CN101787874B - Intelligent injection allocation testing device of water injection well - Google Patents
Intelligent injection allocation testing device of water injection well Download PDFInfo
- Publication number
- CN101787874B CN101787874B CN2010101312784A CN201010131278A CN101787874B CN 101787874 B CN101787874 B CN 101787874B CN 2010101312784 A CN2010101312784 A CN 2010101312784A CN 201010131278 A CN201010131278 A CN 201010131278A CN 101787874 B CN101787874 B CN 101787874B
- Authority
- CN
- China
- Prior art keywords
- water injection
- joint sleeve
- testing device
- intelligent
- circuit board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000002347 injection Methods 0.000 title claims abstract description 30
- 239000007924 injection Substances 0.000 title claims abstract description 30
- 238000012360 testing method Methods 0.000 title claims abstract description 25
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 23
- 238000005516 engineering process Methods 0.000 abstract description 5
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 238000012797 qualification Methods 0.000 abstract description 5
- 238000013461 design Methods 0.000 abstract description 2
- 238000006243 chemical reaction Methods 0.000 abstract 2
- 238000010276 construction Methods 0.000 abstract 1
- 238000013480 data collection Methods 0.000 abstract 1
- 230000010354 integration Effects 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- 238000012544 monitoring process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000003809 water extraction Methods 0.000 description 1
Images
Landscapes
- Pipeline Systems (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
Abstract
The invention relates to the oil field oil production engineering technology field, and belongs to an intelligent injection allocation testing device of a water injection well. The intelligent injection allocation testing device of the water injection well mainly solves the problems that the existing separated layer water injection equipment has high testing work load, long allocation period and low water injection qualification rate in the construction process. The intelligent injection allocation testing device of the water injection well is composed of an upper joint 1, an upper connecting sleeve 2, a guiding body 3, a non-contact electric energy conversion system 4, a central pipe 5, an automatic control circuit board 6, a main body 7, a diversion body 8, a flow control valve 9, a data collection system 10, a lower connecting sleeve 11 and a lower joint 12, wherein, the non-contact electric energy conversion system 4 is connected with the central pipe 5 in a locating way, and the automatic control circuit board 6 is bonded with the central pipe 5. The device adopts mechanical-electrical integration design, saves a great quantity of conventional production test cost, controls the opening degree of the flow control valve and has the advantage of automatic water distribution.
Description
Technical field:
The present invention relates to the oilfield test technical field, belong to a kind of intelligent injection allocation testing device of water injection well.
Background technology:
Be in the main body test technology at tester at present, along with the increase of water injection well, the test job amount also increases substantially thereupon, and existing troop can't satisfy.The water filling qualification rate is subjected to the multifactor impacts such as strata pressure, interwell communication, and situation is complicated, variation is fast, shortens the allotment cycle and can only improve to a certain extent the water filling qualification rate, and the test job amount is multiplied.This technology can realize the comprehensive automation that water filling survey to be transferred, and shortens test period, reduces workload, improves the water filling qualification rate, for oil field steady oil control water extraction for strong technical support, will produce significant economic benefit and social benefit.
Summary of the invention:
The invention provides a kind of comprehensive automation that can realize that the water filling survey is transferred, shorten test period, reduce workload, improve the intelligent injection allocation testing device of water injection well of water filling qualification rate.
Technical scheme of the present invention is: this water injection well intelligent watering device is by top connection, upper joint sleeve, guide way, the non-contact electric energy converting system, central tube, automatic control circuit board, main body, baffle, flow control valve, data collecting system, lower joint sleeve and lower contact form, wherein top connection and upper joint sleeve are threaded connection, guide way and central tube are threaded connection with upper joint sleeve by being inserted in the upper joint sleeve after being located by connecting, non-contact electric energy converting system and central tube are by being located by connecting, automatic control circuit board and central tube are by bonding, the main body upper end is threaded connection with upper joint sleeve, lower end and lower joint sleeve are threaded connection, data collecting system and baffle are by being located by connecting, flow control valve passes baffle and main body by being located by connecting, and lower joint sleeve and lower contact are threaded connection.
Compared with the prior art the present invention has following beneficial effect:
Owing to adopt Electromechanical Design, by various sensors are placed on the down-hole for a long time, can carry out to each characterisitic parameter of down-hole the long-term dynamics monitoring.Help to judge on the one hand the various situations of down-hole, can avoid a large amount of production tests on the other hand, also avoid the interference of test to normal production simultaneously, save a large amount of conventional production test expenses, and can control the size of flow control valve aperture, have the advantage of automatic distribution water.
