CN101722936A - Vehicle CNG filling substation system - Google Patents

Vehicle CNG filling substation system Download PDF

Info

Publication number
CN101722936A
CN101722936A CN200810166598A CN200810166598A CN101722936A CN 101722936 A CN101722936 A CN 101722936A CN 200810166598 A CN200810166598 A CN 200810166598A CN 200810166598 A CN200810166598 A CN 200810166598A CN 101722936 A CN101722936 A CN 101722936A
Authority
CN
China
Prior art keywords
gas
cng
compressor assembly
compressor system
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810166598A
Other languages
Chinese (zh)
Inventor
黄南贲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200810166598A priority Critical patent/CN101722936A/en
Publication of CN101722936A publication Critical patent/CN101722936A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a vehicle CNG filling substation system. A CNG supply vehicle gets gas from a natural gas main station or common filling station and stores gas by using small CNG cylinder groups which are detachably fixed on the gas supply vehicle, when the gas supply vehicle arrives at a filling substation, is stored in the filling substation after the CNG cylinder groups are unloaded by using a loading and unloading forklift, a plurality of CNG cylinder groups can form a gas cylinder warehouse, any one CNG cylinder group in the gas cylinder warehouse can be directly connected with a gas inlet of a compressor system through a quick disconnect coupling to introduce CNG into the compressor system; and the compressor system is an adaptive variable working condition compressor system, the inlet pressure of the compressor system is 2-15MPa and the output pressure is 25MPa, and the natural gas in the gas cylinder groups is pumped to 2MPA, thereby enabling the gas pumping rate to reach 92 percent. Pressurized natural gas enters a sequence control plate, high, medium and low gas storage tanks and CNG dispensers are respectively introduced, wherein the CNG dispensers supply the gas for CNG vehicles.

Description

Vehicle CNG filling substation system
Technical field
The present invention relates to a kind of vehicle CNG filling station, particularly a kind of vehicle CNG filling substation system.
Background technology
CNG (compression natural gas) is promoted rapidly in China as a kind of clean energy resource, particularly compare with gasoline irreplaceable advantage is being arranged aspect economy and the environmental protection as automobile fuel, but, owing to be subjected to the restriction of technology and fund, the development of vehicle CNG is slower at present, its reason shows as: general common CNG gas station builds the place that covers at gas distributing system, and by the direct air feed of gas distributing system, building so common gas station distributed by natural air-air source and the influence of gas distributing system, there be not the place of laying can only build the CNG air entraining substation away from natural air-air source and gas distributing system, but the technology of existing C NG air entraining substation falls behind, operating efficiency is low, particularly fall behind from the CNG technology that car unloads gas to the CNG substation of supplying gas, can not unload gas fully, make the CNG car residual air after unloading gas of supplying gas more, cause the transport power waste, improved traffic cost, simultaneously, the CNG compression system that existing air entraining substation adopts is generally single-stage or multistage compression substation system, need CNG supplied gas and introduce compression system pressurization output again behind the CNG expenditure and pressure of car, cause great energy dissipation.
Summary of the invention
The purpose of this invention is to provide a kind of vehicle CNG filling substation system, this system is owing to adopt the adaptive variable working condition compressor assembly, and the CNG that makes CNG send automobile to be transported to air entraining substation need not through unloading the gas process, directly introduces compressor assembly pressurization output.
Technical scheme of the present invention is:
A kind of vehicle CNG filling substation system, by CNG supply gas car from the natural gas carrier station or common gas station get gas, be transported to the CNG air entraining substation and deposit, CNG is introduced the substation compressor assembly, natural gas via sequence control dish after the pressurization enters storage tank and filling machine, and filling machine is to refueling.
Described CNG supplies gas car by the gas storage of Small-sized C NG gas cylinder group, and CNG supplies gas and by fork truck CNG gas cylinder group unloaded after car arrives the CNG air entraining substation, deposits a plurality of gas cylinder groups in the substation and forms gas bottle depot.
Described substation compressor assembly is the adaptive variable working condition compressor assembly, this compressor assembly can send the gas cylinder group of automobile directly to introduce natural fuels by CNG, need not through the expenditure and pressure process, the inlet pressure scope of described adaptive variable working condition compressor assembly is 2-25Mpa, and delivery pressure is 25Mpa.And the natural fuels in the CNG gas cylinder group can be evacuated to 2Mpa, make gas taking rate reach 92%.Natural gas via sequence control dish after the pressurization enters storage tank and filling machine.
Beneficial effect of the present invention:
Car adopts removably small-sized gas cylinder group because CNG supplies gas, and it can be unloaded the gas cylinder group that is full of CNG in air entraining substation form gas bottle depot, has improved conveying efficiency, has guaranteed the gas-storing capacity that air entraining substation is enough.
Owing to adopt the adaptive variable working condition compressor assembly, make the CNG that is transported to the CNG air entraining substation need not directly to introduce compressor assembly through expenditure and pressure, simplify whole C NG air entraining substation operational system, improved operating efficiency, and reduced the construction cost of air entraining substation.
Description of drawings
Accompanying drawing is a vehicle CNG filling substation system process flow diagram of the present invention
The specific embodiment
Referring to accompanying drawing, vehicle CNG filling substation system of the present invention, by CNG supply gas car from the natural gas carrier station or common gas station get gas, CNG supplies gas car by the gas storage of Small-sized C NG gas cylinder group, CNG gas cylinder group is fixed on the car of supplying gas in mode removably, after the car of supplying gas arrives the CNG air entraining substation, CNG gas cylinder group is unloaded leave in the substation by the loading and unloading fork truck, a plurality of CNG gas cylinder groups can form gas bottle depot, arbitrary gas cylinder group in the gas bottle depot all can be by the admission port direct connection of quick coupling and compressor assembly, CNG is introduced compressor assembly, compressor assembly is the adaptive variable working condition compressor assembly, the inlet pressure scope of this compressor assembly is 2-25Mpa, and delivery pressure is 25Mpa, the natural fuels in the gas cylinder group can be evacuated to 2Mpa, thereby make gas taking rate reach 92%, enter the sequence control dish by the back natural fuels that pressurizes, introduce senior middle school's low pressure gasholder and filling machine more respectively, filling machine is the CNG refueling.

Claims (3)

1. vehicle CNG filling substation system, form by gaholder storehouse, compressor assembly, sequence control dish, storage tank and filling machine, it is characterized in that: described gas bottle depot is made up of some gas cylinder groups, described compressor assembly is the adaptive variable working condition compressor assembly, this system is from the in line introducing natural fuels of gas bottle depot, and the natural gas via sequence control dish after pressurization enters storage tank and filling machine.
2. vehicle CNG filling substation system according to claim 1, it is characterized in that: described gas bottle depot is made up of the gas cylinder group that the car of supplying gas transports, arbitrary gas cylinder group in the described gas bottle depot can directly be introduced compressor assembly with CNG by quick coupling and compressor assembly direct connection.
3. vehicle CNG filling substation system according to claim 1 is characterized in that: the inlet pressure scope of described adaptive variable working condition compressor assembly is 2-25Mpa, and delivery pressure is 25Mpa.
CN200810166598A 2008-10-16 2008-10-16 Vehicle CNG filling substation system Pending CN101722936A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810166598A CN101722936A (en) 2008-10-16 2008-10-16 Vehicle CNG filling substation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810166598A CN101722936A (en) 2008-10-16 2008-10-16 Vehicle CNG filling substation system

Publications (1)

Publication Number Publication Date
CN101722936A true CN101722936A (en) 2010-06-09

Family

ID=42444666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810166598A Pending CN101722936A (en) 2008-10-16 2008-10-16 Vehicle CNG filling substation system

Country Status (1)

Country Link
CN (1) CN101722936A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103003153A (en) * 2010-06-10 2013-03-27 清洁能源燃料公司 Reciprocating compressor with high pressure storage vessel let down for cng station and refueling motor vehicles
CN104334421A (en) * 2012-05-02 2015-02-04 新气体工业有限公司 Method and apparatus for compressing gas in a plurality of stages to a storage tank array having a plurality of storage tanks
CN114198635A (en) * 2021-12-09 2022-03-18 上海氢枫能源技术有限公司 Intelligent hydrogenation system and method
CN115875595A (en) * 2022-12-20 2023-03-31 厚普清洁能源(集团)股份有限公司 Comprehensive hydrogen source hydrogen filling station and control method and control system thereof
CN117432932A (en) * 2023-12-18 2024-01-23 北京海德利森科技有限公司 Hydrogenation station and hydrogenation process

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103003153A (en) * 2010-06-10 2013-03-27 清洁能源燃料公司 Reciprocating compressor with high pressure storage vessel let down for cng station and refueling motor vehicles
CN104334421A (en) * 2012-05-02 2015-02-04 新气体工业有限公司 Method and apparatus for compressing gas in a plurality of stages to a storage tank array having a plurality of storage tanks
CN114198635A (en) * 2021-12-09 2022-03-18 上海氢枫能源技术有限公司 Intelligent hydrogenation system and method
CN114198635B (en) * 2021-12-09 2023-02-28 上海氢枫能源技术有限公司 Intelligent hydrogenation system and method
CN115875595A (en) * 2022-12-20 2023-03-31 厚普清洁能源(集团)股份有限公司 Comprehensive hydrogen source hydrogen filling station and control method and control system thereof
CN117432932A (en) * 2023-12-18 2024-01-23 北京海德利森科技有限公司 Hydrogenation station and hydrogenation process
CN117432932B (en) * 2023-12-18 2024-03-15 北京海德利森科技有限公司 Hydrogenation station and hydrogenation process

Similar Documents

Publication Publication Date Title
CN101722936A (en) Vehicle CNG filling substation system
CN101418907A (en) High-pressure hydrogen supply system for exterior hydrogen feeding hydrogenation stations
US20150090364A1 (en) Enhanced methods for operating refueling station tube-trailers to reduce refueling cost
WO2019009745A1 (en) Mobile gas filling station
CN110081307A (en) Combustion gas distribution method
KR20110128756A (en) Compressed gas dispensing method
CN101059203A (en) Gas-supply method of CNG gas-charging station for automobile
US20100257852A1 (en) Vacuum Accumulator System and Method for Regenerative Braking System
CN101978541A (en) Fuel cell system
US20050212281A1 (en) Hydrogen fueling trailer
CN212537494U (en) Discharging pressure regulating system applied to hydrogen storage type hydrogen adding station
CN204387673U (en) LNG skid gas station
CN201391751Y (en) Energy dissipation device for undisturbed switch in operation mode of multistage pumping station
CN104279422B (en) Vessel for transport of compressed natural gas and unload gas system and unload pneumatic control method
CN1583480A (en) Non-power natural gas supplying system and method thereof
CN209080971U (en) A kind of gas, which is unloaded, conveys the powder easing gear combined with pipe chain
CN203571420U (en) CNG (compressed natural gas) station
CN217208898U (en) Control system of hydrogen production and hydrogenation integrated station
CN102935945B (en) A kind of separate unit high-efficiency and continuous transmission pump
CN201391743Y (en) Movable piston-type natural gas feeding substation
CN209322027U (en) A kind of intelligence bulk transport system
CN208232912U (en) Shared fuel-cell vehicle adds hydrogen locomotive
CN101301885A (en) Secondary gas filling station self-complementing voltage-stabilizing charging method and apparatus
CN110566806A (en) System for recycling compression energy of hydrogen production energy storage system
CN203147265U (en) Hydraulic type coke-oven gas supplementary device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100609