-antenna transmitting; Add up said Cell Edge User in the communication quality average behavior of scheduling of resource in the cycle; When said user's communications quality average behavior reached preset threshold value less than the number of times of said corresponding target door limit value, said Cell Edge User was selected the defeated rule of the corresponding said multi-antenna transmitting of said target door limit value.
5. the device of resource allocation in the OFDM/MIMO system is characterized in that, community user is divided into Cell Edge User or Cell Center User, is said Cell Edge User and said Cell Center User Resources allocation, and said device comprises:
Divide module, be used for running time-frequency resource is divided into the first resource group and the second resource group, and said first resource group and the said second resource group are divided into a plurality of Resource Block;
Configuration module is used for said a plurality of Resource Block of obtaining according to said division Module Division, is primary resource and the auxilliary resource of cell configuration in the said first resource group, is primary resource and the auxilliary resource of cell configuration in the said second resource group;
Wherein, said division module specifically is used for, and dividing running time-frequency resource is said first resource group and the said second resource group, and wherein, said first resource group and the said second resource group overlap on time domain, on frequency domain, take different frequency domain resource; Divide the said first resource group respectively and the said second resource group is a n Resource Block, n is the number of said sub-district, and continuously, n Resource Block is continuous on time domain in the said second resource group on frequency domain for n Resource Block in the said first resource group;
Said configuration module specifically is used for; For a Resource Block in the said cell allocation first resource group as the primary resource of said sub-district in the said first resource group; The primary resource of distributing in each sub-district first resource group does not overlap mutually, and the individual Resource Block of residue (n-1) in the said first resource group is as the auxilliary resource of said sub-district; For a Resource Block in the said cell allocation second resource group as the primary resource of said sub-district in the said second resource group; The primary resource of distributing in each sub-district second resource group does not overlap mutually, and the individual Resource Block of residue (n-1) in the said second resource group is as the auxilliary resource of said sub-district.
Resource distribution module is used for the said primary resource in said first resource group and the said second resource group is distributed to said Cell Edge User, gives said Cell Center User with the said auxilliary resource allocation in said first resource group and the said second resource group.
6. device as claimed in claim 5 is characterized in that, said division module also is used for, and according to the reference signal receiving intensity RSRP of community user measurement and report said community user is divided into said Cell Edge User and said Cell Center User; Obtain the translational speed of said community user and the type of service of support; The frequency bandwidth that takies according to said community user type of service requires said Cell Edge User is divided into arrowband Cell Edge User and broadband cell edge customer, and said Cell Center User is divided into arrowband Cell Center User and broadband cell central user;
Said resource distribution module specifically comprises distribution sub module, judges submodule and processing sub;
When said Cell Edge User is the arrowband Cell Edge User; According to QoS of customer QoS priority said arrowband Cell Edge User is sorted, said distribution sub module according to the height of said QoS priority be followed successively by in proper order said arrowband Cell Edge User distribute in the said second resource group primary resource piece along time shaft by near to resource far away; After traveling through said arrowband Cell Edge User; Said judgement submodule judges whether to exist the arrowband Cell Edge User of unallocated resource; When judged result when being, said processing sub is blocked processing to the arrowband Cell Edge User of said unallocated resource;
When said Cell Edge User is the broadband cell edge customer; According to user moving speed said broadband cell edge customer is sorted, said distribution sub module is followed successively by the resource that said broadband cell edge customer distributes primary resource piece in the said first resource group in proper order according to the height of said user moving speed; After traveling through said broadband cell edge customer; Said judgement submodule judges whether to exist the broadband cell edge customer of unallocated resource; When judged result when being, said processing sub is blocked processing to the broadband cell edge customer of said unallocated resource.
