CN101718138B - Large metal veneer suspending assembly - Google Patents
Large metal veneer suspending assembly Download PDFInfo
- Publication number
- CN101718138B CN101718138B CN2009103086802A CN200910308680A CN101718138B CN 101718138 B CN101718138 B CN 101718138B CN 2009103086802 A CN2009103086802 A CN 2009103086802A CN 200910308680 A CN200910308680 A CN 200910308680A CN 101718138 B CN101718138 B CN 101718138B
- Authority
- CN
- China
- Prior art keywords
- hook
- supporting parts
- last
- screw
- suspending assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Supports Or Holders For Household Use (AREA)
Abstract
The invention relates to a large metal veneer suspending assembly which is formed by combining an upper suspending assembly and a lower suspending assembly, wherein the upper suspending assembly comprises an upper support element, an upper hooking element, an upper switching clamped element, two upper push plugging blocks, a top and bottom adjusting screw and a front and back adjusting screw; and the lower suspending assembly comprises a lower support element, two lower push plugging blocks and a lower limiting clamped element. A veneer is installed in a suspending way, and a hook is fixed to the installed veneer by the switching clamped element and the plugging blocks to prevent fixation by welding and a bolt so that the construction operation is convenient; and the veneer can be easily taken in position by aligning the position of the support element, and the veneer height and a gap between veneers are fine adjusted by the hook adjusting screws. The invention is suitable for a suspending construction project of indoor and outdoor veneers and is particularly suitable for the occasion with larger single-veneer area, larger weight, limited installation condition and higher installation precision requirement.
Description
Technical field
The present invention relates to a kind of suspending assembly of sheet material suspender member, particularly a kind of large metal veneer.
Background technology
In the architectural decoration construction, the mode that metal sheet facing plate generally adopts metal angle sign indicating number to be connected and fixed, its defective are that the position of sheet material is difficult for regulating, and are not suitable for the installation of macroplate metal sheet.In addition, also exist angle sign indicating number machining accuracy not high, install operation process is loaded down with trivial details, the defective that work efficiency is not high.
Summary of the invention
For overcoming the deficiency of existing metal veneer suspending system, the invention provides a kind of large metal veneer suspending assembly, solve the technical problem that macroplate facing plate is difficult for installing, being difficult for the fine setting installation site.
For achieving the above object, the present invention adopts following technical scheme:
This large metal veneer suspending assembly is combined by upper and lower suspending assembly.
Last suspending assembly by last supporting parts, hook spare, on transfer hold out against chock, up-down adjustment screw on the fastener, two before and after set screw form.
The cross section of last supporting parts is L shaped, it by bolt on the lateral keel on main structure upper strata.
The main body upper end of hook spare has hook, lower end that following suspension hook is arranged, and hook is suspended on the vertical limb of supporting parts, and following suspension hook and rising to the bait of last switching fastener articulate, and there is a side direction screw main body side of hook spare, and hook has a top screw.
The head of last switching fastener is hook-shaped, and it articulates with the following suspension hook of hook spare, on the main body of the last fastener of transferring two claws that are used for fixing decoration panel top is arranged.
On hold out against chock between the stringer of the claw of last switching fastener and decoration panel.
The up-down adjustment screw is passed down through the top screw of hook spare, contacts with the vertical limb of last supporting parts to be connected.
The front and back set screw is passed the side direction screw, contacts with the vertical limb side of last supporting parts to be connected.
Following suspending assembly is by holding out against chock under the following supporting parts, two and the lower limit fastener is formed.
The cross section of following supporting parts is L shaped, it by bolt on the lateral keel of main structure lower floor.
The lower limit fastener has a hook in main body one side, and this hook is suspended on down on the vertical limb of supporting parts, at the opposite side of main body two claws that are used for fixing the decoration panel bottom is arranged; A screw hole is arranged at the upper clipping claw top, hold out against screw and pass screw hole, with under hold out against chock and contact and be connected.
Hold out against chock down between the stringer of the claw of the fastener of transferring down and decoration panel.
Described vertical limb top of going up supporting parts can be circular arc.
Compared with prior art the present invention has following characteristics and beneficial effect: 1. aluminium suspension member component becomes each functional block to be respectively installed on building body support system and the metal veneer in advance.Especially adopt fixedly suspension member of chock between metal veneer and suspension member, greatly facilitate the combination between aluminium suspension member and metal veneer simultaneously, only need shirtsleeve operation the aluminium suspension member accurately can be installed to the metal veneer assigned position.
2. utilize quality of fit good between aluminium extruded sections, only need aluminum component on the metal veneer and the aluminum component on the agent structure to agree with when in place, show that promptly metal veneer is in place.
