CN101797555A - Technology for spraying seawater ballast tank - Google Patents

Technology for spraying seawater ballast tank Download PDF

Info

Publication number
CN101797555A
CN101797555A CN 201010114422 CN201010114422A CN101797555A CN 101797555 A CN101797555 A CN 101797555A CN 201010114422 CN201010114422 CN 201010114422 CN 201010114422 A CN201010114422 A CN 201010114422A CN 101797555 A CN101797555 A CN 101797555A
Authority
CN
China
Prior art keywords
steel plate
spraying
ballast tank
time
paint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010114422
Other languages
Chinese (zh)
Inventor
董正楚
刘淑莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wison Nantong Heavy Industry Co Ltd
Original Assignee
Wison Nantong Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wison Nantong Heavy Industry Co Ltd filed Critical Wison Nantong Heavy Industry Co Ltd
Priority to CN 201010114422 priority Critical patent/CN101797555A/en
Publication of CN101797555A publication Critical patent/CN101797555A/en
Pending legal-status Critical Current

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses a technology for spraying a seawater ballast tank, which comprises the following steps of: firstly scouring the surface of an A level steel plate, and spraying base paint; scouring the surface of the steel plate; spraying workshop base paint after treating the surface of the steel plate; after spraying the workshop base paint, machining the structure of the steel plate, and performing second surface treatment; after the second surface treatment, performing first spraying; mainly spraying first-degree bi-component epoxy paint with a spray gun, and performing second pre-spraying after solidifying at 1.5-15 hours; mainly spraying second-degree bi-component epoxy paint with the spray gun; solidifying the steel plate at 5-7 days, and shutting a segmental structure; and repairing shutting places. The technology has convenient operation, greatly prolongs the service life of the seawater ballast tank, and reduces the maintenance cost.

Description

A kind of technology for spraying seawater ballast tank
Technical field:
The present invention relates to a kind of technology for spraying seawater ballast tank.
Background technology:
At present, normally used sea water tank spraying coating process, the anticorrosion time limit is generally 3-5, general boats and ships must keep in repair or spraying once more seawater ballast tank after moving 3-5 at sea, the anticorrosion time limit is lower, far can not satisfy the requirement in boats and ships self life-span, and maintenance cost is very high, the waste resource, cost of idleness.
Summary of the invention:
The objective of the invention is in order to overcome above deficiency, provide a kind of easy to operate, greatly improved seawater ballast tank service life, lowered the technology for spraying seawater ballast tank of maintenance cost.
Purpose of the present invention is achieved through the following technical solutions: a kind of technology for spraying seawater ballast tank may further comprise the steps:
A, selection grade are that the steel plate of A level carries out surface erosion, primer spray afterwards;
B, the water-soluble salt of use are tested, and are equal to the content≤50mg/m of sodium chloride 2Abrasive material surface of steel plate is washed away processing, reach the Sa2.5 grade after making the roughness of surface of steel plate handle, roughness is between 30-75 μ m, the dust granule size is 1 grade for the dust abundance of " 3 ", " 4 " or " 5 ", promptly amount of dust is few;
C, surface of steel plate are handled back painting workshop priming paint, and priming paint has compatibility with the coating that needs spray;
Behind D, the painting workshop priming paint, the steel plate of selecting in the steps A is carried out steel plate structure processing, carry out the surface treatment second time after structure machines, the same B-C of step closes up weld seam 200mm place without primer spray close simultaneously;
After E, the surface treatment for the second time, use cylinder or brush to carry out the precoating first time;
F, use spray gun main jet first degree bi-component epoxy paint then, solidifies after 1.5-15 hour use cylinder or brush and carry out the precoating second time;
G, re-use spray gun main jet second degree bi-component epoxy paint, total build reaches more than the 320 ц M:
Closing up of H, the 5-7 days laggard body segmental structures of navigating of curing;
I, the place of closing up is repaired the same B of steps in sequence, E, F, G.
The present invention compared with prior art has the following advantages: use technology of the present invention to carry out spraying seawater ballast tank now, the anticorrosion time limit of target at least 15 years in the service life of having improved seawater ballast tank greatly, has lowered maintenance cost.
The specific embodiment:
In order to deepen the understanding of the present invention, the invention will be further described below in conjunction with embodiment, and this embodiment only is used to explain the present invention, do not constitute the qualification to protection domain of the present invention.
A kind of specific embodiment of a kind of technology for spraying seawater ballast tank of the present invention, selecting grade is that the steel plate of A level carries out surface erosion, and primer spray afterwards generally is divided into A level or B level according to the surface cleanness of steel plate, the steel plate of A level is cleaner than the steel plate of B level, does not have rust staining substantially; Use water-soluble salt test afterwards, be equal to the content≤50mg/m of sodium chloride 2Abrasive material surface of steel plate is washed away processing, reach the Sa2.5 grade after making the roughness of surface of steel plate handle, roughness is between 30-75 μ m, the dust granule size is 1 grade for the dust abundance of " 3 ", " 4 " or " 5 ", promptly amount of dust is few; Surface of steel plate is handled back painting workshop priming paint, and priming paint has compatibility with the coating that needs spray; Behind the painting workshop priming paint, the steel plate of selecting in the steps A is carried out steel plate structure processing, carry out the surface treatment second time after structure machines, the same B-C of step, close up weld seam 200mm place without primer spray, because segmentation is closed up by welded seam close simultaneously; After the surface treatment for the second time, use cylinder or brush to carry out the precoating first time; Then, use the spray gun main jet first degree bi-component epoxy paint, solidify and use cylinder or brush to carry out the precoating second time after 1.5-15 hour, when temperature was high, hardening time was shorter, and when temperature was hanged down, hardening time was longer; Re-use the spray gun main jet second degree bi-component epoxy paint, total build reaches more than the 320 ц M; To solidify closing up of the 5-7 days laggard body segmental structures of navigating afterwards; At last the place of closing up is repaired the same B of steps in sequence, E, F, G.Use technology of the present invention to carry out spraying seawater ballast tank, the anticorrosion time limit of target at least 15 years in the service life of having improved seawater ballast tank greatly, has lowered maintenance cost.

Claims (1)

1. technology for spraying seawater ballast tank is characterized in that: may further comprise the steps:
A, selection grade are that the steel plate of A level carries out surface erosion, primer spray afterwards;
B, the water-soluble salt of use are tested, and are equal to the content≤50mg/m of sodium chloride 2Abrasive material surface of steel plate is washed away processing, reach the Sa2.5 grade after making the roughness of surface of steel plate handle, roughness is between 30-75 μ m, the dust granule size is 1 grade for the dust abundance of " 3 ", " 4 " or " 5 ", promptly amount of dust is few;
C, surface of steel plate are handled back painting workshop priming paint, and priming paint has compatibility with the coating that needs spray;
Behind D, the painting workshop priming paint, the steel plate of selecting in the steps A is carried out steel plate structure processing, carry out the surface treatment second time after structure machines, the same B-C of step closes up weld seam 200mm place without primer spray close simultaneously;
After E, the surface treatment for the second time, use cylinder or brush to carry out the precoating first time;
F, use spray gun main jet first degree bi-component epoxy paint then, solidifies after 1.5-15 hour use cylinder or brush and carry out the precoating second time;
G, re-use spray gun main jet second degree bi-component epoxy paint, total build reaches more than the 320 ц M;
Closing up of H, the 5-7 days laggard body segmental structures of navigating of curing;
I, the place of closing up is repaired the same B of steps in sequence, E, F, G.
CN 201010114422 2010-02-26 2010-02-26 Technology for spraying seawater ballast tank Pending CN101797555A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010114422 CN101797555A (en) 2010-02-26 2010-02-26 Technology for spraying seawater ballast tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010114422 CN101797555A (en) 2010-02-26 2010-02-26 Technology for spraying seawater ballast tank