7. device as claimed in claim 5 is characterized in that, said division module also is used for, and according to the reference signal receiving intensity RSRP of community user measurement and report said community user is divided into said Cell Edge User and said Cell Center User; Obtain the translational speed of said community user and the type of service of support; The frequency bandwidth that takies according to said community user type of service requires said Cell Edge User is divided into arrowband Cell Edge User and broadband cell edge customer, and said Cell Center User is divided into arrowband Cell Center User and broadband cell central user;
Said resource distribution module specifically comprises distribution sub module, judges submodule and processing sub;
When said Cell Center User is the arrowband Cell Center User:
According to QoS priority said arrowband Cell Center User is sorted, said distribution sub module according to the height of said QoS priority be followed successively by in proper order said arrowband Cell Center User distribute in the said second resource group auxilliary Resource Block along time shaft by near to resource far away; Travel through said arrowband Cell Center User, if there is the said arrowband Cell Center User of unallocated resource, said judgement submodule judges whether to exist the primary resource of the said second resource group that residue is not assigned with,
When judged result for not the time, said processing sub is blocked processing to the arrowband Cell Center User of said unallocated resource; When judged result when being, said distribution sub module be the arrowband Cell Center User of said unallocated resource distribute the second resource group that said residue is not assigned with the primary resource piece along time shaft by near to resource far away; Travel through the arrowband Cell Center User of said unallocated resource; Primary resource assigns in the second resource group that said residue is not assigned with; And when having the arrowband Cell Center User of said unallocated resource, said processing sub is blocked processing to the arrowband Cell Center User of said unallocated resource;
When said Cell Center User is the broadband cell central user:
According to user moving speed said broadband cell central user is sorted, said distribution sub module is followed successively by the resource that said broadband cell central user is distributed auxilliary Resource Block in the said first resource group in proper order according to the height of user moving speed; Travel through said broadband cell central user, if there is the said broadband cell central user of unallocated resource, said judgement submodule judges whether to have primary resource in the said first resource group that residue is not assigned with,
When judged result for not the time, said processing sub is blocked processing to the broadband cell central user of said unallocated resource; When judged result when being, said distribution sub module is the primary resource that the broadband cell central user of said unallocated resource is distributed the said first resource group that said residue is not assigned with; Travel through the broadband cell central user of said unallocated resource; Primary resource assigns in the first resource group that said residue is not assigned with; And when having the broadband cell central user of said unallocated resource, said processing sub is blocked processing to the broadband cell central user of said unallocated resource.
8. device as claimed in claim 5 is characterized in that, said device comprises that also many antenna rules are selected module, is used to said Cell Edge User and selects the defeated rule of suitable multi-antenna transmitting, specifically comprises:
Submodule is set, is used for being provided with in advance the priority list of the defeated rule of multi-antenna transmitting, and the corresponding target door limit value that triggers the defeated rule of said multi-antenna transmitting; The statistics submodule is used to add up said Cell Edge User in the communication quality average behavior of scheduling of resource in the cycle; The chooser module is used for when said user's communications quality average behavior reaches preset threshold value less than the number of times of said corresponding target door limit value, selects the defeated rule of the corresponding said multi-antenna transmitting of said target door limit value.
CN201010102666XA 2010-01-28 2010-01-28 Method and device for allocating resources in OFDM/MIMO system Active CN101801091B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010102666XA CN101801091B (en) 2010-01-28 2010-01-28 Method and device for allocating resources in OFDM/MIMO system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010102666XA CN101801091B (en) 2010-01-28 2010-01-28 Method and device for allocating resources in OFDM/MIMO system

