CN101736660A - Method for manually paving rails of ballastless track - Google Patents

Method for manually paving rails of ballastless track Download PDF

Info

Publication number
CN101736660A
CN101736660A CN200910227418A CN200910227418A CN101736660A CN 101736660 A CN101736660 A CN 101736660A CN 200910227418 A CN200910227418 A CN 200910227418A CN 200910227418 A CN200910227418 A CN 200910227418A CN 101736660 A CN101736660 A CN 101736660A
Authority
CN
China
Prior art keywords
track
rail
gauge
adjust
adjuster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910227418A
Other languages
Chinese (zh)
Other versions
CN101736660B (en
Inventor
王浩
侯荣光
张爱民
郑明林
平栓玲
邓则瑾
尹代洲
李志军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Seventh Group Co Ltd
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
China Railway Seventh Group Co Ltd
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Seventh Group Co Ltd, Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical China Railway Seventh Group Co Ltd
Priority to CN2009102274185A priority Critical patent/CN101736660B/en
Publication of CN101736660A publication Critical patent/CN101736660A/en
Application granted granted Critical
Publication of CN101736660B publication Critical patent/CN101736660B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention discloses a method for manually paving rails of a ballastless track, which comprises the following steps: 1, cleaning the top surface of a supporting layer, and performing scabbling processing; 2, paving steel ribs; 3, placing sleeper and mounting fasters; 4, mounting a spiral regulator, a track gauge pulling rod and a track gauge supporting rod; 5, mounting and adjusting a template; 6, mounting a transverse regulator and roughly regulating; 7, finely regulating the track, namely, using a total station together with a track checking car to regulating the track, the track gauge pulling rod to regulate the track gauge to a tolerance range, the spiral regulator to regulate the level of the top faces of steel rails to a tolerance range, the transverse regulator to regulate the track direction to a tolerance range and locking the rail direction; and 8, performing concrete construction. The method has the advantages of fully utilizing the traditional under-track construction material and equipment, saving a large amount of mechanical cost and oil material cost, creating benefits quickly with less investment, making convenient and quick transition at the limited section of a construction field, achieving stable construction quality, and reducing noise, pollution and influences on the neighboring buildings and the life of surrounding residents.

Description

Method for manually paving rails of ballastless track
Technical field
The present invention relates to the job practices of track, especially relate to method for manually paving rails of ballastless track.
Background technology
The non-fragment orbit engineering comprises the construction of roadbed location, bridge location, location, tunnel and field, station.The general woods mechanical execution of the rising sun is adopted in non-fragment orbit engineering construction at present more, the general woods mechanical execution of the rising sun is the Germany technology of introducing, though this technology is a mechanized, speed of application is fast, but the construction section of the location of, poor transport poor in geographical conditions and preloading influence and track switch construction section use the general woods machinery of the rising sun just to be difficult to construction.Simultaneously, the employed plant equipment investment of the general woods mechanical execution of the employing rising sun is wanted 1,370 ten thousand yuan, and the transition difficulty, and the noise that is produced, exhaust emission influence bigger to adjacent building and surrounding resident life.
Summary of the invention
The method for manually paving rails of ballastless track that provides a kind of construction cost low, applied widely is provided the object of the invention.
For achieving the above object, the present invention can take following technical proposals:
Method for manually paving rails of ballastless track of the present invention, it comprises the steps;
The first step, cleaning supporting layer end face, and cut a hole hair and handle;
Second step, laying reinforcing bar
Make longitudinal reinforcement paving location in the horizontal according to design drawing, longitudinal reinforcement is put by the position of making; The lap length of longitudinal reinforcement is by the designing requirement overlap joint; Being positioned at the outermost longitudinal reinforcement in the superiors both sides in the plate knot of ballast bed structure links to each other as the ground connection reinforcing bar; Vertically the length that goes up every about 100m ± 1m is set to an insulated binding node; Mutually insulated between the longitudinal reinforcement; Vertical ground connection reinforcing bar of the same intranodal of ground connection reinforcing bar is by being weldingly connected, and lap length and weld length meet design requirement;
The 3rd goes on foot, puts sleeper, fastener for installing
By design pitch the position setting-out of every sleepers is come out, double-block type sleeper is put on the line by the setting-out position; At the good fastener backing plate of every sleepers rail support groove position of sound production, then the instrument rail is placed on the rail support groove and then the instrument rail is fixed with fastener, setting tool rail and double-block type sleeper tight a bolt;
The 4th step, installation spiral adjuster, rail distance rod, gauge strut
After the fastener installation, one group of spiral adjuster (adjust rails end face absolute altitude and can finely tune orbital direction simultaneously) is installed on rail every 3 sleepers, and 2~3mm steel sheet on below described spiral adjuster screw rod, filling up; Rail distance rod, gauge strut are installed;
The 5th step, template are installed and are adjusted
The center line and the sideline of circuit emitted in measurement according to design drawing, and template is put by the unwrapping wire position, is positioned at the adjacent template position boring in the template outside on bed plate, places the displacement of reinforcing bar restriction template lower, transverse in the hole; The template outer upper is provided with screw mandrel and supports, and adjusts to location in the limit difference scope;
The 6th step, installation lateral adjuster and coarse adjustment
Earlier on road bed board supported on both sides frame, lateral adjuster is installed, is used to adjust the orbital direction and the fixing section of track; Carry out coarse adjustment then; The bolt height of spiral adjuster is by the tread absolute altitude control line control that is marked on the barricade; The rail that lateral adjuster is adjusted rail to and be fixed; The center line that sets out according to survey, use universal rail gage, Steel Ruler and plumb bob to cooperate and carry out the coarse adjustment track, universal rail gage is good by design standard gauge card, measure the universal rail gage center line with Steel Ruler, on the universal rail gage center line, suspend in midair with plumb bob, depart from ground center line direction by plumb bob and adjust orbital direction, medium line error is controlled within the 5mm; The rail level absolute altitude is adjusted to designing rail surface adjusting screw for elevation adjuster by super flat spot;
The 7th step, track accurate adjustment
Use total powerstation to cooperate track detection car that track circuit is adjusted, gauge stay bolt bar is adjusted gauge to limitting in the difference scope, and the spiral adjuster is adjusted the rail surface absolute altitude to the poor scope of limit, utilizes lateral adjuster to adjust orbital direction to the interior and locking of limit difference scope;
The 8th step, concrete construction
Before the concrete construction, the rail fastening position is covered, prevented that concrete from polluting; During concrete spouting, adopt vibrating spear to vibrate, guarantee sleeper below concrete compaction; After concrete construction is finished, before concrete initial set, unclamp rail fastening, concrete is carried out maintenance according to field condition.
Described the 7th step track accurate adjustment is: at first build a station, promptly adopt total powerstation, track detection car to be used; Build a station and carry out accurate adjustment after finishing; Adopt tracing mode to measure, adjust line midline earlier, by lateral adjuster adjust rail to, adjust absolute altitude by the spiral adjuster then.
Advantage of the present invention mainly is presented as:
1, buy the general woods plant equipment of the large-scale rising sun of cover and want 1,370 ten thousand, want 1,300,000 and buy the described track detection car of a cover the inventive method, track template, support system, though mechanical execution speed is fast, both differ 12,400,000 at investment.And this method has made full use of the material and facility of construction under the existing line, has saved a large amount of machinery expenses, POL expense etc.; Therefore invest for a short time, income is fast;
2, adopt the inventive method for restricted location, construction plant,, make that transition is convenient and swift because of there not being large-scale plant equipment;
3, construction quality is stable, simple to operate, noise is little, pollute less, safe and reliable, little to adjacent building and surrounding resident life influence;
4, adopt work plane of the inventive method construction can reach more than 180 meter in one day,, can effectively guarantee construction speed more if manually carry out several work planes.Especially tight in construction period, more demonstrate its superiority in the demanding engineering of safe mass, have good economic benefits and social benefit.
Description of drawings
Fig. 1 is a construction flow chart of the present invention.
Fig. 2 is that template of the present invention is installed the adjustment schematic diagram.
Fig. 3 is that mounting rail of the present invention is apart from strut, rail distance rod schematic diagram.
The specific embodiment
As shown in Figure 1, method for manually paving rails of ballastless track of the present invention, carry out according to following step:
The first step, cleaning supporting layer end face, and cut a hole hair and handle.
Second step, laying reinforcing bar
Measure the center line of emitting circuit earlier, make longitudinal reinforcement paving location in the horizontal according to design drawing, longitudinal reinforcement is all put by the position of making, the lap length of longitudinal reinforcement is by the designing requirement overlap joint; Being positioned at the outermost longitudinal reinforcement in the superiors both sides in the plate knot of ballast bed structure links to each other as the ground connection reinforcing bar; Vertically the length that goes up every about 100m ± 1m is set to an insulated binding node; Mutually insulated between the longitudinal reinforcement; Vertical ground connection reinforcing bar of the same intranodal of ground connection reinforcing bar is by being weldingly connected, and lap length and weld length meet design requirement.
The 3rd goes on foot, puts sleeper
By design pitch the position setting-out of every sleepers is come out, double-block type sleeper is put on the line by the position of setting-out.At the good fastener backing plate of every sleepers rail support groove position of sound production, then instrument rail (the same with the design rail) is placed on the rail support groove, with fastener the instrument rail is fixed again, setting tool rail and double-block type sleeper tight a bolt.
The 4th step, installation spiral adjuster, gauge stay bolt bar
1, after section of track assembling is finished, manually one group of spiral adjuster is installed on rail every 3 sleepers, and 2~3mm steel sheet on below screw rod, filling up, be convenient to adjust track height and direction.
When being installed, adjuster should note:
The reply adjuster was checked before 1. the spiral adjuster was installed, and the cement dirt on screw rod and the base plate is cleared up, and guaranteed that the adjuster spare and accessory parts are complete, and every duty is good.To should rejecting of torsional deformation, can use behind the whole cooperation lattice.
2. spiral adjuster installation site wants correct, and screw rod and hinged block must be positioned at the outside of track all the time, can adjust section of track height by vertical screw rod, and the base plate and the flange of rail are closely connected, and the vertical rail axis of direction must not be crooked, and each bolt must be tightened.The spiral adjuster is installed on the sleeper position of center line, can adjust section of track travel direction by horizontal adjusting bolt.
2, mounting rail is apart from strut, rail distance rod
As shown in Figure 3, after finishing, section of track assembling supports with the rail frame, rail distance rod, gauge strut are installed, utilize universal rail gage that every gauge is tested, adjustment by rail distance rod, strut is controlled at the gauge error within the limit difference scope, then all fixations of rail distance rod, strut, in order to avoid in section of track installation process, gauge is changed.
The 5th step, template are installed and are adjusted
As shown in Figure 2, measure center line and the sideline that emits circuit earlier according to design drawing, template is put by the good position of previous measurement unwrapping wire, the adjacent template position boring in the bed plate cope match-plate pattern outside, place the transverse shift of bar dowel restriction template bottom in the hole, the template outer upper adds screw mandrel and supports, and adjusts to location in the limit difference scope.
The 6th step, installation lateral adjuster and coarse adjustment
This procedure mainly is that the mounting rail horizontal row is to adjuster and adjustment wire center position and rail surface absolute altitude.The bolt height of spiral adjuster is controlled by the tread absolute altitude control line on the barricade, spiral adjuster straightway is installed 1 every 3 sleepers, rail distance rod, strut spiral adjuster are nearby installed, but strut and pull bar are not wanted overlapping placement, conveniently like this in accurate adjustment, gauge is adjusted, utilize lateral adjuster guarantee the rail rail to.General 12.5 meters instrument sections of track use 7 pairs of spiral adjusters, 7 rail distance rods and 7 gauge struts and 7 pairs of lateral adjusters, can guarantee gauge accuracy and track resistance to overturning like this.Lateral adjuster wants symmetry to place, and the strong point must be firm, because will strengthen support power when adjusting center line, has only the strong point enough firmly just can make about the section of track and laterally moves.Note unified when the spiral adjuster is installed near installing on the sleeper limit, in order to avoid 1 horizontal top reinforcement that influence is laid in 2 sleepers middles, 1 block of 2~3mm steel sheet that 5 * 5cm is square is laid in the place of spiral adjuster lower end kiss the earth, make spiral adjuster frame upright firm, can not sink in concrete cushion when stressed, have enough dynamics to guarantee that the spiral adjuster rises or descends in subsequently coarse adjustment and accurate adjustment process.Through construction verification, 2~3mm steel sheet of adjuster below has played good supporting ﹠ stablizing effect, can produce a desired effect.The rail coarse adjustment is finished after the section of track sets up, according to surveying the center line that sets out in advance, use universal rail gage, Steel Ruler and plumb bob to cooperate to come the coarse adjustment section of track, track forces is good by design standard gauge card, measure the track forces center line with Steel Ruler, on the track forces center line,, depart from the good center line direction of ground bullet by plumb bob and adjust section of track position with the plumb bob suspention, strive for that medium line error is controlled within the 5mm, the rail level absolute altitude is controlled apart from design rail level absolute altitude by super flat spot.
The rail coarse adjustment is a very complicated job, guarantee gauge, about a strand height reach designing requirement substantially, to reduce the track accurate adjustment time, so in the coarse adjustment process, use universal rail gage, simple tools such as Steel Ruler, the string of a musical instrument and plumb bob are adjusted.Sleeper fastening wants order correct when installing, to good position, fastener all adopts standard fastener, so that adopt nonstandard fastener when adjusting at last, allows some leeway for final the adjustment.
The 7th step, track accurate adjustment, the physical dimension of inspection track
Rail laterally between gauge stay bolt bar, rotation gauge holding nut is adjusted gauge back locking to the limit difference scope, fixedly the mutual alignment of rail between horizontal.By lateral adjuster, the lateral attitude of adjusting track integral body is interior fixing to limit difference scope.Concrete steps are as follows: at first build a station, adopt Trimble S 8Total powerstation, GEDO CE track detection car is used, build a station and just entered the accurate adjustment stage after finishing, because the track absolute altitude is the difficult point of ballastless track construction, be not easy to adjust after building moulding, so will carry out strict control to absolute altitude in the accurate adjustment process, through facts have proved that a section of track adjuster is as adjusting the control point, to adopt tracing mode to measure in order to raise the efficiency the accurate adjustment first pass, because the survey data of dolly can and then change along with the adjustment of the section of track at any time under tracing mode, be convenient to control the adjusting range of the section of track like this, make data as far as possible near design load.Data presented comprises line midline, absolute altitude, gauge on the handbook, which and design load differ greatly which just transfer earlier, to adjust line midline earlier generally speaking, with lateral adjuster adjust rail to, because the lateral adjuster symmetric arrangement keeps gauge not change (in design limit difference scope) as much as possible in the adjustment process.And then the adjustment absolute altitude, to adjust by loosening, tighten of screw rod the spiral adjuster, clockwise direction is to tighten to raise rail level, is pine counterclockwise, can reduce rail level.If the absolute altitude deviation will be adjusted the screw rod of two or three adjacent spiral adjusters too greatly simultaneously, can adjust the tread absolute altitude to the right place fast and accurately like this.If adjusting gauge universal rail gage standard at last again adjusts gauge and need not how to move basically.If gauge also has deviation, will reduce or increase gauge by the adjustment of rail distance rod gauge strut.In order to save time, allow the accurate adjustment workman adjust simultaneously, adjust rail and carry out simultaneously to, gauge, absolute altitude, reduce the work holdup, raise the efficiency.Transferred after the first pass with tracing mode, adjust again one time with general mode, adjustment through first pass, rail is just similar basically to, absolute altitude, gauge, and adjustment amount is very little, and purpose is exactly to check one time again, rail is closely to link to each other to, elevation, gauge three, adjust wherein one, other two might be along with variation, so must check one time again.Through twice adjustment, the rail of the section of track just can meet design requirement to, elevation, gauge, can inspection declaration.Geometric parameter for strict control circuit, after finishing, use in concrete receipts face track detection car that how much states of railway roadbed are checked immediately, before the concrete initial set, track can also slightly be transferred, the slight variations that causes during concreting can be adjusted before concrete initial set, so, before concrete initial set, must wipe clean back second hand rail inspection dolly to rail and check one time in order to insure therebetween.
The 8th step, concrete construction
Before the concrete construction, the rail fastening position is covered, prevented that concrete from polluting.
During concrete spouting, adopt vibrating spear to vibrate, guarantee that the sleeper below is concrete closely knit.The time that grasp is vibrated, with coarse aggregate no longer sink, the general position of going up the surface, being shaken of cement mortar is roughly horizontal by shaking into, bubble in the mix no longer comes up is as the criterion.
After concrete vibrating is closely knit, manually concrete surface is wiped one's face for the first time, carry out quadric-plastering and press polish with plasterer's trowel before the concrete initial set, carry out crochet at concrete and sleeper handing-over part with trowel.
After concrete construction is finished, in time unclamp rail fastening before concrete initial set, Stress Transfer exerts an influence to sleeper to the sleeper of below when preventing rail because of temperature difference generation distortion.After concrete construction is finished, concrete is carried out maintenance according to field condition.

Claims (2)

1. method for manually paving rails of ballastless track, it is characterized in that: it comprises the steps;
The first step, cleaning supporting layer end face, and cut a hole hair and handle;
Second step, laying reinforcing bar
Make longitudinal reinforcement paving location in the horizontal according to design drawing, longitudinal reinforcement is put by the position of making.The lap length of longitudinal reinforcement is by designing requirement; Being positioned at the outermost longitudinal reinforcement in the superiors both sides in the plate knot of ballast bed structure links to each other as the ground connection reinforcing bar, vertically the length that goes up every about 100m ± 1m is set to an insulated binding node, mutually insulated between the longitudinal reinforcement, vertical ground connection reinforcing bar of the same intranodal of ground connection reinforcing bar is by being weldingly connected, and lap length and weld length meet design requirement;
The 3rd goes on foot, puts sleeper, fastener for installing
By design pitch the position setting-out of every sleepers is come out, double-block type sleeper is put on the line by the setting-out position; At the good fastener backing plate of every sleepers rail support groove position of sound production, then the instrument rail is placed on the rail support groove and then the instrument rail is fixed with fastener, setting tool rail and double-block type sleeper tight a bolt;
The 4th step, installation spiral adjuster, rail distance rod, gauge strut
After section of track assembling is finished, one group of screw regulator is installed on rail, is used to adjust rails end face absolute altitude and finely tunes orbital direction simultaneously every 3 sleepers, and 2~3mm steel sheet on below the screw regulator screw rod, filling up; Rail distance rod, gauge strut are installed;
The 5th step, template are installed and are adjusted
The center line and the sideline of circuit emitted in measurement according to design drawing, and template is put by the unwrapping wire position, is positioned at the adjacent template position boring in the template outside on bed plate, places the displacement of reinforcing bar restriction template lower, transverse in the hole; The template outer upper is provided with screw mandrel and supports, and adjusts to location in the limit difference scope;
The 6th step, installation lateral adjuster and coarse adjustment
On the support of bed board both sides, road, lateral adjuster is installed, is used to adjust the orbital direction and the fixing section of track; The center line that sets out according to survey, use universal rail gage, Steel Ruler and plumb bob to cooperate and carry out the coarse adjustment section of track, universal rail gage is good by design standard gauge card, measure the universal rail gage center line with Steel Ruler, on the universal rail gage center line, suspend in midair with plumb bob, depart from ground center line direction by plumb bob and adjust section of track direction, medium line error is controlled within the 5mm; Adjust the spiral adjuster and make the tread absolute altitude control line on rail surface absolute altitude and the barricade keep same plane, the rail level absolute altitude is controlled by the tread absolute altitude control line on the barricade;
The 7th step, track accurate adjustment
Use total powerstation to cooperate track detection car to adjust track is linear, gauge stay bolt bar is adjusted gauge to limitting in the difference scope, and the spiral adjuster is adjusted the rail surface absolute altitude to the poor scope of limit, utilizes lateral adjuster to adjust orbital direction to the interior and locking of limit difference scope;
The 8th step, concrete construction
Before the concrete construction, the rail fastening position is covered, prevented that concrete from polluting; During concrete spouting, adopt vibrating spear to vibrate, guarantee sleeper below concrete compaction; After concrete construction is finished, before concrete initial set, unclamp rail fastening, concrete is carried out maintenance according to field condition.
2. method for manually paving rails of ballastless track according to claim 1 is characterized in that: described the 7th step track accurate adjustment: at first build a station, promptly adopt total powerstation, track detection car to be used; Build a station and carry out accurate adjustment after finishing; Adopt tracing mode to measure, transfer orbital direction earlier, by adjust about lateral adjuster rail to, utilize the spiral adjuster to adjust the rail surface absolute altitude then.
CN2009102274185A 2009-12-10 2009-12-10 Method for manually paving rails of ballastless track Active CN101736660B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102274185A CN101736660B (en) 2009-12-10 2009-12-10 Method for manually paving rails of ballastless track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102274185A CN101736660B (en) 2009-12-10 2009-12-10 Method for manually paving rails of ballastless track

Publications (2)

Publication Number Publication Date
CN101736660A true CN101736660A (en) 2010-06-16
CN101736660B CN101736660B (en) 2011-09-28

Family

ID=42460647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102274185A Active CN101736660B (en) 2009-12-10 2009-12-10 Method for manually paving rails of ballastless track

Country Status (1)

Country Link
CN (1) CN101736660B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296495A (en) * 2011-05-25 2011-12-28 中铁二十局集团第四工程有限公司 Long steel rail laying and welding construction process under conditions of large temperature differences and strong sandstorms
CN104264543A (en) * 2014-09-11 2015-01-07 北京铁五院工程机械有限公司 Method for constructing small-radius curve ballastless track
CN105794348A (en) * 2016-03-23 2016-07-27 陈荣明 Method for land leveling seedbed land by utilizing track device
CN108560368A (en) * 2018-07-02 2018-09-21 广西广厦环保科技有限公司 A kind of mobile mechanism of asphalt-spreader rail mould
CN113123183A (en) * 2020-01-15 2021-07-16 西安悦创测绘技术有限公司 Research on fine adjustment technical method of ballastless track of high-speed railway
CN113512913A (en) * 2021-08-20 2021-10-19 中铁一局集团有限公司 Construction method of assembled polyurethane solidified track bed of high-speed railway

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19508108C2 (en) * 1995-03-08 1999-05-27 Pfleiderer Verkehrstechnik Two-block concrete sleeper
DE19854609B4 (en) * 1998-11-26 2009-02-19 Ed. Züblin Ag Solid roadway of vacuum concrete and method of manufacture
CN100494570C (en) * 2006-04-25 2009-06-03 中铁八局集团有限公司 Double-block type slag-free track reinforced steel bar insulating binding method
CN100594273C (en) * 2008-05-22 2010-03-17 北京铁五院工程机械科技开发有限公司 Construction apparatus of double-block ballastless track and construction process
CN101503870B (en) * 2008-12-03 2011-10-05 中铁八局集团第一工程有限公司 Construction method for two-block unballasted track bed board

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296495A (en) * 2011-05-25 2011-12-28 中铁二十局集团第四工程有限公司 Long steel rail laying and welding construction process under conditions of large temperature differences and strong sandstorms
CN102296495B (en) * 2011-05-25 2013-01-23 中铁二十局集团第四工程有限公司 Long steel rail laying and welding construction process under conditions of large temperature differences and strong sandstorms
CN104264543A (en) * 2014-09-11 2015-01-07 北京铁五院工程机械有限公司 Method for constructing small-radius curve ballastless track
CN104264543B (en) * 2014-09-11 2016-08-24 北京铁五院工程机械有限公司 The construction method of sharp radius curve non-fragment orbit
CN105794348A (en) * 2016-03-23 2016-07-27 陈荣明 Method for land leveling seedbed land by utilizing track device
CN108560368A (en) * 2018-07-02 2018-09-21 广西广厦环保科技有限公司 A kind of mobile mechanism of asphalt-spreader rail mould
CN113123183A (en) * 2020-01-15 2021-07-16 西安悦创测绘技术有限公司 Research on fine adjustment technical method of ballastless track of high-speed railway
CN113512913A (en) * 2021-08-20 2021-10-19 中铁一局集团有限公司 Construction method of assembled polyurethane solidified track bed of high-speed railway

Also Published As

Publication number Publication date
CN101736660B (en) 2011-09-28

Similar Documents

Publication Publication Date Title
CN101736660B (en) Method for manually paving rails of ballastless track
CN101748662B (en) Construction process for double-block ballastless track bed on subgrade
CN101503870B (en) Construction method for two-block unballasted track bed board
CN104131498B (en) A kind of for curved section sedimentation non-fragment orbit lifting restorative procedure
CN107401091A (en) A kind of assembled track structure and its construction method
CN205934593U (en) Assemble board -like track structure
CN101812819B (en) Whole construction process for double block type ballastless track
CN103321111B (en) Streetcar track connects the construction method of paving
CN106245467B (en) A kind of paving frame method for assembling board-like track structure
CN212984489U (en) Template connection structure on high-strength curve ultra-flat ground
CN105755915A (en) Construction method for CRTS III plate type ballastless track bed plate
CN103669114A (en) Ballast bed base prefabricated slab and application thereof
CN204849798U (en) Rag bolt fixed bolster
CN109878380B (en) Subway vehicle section flexible contact net track-free construction method
CN106120479A (en) The board-like track structure of a kind of assembling
CN102797223B (en) Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method
CN206298785U (en) A kind of board-like binding type Ballast track of pillow wide
CN205501739U (en) Hole track construction is laid with frame rail frock to hanger rail method
CN205025068U (en) Height mark adjustable super flat terrace mould
CN207347838U (en) A kind of assembled track structure
CN213952280U (en) Support system of concrete track foundation embedded bolt
CN105735228A (en) Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift
CN202705830U (en) Mutual-pull adjusting framed bent for double-block type ballastless track construction
CN102888809B (en) Highly-efficient leveling method for construction of large-area concrete ground floor
CN201981448U (en) Plate-type ballastless track switching turnout plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant