CN101718455B - Ventilating and air-conditioning cooling method of underground engineering - Google Patents

Ventilating and air-conditioning cooling method of underground engineering Download PDF

Info

Publication number
CN101718455B
CN101718455B CN2009102130901A CN200910213090A CN101718455B CN 101718455 B CN101718455 B CN 101718455B CN 2009102130901 A CN2009102130901 A CN 2009102130901A CN 200910213090 A CN200910213090 A CN 200910213090A CN 101718455 B CN101718455 B CN 101718455B
Authority
CN
China
Prior art keywords
air
underground engineering
conditioning
condenser
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009102130901A
Other languages
Chinese (zh)
Other versions
CN101718455A (en
Inventor
缪小平
耿世彬
刘文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing All Delight Refrigeration Equipment Co., Ltd.
National Defense Engineering College, PLA University of Science and Technology
Original Assignee
ENGINEERING-CORPS ENGINEERING COLLEGE SCIENCE AND ENGINEERING UNIV OF PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ENGINEERING-CORPS ENGINEERING COLLEGE SCIENCE AND ENGINEERING UNIV OF PLA filed Critical ENGINEERING-CORPS ENGINEERING COLLEGE SCIENCE AND ENGINEERING UNIV OF PLA
Priority to CN2009102130901A priority Critical patent/CN101718455B/en
Publication of CN101718455A publication Critical patent/CN101718455A/en
Application granted granted Critical
Publication of CN101718455B publication Critical patent/CN101718455B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The invention relates to a ventilating and air-conditioning cooling method of underground engineering for cooling an air-conditioning reservoir of an air-conditioning refrigeration system in underground engineering, wherein heat of condensation is dispersed into the air-conditioning reservoir. A heat pump cooling system is adopted to cool the air-conditioning reservoir, wherein an evaporator of the heat pump cooling system is directly used for cooling the air-conditioning reservoir. Two sets of condensers of the heat pump cooling system are connected in series, wherein the first set of the condensers are air-cooled condensers, and air outlets of the air-cooled condensers are led to the outside of the underground engineering; and the second set of the condensers are arranged at an air inlet of the underground engineering to heat fresh air entering from the outside of the underground engineering so as to ensure that the relative humidity in the underground engineering is not more than 70 percent. The invention provides a method and a device, which are used for the ventilation of the traditional underground engineering and adopt a cooling medium of an active central air-conditioning to cool. A cooling device is arranged underground, and under the condition of small air inlet and outlet amount of the device, the relative humidity in the underground engineering does not more than 70 percent.

