CN101718197B - 脉内超前顺路浅孔留矿采矿法 - Google Patents

脉内超前顺路浅孔留矿采矿法 Download PDF

Info

Publication number
CN101718197B
CN101718197B CN200910250116XA CN200910250116A CN101718197B CN 101718197 B CN101718197 B CN 101718197B CN 200910250116X A CN200910250116X A CN 200910250116XA CN 200910250116 A CN200910250116 A CN 200910250116A CN 101718197 B CN101718197 B CN 101718197B
Authority
CN
China
Prior art keywords
route
stope
mineral
direct
mineral building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200910250116XA
Other languages
English (en)
Other versions
CN101718197A (zh
Inventor
于清军
黄绍华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Gold Mining (Linglong) Co., Ltd.
Original Assignee
SHANDONG GOLD MINING (LINGLONG) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG GOLD MINING (LINGLONG) CO Ltd filed Critical SHANDONG GOLD MINING (LINGLONG) CO Ltd
Priority to CN200910250116XA priority Critical patent/CN101718197B/zh
Publication of CN101718197A publication Critical patent/CN101718197A/zh
Application granted granted Critical
Publication of CN101718197B publication Critical patent/CN101718197B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明是一种脉内超前顺路浅孔留矿采矿法,采场在上采过程中,先行沿矿脉上掘施工两翼人行顺路天井。在顺路天井的靠近矿房一侧的侧壁架设木质隔离板墙;在木质隔离板墙上端部开设与矿房相通的安全出口,安全出口上沿始终略高于矿房上平面。在所述的安全出口上沿与天井顶面之间的行顺路天井内设置防护平台,防护平台上部留出1.8~2m高度。在顺路天井内设置不同高度的梯子平台,相邻梯子平台上放置梯子。省略了采场上采时掘进脉外人行通风天井和联络道的工程。采场不留间柱,减少了矿石损失。实现了边探边采。避免了施工脉外顺路时产生大量废石混入采场,导致矿石贫化率增大的问题。采场风流更畅通。人员及材料进出采场更加安全方便。

Description

脉内超前顺路浅孔留矿采矿法
(一)、技术领域  本发明涉及一种采矿的改进方法,属于金属矿床开采中岩金矿体回采技术领域。具体地说,涉及对浅孔留矿采矿法的改进。
(二)、背景技术  传统的浅孔溜矿法,首先在采场两端矿体下盘掘进脉外天井,然后每隔5~7米垂直于矿体走向掘进联络道,作为进出采场的人行、通风出口。这样势必造成掘进工程量大,而且在上掘脉外天井和人行联络道时,产生大量废石,极易混入采场中,增加了矿石贫化率。另外,如果施工脉内天井,在靠近采场一侧需要施工联络道,又势必留有部分间柱,造成矿石损失。
(三)、发明内容  本发明的目的在于提供了一种脉内超前顺路浅孔留矿采矿法,用以克服现有浅孔溜矿法的不足。所要解决的技术问题是,第一、省略采场上采时掘进脉外人行通风天井和联络道的工程。第二、采场不留间柱,以减少矿石损失。第三、实现边探边采。第四、避免施工脉外顺路时产生大量废石混入采场,导致矿石贫化率增大的问题。第五、使采场风流更畅通。第六、人员及材料进出采场更加安全方便。
本发明的技术方案如下:
一种脉内超前顺路浅孔留矿采矿法,其特征在于:采场在上采过程中,在切巷内先行沿矿脉上掘施工两翼人行顺路天井,要求顺路天井的天井顶面始终高于矿房上平面3~5米;在顺路天井的靠近矿房一侧的侧壁架设木质隔离板墙;在木质隔离板墙上端部开设与矿房相通的供人员和风水绳进出矿房的安全出口,安全出口上沿始终略高于矿房上平面;在所述的安全出口上沿与天井顶面之间的行顺路天井内设置防护平台,防护平台上部留出1.8~2m高度供继续上掘顺路;在顺路天井内设置不同高度的梯子平台,相邻梯子平台上放置供人员上下的梯子。
固定木质隔离板墙的方法是:采用若干根矿房侧圆撑木与木质隔离板墙相固定,其中矿房侧圆撑木的两端分别固定于顺路天井的两侧壁上。
固定防护平台和梯子平台的方法是:将若干根人行侧圆撑木的两端分别固定于顺路天井的两侧壁上,然后将防护平台或者梯子平台搭建在相同高度的矿房侧圆撑木和人行侧圆撑木上。
在矿房中设置有活动踏板,其上端位于所述的安全出口的下沿并搭在矿房内侧圆撑木上,下端搭在矿房的采下矿石上表面上;其中矿房内侧圆撑木与矿房侧圆撑木平行设置,两端分别固定于矿房的两侧壁上。
在矿脉宽度大于或等于1.5米时,顺路天井沿矿体上盘面上掘,宽度为1.5,长度为2.5m,下盘暂留一部分未采下矿体;在安全出口向采场延伸方向进入2~3米时再将采幅放宽至矿脉宽度。
本发明的积极效果在于:(1)、本发明省略了采场上采时首先掘进脉外人行通风天井和联络道等大量工程,有效的减少了采准工程量,减少了采矿时的废石排出量,缩短了采场回采周期。(2)、本方法采场不留间柱,减少了矿石损失。(3)、在上掘顺路的同时进行探矿,发现矿体矿化不好,即可停止上采,实现了边探边采。(4)、沿矿脉上掘顺路天井时崩落的矿石还可当作采矿副产,避免了施工脉外顺路时产生大量废石混入采场,导致矿石贫化率增大的问题。(5)、风流可通过安全出口直接进入采场内,克服了传统的采矿方法风流要经过人行通风井中进出采场的联络道进入采场内,风阻较大的难题。(6)、采用本发明的方法,人员及材料进出采场更加安全方便。本方法由于隔离板墙随采场上采而加高,并且顶部始终比采场高,同时安全出口始终略高于矿房上平面,通过活动活动踏板可随时与采场相通,人员可随时通过安全出口进出采场。而传统方法人员要通过联络道进出采场,在上层联络道未与采场贯通前(通常是采场靠近联络道一侧要先上掘高一点,以便与上层联络道贯通),下一层联络道绝对不能堵住,否则人员无法进出采场。
(四)、附图说明图1是本发明顺路天井和矿房的设置示意图。
(五)、具体实施方式下面结合附图和实施例,对本发明作进一步详细说明。
如图1所示,本发明采用边施工超前顺路,边采矿的方法,采场在上采过程中,在切巷内先行沿矿脉上掘施工两翼人行顺路天井1,要求顺路天井1的天井顶面14始终较矿房上平面11高3~5米。所述的切巷为位于矿脉正下方的切割巷道。在顺路天井1的靠近矿房10一侧的侧壁架设木质隔离板墙8,木质隔离板墙8厚度≥4cm。在木质隔离板墙8上端部开设与矿房10相通的供人员和风水绳进出矿房10的安全出口13,安全出口13上沿始终略高于矿房上平面11。在所述的安全出口13上沿与天井顶面14之间的行顺路天井1内设置防护平台2,防护平台2上部留出1.8~2m高度供继续上掘顺路。所述的安全出口13的尺寸以60~70cm为宜。在顺路天井1内设置不同高度的梯子平台5,相邻梯子平台5上放置供人员上下的梯子7。
固定木质隔离板墙8的方法是:采用若干根矿房侧圆撑木4(Φ≥20cm)与木质隔离板墙8通过钉子相固定,其中矿房侧圆撑木4的两端分别嵌入式固定于顺路天井1的两侧壁上。
固定防护平台2和梯子平台5的方法是:将若干根人行侧圆撑木3(Φ≥20cm)的两端分别嵌入式固定于顺路天井1的两侧壁上,然后将防护平台2及梯子平台5搭建在相同高度的矿房侧圆撑木4和人行侧圆撑木3上。
当采场下部靠近顺路天井1的出矿穿出矿时,往往在木质隔离板墙8内侧形成一个凹面15,给进出采场造成困难,为了进出采场方便,在矿房10中设置了活动踏板12,活动踏板12上端位于所述的安全出口13的下沿并搭在矿房内侧圆撑木6上,下端搭在矿房10的采下矿石上表面9上;其中矿房内侧圆撑木6与矿房侧圆撑木4平行设置,两端分别固定于矿房10的两侧壁上。
其中防护平台2为面对面并靠在一起的两层厚度分别为4cm的木板。
在矿脉宽度小于1.5米时,顺路天井1长边(长度为2.5m)沿矿体上盘面上掘,向下盘扩至规格为1.5m宽。在矿脉宽度大于或等于1.5米时,顺路天井1沿矿体上盘面上掘,宽度为1.5,长度为2.5m,下盘暂留一部分未采下矿体。为了保护板墙8和安全平台2不受矿房采矿时爆破破坏,在安全出口13向采场延伸方向进入2~3米时再将采幅放宽至矿脉宽度。
山东黄金集团有限公司玲珑金矿所属的九曲、大开头矿区和西山坑口5#、7#、9#、47#、24#、10#、55#、51#等脉带采场均在对外保密的前提下采用了本发明的方法。矿房直接采矿成本约为68元/吨,采场生产能力为40~45吨/日,采矿损失率为1.6%,贫化率为16.8%。