Publications (2)

Publication Number Publication Date
CN101801091A CN101801091A (en) 2010-08-11
CN101801091B true CN101801091B (en) 2012-11-14

Family

ID=42596505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010102666XA Active CN101801091B (en) 2010-01-28 2010-01-28 Method and device for allocating resources in OFDM/MIMO system

Country Status (1)

Country Link
CN (1) CN101801091B (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102448126A (en) * 2010-09-30 2012-05-09 索尼公司 Method and device for configuring communication resource collection, and method and system for managing resource
CN102469598B (en) * 2010-11-16 2015-04-01 中兴通讯股份有限公司 Method and device for resource allocation of OFDMA system
CN102480734B (en) * 2010-11-22 2014-04-30 中兴通讯股份有限公司 Time-frequency resource distributing method and device
CN102045857B (en) * 2010-12-13 2014-04-30 中兴通讯股份有限公司 Method for dispatching resources in orthogonal frequency division multiplexing (OFDM) system and base station
CN102186248B (en) * 2011-05-13 2014-01-08 电信科学技术研究院 Scheduling method and device used for interference coordination
JP5758048B2 (en) * 2011-05-17 2015-08-05 華為技術有限公司Huawei Technologies Co.,Ltd. Method, apparatus, and base station for resource allocation
CN102843695B (en) * 2011-06-21 2017-02-08 中兴通讯股份有限公司 Method and device for allocating CRS (Cell Reference Signal)
US8798656B2 (en) * 2011-06-29 2014-08-05 Qualcomm Incorporated Methods and apparatus by which periodically broadcasting nodes can resolve contention for access to a smaller pool of broadcasting resources
CN102883439B (en) * 2011-07-14 2016-04-20 普天信息技术有限公司 The communication means of broadband terminal in discrete spectrum communication system
CN102932838B (en) * 2011-08-11 2014-11-05 华为技术有限公司 Method and equipment for short-delay resource management and wireless access network equipment
CN103595516B (en) 2012-08-15 2016-08-10 京信通信系统(中国)有限公司 A kind of resource allocation methods and base station
CN103491636B (en) * 2013-10-12 2016-07-06 中国联合网络通信集团有限公司 A kind of quality allocation method based on customer service speed and device
CN103702430A (en) * 2013-12-28 2014-04-02 杨学志 Method for multi-stage soft time-frequency multiplexing and resource allocation, equipment and a system
CN104333865B (en) * 2014-11-19 2018-12-18 北京北方烽火科技有限公司 A kind of cooperative multi-point CoMP resource allocation methods and device
CN106712913B (en) * 2015-11-13 2019-10-01 上海朗帛通信技术有限公司 A kind of method and apparatus of narrow band communication
CN107770755B (en) * 2016-08-22 2023-07-14 中兴通讯股份有限公司 Method, device and system for transmitting data and terminal
CN108810904B (en) * 2017-05-04 2020-07-07 华为技术有限公司 Method and apparatus for wireless communication
CN108322240B (en) * 2018-01-04 2021-10-01 南方科技大学 Soft frequency division multiplexing method and device, large-scale multi-antenna system and storage medium
CN114599045B (en) * 2022-04-19 2024-01-30 北京邮电大学 Multi-cell cooperation beam selection and management method in user mobile scene

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1960557A (en) * 2005-11-03 2007-05-09 上海原动力通信科技有限公司 Method for reducing interference between sectors in orthogonal frequency division multiplex system
CN101218775A (en) * 2005-09-30 2008-07-09 华为技术有限公司 Multi-user access system MIMO-OFDM resource distributing method
CN101227698A (en) * 2008-02-03 2008-07-23 普天信息技术研究院有限公司 Resource regulating method
CN101291515A (en) * 2008-06-06 2008-10-22 北京邮电大学 Interference suppressing method in wireless communication system
CN101384066A (en) * 2008-10-31 2009-03-11 华为技术有限公司 Resource distribution method, system and apparatus
CN101437292A (en) * 2008-12-23 2009-05-20 中国移动通信集团设计院有限公司 Method and apparatus for scheduling time frequency resource of OFDM system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101218775A (en) * 2005-09-30 2008-07-09 华为技术有限公司 Multi-user access system MIMO-OFDM resource distributing method
CN1960557A (en) * 2005-11-03 2007-05-09 上海原动力通信科技有限公司 Method for reducing interference between sectors in orthogonal frequency division multiplex system
CN101227698A (en) * 2008-02-03 2008-07-23 普天信息技术研究院有限公司 Resource regulating method
CN101291515A (en) * 2008-06-06 2008-10-22 北京邮电大学 Interference suppressing method in wireless communication system
CN101384066A (en) * 2008-10-31 2009-03-11 华为技术有限公司 Resource distribution method, system and apparatus
CN101437292A (en) * 2008-12-23 2009-05-20 中国移动通信集团设计院有限公司 Method and apparatus for scheduling time frequency resource of OFDM system

