CN101764703A - Network element management system based on virtual technology - Google Patents

Network element management system based on virtual technology Download PDF

Info

Publication number
CN101764703A
CN101764703A CN200910190413A CN200910190413A CN101764703A CN 101764703 A CN101764703 A CN 101764703A CN 200910190413 A CN200910190413 A CN 200910190413A CN 200910190413 A CN200910190413 A CN 200910190413A CN 101764703 A CN101764703 A CN 101764703A
Authority
CN
China
Prior art keywords
management
virtual
network element
resource
supervisor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910190413A
Other languages
Chinese (zh)
Other versions
CN101764703B (en
Inventor
蹇昌树
黄志宏
Original Assignee
Shenzhen Genew Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Genew Technologies Co Ltd filed Critical Shenzhen Genew Technologies Co Ltd
Priority to CN200910190413XA priority Critical patent/CN101764703B/en
Publication of CN101764703A publication Critical patent/CN101764703A/en
Application granted granted Critical
Publication of CN101764703B publication Critical patent/CN101764703B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention aims to provide an implementing method for network element management system. The system comprises virtualization of input equipment, output equipment, storage equipment and communication resource, each target management object in the network element management system is processed by an independent virtual machine and the virtualized resource is subject to exclusive access. The whole system is composed of human-computer interface management, equipment communication management, virtual machine scheduling management, resource management, system management and one or a plurality of virtual network element supervisors. The processing method for the system comprises: packing network element management executing code for managing specific equipment and data resource to manufacture the virtual network element supervisors; loading the network element supervisors into the network element management system to configure input and output equipments, communication interface, file system and database resource; starting the network element supervisors to operate, communicating with the equipments to be managed by the virtual network element supervisors, and managing the equipments by network element management interface. In the invention, implementation based on virtualization technology is adopted to concentrate network element management function for specific equipments in a single virtual machine, and virtual machines are completely isolated, thus ensuring safety of system, greatly enhancing expandability of system and fully utilizing processing capacity of computer.