Description

Underground engineering heating ventilation and air-conditioning cooling means
Technical field
The present invention relates to underground engineering heating ventilation and air-conditioning cooling means and device, especially the cooling means and the cooling device of underground engineering air-conditioning reservoir under the ventilation confined condition.
Background technology
Traditional underground protective engineering the time is thought in design and is not generally given the special project design of air-conditioning by the underground constant temperature that has; Expansion along with underground engineering area development and use scale; Owing to make the increase of electrical appliance and communication apparatus, cause the interior air-conditioning thermic load of engineering sharply to increase, caloric value increases; The temperature and humidity of underground engineering more can increase in summer; The interior air conditioner water warehouse temperature of engineering rises very fast, causes the rate of water make-up of original reservoir can't satisfy reservoir cooling requirement, makes that the air-conditioning system in the engineering can't normally be moved because of coolant water temperature is too high.Because engineering underground, can't adopt conventional ground cooling tower that the condensation heat of air-conditioning reservoir is discharged, and must condensation heat be discharged through underground ventilating system.But very little by the advancing of underground engineering air draft machine room, exhaust air rate, be about the 3000m3/100kw heat, one class air conditioner cooling tower (comprising existing wet cooling tower) has no idea the condensation heat in the engineering is discharged outside the engineering; In addition, the air draft machine room in the engineering also has other electric equipment, and the air that gets in summer does not allow directly to get into new wind in engineering internal face dewfall.
Summary of the invention
The present invention seeks to: propose a kind of underground engineering heating ventilation and air-conditioning cooling means and device; Especially the method and apparatus that the cooling medium of the active central air-conditioning of the ventilation of underground engineering and employing is cooled off.Underground, make the relative humidity in the underground engineering be no more than 70% at cooling device under the condition of the advancing of device, exhaust air rate very little (being about the 3000m3/100kw heat).
The present invention seeks to realize like this: underground engineering heating ventilation and air-conditioning cooling means; The air-conditioning reservoir that the condensation heat of air-conditioning refrigeration system in the underground engineering is dissipated to cools off; Adopt the heat pump cooling system that the air-conditioning reservoir is cooled off, wherein the evaporimeter of heat pump cooling system directly cools off the air-conditioning reservoir, and the condenser of heat pump cooling system is in series with two groups; First group is air-cooled condenser, and the air outlet of air-cooled condenser leads to outside the underground engineering; Second group of condenser is located at the air inlet of underground engineering, and the outer new wind that gets into of heating engineering makes the interior relative humidity of engineering be no more than 70%.
Air-cooled condenser adopts water spray mode can take away a large amount of heats through the evaporation of water mode; Air-cooled condenser adopts water spray mode can take away a large amount of heats through the evaporation of water mode; Cooler is can volume very little; Even cooler still is built in undergroundly, provides an outlet and takes away big calorimetric humid air and get final product.When air-conditioning refrigeration system in the engineering was worked, the condensation heat of air-conditioning system rose in order not make the air conditioner water warehouse temperature as for the air-conditioning reservoir; Adopt the present invention with the compressor in the engineering, chilled water pump, water circulating pump, advance, exhaust blower starts; Compressor is at first sent high-temperature high-pressure refrigerant steam into air-cooled condenser, and the outer new wind that gets into of heating engineering makes the interior relative humidity of engineering be no more than 70%; This air is sucked evaporative condenser by exhaust blower and carries out the wet exchange of heat; Heat is discharged outside the engineering, and the cold-producing medium of cooling refrigeration system makes it accomplish kind of refrigeration cycle simultaneously.
Underground engineering heating ventilation and air-conditioning cooling device of the present invention is provided with compressor, water-cooled evaporimeter, the heat pump cooling system that first condenser and second condenser constitute; First condenser and the series connection of second condenser; First condenser is an air-cooled condenser, and the air outlet of air-cooled condenser leads to outside the underground engineering, and second condenser is located at the air inlet of underground engineering; Be provided with chilled water pump and connect water-cooled evaporimeter and air-conditioning reservoir through pipeline, water circulating pump connects shower water to the first condenser.Condenser makes the interior relative humidity of engineering be no more than 70% to the outer new wind that gets into of air intake machine heating engineering.Compressor, startup, compressor is at first sent high-temperature high-pressure refrigerant steam into air-cooled condenser, the outer new wind that gets into of heating engineering.
Beneficial effect of the present invention is: propose the method and apparatus that a kind of cooling medium of active central air-conditioning of ventilation and the employing to existing underground engineering cools off.Cooling device is underground, under the condition of the advancing of device, exhaust air rate very little (being about the 3000m3/100kw heat), makes the relative humidity in the underground engineering be no more than 70%.The temperature that effectively solves the ubiquitous use of present underground engineering is too high, and the insurmountable difficult problem of cooling problem is for the control level that improves the protection works internal environment.
Description of drawings
Fig. 1 is a principle of the invention block diagram.
The specific embodiment
Place idle call cooling means and cooling tower in the underground engineering, the principle of its structure is as shown in Figure 1, underground engineering heating ventilation and air-conditioning cooling device; Be provided with compressor, water-cooled evaporimeter; The heat pump cooling system that first condenser and second condenser constitute, first condenser and the series connection of second condenser, first condenser is an air-cooled condenser; The air outlet of air-cooled condenser leads to outside the underground engineering; Second condenser is located at the air inlet of underground engineering, is provided with chilled water pump and connects water-cooled evaporimeter and air-conditioning reservoir through pipeline, and water circulating pump connects shower water to the first condenser.Condenser is to the outer new wind that gets into of air intake machine heating engineering, as makes that relative humidity is no more than 70% in the engineering.Compressor, startup, compressor is at first sent high-temperature high-pressure refrigerant steam into air-cooled condenser, the outer new wind that gets into of heating engineering.
The area of dissipation of setting second group of condenser makes the engineering internal relative humidity be no more than 70%, under this damp condition, makes that the air-conditioner efficiency of underground engineering is higher.And be suitable for human body.Can regulate setting through the indication of humidity sensor controlled humidity.