Publications (1)

Publication Number Publication Date
CN101797555A true CN101797555A (en) 2010-08-11

Family

ID=42593481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010114422 Pending CN101797555A (en) 2010-02-26 2010-02-26 Technology for spraying seawater ballast tank

Country Status (1)

Country Link
CN (1) CN101797555A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104554619A (en) * 2014-11-28 2015-04-29 南通明德重工有限公司 Technique for processing ballast tank duplex stainless steel surface of stainless steel category II chemical tanker
CN110238014A (en) * 2019-06-12 2019-09-17 浙江国际海运职业技术学院 A kind of construction method of ship fresh-water tank coating
CN111822311A (en) * 2020-07-24 2020-10-27 上海外高桥造船有限公司 Water-based paint construction method for ship construction

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101134867A (en) * 2007-09-28 2008-03-05 中山大桥化工有限公司 Shipping ballast cabin coating composition

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101134867A (en) * 2007-09-28 2008-03-05 中山大桥化工有限公司 Shipping ballast cabin coating composition

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《上海涂料》 20060831 贾恒涛等 液化天然气船压载舱涂装工艺 17-19 1 第44卷, 第8期 2 *
《第三届国际海洋与重防腐涂料及涂装技术研讨会》 20080422 汪国平 IMO《船舶压载舱保护涂层性能标准》与对策建议 1-4 1 , 2 *
《造船技术》 20091231 陈斌 PSPC在军船压载舱涂装中的应用 31-32 1 , 第2(2009)(总第288期)期 2 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104554619A (en) * 2014-11-28 2015-04-29 南通明德重工有限公司 Technique for processing ballast tank duplex stainless steel surface of stainless steel category II chemical tanker
CN110238014A (en) * 2019-06-12 2019-09-17 浙江国际海运职业技术学院 A kind of construction method of ship fresh-water tank coating
CN111822311A (en) * 2020-07-24 2020-10-27 上海外高桥造船有限公司 Water-based paint construction method for ship construction

Similar Documents

Publication Publication Date Title
JP5447310B2 (en) Steel for ballast tank
CN105436060B (en) A kind of processing method of utilization Dacroment masking liquid to guardrail, column and fastener
CN110640600A (en) Novel corrosion prevention process for offshore wind power tower
CN105032747A (en) Tower cylinder coating method of large floating wind power station
CN105478330A (en) Ship coating technology
CN110586443A (en) Novel onshore corrosion prevention process for wind power tower cylinder
CN101797555A (en) Technology for spraying seawater ballast tank
CN103041975A (en) Rust prevention method of ship
CN112024340A (en) Underwater coating construction method for ship engineering
CN102744186B (en) Method for spraying coating and killing coating on surface of oil tank and for jointly preventing corrosion
CN102896082B (en) Coating process
CN105369904A (en) Modified acrylic coating concrete anti-corrosion method
CN105413984B (en) A kind of means of defence for improving ammonia water tank service life
JP2001046957A (en) Method of coating ship or steel structure
US20220049358A1 (en) Treated particles and substrates
CN102059216A (en) Secondary rust removal process for hull
CN110860448A (en) Novel polyurethane coating process for nodular cast iron pipe fitting
CN102990319A (en) Corrosion control method of welding bead and melting loss portion
CN206202631U (en) Hull cleans monitoring underwater robot sensor installing pipe with water
KR102614304B1 (en) New surface coating method of structures using starfish nano-bio coating composition and solvent-free eco-friendly double coating material for surface repair protection of steel bridges and steel structures
CN102620108A (en) Pouring repair method for leakage of underwater pipeline
J Peter Ault PE Retaining Pre-Construction Primers during Shipbuilding
JP2010247058A (en) Method of removing rust of steel structure
CN108247928A (en) A kind of renovation processing technology of seawater pipeline
Fujiwara et al. Environmentally Friendly-Air Mixed & High-Pressure Water Blasting-(Konki-Jet) Developed To Comply With Pspc Requirements

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100811