Also Published As

Publication number Publication date
CN101801091A (en) 2010-08-11

Similar Documents

Publication Publication Date Title
CN101801091B (en) Method and device for allocating resources in OFDM/MIMO system
US8078185B2 (en) User group-based adaptive soft frequency reuse method to mitigate downlink interference for wireless cellular networks
CN107547184B (en) Dynamic pilot frequency distribution method in large-scale MIMO system
CN101964980B (en) Method and device for coordinating inter-cell interference
CN107949061B (en) Multi-user grouping method based on non-orthogonal multiple access system
CN104717755A (en) Downlink frequency spectrum resource distribution method with D2D technology introduced in cellular network
CN108055701B (en) Resource scheduling method and base station
WO2016037660A1 (en) Method and apparatus for determining clusters of access nodes
CN110445518B (en) Pilot frequency distribution method based on micro cell clustering under large-scale MIMO heterogeneous network system
US9642152B2 (en) Resource allocation method and base station
Aramide et al. Generalized proportional fair (GPF) scheduler for LTE-A
Prabowo et al. Joint-Greedy allocation algorithm on D2D communication underlaying networks
CN101772172B (en) Multi-band based method for allocating frequency spectrum resources, device and system thereof
CN102970683B (en) Graph theory based multi-cell two-layer network spectrum allocation method
CN1980450B (en) Sub-band scheduling method in orthogonal frequency-division multiplexing system
CN104023400A (en) Downlink channel according-to-requirement distribution method for aiming at OFDM base station system
CN102572844B (en) Method and device for distributing cell resources
CN104170309B (en) A kind of method for managing resource and device
CN101640841B (en) Method and device for allocating multimedia broadcast-multicast service resources
CN103237309A (en) Quasi-dynamic frequency resource classification method for interference coordination of LTE-A (Long Term Evolution-Advanced) relay system
Gajewski Throughput-coverage characteristics for soft and Partial Frequency Reuse in the LTE downlink
CN110177340A (en) A kind of super-intensive network resource allocation method of customer-centric
CN102340776B (en) Time frequency resource classification method and base station
CN106575983B (en) Method and apparatus for switching control region in wireless communication system
CN102655645B (en) Relative-narrowband-TX-power (RNTP)-based interference suppression method in long-term evolution (LTE) system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JINGXIN COMMUNICATION TECHNOLOGY (GUANGZHOU) CO.,

Free format text: FORMER OWNER: BEIJING POSTAL AND TELECOMMUNICATIONS UNIV.

Effective date: 20150226

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100876 HAIDIAN, BEIJING TO: 510663 GUANGZHOU, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150226

Address after: 510663 Guangzhou Science City, Guangdong Shenzhou Road, No. 10

Patentee after: Jingxin Communication Technology (Guangzhou) Co., Ltd.

Address before: 100876 Beijing city Haidian District Xitucheng Road No. 10

Patentee before: Beijing University of Posts and Telecommunications

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200131

Address after: 510663 Shenzhou Road, Guangzhou Science City, Guangzhou economic and Technological Development Zone, Guangdong, 10

Patentee after: Comba Telecom System (China) Ltd.

Address before: 510663 Guangzhou Science City, Guangdong Shenzhou Road, No. 10

Patentee before: COMBA TELECOM TECHNOLOGY (GUANGZHOU) Ltd.

CP01 Change in the name or title of a patent holder

Address after: 510663 Shenzhou Road, Guangzhou Science City, Guangzhou economic and Technological Development Zone, Guangdong, 10

Patentee after: Jingxin Network System Co.,Ltd.

Address before: 510663 Shenzhou Road, Guangzhou Science City, Guangzhou economic and Technological Development Zone, Guangdong, 10

Patentee before: Comba Telecom System (China) Ltd.

CP01 Change in the name or title of a patent holder