CN101725061A - 特高强度大规格钢丝绳分段预张拉方法 - Google Patents
特高强度大规格钢丝绳分段预张拉方法 Download PDFInfo
- Publication number
- CN101725061A CN101725061A CN200910102848A CN200910102848A CN101725061A CN 101725061 A CN101725061 A CN 101725061A CN 200910102848 A CN200910102848 A CN 200910102848A CN 200910102848 A CN200910102848 A CN 200910102848A CN 101725061 A CN101725061 A CN 101725061A
- Authority
- CN
- China
- Prior art keywords
- wire rope
- steel wire
- stretch
- draw
- anchor clamps
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Ropes Or Cables (AREA)
Abstract
一种特高强度大规格钢丝绳分段预张拉方法,包括以下步骤:分段夹紧加载,加载到钢丝绳最小破断拉力的5%时,标记,测量其长度L0,继续加载到钢丝绳最小破断拉力的55%时,保持60分钟后卸载并保持2~3分钟,再加载到钢丝绳最小破断拉力的5%,再测其长度,该段第1次预张拉结束;重复上述步骤,直至该段钢丝绳钢丝绳最后两次预张拉后结构伸长之差不大于预张拉长度的0.15‰时,该段钢丝绳预张拉结束,进行下一段钢丝绳预张拉,直至整索完成。本发明所述纲丝绳预张拉方法可达到一次整索预张拉的效果,甚至优于一次预张拉,可在有限的工作区域进行任意长度钢丝绳预张拉。
Description
技术领域
本发明涉及一种钢丝绳预张拉方法,尤其是大规格钢丝绳分段预张拉方法,属于钢丝绳加工生产技术领域。
背景技术
钢丝绳预张拉的目的是消除钢丝绳受力后非弹性变形的伸长值,这种变形将会直接影响承重索的垂度变化,影响使用。生产过程中,因生产线现够长度的局限性,不能满足超长钢丝绳的一次性整索预张拉,在实际预张拉过程中必须采用分段进行预张拉,并保证其预张拉的效果。
发明内容
本发明的目的是为了解决厂房及生产线的不足,满足任意长度钢丝预张拉需求,提供一种大规格钢丝绳分段预张拉方法,提高生产效率及质量。
本发明所述的钢丝绳预张拉方法包括下述步骤:
在分段预张拉设备上将钢丝绳夹紧后,在主、被动托架压瓦口处作标记,进行加载;
当钢丝绳从松弛状态加载到钢丝绳最小破断拉力的5%时,停止加载,在起点、终点处作好标记,测量出预张拉段基本长度L0;
继续加载到钢丝绳最小破断拉力的55%时,保持60分钟,缓慢卸载至松弛状态,并在此状态保持2~3分钟,然后再加载到钢丝绳最小破断拉力的5%,用激光测距仪测量预张拉段基本长度L0预张拉后的长度,第1次预张拉结束;
依次重复上述两步骤,完成第2、3……n次预张拉,并按公式 计算,直至该段钢丝绳钢丝绳最后两次预张拉后结构伸长之差不大于预张拉长度的0.15‰,该段钢丝绳预张拉结束。
每段钢丝绳预张拉的次数不少于3次,可选择采用直拉或绕拉两种方式。
所述预张拉方法使用的预张拉设备即钢丝绳分段预张拉压瓦由主动夹具及测力装置、被动夹具及施力装置组成,设置在工作台两端,其中,施力装置端设有张力自动补偿装置,所述主被动夹具采用30#-45#中碳素钢制造,夹持面平滑。
本发明所述纲丝绳预张拉方法可达到一次整索预张拉的效果,甚至优于一次预张拉;本发明所述的预张拉设备,夹具与钢丝绳接触面平滑,不存在一般夹具需要的牙口,确保钢丝绳中心股、内外层股的有效夹持,保证各股承受预张拉力的均匀性,操作简便,设备结构简单,生产质量稳定。
附图说明
图1是本发明所述大规格钢丝绳分段预张拉直拉设备结构示意图。
图中:1-主动夹具及测力装置、2-被动夹具及施力装置、3-放绳工字轮、4-收绳工字轮。
具体实施方式
下面结合具体实施例对本发明所述钢丝绳预张拉方法进行详细说明:
如8×41SW+IWR-60.0mm钢丝绳拟在YZ2500预张拉稳定化处理生产线上进行,而8×41SW+R-IWR-80.0mm和8×55SWS+R-IWR-88.0mm钢丝绳拟在YZ5000预张拉稳定化处理生产线上进行。YZ2500和YZ5000预张拉稳定化处理生产线的工作原理相同,具体操作按下述步骤进行:
1、预张拉前准备
钢丝绳进行预张拉前对预张拉设备进行擦拭、检修,保证各运动件灵活,场地干净,钢丝绳不得粘上任何油污,同时认真检查待张拉钢丝绳是否与卡片内容(绳径、捻向、捻距、)一致,表面状况、压瓦孔型尺寸是否符合相关技术要求;
2、夹紧加载
将钢丝绳从放绳工字轮3伸至预张拉设备上并夹紧后,在主、被动夹具口处作标记,进行加载;当钢丝绳从松弛状态加载到钢丝绳最小破断拉力的5%时,停止加载,在起点、终点处作好标记,测量出预张拉段基本长度L0;
继续加载到钢丝绳最小破断拉力的55%时,保持60分钟,缓慢卸载至松弛状态,并在此状态保持2~3分钟,然后再加载到钢丝绳最小破断拉力的5%,用激光测距仪测量预张拉段基本长度L0预张拉后的长度,该段第1次预张拉结束;