3. each that realizes the metal finish Board position by the effect of set screw be to accurate adjustment, eliminates the alternate position spike that influence such as support system distortion causes.
The present invention is by adopting the suspending way mounting decoration panel, utilize switching fastener and chock that suspension hook is fixed in mounting decoration panel and avoid using welding and bolt, make constructing operation become convenient, being harmonized in the supporting parts position can be easily in place with the plate face, by slit between suspension hook set screw tuning plate face height and plate and plate.Have simple in structurely, with low cost, easy for installation, the advantage that is easy to regulate makes things convenient for hanging and position adjustments of large metal veneer.Be applicable to that indoor and outdoor facing plate hangs construction works, be specially adapted to the occasion that monolithic facing plate area is big, weight is big, mounting condition is restricted and installation accuracy is had relatively high expectations.
Description of drawings
The present invention will be further described in detail below in conjunction with accompanying drawing.
Fig. 1 is the suspending assembly structural representation of going up of the present invention.
Fig. 2 is a suspending assembly structural representation down of the present invention.
Fig. 3 is the scheme of installation of suspending assembly of the present invention and decoration panel.
Hold out against on the last supporting parts of 1-, 2-hook spare, the last switching of 3-fastener, the 4-and hold out against chock, 9-lower limit fastener, 10-decoration panel, 11-lateral keel, 12-under set screw before and after the chock, 5-up-down adjustment screw, 6-, the 7-under supporting parts, the 8-and hold out against suspending assembly, the vertical keel of 16-, 17-stringer under screw, 13-bolt, the last suspending assembly of 14-, the 15-.
The specific embodiment
Embodiment is referring to Fig. 1, Fig. 2 and shown in Figure 3, and this large metal veneer suspending assembly is combined by upper and lower suspending assembly.
Referring to Fig. 1, Fig. 3, last suspending assembly 14 by last supporting parts 1, hook spare 2, on transfer hold out against chock 4 on the fastener 3, two, up-down adjustment screw 5 front and back set screw 6 are formed; The cross section of last supporting parts 1 is L shaped, it by bolt on the lateral keel 11 on main structure upper strata; The main body upper end of hook spare 2 has hook, lower end that following suspension hook is arranged, and hook is suspended on the vertical limb of supporting parts 1, and following suspension hook and rising to the bait of last switching fastener 3 articulate, and there is a side direction screw main body side of hook spare 2, and hook has a top screw; The head of last switching fastener 3 is hook-shaped, and it articulates with the following suspension hook of hook spare 2, on the main body of the last fastener of transferring two claws that are used for fixing decoration panel top is arranged; On hold out against chock 4 between the stringer 17 of the claw of last switching fastener and decoration panel 10; Up-down adjustment screw 5 is passed down through the top screw of hook spare 2, contacts with the vertical limb of last supporting parts 1 to be connected; Front and back set screw 6 is passed the side direction screw, contacts with the vertical limb side of last supporting parts 1 to be connected.Described vertical limb top of going up supporting parts 1 is a circular arc.
Referring to Fig. 2, Fig. 3, following suspending assembly 15 is by holding out against chock 8 under the following supporting parts 7, two and lower limit fastener 9 is formed; The cross section of following supporting parts 7 is L shaped, it by bolt on the lateral keel 11 of main structure lower floor; Lower limit fastener 9 has a hook in main body one side, and this hook is suspended on down on the vertical limb of supporting parts 7, at the opposite side of main body two claws that are used for fixing the decoration panel bottom is arranged; A screw hole is arranged at the upper clipping claw top, hold out against screw 12 and pass screw hole, with under hold out against chock 8 and contact and be connected; Hold out against chock 8 down between the stringer 11 of the claw of the fastener of transferring down and decoration panel 10.
Referring to Fig. 3, install at first when specifically installing that to hang the skeleton steel perpendicular logical horizontal logical, install down supporting parts then in horizontal logical and regulate the turnover position up and down to satisfying required precision, fixing.Switching fastener and lower limit fastener on the aluminium alloys installed respectively and be fixed in the metal veneer both sides of stringer up and down, fill in simultaneously and hold out against chock, hold out against screw with the interior hexagonal of M6 and hold out against.Install hook member, limited block is inserted in down on the supporting parts, and hook spare is hooked on the supporting parts.Hang height and position by the fine setting of the set screw on hook metal sheet, finish installation.