Description

Element management system based on virtual technology
Technical field
The present invention relates to a kind of Element management system of realizing based on virtual technology, in particular realize the method for Element management system by virtual technology at computer network communication field or field of telecommunications.
Background technology
Traditional Element management system is generally all directly realized based on the general-purpose operating system (for example operating system such as Linux, Windows) or general-purpose platform (for example Java .NET or other commercial platform), and various physics or software resource that direct control operating system or platform provide, comprise input-output equipment, storage resources, Internet resources etc.Operating system or general-purpose platform operate on the physical computer, perhaps operate on the virtual machine, and this can bring following several problem:
1, relies on particular platform, very flexible: because traditional Element management system is when exploitation, directly rely on the resource access ability that operating system or platform provide, cause different element management softwares on resource use and management strategy, difference or conflict to occur, for example use the Element management system of Java to have different input-output operation modes, thereby when defining and realizing man-machine administration interface, can't form unified standard with the Element management system that uses .NET.This Element management system too relies on first floor system or platform, has caused system flexibility poor, can't select flexibly to operate in the different system or platform according to the network actual needs;
2, autgmentability is poor: when traditional Element management system software is upgraded, when if new management system software and old management system software need exclusive access for some resource in the system, database resource for example, Internet resources (for example specific SOCKET port), input-output equipment, necessary old management software out of service earlier, finish the new management software that reruns after the upgrading, cause the target device of NE management and the off-line between the management system, therefore be necessary for the element management software upgrading and limit some conditions, for example can not be when service operation be arranged online upgrading, can not carry out system extension with need at any time;
3, poor stability: when Element management system is managed a plurality of objective management object, in default of effective isolation to system resource, cause when causing certain management object to cause a functional module mistake that this functional module lost efficacy to all management objects, with common data configuration management is example, traditional Element management system can adopt the data collocation error of concentrated data management module or all objective management objects of assembly management, if it is unusual that data access appears in the data of certain object, may will cause data management module or assembly unusual, thereby cause all data management functions to lose efficacy.
Therefore, prior art has yet to be improved and developed.
Summary of the invention
The object of the present invention is to provide a kind of implementation method of Element management system,, provide a kind of Element management system based on virtual technology at the defective of above-mentioned prior art.
Technical scheme of the present invention comprises:
A kind of Element management system based on virtual technology: this system comprises virtual to input equipment, output equipment, memory device, the communication resource, each objective management object is all undertaken by an independent virtual machines in the Element management system, and virtual resource of coming out is monopolized the formula access.Whole system is made up of man-machine interface management, devices communicating management, scheduling virtual machine management, resource management, system management and one or more Virtual NE supervisor; The man-machine interface management is finished the generation of user interface with mutual, for the Virtual NE supervisor provides virtual output equipment and input instruction, the devices communicating management externally provides the communication interface with managed devices, the virtual communication passage internally is provided, the scheduling virtual machine management provides the maintenance management and the operational management of all Virtual NE supervisors in the system, resource management is used for computational resource, file system and database are carried out virtual, and system management provides the needed daily record of network element system platform, safety, diagnostic function.
A kind of implementation method of the Element management system based on virtual technology, it may further comprise the steps at least:
A, the NE management run time version that will manage particular device and data resource are packed and are made the Virtual NE supervisor;
B, the NE management machine is loaded in the Element management system, input-output equipment, communication interface, file system, database resource are configured;
The operation of C, startup NE management machine, the Virtual NE supervisor is communicated by letter with managed devices, can manage equipment by the network element system administration interface.
By such scheme as can be seen, key of the present invention is: to cause easily between distinct device in the NE management that visit is shared or the resource of conflict carry out virtual, thereby allow the NE management unit to different management equipments isolate fully.
Therefore adopt the Element management system based on virtual technology provided by the present invention, the NE management function of particular device is concentrated in the single virtual machine, isolate fully between virtual machine, both guaranteed system safety, the extensibility of system is provided greatly, also can make full use of the disposal ability of computer, the NE management of many equipment is focused on same computer, avoid adopting operating system is carried out the complete wasting of resources that causes when virtual.
Description of drawings
Fig. 1 is the Element management system structural representation that the present invention is based on virtual technology;
Fig. 2 is a Virtual NE supervisor internal resource logical construction schematic diagram of the present invention;
Fig. 3 is the file system virtual map schematic diagram of the inventive method;
Fig. 4 is the communication resource virtual map schematic diagram of the inventive method;
Embodiment
Below in conjunction with accompanying drawing, will be described in more detail each preferred embodiment of the present invention.
Among the present invention, the manufacturing process of NE management virtual machine: finish exploitation in the development environment according to network element system, in the process of product NE management program binary code, the resource that is associated is carried out virtualized processing to the hypervisor of particular device; Set a virtual top-level directory, the All Files that the NE management virtual machine is related to is organized under this catalogue, with Fig. 2 is example, by a tree-shaped institutional framework, the working procedure that the NE management virtual machine is related to, file system, under data base organization's to virtual top-level directory, and with this content packaging to being a virtual-machine data file.
Among the present invention, for the virtual processing procedure of managed devices: NE management virtual-machine data file load in network element system, and is launched the content in the data file, and it is constant to keep logical construction after the expansion; Manage by scheduling virtual machine then, physical configuration according to the computer of network element system operation, the virtual resource that virtual machine relates to is set one by one, after finishing, setting promptly can start the operation of Virtual NE supervisor by the scheduling virtual machine management, in running, for the input of system outside, network element system will be according to mapping relations, and the information of system outside is sent to corresponding virtual NE management machine; For the outside output that the Virtual NE supervisor produces, network element system also will send to corresponding external system with output according to mapping relations.Below with reference to the file resource that example uses virtual machine, the communication resource, input equipment, the virtual process of output equipment is described.
Among the present invention, virtual processing procedure for file resource: in the Virtual NE supervisor, all file system resources that need use of virtual machine are all write down with the tree-shaped level of logic, when a certain function of virtual machine need be used certain file of file system, network element system can be mapped to the logical path of virtual machine visit in the actual file system of computer, with Fig. 3 is example, when loaded virtual machine, " filesystem " project of Virtual NE supervisor is formulated under " the D: EMS VM1 fs " catalogue of computer at network element system place, when virtual machine needs "/filesystem/config " in the access logic file system, network element system can generate visit " D: EMS VM1 fs config " the actual access request, and the execution result that will ask feeds back to the Virtual NE supervisor.
Among the present invention, virtual processing procedure for the communication resource: in the Virtual NE supervisor, all be kept in the logical node for all communication ports that need use of virtual machine, the connected mode that node adopts communication port, parameter is described, at network element system the Virtual NE supervisor is loaded in the system, can carry out physical mappings to communication port according to configuration, for the mode that communicates to connect that can be multiplexing, network element system can be set up corresponding relation according to the parameter attribute between Virtual NE supervisor and the managed devices, for the mode that communicates to connect that can not take, network element system can specified configuration have the virtual machine of this connected mode to monopolize the mapping of formula.With Fig. 4 is example, two kinds of communication ports that the Virtual NE supervisor need use all are kept under the logical node communication, a kind of is to adopt 4888 ports of udp protocol to communicate by letter with managed devices, and another is to adopt the COM1 interface to communicate by letter with managed devices.When network element system loads this Virtual NE supervisor, use to this Virtual NE supervisor 4888 port assignment of the udp protocol on the physical machine, and be the mapping table between this Virtual NE supervisor foundation and the objective management equipment, like this when managed devices sends message to network element system, to search this mapping table according to the source address of message, give the Virtual NE supervisor with forwards, when the Virtual NE supervisor sent UDP message to managed devices, network element system directly forwarded this message.The COM1 interface that uses for the Virtual NE supervisor owing to be the visit of the formula of monopolizing, the configuration that network element system will be when loading directly and the COM3 interface set up mapping, and this interface is assigned to the use of Virtual NE supervisor to monopolize the formula mode.
Among the present invention, virtual processing procedure for output equipment: for the definition of output equipment, comprise figure output and report output, the virtual output area that constitutes by bitmap format during figure output, be used for patterned demonstration, include but not limited to the device hardware structure, panel and led status, operation information etc.The method for expressing of output equipment multiply by the width of representing with a number for the length of representing with a number, and the color of each point represents that in the RGB mode report output is mainly used in the descriptor of output character, adopts XML to be described.Every Virtual NE supervisor graphical output device of definition and a report output equipment, when loading the Virtual NE supervisor, network element system is configured, when the Virtual NE supervisor in running, produce when output, network element system is transformed into actual screen with the output of correspondence and exports demonstration.
Among the present invention, virtual processing procedure for input equipment: at first for the definition of input equipment, comprise two kinds of analog input and numeral inputs, analog input refers to the operations such as keyboard/mouse that take place at device display area, during the numeral input at the specific command word of equipment.When network element system loads the Virtual NE supervisor, at first specify this virtual machine acceptable digital input signals set, default to and handle all digital input signals set.In running, network element system will detect outside input signal, include, but are not limited to the operational order that the user sends by system interface, network element system is resolved instruction, based on contextual information need to determine the virtual machine of received signal, then instruction is resolved to respective input signals and sends to the Virtual NE supervisor of appointment.
Among the present invention, virtual processing procedure for database: the Virtual NE supervisor on stream, use the standard SQL language to define for data dictionary and data, when network element system loads the Virtual NE supervisor, at first formulate the actual database that supervisor need use, create the database of specific names then for the Virtual NE supervisor, and import corresponding database script and data, in running, so the operation at database all will be mapped in the actual physical database through network element system, when the Virtual NE supervisor receives halt instruction, to at first the content of physical database be exported as standard SQL sentence, and preserve.
Among the present invention Element management system the core implementation method be exactly that the separate outer resource that the NE management machine is relied on is carried out virtualization process, in the supervisor running, the external environment condition that supervisor needs is provided by adaptive providing by network element system.Employing the inventive method has the following advantages:
Advantage 1: integrated level height, by to file system, Internet resources, database resource, the virtualization process of input-output equipment has effectively been avoided the resource contention between the different network element equipment hypervisor, move thereby different network element management equipment program can be concentrated on the Element management system, realization makes full use of the physical computing resource, has improved the integrated level and the resource utilization of system, has reduced hardware cost.
Advantage 2: safe, by isolation, realized that hypervisor operation do not disturb the problem of having avoided resource contention to cause mutually to the different network elements device manager.Virtual NE supervisor to appointment can carry out the integral body backup simultaneously, the supervisor of backup will be can independent operating an entity, be different from the mode that traditional NE management is only backed up data, when breaking down in system like this, backup point in the time of can rolling back to normal the operation at any time, guarantee under various known or unknowable failure factors the operation that system can be safe and reliable.
Advantage 3: be convenient to safeguard, expansion is convenient, when the Virtual NE supervisor stops, the data problem that produces when network element system can move supervisor is irritated in the packaging file of getting back to the Virtual NE supervisor again, this packaging file moved on the new network element system reload operation, can begin to continue operation by the state when stopping, can when physical system breaks down or carries out the upgrading of hardware/operating system, realizing the level and smooth migration of NE management program like this.When needs self need upgrade management program to the Virtual NE supervisor, the mechanism that can take new Virtual NE supervisor and old Virtual NE supervisor to move simultaneously, at first specify network element device to communicate by letter with old Virtual NE supervisor by network element system, when new Virtual NE supervisor is ready, switch, allow network element device and new Virtual NE supervisor communicate, if the operation of new Virtual NE supervisor is undesired, can switch the Virtual NE supervisor of just getting back at any time, thereby guarantee the level and smooth and reliability of escalation process.
Should be understood that above-mentioned description at preferred embodiment of the present invention only is the example explanation, can not therefore think the restriction to scope of patent protection of the present invention, scope of patent protection of the present invention should be as the criterion with claims.

Claims (5)

1. Element management system based on virtual technology: this system comprises virtual to input equipment, output equipment, memory device, the communication resource, each objective management object is all undertaken by an independent virtual machines in the Element management system, and virtual resource of coming out is monopolized the formula access.Whole system is made up of man-machine interface management, devices communicating management, scheduling virtual machine management, resource management, system management and one or more Virtual NE supervisor; The man-machine interface management is finished the generation of user interface with mutual, for the Virtual NE supervisor provides virtual output equipment and input instruction, the devices communicating management externally provides the communication interface with managed devices, the virtual communication passage internally is provided, the scheduling virtual machine management provides the maintenance management and the operational management of all Virtual NE supervisors in the system, resource management is used for computational resource, file system and database are carried out virtual, and system management provides the needed daily record of network element system platform, safety, diagnostic function.
2. implementation method based on the Element management system of virtual technology, it may further comprise the steps at least:
1) will manage the NE management run time version of particular device and data resource packs and makes the Virtual NE supervisor;
2) the NE management machine is loaded in the Element management system, input-output equipment, communication interface, file system, database resource are configured;
3) operation of startup NE management machine, the Virtual NE supervisor is communicated by letter with managed devices, can manage equipment by the network element system administration interface.
3. method according to claim 2 is characterized in that, the mapping between the physical resource that virtual resource and computer provided that the configuration packet purse rope unit supervisor described in the described step 2 uses.
4. method according to claim 2 is characterized in that, also comprises in the described step 3: in the running of NE management machine, the startup to the NE management machine is carried out stops, backup, rolling back action.
5. method according to claim 2 is characterized in that, also comprises in the described step 3: network element system provides unified administration interface that the I of all Virtual NE supervisors is carried out unified integration.
CN200910190413XA 2009-09-16 2009-09-16 Implementing method of network element management system based on virtual technology Expired - Fee Related CN101764703B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910190413XA CN101764703B (en) 2009-09-16 2009-09-16 Implementing method of network element management system based on virtual technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910190413XA CN101764703B (en) 2009-09-16 2009-09-16 Implementing method of network element management system based on virtual technology

Publications (2)

Publication Number Publication Date
CN101764703A true CN101764703A (en) 2010-06-30
CN101764703B CN101764703B (en) 2011-12-21

Family

ID=42495699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910190413XA Expired - Fee Related CN101764703B (en) 2009-09-16 2009-09-16 Implementing method of network element management system based on virtual technology

Country Status (1)

Country Link
CN (1) CN101764703B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102457575A (en) * 2010-10-22 2012-05-16 国际商业机器公司 Server consolidation system
WO2014169870A1 (en) * 2013-08-05 2014-10-23 中兴通讯股份有限公司 Virtual network element automatic loading and virtual machine ip address acquisition method and system, and storage medium
CN104133670A (en) * 2014-06-30 2014-11-05 中国科学院信息工程研究所 Intelligent terminal security GUI (Graphical User Interface) generation method on the basis of virtual isolation technology
CN104221334A (en) * 2012-03-27 2014-12-17 日本电气株式会社 Control device, physical node, terminal device, communication system, port state display method, and program
CN104899078A (en) * 2015-07-01 2015-09-09 山东中孚信息产业股份有限公司 Auditing system and method in virtual machine environment
CN105389253A (en) * 2015-10-19 2016-03-09 烽火通信科技股份有限公司 Method and system for simulating client to execute network element management based on multithreading technology
CN105703927A (en) * 2014-11-25 2016-06-22 华为软件技术有限公司 Resource allocation method, network device and network system
CN105812166A (en) * 2014-12-30 2016-07-27 中兴通讯股份有限公司 Connection implementation method and system, network server, gateway network cell, and management method
CN106301877A (en) * 2015-06-29 2017-01-04 中兴通讯股份有限公司 The upgrade method of a kind of Virtual NE and device
CN106464515A (en) * 2014-08-04 2017-02-22 华为技术有限公司 Virtual-operation administration and maintenance deployment method, device and virtual network system
CN106850322A (en) * 2017-04-06 2017-06-13 上海烟草集团有限责任公司 Resource apparatus management system based on six-layer model

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1992752A (en) * 2005-12-30 2007-07-04 华为技术有限公司 System, method and network equipment for implementing network equipment on-condition maintenance
CN100555958C (en) * 2007-07-03 2009-10-28 中兴通讯股份有限公司 Collocation method in the Element management system
CN101436966B (en) * 2008-12-23 2011-06-01 北京航空航天大学 Network monitoring and analysis system under virtual machine circumstance

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102457575B (en) * 2010-10-22 2015-05-20 国际商业机器公司 Server consolidation method, device and system
CN102457575A (en) * 2010-10-22 2012-05-16 国际商业机器公司 Server consolidation system
US10797953B2 (en) 2010-10-22 2020-10-06 International Business Machines Corporation Server consolidation system
CN104221334A (en) * 2012-03-27 2014-12-17 日本电气株式会社 Control device, physical node, terminal device, communication system, port state display method, and program
CN104348873A (en) * 2013-08-05 2015-02-11 中兴通讯股份有限公司 Virtual network element automatic loading method and system and virtual machine IP (Internet Protocol) address acquisition method and system
CN104348873B (en) * 2013-08-05 2019-03-29 中兴通讯股份有限公司 The method and system that Virtual NE loads automatically and virtual machine IP address obtains
WO2014169870A1 (en) * 2013-08-05 2014-10-23 中兴通讯股份有限公司 Virtual network element automatic loading and virtual machine ip address acquisition method and system, and storage medium
CN104133670A (en) * 2014-06-30 2014-11-05 中国科学院信息工程研究所 Intelligent terminal security GUI (Graphical User Interface) generation method on the basis of virtual isolation technology
CN104133670B (en) * 2014-06-30 2017-06-09 中国科学院信息工程研究所 A kind of safe GUI generation methods of intelligent terminal based on virtual isolation technology
US10587462B2 (en) 2014-08-04 2020-03-10 Huawei Technologies Co., Ltd. Method and apparatus for deploying virtual operation, administration and maintenance, and virtualized network system
CN106464515A (en) * 2014-08-04 2017-02-22 华为技术有限公司 Virtual-operation administration and maintenance deployment method, device and virtual network system
CN105703927A (en) * 2014-11-25 2016-06-22 华为软件技术有限公司 Resource allocation method, network device and network system
CN105703927B (en) * 2014-11-25 2019-09-03 华为软件技术有限公司 A kind of resource allocation methods, the network equipment and network system
CN105812166B (en) * 2014-12-30 2020-06-12 中兴通讯股份有限公司 Connection implementation method and system, network server, gateway network element and management method
CN105812166A (en) * 2014-12-30 2016-07-27 中兴通讯股份有限公司 Connection implementation method and system, network server, gateway network cell, and management method
CN106301877A (en) * 2015-06-29 2017-01-04 中兴通讯股份有限公司 The upgrade method of a kind of Virtual NE and device
WO2017000586A1 (en) * 2015-06-29 2017-01-05 中兴通讯股份有限公司 Method and device for upgrading virtual network element, and computer storage medium
CN104899078B (en) * 2015-07-01 2018-03-06 中孚信息股份有限公司 A kind of auditing system being used under virtual machine environment
CN104899078A (en) * 2015-07-01 2015-09-09 山东中孚信息产业股份有限公司 Auditing system and method in virtual machine environment
CN105389253B (en) * 2015-10-19 2017-12-08 烽火通信科技股份有限公司 The method and system of NE management are performed based on multithreading simulant-client
CN105389253A (en) * 2015-10-19 2016-03-09 烽火通信科技股份有限公司 Method and system for simulating client to execute network element management based on multithreading technology
CN106850322A (en) * 2017-04-06 2017-06-13 上海烟草集团有限责任公司 Resource apparatus management system based on six-layer model

Also Published As

Publication number Publication date
CN101764703B (en) 2011-12-21

Similar Documents

Publication Publication Date Title
CN101764703B (en) Implementing method of network element management system based on virtual technology
US11288053B2 (en) Conversion and restoration of computer environments to container-based implementations
US10509686B2 (en) Distributable computational units in a continuous computing fabric environment
CN109062655A (en) A kind of containerization cloud platform and server
CN101211272B (en) Dynamic virtual machine generation, virtual machine generation method and virtual machine supervisor
CN101765225B (en) Virtual cluster management method and cluster node
EP2344953B1 (en) Provisioning virtual resources using name resolution
US8464242B2 (en) Virtualization of configuration settings
US20080140857A1 (en) Service-oriented architecture and methods for direct invocation of services utilizing a service requestor invocation framework
US20080140760A1 (en) Service-oriented architecture system and methods supporting dynamic service provider versioning
CN110874261B (en) Availability system, method, and storage medium storing program
US20070240171A1 (en) Device, Method, And Computer Program Product For Accessing A Non-Native Application Executing In Virtual Machine Environment
WO2001025894A1 (en) Snapshot virtual-templating
US10228993B2 (en) Data dump for a memory in a data processing system
WO2020123213A1 (en) Container migration in computing systems
CN100549957C (en) One kind is loaded the method and a kind of isolating and is loaded the device of isolating
US20130024857A1 (en) Method and system for flexible resource mapping for virtual storage appliances
CN102955714A (en) Device and method for implementing dynamic analog remote interface
KR20210036874A (en) Method and apparatus for processing development machine operation task, device and storage medium
CN103324582A (en) Memory migration method, memory migration device and equipment
CN101132329A (en) Mobile virtual environment system
CN102289513A (en) Method and system for obtaining internal files of virtual machine
CN104318091A (en) Moonlet ground testing method based on virtualization computer system
CN113626095A (en) Switching method and switching system of configuration center, electronic equipment and storage medium
JP2001290665A (en) Processor system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Liang Xue

Document name: Notification of Passing Examination on Formalities

C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Implementing method of network element management system based on virtual technology

Effective date of registration: 20130830

Granted publication date: 20111221

Pledgee: Shenzhen high tech investment and financing Company limited by guarantee

Pledgor: SHENZHEN GENEW TECHNOLOGIES Co.,Ltd.

Registration number: 2013990000626

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20141104

Granted publication date: 20111221

Pledgee: Shenzhen high tech investment and financing Company limited by guarantee

Pledgor: SHENZHEN GENEW TECHNOLOGIES Co.,Ltd.

Registration number: 2013990000626

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Implementing method of network element management system based on virtual technology

Effective date of registration: 20141105

Granted publication date: 20111221

Pledgee: Shenzhen high tech investment and financing Company limited by guarantee

Pledgor: SHENZHEN GENEW TECHNOLOGIES Co.,Ltd.

Registration number: 2014990000930

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 518057 Guangdong city of Shenzhen province Nanshan District seven South Road Shenzhen Digital Technology Park building B1 on the third floor A District No. 1

Patentee after: SHENZHEN GENEW TECHNOLOGY Co.,Ltd.

Address before: 518057 Guangdong city of Shenzhen province Nanshan District seven South Road Shenzhen Digital Technology Park building B1 on the third floor A District No. 1

Patentee before: SHENZHEN GENEW TECHNOLOGIES Co.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20191210

Granted publication date: 20111221

Pledgee: Shenzhen high tech investment and financing Company limited by guarantee

Pledgor: SHENZHEN GENEW TECHNOLOGY Co.,Ltd.

Registration number: 2014990000930

PM01 Change of the registration of the contract for pledge of patent right
PM01 Change of the registration of the contract for pledge of patent right

Change date: 20191210

Registration number: 2014990000930

Pledgor after: SHENZHEN GENEW TECHNOLOGY Co.,Ltd.

Pledgor before: SHENZHEN GENEW TECHNOLOGIES Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111221

Termination date: 20210916