CN101777147B - 预测建模 - Google Patents
预测建模 Download PDFInfo
- Publication number
- CN101777147B CN101777147B CN200911000055.8A CN200911000055A CN101777147B CN 101777147 B CN101777147 B CN 101777147B CN 200911000055 A CN200911000055 A CN 200911000055A CN 101777147 B CN101777147 B CN 101777147B
- Authority
- CN
- China
- Prior art keywords
- data
- performance
- data set
- decision
- making
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (20)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/265,281 US8346516B2 (en) | 2008-11-05 | 2008-11-05 | Predictive modeling |
US12/265,281 | 2008-11-05 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101777147A CN101777147A (zh) | 2010-07-14 |
CN101777147B true CN101777147B (zh) | 2014-07-30 |
Family
ID=42104377
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200911000055.8A Active CN101777147B (zh) | 2008-11-05 | 2009-11-05 | 预测建模 |
Country Status (4)
Country | Link |
---|---|
US (1) | US8346516B2 (zh) |
EP (1) | EP2192537A3 (zh) |
CN (1) | CN101777147B (zh) |
CA (2) | CA2684304C (zh) |
Families Citing this family (66)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6901582B1 (en) | 1999-11-24 | 2005-05-31 | Quest Software, Inc. | Monitoring system for monitoring the performance of an application |
US7979245B1 (en) | 2006-05-17 | 2011-07-12 | Quest Software, Inc. | Model-based systems and methods for monitoring computing resource performance |
US8175863B1 (en) | 2008-02-13 | 2012-05-08 | Quest Software, Inc. | Systems and methods for analyzing performance of virtual environments |
US20100138273A1 (en) * | 2008-12-01 | 2010-06-03 | Arash Bateni | Repeatability index to enhance seasonal product forecasting |
US20100241600A1 (en) * | 2009-03-20 | 2010-09-23 | Nokia Corporation | Method, Apparatus and Computer Program Product for an Instruction Predictor for a Virtual Machine |
US10242329B2 (en) * | 2009-07-02 | 2019-03-26 | Hewlett Packard Enterprise Development Lp | Method and apparatus for supporting a computer-based product |
US8478451B2 (en) * | 2009-12-14 | 2013-07-02 | Intel Corporation | Method and apparatus for dynamically allocating power in a data center |
WO2012011940A1 (en) * | 2010-07-19 | 2012-01-26 | Predixion Software, Inc. | Generating predictive models on supplemental workbook data |
US9215142B1 (en) | 2011-04-20 | 2015-12-15 | Dell Software Inc. | Community analysis of computing performance |
CN102760250B (zh) * | 2011-04-28 | 2016-03-30 | 国际商业机器公司 | 用于选择碳排放预测方案的方法、设备和系统 |
US20130024225A1 (en) * | 2011-07-22 | 2013-01-24 | Accenture Global Services Limited | Business outcome tradeoff simulator |
US9208462B2 (en) * | 2011-12-21 | 2015-12-08 | Mu Sigma Business Solutions Pvt. Ltd. | System and method for generating a marketing-mix solution |
US10489802B1 (en) * | 2012-06-15 | 2019-11-26 | Amazon Technologies, Inc. | Cluster-based demand forecasting procedure |
US9557879B1 (en) | 2012-10-23 | 2017-01-31 | Dell Software Inc. | System for inferring dependencies among computing systems |
US10333820B1 (en) | 2012-10-23 | 2019-06-25 | Quest Software Inc. | System for inferring dependencies among computing systems |
US20140200946A1 (en) * | 2013-01-15 | 2014-07-17 | Fluor Technologies Corporation | Methods and systems for inventory optimization |
WO2014145117A2 (en) * | 2013-03-15 | 2014-09-18 | Brightroll, Inc. | Geo, segment, uniques distributed computing system |
TWI506570B (zh) * | 2013-08-16 | 2015-11-01 | Nat Univ Tsing Hua | 分級產品資源規劃系統及其方法 |
US20150149255A1 (en) * | 2013-11-27 | 2015-05-28 | International Business Machines Corporation | Robust pricing solution for products and services |
US11005738B1 (en) | 2014-04-09 | 2021-05-11 | Quest Software Inc. | System and method for end-to-end response-time analysis |
US9479414B1 (en) | 2014-05-30 | 2016-10-25 | Dell Software Inc. | System and method for analyzing computing performance |
US10346774B2 (en) * | 2014-09-01 | 2019-07-09 | Accenture Global Services Limited | Inventory optimization tool |
