CN101746483A - Method for positioning butt joint of two total sections in large dock shipbuilding - Google Patents

Method for positioning butt joint of two total sections in large dock shipbuilding Download PDF

Info

Publication number
CN101746483A
CN101746483A CN200810229117A CN200810229117A CN101746483A CN 101746483 A CN101746483 A CN 101746483A CN 200810229117 A CN200810229117 A CN 200810229117A CN 200810229117 A CN200810229117 A CN 200810229117A CN 101746483 A CN101746483 A CN 101746483A
Authority
CN
China
Prior art keywords
section
complete cross
butt joint
positioning
measurement point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810229117A
Other languages
Chinese (zh)
Inventor
宫照明
杨玉波
陈奎
杨向荣
李慧君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Shipbuilding Industry Co Ltd
Original Assignee
Dalian Shipbuilding Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Shipbuilding Industry Co Ltd filed Critical Dalian Shipbuilding Industry Co Ltd
Priority to CN200810229117A priority Critical patent/CN101746483A/en
Publication of CN101746483A publication Critical patent/CN101746483A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a method for positioning butt joint of two total sections in large dock shipbuilding. The method comprises the following steps: firstly, measuring the following data of the butt joint surface of a first total section: a molded breadth or molded depth measuring point (P1), a deck centre measuring point (P4), each measuring point (P3) of an outside plate of a bilge, centre measuring points (P5) of an inner bottom plate and an outer bottom plate, and points (P2) for measuring heights from each break angle of an inner shell plate to the centre and a base line; and secondly, feeding the data back to a second total section so as to provide positioning reference data for the subsection positioning at the close seam when subsequently positioning the second total section. In the method, in order to reduce cutting and repairing work, a set of positioning process requirements on the subsection at butt point close seam of the two total sections in the large dock shipbuilding is provided, which realizes the butt joint of the two total sections effectively, improves work efficiency, and reduces working cost and working difficulty.

Description

A kind of localization method of two total sections in large dock shipbuilding butt joint
Technical field
The present invention relates to shipbuilding industry, more particularly, relate to the localization method of two complete cross sections butt joint in the shipbuilding.
Background technology
Two complete cross sections the not contraposition of structure of butt seam place usually can occur behind the location, height or left and right sides inconsistent phenomenon occur.Inequality the causing of elements of a fix value of seam punishment section closed up in the butt joint of one of reason two complete cross sections.Repair thereby caused to cut in a large number.
Building traditional method in the complete cross section depressed place is " doing things in his own way ", does not consider the split fix that the seam place is closed up in the butt joint of the 2nd complete cross section when promptly the 1st complete cross section docks the split fix of closing up the seam place.When docking the split fix of closing up the seam place, the 2nd complete cross section do not consider the split fix that the seam place is closed up in the butt joint of the 1st complete cross section yet.Deviations will appear like this.If after the 1st complete cross section split fix outwards or to bias internal 15mm, if do not consider the side-play amount of the 1st complete cross section during the 2nd complete cross section location, be that benchmark is located with the 1st complete cross section.Deviation will appear in structure when 1,2 complete cross sections docked so, repaiied thereby caused to cut in a large number.
Summary of the invention
The present invention is in order to reduce the work of repairing of cutting, and provides a cover two total sections in large dock shipbuilding butt joint to close up the positioning process requirement of seam punishment section, thereby effectively realized the butt joint of two complete cross sections, increases work efficiency and therefore reduced job costs and work difficulty.
In order to address the above problem, the localization method of a kind of two total sections in large dock shipbuilding butt joint of the present invention comprises the 1st complete cross section to be docked and the 2nd complete cross section.Wherein, at first to measure the following data of the 1st complete cross section interface: molded breadth or moldeed depth measurement point, center deck measurement point, each measurement point of bilge plank, interior Outer Bottom Plating center measurement point, and each knuckle place of inner hull is far from the center and the height measurement point of baseline.Secondly, above-mentioned data are fed back to the 2nd complete cross section, for the split fix of closing up the seam place in the 2nd complete cross section of follow-up location provides the location Reference data.
The invention provides two complete cross section butt seams punishment section positioning control main points, form complete cross section behind several segment foldings, when the split fix that forms each complete cross section, after close up in the complete cross section of moulding, to be benchmark with the split fix data in the first moulding complete cross section during split fix at complete cross section butt seam place.Split fix will be benchmark with the data of 1 complete cross section split fix in the 2nd complete cross section.Promptly the split fix coordinate figure of the 2nd complete cross section is identical with the split fix coordinate figure of the 1st complete cross section.Thereby for effective butt joint of complete cross section provides assurance.
Description of drawings
Fig. 1 is the 1st complete cross section and the 2nd a complete cross section structural representation to be docked;
Fig. 2 is the 1st complete cross section and the 2nd complete cross section structural representation that butt joint is finished;
Fig. 3 is the scheme drawing of the 1st complete cross section interface, shows the position of each measurement point.
The specific embodiment
As Figure 1-3, the localization method of a kind of two total sections in large dock shipbuilding butt joint of the present invention comprises the 1st complete cross section 1 to be docked and the 2nd complete cross section 1.The inventive method is at first measured the following data of the 1st complete cross section 1 interface 3, as shown in Figure 3, molded breadth or moldeed depth measurement point P1, center deck measurement point P4, each measurement point P3 of bilge plank, interior Outer Bottom Plating center measurement point P5, and each knuckle place of inner hull is far from the center and the height measurement point P2 of baseline.Secondly, the present invention feeds back to the 2nd complete cross section with above-mentioned data, for the split fix of closing up the seam place in the 2nd complete cross section of follow-up location provides the location Reference data.
The present invention is if guarantee the structure aligning accuracy of the 1st, 2 complete cross sections, just must take to follow the tracks of and be equal to the coordinate figure localization method, that is: the 2nd complete cross section stern end split fix take off data that will close up seam with the 1st complete cross section bow end is a benchmark, and promptly the split fix coordinate figure of the 2nd complete cross section is identical with the split fix coordinate figure of the 1st complete cross section.Perhaps, the take off data that the 1st complete cross section bow end split fix will be closed up seam with the 2nd complete cross section stern end is a benchmark, and promptly the split fix coordinate figure of the 1st complete cross section is identical with the split fix coordinate figure of the 2nd complete cross section.
In order to control the accuracy of positioning of complete cross section well, must carry out the measurement of following project.To measure the data that the 1st complete cross section head end closes up seam comprehensively, and carry out record, and these data are fed back to 2 complete cross sections, for the split fix of closing up the seam place in 2 complete cross sections of follow-up location provides the location Reference data.The measurement project has: width and distance base are highly in the distance of the height of molded breadth, moldeed depth, center deck, each knuckle point of inner hull, the intensive measurement point is wanted in bigger turn of the bilge segmentation for the outside plate line style, per two vertical bone shelves are established a measurement point, measure it apart from the data of neutralization apart from base.And to the 2nd complete cross section stern abutted seam punishment section positioning requirements be: the take off data that the 2nd complete cross section stern end split fix will be closed up seam with the 1st complete cross section bow end is a benchmark, and promptly the split fix coordinate figure of the 2nd complete cross section is identical with the split fix coordinate figure of 1 complete cross section.Among Fig. 3 on the interface
Figure G2008102291171D0000031
Represent each measurement point position in the above-mentioned measurement project.
After the weldering of the 1st complete cross section dress finishes, look for informant person will carry out the surveying work of each measurement point in the interface, and carry out record.During the 2nd complete cross section split fix, be that benchmark positions with the take off data of the 1st complete cross section.The split fix coordinate figure that guarantees complete cross section 2 is identical with the split fix coordinate figure of complete cross section 1.
The above; only be the preferable specific embodiment of the present invention; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to replacement or change according to technical scheme of the present invention and inventive concept thereof, all should be encompassed within protection scope of the present invention.

Claims (1)

1. the localization method of a two total sections in large dock shipbuilding butt joint comprises the 1st complete cross section (1) to be docked and the 2nd complete cross section (1), it is characterized in that,
Measure the following data of described the 1st complete cross section (1) interface (3): molded breadth or moldeed depth measurement point (P1), center deck measurement point (P4), each measurement point of bilge plank (P3), interior Outer Bottom Plating center measurement point (P5), and each knuckle place of inner hull is far from the center and the height measurement point of baseline (P2);
Above-mentioned data are fed back to the 2nd complete cross section, for the split fix of closing up the seam place in the 2nd complete cross section of follow-up location provides the location Reference data.
CN200810229117A 2008-11-28 2008-11-28 Method for positioning butt joint of two total sections in large dock shipbuilding Pending CN101746483A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810229117A CN101746483A (en) 2008-11-28 2008-11-28 Method for positioning butt joint of two total sections in large dock shipbuilding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810229117A CN101746483A (en) 2008-11-28 2008-11-28 Method for positioning butt joint of two total sections in large dock shipbuilding

Publications (1)

Publication Number Publication Date
CN101746483A true CN101746483A (en) 2010-06-23

Family

ID=42474251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810229117A Pending CN101746483A (en) 2008-11-28 2008-11-28 Method for positioning butt joint of two total sections in large dock shipbuilding

Country Status (1)

Country Link
CN (1) CN101746483A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102328729A (en) * 2011-05-31 2012-01-25 江苏熔盛造船有限公司 Process of afloat ship twin-islet jointing
CN103661810A (en) * 2013-11-29 2014-03-26 大连船舶重工集团有限公司 Ship with double-layer bottom space and ship subdivision method
CN106289125A (en) * 2016-07-14 2017-01-04 广船国际有限公司 A kind of boats and ships close up greatly the measuring method that step simulations carries
CN107745781A (en) * 2017-10-09 2018-03-02 中国船舶工业集团公司第七0八研究所 A kind of fertile large transport ship of rise of floor or deadrise
CN108394514A (en) * 2018-04-26 2018-08-14 广船国际有限公司 A kind of ship deck block method of construction
CN110466679A (en) * 2019-08-29 2019-11-19 广船国际有限公司 A kind of control method of curved outside plate segmentation line style precision
CN110836664A (en) * 2019-09-29 2020-02-25 渤海造船厂集团有限公司 Building method and device for uniform benchmark of slipway
CN112644665A (en) * 2021-01-06 2021-04-13 友联船厂(蛇口)有限公司 Closure process for building bow and stern block of ship body
CN114670986A (en) * 2022-04-01 2022-06-28 江南造船(集团)有限责任公司 Ship block floating state docking method

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102328729A (en) * 2011-05-31 2012-01-25 江苏熔盛造船有限公司 Process of afloat ship twin-islet jointing
CN102328729B (en) * 2011-05-31 2013-08-14 江苏熔盛造船有限公司 Process of afloat ship twin-islet jointing
CN103661810A (en) * 2013-11-29 2014-03-26 大连船舶重工集团有限公司 Ship with double-layer bottom space and ship subdivision method
CN106289125B (en) * 2016-07-14 2019-03-01 广船国际有限公司 A kind of ship closes up greatly the measurement method of step simulations carrying
CN106289125A (en) * 2016-07-14 2017-01-04 广船国际有限公司 A kind of boats and ships close up greatly the measuring method that step simulations carries
CN107745781A (en) * 2017-10-09 2018-03-02 中国船舶工业集团公司第七0八研究所 A kind of fertile large transport ship of rise of floor or deadrise
CN108394514A (en) * 2018-04-26 2018-08-14 广船国际有限公司 A kind of ship deck block method of construction
CN108394514B (en) * 2018-04-26 2019-08-09 广船国际有限公司 A kind of ship deck block method of construction
CN110466679A (en) * 2019-08-29 2019-11-19 广船国际有限公司 A kind of control method of curved outside plate segmentation line style precision
CN110466679B (en) * 2019-08-29 2021-05-11 广船国际有限公司 Control method for linear precision of curved outer plate sections
CN110836664A (en) * 2019-09-29 2020-02-25 渤海造船厂集团有限公司 Building method and device for uniform benchmark of slipway
CN110836664B (en) * 2019-09-29 2021-06-08 渤海造船厂集团有限公司 Building method and device for uniform benchmark of slipway
CN112644665A (en) * 2021-01-06 2021-04-13 友联船厂(蛇口)有限公司 Closure process for building bow and stern block of ship body
CN114670986A (en) * 2022-04-01 2022-06-28 江南造船(集团)有限责任公司 Ship block floating state docking method

Similar Documents

Publication Publication Date Title
CN101746483A (en) Method for positioning butt joint of two total sections in large dock shipbuilding
US9533377B2 (en) Weld bead shaping apparatus and weld bead shaping method
US6365221B1 (en) Computer controlled method and apparatus for fairing and painting of marine vessel surfaces
CN109094722B (en) Double-oblique-cutting jig frame installation method of hull outer plate
CN102874379B (en) Manufacture method of offshore riprap leveling ship
CN112222947B (en) Secondary tool setting method for 3+ 2-axis machine tool machining
CN104908886B (en) A kind of installation method of ship energy saving fin keel
CN102501944A (en) Method for manufacturing and installing inclined curved side port
CN101407246A (en) Method for fairing and mounting shipping anchor lug and hawse pipe
CN103506846A (en) Method and device for milling steering oar base
CN110341878A (en) A kind of installation method of stern transom plate hinge
CN103204224B (en) Large ship energy saver building berth installation method
CN203544297U (en) Tool component for segmental positioning and closure of ocean engineering
KR101154096B1 (en) The rudder for a ship
CN101746482A (en) Method of abutting joint of two total segments in shipbuilding process
CN108196511B (en) Error prediction method for turning track of spiral cutter
CN103569313A (en) Locating datum line drawing and butt joint method in boat segmented manufacturing
CN113148054A (en) Modeling and lofting method of ship air guide sleeve
CN103010405A (en) Method for controlling section cutting precision of transverse bulkhead
CN116198681A (en) Ship folding method based on simulation assembly
CN109094716A (en) The production method of deflector processing sample case
CN113210688B (en) Milling groove track determination method for throat flow channel groove of drill shank of spray pipe part
US8776654B2 (en) Crown molding scales for a miter saw
CN106741610B (en) The automatic manufacturing process of aluminum alloy ship
CN110309569B (en) Method for processing annular sunken characteristic of inner wall of cylindrical structural part

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100623