Claims (2)
1. a large metal veneer suspending assembly is combined by upper and lower suspending assembly, it is characterized in that:
Last suspending assembly (14) by last supporting parts (1), hook spare (2), on transfer and hold out against chock (4), up-down adjustment screw (5), front and back set screw (6) on the fastener (3), two and form;
The cross section of last supporting parts (1) is L shaped, it by bolt on the lateral keel (11) on main structure upper strata;
There is hook the main body upper end of hook spare (2), there is following suspension hook the lower end, and hook is suspended on the vertical limb of supporting parts (1), and following suspension hook and rising to the bait of last switching fastener (3) articulate, there is a side direction screw main body side of hook spare (2), and hook has a top screw;
The head of last switching fastener (3) is hook-shaped, and it articulates with the following suspension hook of hook spare (2), on the main body of the last fastener of transferring two first claws that are used for fixing decoration panel top is arranged;
On hold out against chock (4) and be positioned between the stringer (17) of switching first claw of fastener and decoration panel (10);
Up-down adjustment screw (5) is passed down through the top screw of hook spare (2), contacts with the vertical limb of last supporting parts (1) to be connected;
Front and back set screw (6) are passed the side direction screw, contact with the vertical limb side of last supporting parts (1) to be connected;
Following suspending assembly (15) is by holding out against chock (8) under the following supporting parts (7), two and lower limit fastener (9) is formed;
The cross section of following supporting parts (7) is L shaped, it by bolt on the lateral keel (11) of main structure lower floor;
Lower limit fastener (9) has a hook in main body one side, and this hook is suspended on down on the vertical limb of supporting parts (7), at the opposite side of main body two second claws that are used for fixing the decoration panel bottom is arranged; A screw hole is arranged at the last second claw top, hold out against screw (12) and pass screw hole, with under hold out against chock (8) and contact and be connected;
Holding out against chock (8) down is positioned between the stringer (17) of second claw of lower limit fastener (9) and decoration panel (10).
2. large metal veneer suspending assembly according to claim 1 is characterized in that: described vertical limb top of going up supporting parts (1) is a circular arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009103086802A CN101718138B (en) | 2009-10-23 | 2009-10-23 | Large metal veneer suspending assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009103086802A CN101718138B (en) | 2009-10-23 | 2009-10-23 | Large metal veneer suspending assembly |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101718138A CN101718138A (en) | 2010-06-02 |
CN101718138B true CN101718138B (en) | 2011-10-05 |
Family
ID=42432769
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009103086802A Expired - Fee Related CN101718138B (en) | 2009-10-23 | 2009-10-23 | Large metal veneer suspending assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101718138B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101914981B (en) * | 2010-07-02 | 2011-10-05 | 中国建筑装饰工程有限公司 | Adjustable wall electromechanical end concave tray box and installation method thereof |
CN106545116A (en) * | 2016-11-02 | 2017-03-29 | 广州电力机车有限公司 | The steel house roof and its construction method of people on a kind of energy |
-
2009
- 2009-10-23 CN CN2009103086802A patent/CN101718138B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101718138A (en) | 2010-06-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107035095B (en) | Integrated mounting structure of wall | |
CN101718138B (en) | Large metal veneer suspending assembly | |
CN112814257B (en) | Anti-displacement suspended ceiling connection structure and installation method thereof | |
CN101424119B (en) | Structure member capable of independently installing and disassembling sliced veneer and using method | |
CN201835410U (en) | Three-dimension adjustable curtain wall hanger | |
CN201554195U (en) | Hanging component for large metal veneer | |
CN102230332B (en) | Unit-type curtain wall mounting suspender | |
CN202691471U (en) | Video camera installing frame | |
CN213062597U (en) | Indoor furred ceiling is with convenient to detach's aluminium veneer mechanism | |
CN201343844Y (en) | Structural component capable of independently installing and disassembling decorative panel | |
CN210459731U (en) | Quick installation formula combination fossil fragments | |
CN219219519U (en) | Assembled honeycomb aluminum plate ceiling mounting structure | |
CN108086568B (en) | Suspended ceiling hanging assembly and hanging method | |
CN112814252B (en) | Mounting structure and mounting method of drop-level suspended ceiling | |
CN218714236U (en) | Indoor panel fitment structure | |
CN215407136U (en) | Top stone cover top plate mounting system for window | |
CN216810575U (en) | Clamp type suspender based on profiled steel sheet | |
CN220117540U (en) | Unit curtain wall hooking system | |
CN220747514U (en) | Wallboard combination pendant convenient to quick construction | |
CN218786930U (en) | Slotting and hooking aluminum plate curtain wall structure | |
CN216042721U (en) | Jig frame structure for assembling steel truss | |
CN216405836U (en) | A novel stone material pendant that is used for quick installation of stone material plate and dismantles | |
CN212613512U (en) | Wallboard fixing assembly | |
CN218668134U (en) | Dragon bone fixator | |
CN216920948U (en) | Hooking type kneading bearing keel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111005 Termination date: 20191023 |
|
CF01 | Termination of patent right due to non-payment of annual fee |