Claims (1)

1. underground engineering heating ventilation and air-conditioning cooling means; It is characterized in that the air-conditioning reservoir that the condensation heat to air-conditioning refrigeration system in the underground engineering is dissipated to cools off; Adopt the heat pump cooling system that the air-conditioning reservoir is cooled off, by compressor, water-cooled evaporimeter, first condenser and second condenser constitute the heat pump cooling system; Wherein the evaporimeter of heat pump cooling system directly cools off the air-conditioning reservoir; First condenser of heat pump cooling system and the series connection of second condenser, first condenser is an air-cooled condenser, the air outlet of air-cooled condenser leads to outside the underground engineering; Second condenser is located at the air inlet of underground engineering, the outer new wind that gets into of heating underground engineering; Be provided with chilled water pump and connect water-cooled evaporimeter and air-conditioning reservoir, be provided with water circulating pump and connect shower water to the first condenser through pipeline.
CN2009102130901A 2009-11-06 2009-11-06 Ventilating and air-conditioning cooling method of underground engineering Expired - Fee Related CN101718455B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102130901A CN101718455B (en) 2009-11-06 2009-11-06 Ventilating and air-conditioning cooling method of underground engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102130901A CN101718455B (en) 2009-11-06 2009-11-06 Ventilating and air-conditioning cooling method of underground engineering

Publications (2)

Publication Number Publication Date
CN101718455A CN101718455A (en) 2010-06-02
CN101718455B true CN101718455B (en) 2012-07-18

Family

ID=42433064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102130901A Expired - Fee Related CN101718455B (en) 2009-11-06 2009-11-06 Ventilating and air-conditioning cooling method of underground engineering

Country Status (1)

Country Link
CN (1) CN101718455B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102494383B (en) * 2011-12-20 2014-07-23 青岛海信房地产股份有限公司 Method for ventilating and dehumidifying underground garage
CN103557569B (en) * 2013-10-12 2016-05-18 广州市第四建筑工程有限公司 Hypogee air draft, draining combined recovery are utilized method
CN106871474A (en) * 2017-04-14 2017-06-20 深圳市恒星机电设备有限公司 Air-cooled water-cooled combined air-conditioning system
CN111678199B (en) * 2020-06-08 2024-03-19 珠海格力电器股份有限公司 Indoor unit with condensation prevention function, air conditioner and control method of indoor unit

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2214635Y (en) * 1994-12-07 1995-12-06 邵阳市地下世界 Water cooling device for temp. regulating and moisture reducing unit
CN1375662A (en) * 2001-03-15 2002-10-23 王子介 Air conditioners utilizing underground cold and head for precooling and preheating
CN2589861Y (en) * 2002-12-09 2003-12-03 全国人防工程内部环境与设备研究中心 Pit dehumidifying air conditioner
CN201561511U (en) * 2009-11-06 2010-08-25 全国人防工程内部环境与设备研究中心 Device for underground engineering ventilation and air conditioning cooling

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2214635Y (en) * 1994-12-07 1995-12-06 邵阳市地下世界 Water cooling device for temp. regulating and moisture reducing unit
CN1375662A (en) * 2001-03-15 2002-10-23 王子介 Air conditioners utilizing underground cold and head for precooling and preheating
CN2589861Y (en) * 2002-12-09 2003-12-03 全国人防工程内部环境与设备研究中心 Pit dehumidifying air conditioner
CN201561511U (en) * 2009-11-06 2010-08-25 全国人防工程内部环境与设备研究中心 Device for underground engineering ventilation and air conditioning cooling