依次重复上述两步骤,完成第2、3……n次预张拉,并按公式 计算,直至该段钢丝绳钢丝绳最后两次预张拉后结构伸长之差不大于预张拉长度的0.15‰时,该段钢丝绳预张拉结束,要求每段钢丝绳预张拉不低于3次。重复进行下一段钢丝绳预张拉,直至整索完成。
第一段预张拉合格后按要求定尺并作好测量标记,绳头处理好后卷入收绳工字轮4,待后续需要预张拉的钢丝绳接近被动托架压瓦(即钢丝绳夹具)口前将钢丝绳夹持好后重复上述操作进行每一段钢丝绳的预张拉,以保证整条钢丝绳的每一部分都达到预张拉稳定化处理每件钢丝绳(按粗绳制品号)在预张拉过程中,按每件钢丝绳下料长度的中部预张拉段完成后进行弹性模量测量,弹性模量测量报告交技术中心一份(弹性模量数值保留到小数点后第5位)。
所述预张拉方法使用的预张拉设备由主动夹具及测力装置1、被动夹具及施力装置2组成,设置在工作台两端,其中,施力装置端设有张力自动补偿装置,当加载过程中因纲丝绳结构性伸长导致需保持的张力降低时,该装置可自动进行补偿,所述主被动夹具采用30#-45#中碳素钢制造,且不进行热处理,与钢丝绳的接触面比较平滑,不存在一般夹具需要的牙口,且强度、硬度都比较低;而所有钢丝绳都是采用70#~82#优质碳素结构钢制造,其强度、硬度都大大高于钢丝绳夹具,所以钢丝绳夹具的夹持不会对钢丝绳造成损伤。该设备也可在主被动夹具之间设置张拉盘,组成绕拉设备。
Claims (5)
1.一种特高强度大规格钢丝绳分段预张拉方法,其特征在于:所述方法包括以下步骤:
在预张拉设备上将钢丝绳夹紧后,在主、被动夹具口处作标记,进行加载;
当钢丝绳从松弛状态加载到钢丝绳最小破断拉力的5%时,停止加载,在起点、终点处作好标记,测量出预张拉段基本长度L0;
继续加载到钢丝绳最小破断拉力的55%时,保持60分钟,缓慢卸载至松弛状态,并在此状态保持2~3分钟,然后再加载到钢丝绳最小破断拉力的5%,用激光测距仪测量预张拉段基本长度L0预张拉后的长度,该段第1次预张拉结束;
依次重复上述两步骤,完成第2、3……n次预张拉,并按公式 计算,直至该段钢丝绳钢丝绳最后两次预张拉后结构伸长之差不大于预张拉长度的0.15‰时,该段钢丝绳预张拉结束,重复进行下一段钢丝绳预张拉,直至整索完成。
2.如权利要求1所述的钢丝绳预张拉方法,其特征在于:每段钢丝绳预张拉的次数不少于3次。
3.一种权利要求1所述预张拉方法使用的预张拉方法,其特征在于:该方法中所用预张拉设备由主动夹具及测力装置(1)、被动夹具及施力装置(2)组成,其中施力装置带有张力自动补偿装置,所述主被动夹具采用30#-45#号中碳钢制造。
4.如权利要求3所述的钢丝绳预张拉方法,其特征在于:该方法中所用设备的主动夹具及测力装置(1)、被动夹具及施力装置(2)分别设置在工作台两端。
5.如权利要求3所述预张拉方法,其特征在于:在主被动夹具之间可设置张拉盘,组成绕拉设备。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910102848A CN101725061A (zh) | 2009-11-14 | 2009-11-14 | 特高强度大规格钢丝绳分段预张拉方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910102848A CN101725061A (zh) | 2009-11-14 | 2009-11-14 | 特高强度大规格钢丝绳分段预张拉方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101725061A true CN101725061A (zh) | 2010-06-09 |
Family
ID=42446564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910102848A Pending CN101725061A (zh) | 2009-11-14 | 2009-11-14 | 特高强度大规格钢丝绳分段预张拉方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101725061A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103591917A (zh) * | 2013-11-13 | 2014-02-19 | 贵州钢绳股份有限公司 | 钢丝绳计米测量方法及其装置 |
CN107059620A (zh) * | 2017-04-13 | 2017-08-18 | 北京市第三建筑工程有限公司 | 预应力单耳拉索及其张拉方法 |
CN109132706A (zh) * | 2018-10-19 | 2019-01-04 | 重庆前卫科技集团有限公司 | 一种线缆排线方法 |
CN110261229A (zh) * | 2019-06-21 | 2019-09-20 | 杨振民 | 一种智能种机动车吊装钢丝绳检测装置 |
CN112432856A (zh) * | 2020-11-27 | 2021-03-02 | 青岛鲁普耐特绳网研究院有限公司 | 具有精确系泊长度的系泊纤维缆绳及其获取方法 |
CN114101978A (zh) * | 2021-11-27 | 2022-03-01 | 中国电波传播研究所(中国电子科技集团公司第二十二研究所) | 一种新型的集合线结构及其制作方法 |
-
2009
- 2009-11-14 CN CN200910102848A patent/CN101725061A/zh active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103591917A (zh) * | 2013-11-13 | 2014-02-19 | 贵州钢绳股份有限公司 | 钢丝绳计米测量方法及其装置 |
CN103591917B (zh) * | 2013-11-13 | 2016-04-06 | 贵州钢绳股份有限公司 | 钢丝绳计米测量方法及其装置 |
CN107059620A (zh) * | 2017-04-13 | 2017-08-18 | 北京市第三建筑工程有限公司 | 预应力单耳拉索及其张拉方法 |
CN109132706A (zh) * | 2018-10-19 | 2019-01-04 | 重庆前卫科技集团有限公司 | 一种线缆排线方法 |
CN110261229A (zh) * | 2019-06-21 | 2019-09-20 | 杨振民 | 一种智能种机动车吊装钢丝绳检测装置 |
CN110261229B (zh) * | 2019-06-21 | 2021-09-14 | 安徽永利建设工程有限公司 | 一种智能种机动车吊装钢丝绳检测装置 |
CN112432856A (zh) * | 2020-11-27 | 2021-03-02 | 青岛鲁普耐特绳网研究院有限公司 | 具有精确系泊长度的系泊纤维缆绳及其获取方法 |
CN114101978A (zh) * | 2021-11-27 | 2022-03-01 | 中国电波传播研究所(中国电子科技集团公司第二十二研究所) | 一种新型的集合线结构及其制作方法 |
CN114101978B (zh) * | 2021-11-27 | 2023-10-20 | 中国电波传播研究所(中国电子科技集团公司第二十二研究所) | 一种集合线结构及其制作方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101725061A (zh) | 特高强度大规格钢丝绳分段预张拉方法 | |
CN204920237U (zh) | 一种预应力智能张拉系统 | |
ATE472010T1 (de) | Kunstfaserseil mit verstärkungselement zum mechanischen verstärken des seilmantels | |
EP1439262A3 (en) | Rope and method for detecting damage thereof | |
CN105628361B (zh) | 扣件扣压力测试设备及方法 | |
ATE297548T1 (de) | Testmaschine für torsion, druck, zug mit einem röhrenförmigen körper | |
CN108375343A (zh) | 一种链条智能化预拉链长检测方法及其装置 | |
CN103674700B (zh) | 千米长钢丝绳预张拉试验机 | |
CN201681025U (zh) | 电线曲挠试验机 | |
CN1963152A (zh) | 一种矿山支护锚索用钢绞线及其加工方法 | |
CN105568856A (zh) | 一种稀索斜拉桥索梁同步施工方法 | |
CN112146980B (zh) | 一种预应力钢绞线初始张拉力及稳压时间判别系统及方法 | |
ATE317732T1 (de) | Vorrichtung zum reinigen und polieren von drahtoberflächen sowie zur verbesserung der drahtqualität für die weiterverarbeitung | |
DE50112106D1 (de) | Gerät zum Festwalzen von Kurbelwellen | |
CN208950328U (zh) | 一种高效预应力张拉装置 | |
CN101608429B (zh) | 高强度大规格钢丝绳吊索制作方法 | |
DE60021147D1 (de) | Verfahren und Vorrichtung zum Spannen eines mehrlitzigen Kabel zwischen zwei Verankerungen | |
CN207528574U (zh) | 一种基于力学反馈的电线硬度检测装置 | |
CN107503527B (zh) | 一种预应力碳纤维板可拆卸锚具 | |
CN102493443A (zh) | 提高混凝土管桩桩顶预应力的预应力筋张拉方法 | |
CN203643259U (zh) | 千米长钢丝绳预张拉试验机 | |
ATE375920T1 (de) | Verfahren und vorrichtung zum konditionieren von reifen in stapel | |
CN211679358U (zh) | 一种牵引式铝材矫正装置 | |
CN201152732Y (zh) | 便携式丝杠校正器 | |
CN113094844A (zh) | 预应力钢结构施工过程有限元仿真方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20100609 |