Claims (4)

1.一种脉内超前顺路浅孔留矿采矿法,其特征在于:采场在上采过程中,在切巷内先行沿矿脉上掘施工两翼人行顺路天井(1),要求人行顺路天井(1)的天井顶面(14)始终高于矿房上平面(11)3~5米;在人行顺路天井(1)的靠近矿房(10)一侧的侧壁架设木质隔离板墙(8);在木质隔离板墙(8)上端部开设与矿房(10)相通的供人员和风水绳进出矿房(10)的安全出口(13),安全出口(13)上沿始终略高于矿房上平面(11);在所述的安全出口(13)上沿与天井顶面(14)之间的人行顺路天井(1)内设置防护平台(2),防护平台(2)上部留出1.8~2m高度供继续上掘顺路;在人行顺路天井(1)内设置不同高度的梯子平台(5),相邻梯子平台(5)上放置供人员上下的梯子(7)。
2.如权利要求1所述的脉内超前顺路浅孔留矿采矿法,其特征在于:固定木质隔离板墙(8)的方法是:采用若干根矿房侧圆撑木(4)与木质隔离板墙(8)相固定,其中矿房侧圆撑木(4)的两端分别固定于人行顺路天井(1)的两侧壁上。
3.如权利要求2所述的脉内超前顺路浅孔留矿采矿法,其特征在于:固定防护平台(2)和梯子平台(5)的方法是:将若干根人行侧圆撑木(3)的两端分别固定于人行顺路天井(1)的两侧壁上,然后将防护平台(2)或者梯子平台(5)搭建在相同高度的矿房侧圆撑木(4)和人行侧圆撑木(3)上。
4.如权利要求2或3所述的脉内超前顺路浅孔留矿采矿法,其特征在于:在矿房(10)中设置有活动踏板(12),其上端位于所述的安全出口(13)的下沿并搭在矿房内侧圆撑木(6)上,下端搭在矿房(10)的采下矿石上表面(9)上;其中矿房内侧圆撑木(6)与矿房侧圆撑木(4)平行设置,两端分别固定于矿房(10)的两侧壁上。
CN200910250116XA 2009-11-27 2009-11-27 脉内超前顺路浅孔留矿采矿法 Active CN101718197B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910250116XA CN101718197B (zh) 2009-11-27 2009-11-27 脉内超前顺路浅孔留矿采矿法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910250116XA CN101718197B (zh) 2009-11-27 2009-11-27 脉内超前顺路浅孔留矿采矿法

Publications (2)

Publication Number Publication Date
CN101718197A CN101718197A (zh) 2010-06-02
CN101718197B true CN101718197B (zh) 2011-09-21

Family

ID=42432826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910250116XA Active CN101718197B (zh) 2009-11-27 2009-11-27 脉内超前顺路浅孔留矿采矿法

Country Status (1)

Country Link
CN (1) CN101718197B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179505B (zh) * 2014-02-12 2016-01-20 云南磷化集团有限公司 一种磷矿的地下采矿方法
CN105756679A (zh) * 2016-04-01 2016-07-13 江西稀有稀土金属钨业集团有限公司 一种极薄复杂石英矿脉由缓变急浅孔综合采矿方法
CN112855159A (zh) * 2021-01-15 2021-05-28 山东黄金归来庄矿业有限公司 一种缓倾斜矿柱扇形回收方法
CN113700485A (zh) * 2021-09-17 2021-11-26 武汉科技大学 急倾斜薄矿床的采矿装置及使用其的深孔凿岩阶段矿房法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1988006225A1 (en) * 1987-02-19 1988-08-25 Alimak Ab Method and equipment for narrow ore mining
CN1450249A (zh) * 2002-04-10 2003-10-22 招远市大河金矿 一种采矿方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1988006225A1 (en) * 1987-02-19 1988-08-25 Alimak Ab Method and equipment for narrow ore mining
CN1450249A (zh) * 2002-04-10 2003-10-22 招远市大河金矿 一种采矿方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘国栋.留矿采矿法变型方案的应用.《湖南冶金》.1996,(第1期),39-42. *
吴克祥.平度市金矿采矿方法的改进.《黄金》.1991,第12卷(第1期),16-19. *
王炳文,张宗永.连续矿段无间柱回采方法的实践.《有色金属》.2002,第54卷(第2期),4-6. *

Also Published As

Publication number Publication date
CN101718197A (zh) 2010-06-02

Similar Documents

Publication Publication Date Title
CN102226413B (zh) 瓦斯排放巷穿层钻孔区域瓦斯抽采方法
CN101864956B (zh) 一种区段无煤柱开采方法
CN105221179B (zh) 一种高瓦斯矿井y型通风方法
CN100535396C (zh) 不稳定薄煤层组条件下被保护煤层的卸压瓦斯抽采方法
CN102094647B (zh) 两硬条件薄煤层安全高效综采方法
CN101302931B (zh) 一种仓房采煤后的复采和边角煤回采的方法
CN101725352A (zh) 一种固体充填综采回收房式煤柱方法
CN102392642A (zh) 一种无煤柱回采工作面的巷道布置方法
CN103485786B (zh) 一种急倾斜煤层走向长壁机械化开采方法
CN111550244B (zh) 缓倾斜矿体分层条带开采方法
CN105804788A (zh) 一种煤层瓦斯巷道治理方法
CN108397227A (zh) 一种倾向递进消突巷道布置方法
CN104806285A (zh) 基于地面水平井的煤矿采空区瓦斯治理方法
CN103089267A (zh) 薄矿体无底柱浅孔留矿法
CN101718197B (zh) 脉内超前顺路浅孔留矿采矿法
CN107152279A (zh) 旺格维利回采工作面顶板水力压裂弱化方法及装置
CN105239964A (zh) 保护层卸压井上下立体化煤与煤层气协调开发方法
CN110359914A (zh) 一种缓倾斜中厚矿体安全、低成本组合分段采矿方法
CN108505999A (zh) 一种高突煤层工作面多巷布置方法
CN103726848A (zh) 适用于缓倾斜/倾斜薄矿体回采的采矿方法
CN102425431B (zh) 一种极近距离煤层开采巷道布置方法
CN207080226U (zh) 一种急倾斜薄至中厚矿脉平底出矿结构
CN103670417A (zh) 利用电耙巷道侧部出矿的无底柱分段崩落采矿法
CN103982185B (zh) 垂直孔与水平孔协同回采的机械化分段充填采矿法
CN115653602A (zh) 一种预留间隔式矿柱上向进路充填采矿法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANDONG GOLD MINING (LINGLONG) CO., LTD.

Free format text: FORMER OWNER: SHANDONG GOLD GROUP CO., LTD. LINGLONG GOLD MINE

Effective date: 20100617

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20100617

Address after: 265419 Shandong city of Zhaoyuan Province Huang Road No. 999

Applicant after: Shandong Gold Mining (Linglong) Co., Ltd.

Address before: 265419 Shandong city of Zhaoyuan Province Huang Road No. 999

Applicant before: Shandong Gold Group Co., Ltd., Linglong Goldmine

C14 Grant of patent or utility model