US10291493B1 (en) | 2014-12-05 | 2019-05-14 | Quest Software Inc. | System and method for determining relevant computer performance events |
US9274758B1 (en) | 2015-01-28 | 2016-03-01 | Dell Software Inc. | System and method for creating customized performance-monitoring applications |
US9996577B1 (en) | 2015-02-11 | 2018-06-12 | Quest Software Inc. | Systems and methods for graphically filtering code call trees |
US10521809B2 (en) * | 2015-03-04 | 2019-12-31 | Walmart Apollo, Llc | System and method for grouping time series data for forecasting purposes |
US10277666B2 (en) * | 2015-03-31 | 2019-04-30 | At&T Intellectual Property I, L.P. | Escalation of feedback instances |
US10187260B1 (en) | 2015-05-29 | 2019-01-22 | Quest Software Inc. | Systems and methods for multilayer monitoring of network function virtualization architectures |
US10200252B1 (en) | 2015-09-18 | 2019-02-05 | Quest Software Inc. | Systems and methods for integrated modeling of monitored virtual desktop infrastructure systems |
WO2017063178A1 (en) * | 2015-10-15 | 2017-04-20 | Accenture Global Services Limited | System and method for selecting controllable parameters for equipment operation safety |
US10614394B2 (en) * | 2015-11-09 | 2020-04-07 | Dell Products, L.P. | Data analytics model selection through champion challenger mechanism |
US20190279031A1 (en) * | 2016-06-20 | 2019-09-12 | Res Software Development B.V. | Method and system for replacing a processing engine |
US10230601B1 (en) | 2016-07-05 | 2019-03-12 | Quest Software Inc. | Systems and methods for integrated modeling and performance measurements of monitored virtual desktop infrastructure systems |
WO2018035718A1 (en) | 2016-08-23 | 2018-03-01 | Accenture Global Solutions Limited | Real-time industrial plant production prediction and operation optimization |
CN106355308B (zh) * | 2016-08-24 | 2019-09-24 | 张雪敏 | 一种基于决策树辨识风电接入系统关键设备的方法 |
JP7069456B2 (ja) | 2017-03-17 | 2022-05-18 | ザ・リージェンツ・オブ・ザ・ユニバーシティ・オブ・ミシガン | マルチポリシー意思決定を導くための有益な結果を構築するための方法および装置 |
EP3459208A4 (en) | 2017-07-25 | 2019-07-24 | Beijing Didi Infinity Technology and Development Co., Ltd. | Systems and method for determining an optimal strategy |
CN109302301A (zh) * | 2017-07-25 | 2019-02-01 | 北京嘀嘀无限科技发展有限公司 | 一种业务策略的评估方法及装置 |
US10423741B1 (en) * | 2017-11-15 | 2019-09-24 | Cadence Design Systems, Inc. | Constrained metric verification analysis of a system on chip |
CN110120882B (zh) * | 2018-02-07 | 2020-10-09 | 华为技术有限公司 | 策略驱动方法和装置 |
US10938675B2 (en) * | 2018-04-02 | 2021-03-02 | Futurewei Technologies, Inc. | Dynamic negotiation models in software-defined networks |
JP7199545B2 (ja) | 2018-07-20 | 2023-01-05 | メイ モビリティー,インコーポレイテッド | 自律エージェントによる行動方針選択のための多視点システムおよび方法 |
CN110826823A (zh) * | 2018-08-07 | 2020-02-21 | 北京京东尚科信息技术有限公司 | 定价策略的评价方法和系统 |
US10846651B2 (en) * | 2018-08-31 | 2020-11-24 | Kinaxis Inc. | Analysis and correction of supply chain design through machine learning |
US10832196B2 (en) | 2018-08-31 | 2020-11-10 | Kinaxis Inc. | Analysis and correction of supply chain design through machine learning |
US10969470B2 (en) | 2019-02-15 | 2021-04-06 | May Mobility, Inc. | Systems and methods for intelligently calibrating infrastructure devices using onboard sensors of an autonomous agent |
CN110503263A (zh) * | 2019-08-23 | 2019-11-26 | 苏州肯博思智能科技有限公司 | 通过仿真计算模型对备件需求预测及管理策略的优化方法 |
AU2020378413A1 (en) * | 2019-11-06 | 2022-06-23 | OnScale, Inc. | Methods and systems for the estimation of the computational cost of simulation |
CN110826928A (zh) * | 2019-11-12 | 2020-02-21 | 山东怡之家智能科技有限公司 | 一种基于大数据的erp库存优化分析方法及系统 |
CN110929945B (zh) * | 2019-11-28 | 2023-07-04 | 海南太美航空股份有限公司 | 一种航线开通的预测方法、系统及电子设备 |
US11573880B2 (en) * | 2020-01-27 | 2023-02-07 | Salesforce.Com, Inc. | Performance simulation for selected platforms for web products in database systems |
US11948163B2 (en) * | 2020-04-24 | 2024-04-02 | Target Brands, Inc. | User interface for visualizing output from supply chain replenishment simulation |