Also Published As

Publication number Publication date
CN101718455A (en) 2010-06-02

Similar Documents

Publication Publication Date Title
CN100417864C (en) Air conditioner system based on indirect evaporative cooling technology
CN203432016U (en) Desk-type portable semiconductor refrigeration air conditioner
CN101788174B (en) Evaporative cooling and air-cooled heat pump type composite water chiller-heater unit
CN102305443A (en) Tubular indirect recycling compact evaporation cooling air-conditioning unit
CN113654113B (en) Heat pump air conditioner with dehumidification function
CN2811873Y (en) Heat radiator for air conditioner compressor
CN101718455B (en) Ventilating and air-conditioning cooling method of underground engineering
CN201621798U (en) Cold and hot water machine set with combined evaporative type cold water machine set and air cooling heat pump cold and hot water machine set
CN202254205U (en) Direct expansion type air conditioning unit adopting tubular indirect evaporative cooling air side economizer
CN205001129U (en) Directly drive empty cooling system of empty water of wind generating set generator
CN202254035U (en) Compact recycling tube type indirect-direct evaporation cooling composite air conditioner unit
CN102022788A (en) Combined cooling air-conditioning system of indirect evaporation chiller and mechanical refrigeration chiller
CN206113186U (en) A energy -conserving refrigerating plant of modularization for data center
CN201561511U (en) Device for underground engineering ventilation and air conditioning cooling
CN211011738U (en) Small-sized water-cooling cold air conditioning system
CN104482687A (en) Special air conditioning system of gravity type heat pipe compound evaporative condenser for data center
CN101576303B (en) Total fresh air high-efficient energy-saving central air conditioning system using off-peak power for operating main engine
CN203478671U (en) Air conditioning equipment with double condensation systems
CN206724389U (en) A kind of indirect evaporating colling type water-cooled multi-connected air-conditioning system
CN206743754U (en) Heat pipe radiating system between a kind of data center's row
CN202033206U (en) Fresh air heat recovery experiment device utilizing evaporative cooling
CN202135049U (en) Cooling device of frequency converter
CN104654496A (en) Energy-saving base station room adopting heat extraction and heat exchange refrigeration combination and cooling method for energy-saving base station room
CN101639288A (en) High-temperature air source heat pump air heater with evaporator with adjustable heat exchange capability
CN104061638A (en) Filter-free annual-operating air conditioning device and air conditioning method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: ENGINEERING-CORPS ENGINEERING COLLEGE, SCIENCE AND

Free format text: FORMER OWNER: NATIONAL AIRRAID SHELTER INTERNAL ENVIRONMENT AND FACILITIES RESEARCH CENTER

Effective date: 20120607

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120607

Address after: Holford Lane Baixia District of Nanjing city of Jiangsu Province, No. 1 210007

Applicant after: Engineering-Corps Engineering College, Science and Engineering Univ of PLA

Address before: Nanjing City, Jiangsu province 210007 Holford Lane No. 1 Engineering College of PLA University of Science and Technology

Applicant before: National Civil Defense Engineering Research Center of Internal Environment and Equipment

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DEFENSE ENGINEERING COLLEGE OF PLA UNIVERSITY OF S

Free format text: FORMER OWNER: ENGINEERING-CORPS ENGINEERING COLLEGE, SCIENCE AND ENGINEERING UNIV OF PLA

Effective date: 20130130

Owner name: NANJING ALL DELIGHT REFRIGERATION EQUIPMENT CO., L

Effective date: 20130130

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Jiu Xiaoping

Inventor after: Geng Shibin

Inventor after: Liu Wenjie

Inventor after: Zhu Zhiping

Inventor after: Peng Fusheng

Inventor after: Xu Zhongyong

Inventor after: Zhang Guide

Inventor before: Jiu Xiaoping

Inventor before: Geng Shibin

Inventor before: Liu Wenjie

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: MIAO XIAOPING GENG SHIBIN LIU WENJIE TO: MIAO XIAOPING GENG SHIBIN LIU WENJIE ZHU ZHIPING PENG FUSHENG XU ZHONGYONG ZHANG GUIDE

TR01 Transfer of patent right

Effective date of registration: 20130130

Address after: Nanjing City, Jiangsu province 210007 Holford Lane No. 1

Patentee after: National Defense Engineering College, PLA University of Science and Technology

Patentee after: Nanjing All Delight Refrigeration Equipment Co., Ltd.

Address before: Holford Lane Baixia District of Nanjing city of Jiangsu Province, No. 1 210007

Patentee before: Engineering-Corps Engineering College, Science and Engineering Univ of PLA

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120718

Termination date: 20131106