Description of drawings:
Accompanying drawing 1 is structural representation of the present invention;
1-top connection among the figure, 2-upper joint sleeve, 3-guide way, 4-non-contact electric energy converting system, 5-central tube, 6-automatic control circuit board, 7-main body, 8-baffle, 9-flow control valve, 10-data collecting system, 11-lower joint sleeve, 12-lower contact.
The specific embodiment:
The invention will be further described below in conjunction with accompanying drawing: by shown in Figure 1, this water injection well intelligent watering device is by top connection 1, upper joint sleeve 2, guide way 3, non-contact electric energy converting system 4, central tube 5, automatic control circuit board 6, main body 7, baffle 8, flow control valve 9, data collecting system 10 lower joint sleeves 11 and lower contact 12 form, wherein top connection 1 is threaded connection with upper joint sleeve 2, guide way 3 is threaded connection with upper joint sleeve 2 by being inserted into after being located by connecting in the upper joint sleeve 2 with central tube 5, non-contact electric energy converting system 4 and central tube 5 are by being located by connecting, automatic control circuit board 6 passes through bonding with central tube 5, main body 7 upper ends and upper joint sleeve 2 are threaded connection, lower end and lower joint sleeve 11 are threaded connection, data collecting system 10 and baffle 8 are together by being located by connecting, flow control valve 9 passes baffle 8 and main body 7 by being located by connecting, and lower joint sleeve 11 is threaded connection with lower contact 12.During on-the-spot the use:
A, at first the Intelligent water injection tubing string is set in the down-hole, simultaneously corresponding each the injection allocation stratum of each intelligent allocation testing device, the at this moment automatic control circuit board 6 in the intelligent allocation testing device, data collecting system 10 and the mutual co-ordination of flow control valve 9 beginnings;
C, when needs are revised the injection allocation scheme, be lowered into allocation instrument in the intelligent allocation testing device of appointment by power cable, carry out Wireless Data Transmission with the automatic control circuit board 6 in the intelligent allocation testing device, simultaneously the injection allocation scheme of automatic control circuit board 6 is allocated;
After d, allotment are finished, trip out allocation instrument, intelligent allocation testing device is then proceeded monitoring and the automatic governing of flow in the down-hole, realize the comprehensive automation of water injection technology.
Claims (1)
1. intelligent injection allocation testing device of water injection well, it is characterized in that: by top connection (1), upper joint sleeve (2), guide way (3), non-contact electric energy converting system (4), central tube (5), automatic control circuit board (6), main body (7), baffle (8), flow control valve (9), data collecting system (10), lower joint sleeve (11) and lower contact (12) form, wherein top connection (1) is threaded connection with upper joint sleeve (2), guide way (3) is threaded connection with upper joint sleeve (2) by being inserted into after being located by connecting in the upper joint sleeve (2) with central tube (5), non-contact electric energy converting system (4) and central tube (5) are by being located by connecting, automatic control circuit board (6) passes through bonding with central tube (5), main body (7) upper end is threaded connection with upper joint sleeve (2), lower end and lower joint sleeve (11) are threaded connection, data collecting system (10) and baffle (8) are by being located by connecting, flow control valve (9) passes baffle (8) and main body (7) by being located by connecting, and lower joint sleeve (11) is threaded connection with lower contact (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101312784A CN101787874B (en) | 2010-03-24 | 2010-03-24 | Intelligent injection allocation testing device of water injection well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101312784A CN101787874B (en) | 2010-03-24 | 2010-03-24 | Intelligent injection allocation testing device of water injection well |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101787874A CN101787874A (en) | 2010-07-28 |
CN101787874B true CN101787874B (en) | 2013-10-30 |
Family
ID=42531234
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101312784A Active CN101787874B (en) | 2010-03-24 | 2010-03-24 | Intelligent injection allocation testing device of water injection well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101787874B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102418504B (en) * | 2010-09-27 | 2014-06-04 | 中国石油天然气股份有限公司 | Intelligent underground water distribution control device |
CN102011577B (en) * | 2010-12-14 | 2014-05-07 | 北京金科龙石油技术开发有限公司 | Intelligent testing and regulating controller |
CN103993864A (en) * | 2013-02-20 | 2014-08-20 | 大庆国电海天科技有限公司 | Underground electric adjustable water injection nozzle of oil field water injection well |
CN108222903B (en) * | 2017-10-24 | 2020-12-22 | 中国石油化工股份有限公司 | Downhole flow metering device and method for separate-zone water injection well |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2363056Y (en) * | 1999-02-13 | 2000-02-09 | 大庆三环机械制造有限公司 | Eccentric water distributor |
CN2608685Y (en) * | 2003-02-24 | 2004-03-31 | 栾德民 | Single layer testing water distribution apparatus |
CN200943480Y (en) * | 2006-08-02 | 2007-09-05 | 大庆油田有限责任公司 | Compound injection device |
CN200975246Y (en) * | 2006-11-25 | 2007-11-14 | 迟福佐 | Integrating layered water distributor |
CN101270646A (en) * | 2008-05-22 | 2008-09-24 | 大庆油田有限责任公司 | Water injection well down-hole water sound intelligent control regulating and measuring system |
-
2010
- 2010-03-24 CN CN2010101312784A patent/CN101787874B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2363056Y (en) * | 1999-02-13 | 2000-02-09 | 大庆三环机械制造有限公司 | Eccentric water distributor |
CN2608685Y (en) * | 2003-02-24 | 2004-03-31 | 栾德民 | Single layer testing water distribution apparatus |
CN200943480Y (en) * | 2006-08-02 | 2007-09-05 | 大庆油田有限责任公司 | Compound injection device |
CN200975246Y (en) * | 2006-11-25 | 2007-11-14 | 迟福佐 | Integrating layered water distributor |
CN101270646A (en) * | 2008-05-22 | 2008-09-24 | 大庆油田有限责任公司 | Water injection well down-hole water sound intelligent control regulating and measuring system |
Also Published As
Publication number | Publication date |
---|---|
CN101787874A (en) | 2010-07-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101787873B (en) | Intelligent injection allocation process of water injection well | |
US10890059B2 (en) | Layered water injection system and layered water injection method | |
CN102953711B (en) | Device and method for horizontal gas well to drain liquid and produce gas | |
CN101787874B (en) | Intelligent injection allocation testing device of water injection well | |
CN109025926A (en) | A kind of centralized control type intelligence separate layer water injection string and regulator control system | |
CN106089186A (en) | Subsection water injection well well head and shaft bottom signal wireless transmitter and radio transmitting method | |
CN105298456A (en) | Eccentric water distributor | |
CN106032745A (en) | Digital layered water injection ground control system and method | |
CN106121987A (en) | A kind of electric submersible pump oil pumping system intelligent flushing secondary control device and control method | |
CN205078244U (en) | Plunger device with real-time continuous monitoring function of pressure and temperature | |
CN202348248U (en) | Porous concentric integrated continuous quantitative production allocator | |
CN106089162B (en) | A kind of the layering section exploitation flow string and regulation device of double-direction radio identification control | |
He et al. | Development and prospect of downhole monitoring and data transmission technology for separated zone water injection | |
CN202132029U (en) | Layer mining and testing system for petroleum | |
CN110965971B (en) | Annular simulation device for water injection well | |
CN204782866U (en) | Well drilling choke manifold device is pressed in accuse | |
CN203188985U (en) | direct-reading flow electric control water distributor | |
CN206071551U (en) | Preset cable type underground integrated measurement and control production allocator | |
CN203515558U (en) | Deep well water source well water level monitoring process pipe column | |
CN101787878B (en) | Intelligent injection allocation instrument of water injection well | |
CN205977205U (en) | Segmentation water injection well well head and shaft bottom signal wireless transceiver | |
CN106014393A (en) | Device for transmitting magnetic localization measured data through sound waves and use method of device | |
CN205172539U (en) | Eccentric water distributor | |
CN211201791U (en) | Connecting device for inner wall preset cable non-metal continuous pipe and intelligent water distributor | |
CN204024644U (en) | Ground and underground equipment two-way communication inclinometer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200924 Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No. Patentee after: PetroChina Company Limited Patentee after: Daqing Oilfield Co.,Ltd. Address before: 163453 Heilongjiang Province, Daqing City Ranghulu District No. 233 South Central Avenue Patentee before: Daqing Oilfield Co.,Ltd. |
|
TR01 | Transfer of patent right |