WO2022006418A1 (en) | 2020-07-01 | 2022-01-06 | May Mobility, Inc. | Method and system for dynamically curating autonomous vehicle policies |
US11240153B1 (en) * | 2020-07-31 | 2022-02-01 | Cisco Technology, Inc. | Scoring policies for predictive routing suggestions |
CN112134761B (zh) * | 2020-09-23 | 2022-05-06 | 国网四川省电力公司电力科学研究院 | 基于固件分析的电力物联网终端脆弱性检测方法及系统 |
CN112200489B (zh) * | 2020-10-30 | 2023-06-23 | 中国科学院自动化研究所 | 有色金属冶炼产供销一体优化系统、方法、装置 |
US11652688B2 (en) * | 2020-11-25 | 2023-05-16 | International Business Machines Corporation | Predicting usage pattern of serverless environment via machine learning |
WO2022132774A1 (en) | 2020-12-14 | 2022-06-23 | May Mobility, Inc. | Autonomous vehicle safety platform system and method |
EP4264181A1 (en) | 2020-12-17 | 2023-10-25 | May Mobility, Inc. | Method and system for dynamically updating an environmental representation of an autonomous agent |
JP2024512980A (ja) | 2021-04-02 | 2024-03-21 | メイ モビリティー,インコーポレイテッド | 不完全な環境情報で自律エージェントを動作させる方法及びシステム |
JP2024526037A (ja) | 2021-06-02 | 2024-07-17 | メイ モビリティー,インコーポレイテッド | 自律エージェントの遠隔支援のための方法及びシステム |
CN113361105B (zh) * | 2021-06-07 | 2023-09-19 | 杭州未名信科科技有限公司 | 一种订单分配方法、装置、存储介质及终端 |
WO2023102098A1 (en) | 2021-12-01 | 2023-06-08 | May Mobility, Inc. | Method and system for impact-based operation of an autonomous agent |
WO2023154568A1 (en) | 2022-02-14 | 2023-08-17 | May Mobility, Inc. | Method and system for conditional operation of an autonomous agent |
US11995669B2 (en) | 2022-04-20 | 2024-05-28 | Target Brands, Inc. | Method and system for simulating fulfillment of digital orders |
WO2024129832A1 (en) | 2022-12-13 | 2024-06-20 | May Mobility, Inc. | Method and system for assessing and mitigating risks encounterable by an autonomous vehicle |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070156478A1 (en) * | 2005-09-23 | 2007-07-05 | Accenture Global Services Gmbh | High performance business framework and associated analysis and diagnostic tools and processes |
CN101141456A (zh) * | 2007-10-09 | 2008-03-12 | 南京财经大学 | 基于垂直搜索的网络数据挖掘方法 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5630070A (en) | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
US5946662A (en) | 1996-03-29 | 1999-08-31 | International Business Machines Corporation | Method for providing inventory optimization |
US6366890B1 (en) | 1998-02-27 | 2002-04-02 | Gerald L. Usrey | Product inventory category management and variety optimization method and system |
US6253187B1 (en) | 1998-08-31 | 2001-06-26 | Maxagrid International, Inc. | Integrated inventory management system |
US6341269B1 (en) | 1999-01-26 | 2002-01-22 | Mercani Technologies, Inc. | System, method and article of manufacture to optimize inventory and merchandising shelf space utilization |
US20010047293A1 (en) | 1999-01-26 | 2001-11-29 | Waller Matthew A. | System, method and article of manufacture to optimize inventory and inventory investment utilization in a collaborative context |
US6970841B1 (en) | 2000-04-17 | 2005-11-29 | International Business Machines Corporation | Large inventory-service optimization in configure-to-order systems |
DE102004022485A1 (de) | 2003-05-09 | 2005-03-17 | i2 Technologies, Inc., Dallas | System zur Bestandsoptimierung im Zusammenhang mit einem zentral verwalteten Masterspeicher für einem Unternehmen zugeordnete Kernreferenzdaten |
US20050288993A1 (en) | 2004-06-28 | 2005-12-29 | Jie Weng | Demand planning with event-based forecasting |
-
2008
- 2008-11-05 US US12/265,281 patent/US8346516B2/en active Active
-
2009
- 2009-11-03 CA CA2684304A patent/CA2684304C/en active Active
- 2009-11-03 CA CA2990112A patent/CA2990112A1/en not_active Abandoned
- 2009-11-05 CN CN200911000055.8A patent/CN101777147B/zh active Active
- 2009-11-05 EP EP09252553.4A patent/EP2192537A3/en not_active Withdrawn
