CN101789597A - 基于规则引擎技术的电网稳定限额智能化管理方法 - Google Patents
基于规则引擎技术的电网稳定限额智能化管理方法 Download PDFInfo
- Publication number
- CN101789597A CN101789597A CN201010102611A CN201010102611A CN101789597A CN 101789597 A CN101789597 A CN 101789597A CN 201010102611 A CN201010102611 A CN 201010102611A CN 201010102611 A CN201010102611 A CN 201010102611A CN 101789597 A CN101789597 A CN 101789597A
- Authority
- CN
- China
- Prior art keywords
- stable
- rule
- power grid
- limitation
- limit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010102611A CN101789597A (zh) | 2010-01-29 | 2010-01-29 | 基于规则引擎技术的电网稳定限额智能化管理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010102611A CN101789597A (zh) | 2010-01-29 | 2010-01-29 | 基于规则引擎技术的电网稳定限额智能化管理方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101789597A true CN101789597A (zh) | 2010-07-28 |
Family
ID=42532704
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010102611A Pending CN101789597A (zh) | 2010-01-29 | 2010-01-29 | 基于规则引擎技术的电网稳定限额智能化管理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101789597A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104732450A (zh) * | 2015-03-06 | 2015-06-24 | 国家电网公司 | 一种基于规则引擎的供电质量评价系统 |
CN105138771A (zh) * | 2015-08-25 | 2015-12-09 | 国网江西省电力公司鹰潭供电分公司 | 基于电力调度自动化规则引擎的数据建模工具 |
CN105140912A (zh) * | 2015-08-14 | 2015-12-09 | 国电南瑞科技股份有限公司 | 计及稳控系统运行状态的电网稳定断面控制限额识别方法 |
CN110086166A (zh) * | 2019-04-04 | 2019-08-02 | 中国电力科学研究院有限公司 | 一种电网稳定运行限额的表示方法及系统 |
CN110336303A (zh) * | 2019-07-12 | 2019-10-15 | 国家电网有限公司 | 一种面向实时调度运行的电网稳定控制规定电子化解析方法及系统 |
CN111143967A (zh) * | 2019-11-29 | 2020-05-12 | 国网湖南省电力有限公司 | 一种改进的电网限额决策方法及系统 |
CN112258311A (zh) * | 2020-10-13 | 2021-01-22 | 北京神州数字科技有限公司 | 一种催收策略规则的配置方法及配置装置 |
-
2010
- 2010-01-29 CN CN201010102611A patent/CN101789597A/zh active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104732450A (zh) * | 2015-03-06 | 2015-06-24 | 国家电网公司 | 一种基于规则引擎的供电质量评价系统 |
CN105140912A (zh) * | 2015-08-14 | 2015-12-09 | 国电南瑞科技股份有限公司 | 计及稳控系统运行状态的电网稳定断面控制限额识别方法 |
CN105138771A (zh) * | 2015-08-25 | 2015-12-09 | 国网江西省电力公司鹰潭供电分公司 | 基于电力调度自动化规则引擎的数据建模工具 |
CN110086166A (zh) * | 2019-04-04 | 2019-08-02 | 中国电力科学研究院有限公司 | 一种电网稳定运行限额的表示方法及系统 |
CN110086166B (zh) * | 2019-04-04 | 2023-10-20 | 中国电力科学研究院有限公司 | 一种电网稳定运行限额的表示方法及系统 |
CN110336303A (zh) * | 2019-07-12 | 2019-10-15 | 国家电网有限公司 | 一种面向实时调度运行的电网稳定控制规定电子化解析方法及系统 |
CN111143967A (zh) * | 2019-11-29 | 2020-05-12 | 国网湖南省电力有限公司 | 一种改进的电网限额决策方法及系统 |
CN112258311A (zh) * | 2020-10-13 | 2021-01-22 | 北京神州数字科技有限公司 | 一种催收策略规则的配置方法及配置装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11378994B2 (en) | Systems and methods for grid operating systems in electric power systems | |
US20200220351A1 (en) | Systems and Methods for Model-Driven Demand Response | |
US20190005165A1 (en) | Systems and methods for real-time dc microgrid power analytics for mission-critical power systems | |
US8924033B2 (en) | Generalized grid security framework | |
CN101789597A (zh) | 基于规则引擎技术的电网稳定限额智能化管理方法 | |
CN101447669B (zh) | 一种基于稳定规则信息模型的电网安全稳定监控方法 | |
EP2875575A2 (en) | Multi terminal hvdc control | |
US11354457B2 (en) | Method for structuring an existing grid for distributing electric energy | |
CN111461579B (zh) | 全电压等级的电网实时风险评估系统及方法 | |
CN114971583A (zh) | 电网复杂调控规则的数字化建模系统 | |
Alizadeh et al. | Resiliency‐oriented islanding of distribution network in the presence of charging stations for electric vehicles | |
CN106776750B (zh) | 一种图模一体化的配电网数字化预案系统 | |
CN117374978A (zh) | 结合知识图谱构建的并网调度管理方法及系统 | |
CN203552029U (zh) | 一种基于分布式控制器的微网控制系统 | |
KR102615485B1 (ko) | 디지털트윈 기반 마이크로그리드 운영 방법 | |
Roche | Agent-Based Architectures and Algorithms for Energy Management in Smart Grids. Application to Smart Power Generation and Residential Demand Response | |
Hatziargyriou et al. | The" CARE" System Overview: Advanced Control Advice for Power Systems with Large-scale Integration of Renewable Energy Sources | |
Shi et al. | Digital Twin-Based Modeling Platform Development for Complex Regulation Rules of Large Power Grids | |
Eichler et al. | Mitigating risk of system instability caused by fluctuating renewables with smart transmission grid applications | |
Ucich et al. | Case study: DERMS deployment to the Onslow microgrid | |
Wen et al. | Research on CEP Dispatching Decision Model Based on Digital Twin Grid | |
Leva | Transmission Control Centres and Human Interface Design: The need to support situational awareness in the face of increasing complexity | |
CN116137461A (zh) | 一种电网稳控策略源端维护方法及装置 | |
Lu et al. | A Situation Awareness and Fault Recovery Decision-Aid System for UHVDC | |
Catterson et al. | Demonstration of decision support for real time operation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI HUADONG ELECTROJET ENERGY INFORMATION CO. Free format text: FORMER OWNER: SHANGHAI DONGYUN INFORMATION TECHNOLOGY DEVELOPMENT CO., LTD. |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 200002 NO. 201, NANJING EAST ROAD, SHANGHAI TO: 200002 NO. 201, NANJING EAST ROAD, HUANGPU DISTRICT, SHANGHAI |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20110113 Address after: 200002 No. 201 East Nanjing Road, Shanghai, Huangpu District Applicant after: Huadong Electric Network Co., Ltd. Co-applicant after: Shanghai Huadong Electrojet Energy Information Co., Ltd. Address before: 200002 No. 201 East Nanjing Road, Shanghai Applicant before: Huadong Electric Network Co., Ltd. Co-applicant before: Shanghai Dongyun Information Technology Development Co., Ltd. |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20100728 |