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070156478A1 (en) * | 2005-09-23 | 2007-07-05 | Accenture Global Services Gmbh | High performance business framework and associated analysis and diagnostic tools and processes |
CN101141456A (zh) * | 2007-10-09 | 2008-03-12 | 南京财经大学 | 基于垂直搜索的网络数据挖掘方法 |
Non-Patent Citations (2)
Title |
---|
Advances in analytics: Integrating dynamic data mining with simulation optimization;M.Better;《IEEE》;20070731;第51卷(第3/4期);477-487 * |
M.Better.Advances in analytics: Integrating dynamic data mining with simulation optimization.《IEEE》.2007,第51卷(第3/4期),477-487. |
Also Published As
Publication number | Publication date |
---|---|
US20100114554A1 (en) | 2010-05-06 |
EP2192537A2 (en) | 2010-06-02 |
CA2684304C (en) | 2018-03-13 |
US8346516B2 (en) | 2013-01-01 |
EP2192537A3 (en) | 2013-12-18 |
CN101777147A (zh) | 2010-07-14 |
CA2990112A1 (en) | 2010-05-05 |
CA2684304A1 (en) | 2010-05-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101777147B (zh) | 预测建模 | |
US6151582A (en) | Decision support system for the management of an agile supply chain | |
US20220309436A1 (en) | Orchestrated intelligent supply chain optimizer | |
US20160239919A1 (en) | Predictive model development system applied to organization management | |
US20050065863A1 (en) | Dynamic cost accounting | |
US20100125486A1 (en) | System and method for determining supply chain performance standards | |
WO2010051433A1 (en) | Automated specification, estimation, discovery of causal drivers and market response elasticities or lift factors | |
WO2021042896A1 (zh) | 基于大数据的车辆估值方法、系统、设备及可读存储介质 | |
US11062250B1 (en) | System and method for database architecture for electronic data optimization and management | |
US20230306347A1 (en) | Systems and methods for supply chain optimization with channel saliency | |
US20210312488A1 (en) | Price-Demand Elasticity as Feature in Machine Learning Model for Demand Forecasting | |
US20150120370A1 (en) | Advanced planning in a rapidly changing high technology electronics and computer industry through massively parallel processing of data using a distributed computing environment | |
CN113674013B (zh) | 一种基于商户自定义规则的广告竞价调整方法及系统 | |
CN113469598A (zh) | 智慧供应链系统及服务器平台 | |
CN114757630B (zh) | 仓储管理模型确定方法、装置及计算机设备 | |
US20210304243A1 (en) | Optimization of markdown schedules for clearance items at physical retail stores | |
US8019638B1 (en) | Dynamic construction of business analytics | |
CN113469397A (zh) | 智慧供应链系统及服务器平台 | |
US20160328734A1 (en) | Balancing inventory by personalized transition planning | |
US20230419184A1 (en) | Causal Inference Machine Learning with Statistical Background Subtraction | |
CN115699057A (zh) | 短生命周期销售曲线估计 | |
CN116862574A (zh) | 产品需求预测方法、装置、电子设备及可读存储介质 | |
US20240169300A1 (en) | Systems and methods for hypothetical testing of supply chain optimization | |
Olaleye | Machine Learning and Stochastic Simulation for Inventory Management | |
Shaffaf | Raw Material Inventory Control Analysis: A Case Study for a Manufacturing Firm in Norway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
ASS | Succession or assignment of patent right |
Owner name: ACCENTURE GLOBAL SERVICES GMBH Free format text: FORMER OWNER: ACCENTURE INTERNATIONAL GMBH Effective date: 20101208 Owner name: ACCENTURE INTERNATIONAL GMBH Free format text: FORMER OWNER: ACCENTURE GLOBAL SERVICES GMBH Effective date: 20101208 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: SCHAFFHAUSEN, SWITZERLAND TO: LUXEMBOURG, LUXEMBOURG Free format text: CORRECT: ADDRESS; FROM: LUXEMBOURG, LUXEMBOURG TO: DUBLIN, IRELAND |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20101208 Address after: Dublin, Ireland Applicant after: ACCENTURE GLOBAL SERVICES Ltd. Address before: Luxemburg Luxemburg Applicant before: Accenture international LLC Effective date of registration: 20101208 Address after: Luxemburg Luxemburg Applicant after: Accenture international LLC Address before: Schaffhausen Applicant before: ACCENTURE GLOBAL SERVICES Ltd. |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |