CN101706773B - Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination - Google Patents

Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination Download PDF

Info

Publication number
CN101706773B
CN101706773B CN2009102375561A CN200910237556A CN101706773B CN 101706773 B CN101706773 B CN 101706773B CN 2009102375561 A CN2009102375561 A CN 2009102375561A CN 200910237556 A CN200910237556 A CN 200910237556A CN 101706773 B CN101706773 B CN 101706773B
Authority
CN
China
Prior art keywords
information
model
ied
automatically
iec61850
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009102375561A
Other languages
Chinese (zh)
Other versions
CN101706773A (en
Inventor
唐喜
任雁铭
王治民
晋阳珺
杜宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sifang Automation Co Ltd
Beijing Sifang Engineering Co Ltd
Original Assignee
Beijing Sifang Automation Co Ltd
Beijing Sifang Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sifang Automation Co Ltd, Beijing Sifang Engineering Co Ltd filed Critical Beijing Sifang Automation Co Ltd
Priority to CN2009102375561A priority Critical patent/CN101706773B/en
Publication of CN101706773A publication Critical patent/CN101706773A/en
Application granted granted Critical
Publication of CN101706773B publication Critical patent/CN101706773B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a method for realizing fast and automatic modeling of a transformer substation IEC 61850 by adopting XML information recombination, which is applied to IED modeling of space layers in a digital transformer substation and a traditional transformer substation by adopting IEC 61850 communication. The method comprises the following steps of: recombining the IED information by adopting XML, and providing an IED information standardization interface; editing and setting the standardized XML files; loading an embedded minimum model which accords to the IEC61850 standard; appointing an sAddr information format in advance, automatically adding sAddr information and leading out an ICD model file; analyzing the led-out ICD model file by the IED, and automatically extracting the sAddr information, and automatically mapping model leafage nodes to a real-time database according to the sAddr information; and enabling the information of the real-time database to normally communicate with station control layer equipment by the IED through adopting an IEC61850 protocol. The model collocation can be set by engineering personnel according to actual engineering. Therefore, the invention greatly shortens the time for generating the IEC61850 model, improves the efficiency of production and regulation and is convenient for 61850 engineered actualization and generalization.

Description

Adopt the reorganization of XML information to realize the method for fast and automatic modeling of transformer substation IEC 61850
Technical field
The present invention relates to bay device ICD (the intelligent electronic device ability description that digital transformer substation and traditional transformer station adopt the communication of IEC61850 stipulations, hereinafter to be referred as ICD) the model file generation technique, the implementation method of automatic modeling is provided, particularly provide and utilized sAddr (short address, hereinafter to be referred as sAddr) implementation method of wall IED (intelligent electronic device is hereinafter to be referred as IED) real-time data base in the automatic mapping model of information and digital transformer substation and the traditional transformer station.
Background technology
On the basis of the TC57 of International Electrotechnical Commission communication protocol before summing up, formulated the IEC61850 communication standard.This communication standard is by carrying out unified Modeling to the object in the electric substation automation system, adopt Object-oriented Technique and the Abstract Common Service Interface (ACSI) that is independent of network structure, strengthen the interoperability of equipment room, can between the equipment of different manufacturers, realize seamless link.This standard possesses the characteristics of flexible configuration, reliability height, high safety, has represented automation of transformation substations technology development in future direction.
The core of IEC61850 communication standard is exactly " model and modeling ", the model that not only comprises data object in the electric substation automation system, and comprise the model of substation communication system, these models and OO Abstract Common Service Interface (ACSI) combine, and have just formed the communications platform that has the opening of enriching self-described information.
IEC61850 mainly solves " interoperability " problem, and the basis of " interoperability " is exactly the model unification, and IEC61850 standard, " IEC61850 engineering construction standard " all have detailed definition to model.IEC 61850 in implementation of China so far, generate this link for model, great majority still adopt the mode of manual modeling, a lot of links need artificial interference, because the participation of human factor make mistakes easily, and the project cycle is longer, limited the large tracts of land of IEC 61850 functions and promoted, manual editing's intelligent electronic device ability description ICD model file also has following shortcoming simultaneously:
1) needs cost plenty of time study substation configuration description language SCL
2) mode of substation configuration description language SCL descriptive model is very flexible, and the manual editing is unfavorable for model specificationization
3) because the complicacy of model causes intelligent electronic device ability description ICD file editing amount big
In view of above shortcoming, manual editing ICD model file is not suitable for using in the 61850 through engineering approaches application stages of IEC.
The tradition modeling pattern adopts manual modeling or some small tool softwares; the operation interface of editorial logic equipment LD, logic node LN, data object DO, data attribute DA is provided; the corresponding relation of model file and IED real-time data base can be edited; basically can realize modeling; but need the user to be familiar with very much IEC 61850; this has relatively high expectations to the relay protection slip-stick artist, and automaticity is not high yet, is difficult to through engineering approaches and uses.
IEC 61850 automatic modelings are based on IEC 61850 basic models; adopt the practice of model configuration specificationization; the IEC61850 function is encapsulated; IEC 61850 ins and outs are realized by software inhouse; the corresponding relation of model and IED real-time data base is also realized by software automatically by short address sAddr; externally only provide and protect relevant information; thereby enlarge the scope of using object; all can carry out IEC 61850 modelings as long as understand the slip-stick artist of relay protection function, this promotes on a large scale IEC 61850 and seems particularly important.
Therefore, in order to utilize the IEC61850 communication standard better, reduce engineering configuration effort amount, the present invention proposes a kind of IEC61850 automatic modeling implementation method, this is manually on the modeling basis IEC61850 through engineering approaches to be promoted the new trial of being done.
Summary of the invention
The present invention proposes a kind of implementation method of IEC61850 automatic modeling, its purpose is to guarantee the correctness of IED model file, and unitarity shortens the modeling cycle, for engineering construction brings maximum convenience.
Adopt digital transformer substation or traditional transformer station of IEC61850 standard, require system modelling to realize standardization, IEC61850 has established the modeling standard of electric system, for electric substation automation system has defined information model and information exchange model unified, standard, realize the interoperability of smart machine, realize transformer station's information sharing.The ICD model reflects the virtual rating of IED strictly according to the facts, is the basis of realizing interoperability, each IED producer provide separately ICD model file to system integrator as the system integration and test foundation.First and second equipment is carried out unified Modeling, and resource adopts the unified naming rule of the overall situation, has realized seamless communication in the transformer station and between transformer station and the control center, thus simplified system maintenance, configuration and engineering construction.
The present invention is specifically by the following technical solutions:
A kind of method that adopts the reorganization of XML information to realize the transformer substation IEC 61850 automatic modeling may further comprise the steps:
1), the wall intelligent electronic device IED of standard transformer station information, adopt XML serializing technology that above-mentioned information is recombinated, definition model configuration specification interface document is for automatic modeling provides unified model configuration template;
2), the stress model configuration template, load embedded model, the configuration template edition interface that supplies a model is derived the ICD model file, adds sAddr information automatically, generates the ICD model file;
3), the wall intelligent electronic device IED of transformer station loads described ICD model file, resolves described ICD model automatically, extracts sAddr information automatically, and sAddr information and real-time data base are shone upon one by one, carries out inside and outside data sync.
Wherein, in step 1), further preferably mate IED information automatically by key word; Quick search function is provided, merges the IED information of general character automatically; The IED information spinner will comprise the description and the configuration information of measuring amount, incident, definite value; At measuring amount, carry out automatic packet transaction according to channel attributes, passage are separate; At incident, definite value, preferably carry out auto-associating by the practice of defencive function coupling; Definition meets the dictionary template of IEC61850 instantiation title.
In step 2) in, described embedded model meets IEC61850 standard XML template for what formulate in advance, is configured according to engine request.
In step 3), IED searches for effective I CD model file automatically and resolves, to decoding with the ICD model file of UTF-8 (a kind of elongated character of UNICODE is hereinafter to be referred as UTF-8) form coding; Adopt the linear address Unified coding
The advantage of this IEC61850 method for automatic modeling is, the IEC61850 function is encapsulated, and the operation of logic node is finished by Automatic Program, reduces the technical requirement to the user; Automatically derive the ICD model file, saved a large amount of engineering configuration efforts; Simultaneously, IED information can be adjusted, and guarantees the dirigibility of implementation procedure.
The characteristics of this implementation method are:
1. workable, also can modeling for the protection personnel that are unfamiliar with the IEC61850 standard.
2. efficient, generate the ICD model file automatically.
3. extensibility is strong, generates the mapping relations of IEC61850 information and real time data library information automatically, and the sAddr content can define flexibly.
Description of drawings
Fig. 1 is an IEC61850 automatic modeling level synoptic diagram;
Fig. 2 is an automatic modeling instrument design flow diagram;
Fig. 3 is that IED resolves sAddr and mapping process flow diagram.
Embodiment
The invention provides the method that a kind of XML of employing information reorganization realizes the transformer substation IEC 61850 automatic modeling, comprise the ICD model file generates, IED resolves automatically processing, model and real-time data base mapping, this method has following steps:
A. standard transformer station wall intelligent electronic device IED information adopts XML serializing technology that above-mentioned information is recombinated, and generates automatic modeling standardization interface document, mates IED information automatically by key word, improves the information working (machining) efficiency.Definition meets the dictionary template of IEC61850 instantiation title, is used for retrieving fast title abbreviations such as definite value, pressing plate;
B. stress model configuration template, load embedded model, by the automatic modeling instrument IED information is edited, disposed, on embedded model based, enrich the expression connotation of model, with the linear address of internal data according to certain rule encoding, automatically add pairing data attribute DAI (instantiation data attribute to, hereinafter to be referred as DAI) sAddr in, carry out logic node operation automatically, derive correct ICD model file; The automatic modeling instrument provides friendly configuration editing interface, 61850 abstract concepts are encapsulated, externally only provide and protect relevant option, reference symbol, allow the user is imperceptible to carry out 61850 modelings, possesses intelligent memory functional to repeating content edited in the modeling simultaneously, the content of general character is only imported once, is entered into historical template then;
C. transformer station's wall intelligent electronic device IED searches for and resolves the ICD model file that the automatic modeling instrument generates automatically, tree shaped model is converted into the plane leaf node, automatically extract sAddr information, with sAddr information is bridge, model and real-time data base are shone upon one by one, carry out inside and outside data sync.
Further combined with Figure of description and specific embodiment technical scheme of the present invention is described below.
Provide the hierarchical model of IEC61850 automatic modeling at accompanying drawing 1, comprised following three partial contents on concrete the enforcement: the one, the reorganization of IED information, standardization part; The 2nd, the automatic modeling instrument is derived ICD model file part; The 3rd, IED resolves the ICD model file and shines upon the real-time data base part automatically.Be illustrated with regard to the realization of each several part content respectively below:
(1), IED information reorganization, standardization
There are a plurality of defencive functions in protection, and different defencive functions can be thrown flexibly and move back, and configuration is abundant; each IED of IED producer information is also incomplete same; mainly comprise description, configuration informations such as measuring amount, incident, definite value,, need carry out standardization processing these information for unified Modeling.The invention provides XML information recombination form and standardization interface document, adopt Object-oriented Technique, design configurations base class and derived class, use XML serializing technology and load, store IED information, each IED producer can will describe according to debugging software separately, configuration information is converted into normalized interface document automatically, utilize the automatic modeling instrument to carry out modeling then.
(2), the automatic modeling instrument is derived the ICD model file
The normalized interface document of automatic modeling tool loads, stuff event, alarm, open into etc. the structural information body, and with these message reflections to tools interfaces, be convenient to check, edit.Simultaneously for these imformosomes that do not adopt Object-Oriented Design, can be configured, association, configuration interface encapsulates the IEC61850 function, need not the user and understands the IEC61850 standard, and protection slip-stick artist, Mechanic Engineer all can use.Specifically comprise two parts content: the one, information processing; The 2nd, generation model is illustrated with regard to the realization of this two parts content respectively below.
1, information processing
Tradition transformer station is to the digital transformer substation transition period, the IED internal data is not fully according to the IEC61850 standard definition, therefore exist on IED internal data and the IEC61850 stipulations interface and have asymmetric situation, for remedying information gap between the two, need process IED information, to satisfy of the requirement of IEC61850 standard the IED information integrity.
1), opens into, alarm, pressing plate
Adopt the instantiation title that defines in the IEC61850 standard, reflect IED input, output interface ability strictly according to the facts, the information that filtering is unnecessary.
2), incident
Adopt different defencive function logic nodes at different defencive functions, the special-purpose definite value item of clear and definite event correlation clearly is satellite informations such as protection startup or protection outlet.
3), definite value
Adopt the instantiation title that defines in the IEC61850 standard, fill information such as definite value step-length, dimension, maximal value, minimum value.
4), measuring amount
Separate according to voltage, current channel attribute, passage, mate MMXU, MMXN logic node automatically, carry out packet transaction automatically at the MMXU logic node.Do not meet the measuring amount of branch set condition, adopt MMXN or GGIO logic node automatically, satellite informations such as the dimension of filling measuring amount, bound.
5), record ripple
Filling record ripple starts, the record ripple is finished, electric network fault information.
2, generation model
The common information that defines in IEC 61850 standards is categorized in the embedded model,, follows principle from small to large, promptly from the bottom to the upper strata, set forth model as the common information of automatic modeling instrument.Comprising EnumType, DAType, several big classes of DOType.
As shown in Figure 2, after the operation of automatic modeling instrument, generate the automatic modeling instance objects, at first IED information is carried out standardization processing, in this process, if the standardization failure, instrument can provide miscue information; After ruleization changed into merit, automatic modeling tool loads embedding model judged whether embedded model is effective, whether meets the IEC61850 standard, whether possesses IEC61850 basic model information.After confirming that configuration is errorless, enter the ICD model file and generate ready state.The automatic modeling instrument shines upon LD, Dataset, LNType, LN example, DOI, DAI successively automatically, adds sAddr automatically, clears up useless nodal information, and model is carried out verification, derives correct ICD model file then.
The automatic modeling instrument adopts Object-oriented Technique based on the MSXML2.0 control, and file operation encapsulates to XML, simplifies the XML file operation.For follow-up XML node adds, deletion is got ready.After the user assigned " reduced model " instruction, the automatic modeling instrument is executable operations according to the following steps:
1), adds the LD node, some LD node commonly used acquiescences embody in embedded model, can add according to the IED actual disposition during generation model, cutting, during generation model, need to obtain earlier LD node handle, empty information about firms, and then add again, residual to guarantee unnecessary historical information.
2), add Dataset, the dot information with the remote signalling of model configuration, remote measurement, definite value adds Dataset to, forms data acquisition, guarantees the order of data.
3), add the LN node, add Mod, Beh, Health nodal information automatically for each node, reflect the operational mode and the quality situation of this logic node.The instance number of each LN node is appended processing automatically, prefix, and lnClass is according to model configuration interpolation automatically.
4), add LNType, according to the normalization information in the model configuration, logic node is sorted out, take out logical node type, the logic node of concrete similar behavior can shared logical node type, adds class members's information in each logical node type automatically.
5), add DOI, the dot information in the model configuration need carry out instantiation by DOI, adds data attribute, and the data object nest information.
6), add DAI, each member's of instantiation DOI data attribute for example, adds the description of each information point under ' dU ' node to the form of UTF-8
7), add sAddr information, sAddr is positioned at the terminal leaf node of model, configuration is added automatically according to model, sAddr information is the information that automatic modeling instrument and IED server software incident are appointed, is used for data map and identifies.SAddr information sample: " s1.s2.s3.s4... ", the s1 ~ s4 here can be self-defined, and for example defining s1 is type identification, differentiation incident, warning information; Definition s2 is the CPU sign; Definition s3 is the ID sign; Definition s4 is attribute-bit (expression numerical value, time, a quality etc.).
8), the reduced model file, append model file CRC check sign indicating number automatically, be used for version identifier.
(3), IED resolves the ICD model file and shines upon real-time data base automatically
Database is a most important module in the functional module of automatic modeling, because all realizations all depend on database structure.Utilizing the information of database storing model associated documents, wherein mainly is ICD information.The quantity of information that ICD comprises is very big, can not all have all information in the database.Under the prerequisite that guarantees the storage necessary information, the structure of database should be tried one's best simply, should make things convenient for applied function module and interface module to extract data simultaneously.
The information that ICD comprises can be divided into mark and data two classes.Wherein mark part belongs to constant part by IEC 61850-6 standardization, does not need to be stored in the database.And data division needs the modeling personnel to set up according to IED function and IEC61850 modeling method, belongs to uncertain part, needs input database.A principle of canned data should be: storing format informations not, only store concrete data message.
ICD mainly comprises DataTypeTemplate section and IED section.
Consider that from IEC 61850 through engineering approaches application point of view types such as the LNType in the DataTypeTemplate section, DOType are unified normalized.Begin before the IED modeling, the type that should use each IED gather after standardization and is the fundamental type storehouse.When setting up the IED model, the type of quoting must be chosen from the fundamental type storehouse, could guarantee to realize standardization.Information in the fundamental type storehouse can satisfy the needs of novel I ED modeling behind a small amount of the expansion, reach information multiplexing.The fundamental type data belong to system and share information, must guarantee data integrity when safeguarding, standardization.
The IED section mainly is to describe the information such as LN, DAI, DataSet and various controll blocks of each IED function.The IED model data belongs to the IED exclusive data.
After IED powers on, carry out init state, create real-time data base, creates successfully after, unlatching 61850 real-time Processing tasks.
After IED enters 61850 duties, automatically search icd or cid are the model file of suffix and carry out verification, search effective model file after, the beginning analytic model, with tree shaped model structure mapping SCL information structure, resolution data type template is opened up memory headroom, creates logical device, logic node, report controll block imformosome, the initialization report instance, generation model leaf node array after the success, promptly enters 61850 models and resolves completion status.
As shown in Figure 3, IED obtains the model information structure, automatically search for sAddr information, successively resolve tree-shaped nested structure, start with from the LD root node, travel through LD successively, LN, DO, for the SDO type of the nest of DO, the FC character set is empty, so the FC character set is appended into after need indexing DA again, search for the instantiated nodes at DAI place then, just calculate the primary retrieval process up to leaf node and finish, if find the sAddr node, and content is effective, then with sAddr and reference common storage in two-dimensional array, configuration result is outputed to file or global data structures body.If any place that does not meet the modeling standard is arranged in the recursive lookup process, can finish this recursive procedure in advance.More than described the process of searching a sAddr, existed a plurality of sAddr, leaching process to repeat above process in the ICD model file and get final product.
Guaranteeing under the effective situation of sAddr information, resolve sAddr information connotation, model leaf node and real-time data base are set up relation one to one, simultaneously the real-time data base feedback of status is arrived model leaf node data buffer, like this, the practical operation situation of IED is promptly by delivering to station level on the IEC61850 method of service.
More than describe the embodiment of the present invention in IEC61850 automatic modeling process in detail.
And scope of the present invention should not be limited to these descriptions.Any modification, improvement in principle of the invention scope all belongs to protection scope of the present invention.

Claims (4)

1. method that adopts XML information reorganization to realize the transformer substation IEC 61850 automatic modeling may further comprise the steps:
1), the wall intelligent electronic device IED of standard transformer station information, adopt XML serializing technology that above-mentioned information is recombinated, definition model configuration specification interface document is for automatic modeling provides unified model configuration template;
2), the stress model configuration template, load embedded model, the configuration template edition interface that supplies a model, encapsulation IEC61850 function is carried out the logic node operation automatically, adds short address sAddr information automatically, derives intelligent electronic device ability description ICD model file;
3), transformer station's wall intelligent electronic device IED loads described intelligent electronic device ability description ICD model file, automatically resolve described intelligent electronic device ability description ICD model, automatically extract short address sAddr information, with short address sAddr information is bridge, model and real-time data base are shone upon one by one, carry out inside and outside data sync.
2. according to the method for claim 1, it is characterized in that: in step 1), further mate IED information automatically by key word; Quick search function is provided, merges the IED information of general character automatically; IED information comprises the information of measuring amount, incident, definite value;
Wherein, at measuring amount, carry out automatic packet transaction according to channel attributes, passage are separate;
At incident, definite value, carry out auto-associating by the practice of defencive function coupling; Definition meets the dictionary template of IEC61850 instantiation title.
3. according to the method for claim 1, it is characterized in that: in step 2) in, described embedded model meets IEC61850 standard XML template for what formulate in advance, is configured according to engine request.
4. according to the method for claim 1, it is characterized in that: in step 3), IED searches for effective intelligent electronic device ability description ICD model file automatically and resolves, to decoding with the ICD model file of UTF-8 form coding; Adopt the linear address Unified coding.
CN2009102375561A 2009-11-19 2009-11-19 Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination Active CN101706773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102375561A CN101706773B (en) 2009-11-19 2009-11-19 Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102375561A CN101706773B (en) 2009-11-19 2009-11-19 Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination

Publications (2)

Publication Number Publication Date
CN101706773A CN101706773A (en) 2010-05-12
CN101706773B true CN101706773B (en) 2011-04-06

Family

ID=42376999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102375561A Active CN101706773B (en) 2009-11-19 2009-11-19 Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination

Country Status (1)

Country Link
CN (1) CN101706773B (en)

Families Citing this family (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101916999B (en) * 2010-07-14 2013-02-27 中国南方电网有限责任公司超高压输电公司南宁局 500kV regional control center control domain optimization system
CN101944770B (en) * 2010-08-04 2013-01-16 浙江省电力公司 Communication implementation method of virtual station grade IED mode between primary station and substation in fault information system 61850
CN102004817B (en) * 2010-11-03 2012-07-25 中国科学院电工研究所 International electrotechnical commission (IEC) 61850-7-420 standard-based distributed generating equipment modeling implementation method
CN101989312B (en) * 2010-11-18 2011-11-16 江苏省电力设计院 Graphical intelligent transformer substation model design method based on computer-aided design (CAD)
CN102830637A (en) * 2011-06-10 2012-12-19 辽宁省电力有限公司大连供电公司 Automatic self-description interface control document (ICD) encoder
CN102254074B (en) * 2011-08-04 2013-01-09 上海思源弘瑞自动化有限公司 Automatic modeling method of intelligent transformer substation spacer
CN102270261B (en) * 2011-08-09 2012-10-03 山东电力工程咨询院有限公司 Design method for intelligent transformer station model based on CAD (Computer-Aided Design) graph and model integration
CN102361350B (en) * 2011-10-13 2013-10-30 广东电网公司电力科学研究院 Method for monitoring power grid equipment on line
CN102436523A (en) * 2011-10-17 2012-05-02 浙江省电力试验研究院 Method for automatically mapping digital substation interval wiring diagram
CN102510133B (en) * 2011-11-22 2014-07-23 广东电网公司电力科学研究院 On-line monitoring method for insulated equipment
CN102436242A (en) * 2011-11-22 2012-05-02 广东电网公司电力科学研究院 On-line environmental monitoring method and system
CN102611197B (en) * 2011-12-31 2013-12-04 南京因泰莱电器股份有限公司 Digital power monitoring system according with IEC61850 (Communication Networks and Systems in Substations) standard
CN102624607B (en) * 2011-12-31 2013-03-27 山东电力工程咨询院有限公司 Intelligent transformer substation communication method capable of modeling on basis of physical port of Ethernet switch
CN102646112A (en) * 2012-02-17 2012-08-22 南京南瑞继保电气有限公司 Visual modeling method for capability description file of direct-current protection control device
CN102647024A (en) * 2012-04-13 2012-08-22 广东省电力调度中心 Method for realizing plug and play of IED (Intelligent Electronic Device) equipment in transformer substation based on standardized virtual terminal
CN102779156B (en) * 2012-05-31 2014-11-05 南京南瑞继保电气有限公司 Configuration method for database of communication device in digital substation
CN102799789B (en) * 2012-07-30 2015-12-16 国网电力科学研究院 The main equipment model foundation of a kind of hydraulic power plant, storage and synchronous method
CN102914721B (en) * 2012-11-15 2016-12-21 宁波电业局 The checking system of a kind of protective relaying device and the method for inspection
CN103324693A (en) * 2013-06-05 2013-09-25 国电南瑞科技股份有限公司 Modeling method based on international electro technical commission (IEC) 61850 protocol and extensive makeup language (XML) database
CN103338262B (en) * 2013-07-05 2016-05-04 南京国电南自电网自动化有限公司 Based on the fast initializing method of IEC61850 and MMS client
CN103399244B (en) * 2013-08-21 2015-10-28 国网电力科学研究院 A kind of substation field test intelligently parsing data method
US20150294037A1 (en) * 2014-04-11 2015-10-15 General Electric Company System and method for automated substation design and configuration
CN103942345B (en) * 2014-05-13 2017-04-19 国家电网公司 Method for automatically generating IED network graph
CN104156515B (en) * 2014-07-28 2017-09-15 湖北文理学院 A kind of IED formalized description method for analyzing performance based on Markov process
CN104333134B (en) * 2014-10-30 2017-01-18 国家电网公司 Substation cluster measurement and control system ICD model automatic recognition device and recognition method
CN104463699A (en) * 2014-12-08 2015-03-25 宁夏回族自治区电力设计院 Intelligent substation control layer information extraction method and device
CN104638767B (en) * 2015-02-05 2017-01-04 广东电网有限责任公司电力科学研究院 Spacer layer data source simulation method and device for intelligent substation test
CN105162252B (en) * 2015-08-28 2018-03-02 珠海许继电气有限公司 The method of plug and play distribution terminal information realization automatic mapping based on CID files
CN105243116A (en) * 2015-09-28 2016-01-13 许继集团有限公司 Automatic generation method for electronic device capability description file of intelligent substation
CN105630563A (en) * 2016-01-25 2016-06-01 南京国电南自电网自动化有限公司 Dynamic model configuration method of relay protection device specification based on XML (Extensible Markup Language)
CN106022962B (en) * 2016-05-24 2022-01-28 南京国电南自电网自动化有限公司 Improved method for analyzing configuration file of merging unit by using extended 61850 model
CN106021203B (en) * 2016-05-26 2021-08-27 中国电力科学研究院有限公司 Intelligent substation anti-misoperation lockout logic graphical expression method
CN106027316A (en) * 2016-07-18 2016-10-12 中国南方电网有限责任公司 Power distribution network terminal modeling method
CN106227543B (en) * 2016-07-27 2019-11-12 北京四方继保自动化股份有限公司 A kind of modeling method towards IEC61850
CN106254124B (en) * 2016-08-17 2019-07-19 许继集团有限公司 One kind being based on the improved Intelligent substation merging unit configuration method in short address
CN106557316B (en) * 2016-10-28 2019-11-12 南京国电南自电网自动化有限公司 Based on 61850 site protective relaying device menu modeling method
CN108279885B (en) * 2017-01-03 2021-04-09 中国航发商用航空发动机有限责任公司 Method and device for integrating software of multiple model codes
CN106940642B (en) * 2017-01-13 2020-03-31 西南电子技术研究所(中国电子科技集团公司第十研究所) Bus simulator system with dynamic ICD configuration
CN106874011B (en) * 2017-02-28 2020-06-09 南京南瑞继保电气有限公司 File generation method and device
CN107482572B (en) * 2017-09-08 2019-01-18 南京国电南自电网自动化有限公司 A kind of site protective device based on 61850 outputs drive method
CN109034616B (en) * 2018-07-25 2021-11-02 贵州电网有限责任公司 Statistical analysis system based on intelligent substation configuration data management and control
CN109301933A (en) * 2018-09-11 2019-02-01 国网天津市电力公司电力科学研究院 One kind being based on low-voltage intelligent platform area secondary function method of integrated modeling
CN109409003B (en) * 2018-11-13 2022-06-28 南京南瑞继保电气有限公司 Method for instantiating array model
CN110602265B (en) * 2019-09-02 2022-02-01 积成电子股份有限公司 61850 model short address configuration and resource mapping method suitable for IED equipment
CN110781162A (en) * 2019-09-27 2020-02-11 国电南瑞科技股份有限公司 Database modeling method based on SCD
CN111475919B (en) * 2020-03-12 2023-06-13 中国南方电网有限责任公司 Automatic modeling method of protection device fixed value calculation model based on ICD file
CN111817437B (en) * 2020-07-03 2023-06-09 中国南方电网有限责任公司 Intelligent substation intelligent recorder modeling method
CN114221864A (en) * 2020-09-03 2022-03-22 中国南方电网有限责任公司 Intelligent substation switch machine model and configuration dynamic management method and device
CN112445516A (en) * 2020-10-30 2021-03-05 许继集团有限公司 Relay protection system software dynamic data modeling method and device
CN113326309B (en) * 2021-06-16 2024-02-20 南京国电南自轨道交通工程有限公司 Tool for automatically extracting SCD information aiming at phenotype structure database
CN114157732B (en) * 2021-11-12 2024-03-19 西安羚控电子科技有限公司 Remote measurement data analysis method and system for large and medium-sized fixed wing unmanned aerial vehicle

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1960107A (en) * 2006-12-01 2007-05-09 北京四方继保自动化股份有限公司 Intellective method of modeling electronic equipment compatible to IEC61850 standard, and traditional protection models
CN101026633A (en) * 2007-03-01 2007-08-29 江西省电力科学研究院 IEC 61850 and OPC based heterogeneous power quality monitoring device integrating method and gateway
CN101035099A (en) * 2007-02-09 2007-09-12 浙江大学 General gateway design method for realizing the IEC61850 standard

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1960107A (en) * 2006-12-01 2007-05-09 北京四方继保自动化股份有限公司 Intellective method of modeling electronic equipment compatible to IEC61850 standard, and traditional protection models
CN101035099A (en) * 2007-02-09 2007-09-12 浙江大学 General gateway design method for realizing the IEC61850 standard
CN101026633A (en) * 2007-03-01 2007-08-29 江西省电力科学研究院 IEC 61850 and OPC based heterogeneous power quality monitoring device integrating method and gateway

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
罗四倍,黄润长,崔琪等.基于IEC61850 标准面向对象思想的IED 建模.《电力系统保护与控制》.2009,第37卷(第17期),88-92,121. *

Also Published As

Publication number Publication date
CN101706773A (en) 2010-05-12

Similar Documents

Publication Publication Date Title
CN101706773B (en) Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination
CN102439818B (en) Method and device for auto-generating goose signal connection topology from substation level
CN103077212B (en) Transformer substation configuration file control method and system
CA2658579C (en) A method of configuring intelligent electronic devices to facilitate standardized communication messages among a plurality of ieds within a network
CN102929911B (en) Substation and scheduling station method of integrated modeling
CN103295163A (en) Chart-model integrated transformer substation and dispatch master station cooperation modeling method
CN102542513A (en) Body-based verification tool of power grid public information model and method thereof
CN109284346A (en) A kind of distribution network planning method and device based on cloud computing
Rohjans et al. Cimbat-automated generation of cim-based opc ua-address spaces
KR101397380B1 (en) System for integrating meta-modeling
CN112328323B (en) Relay protection device capability description file generation system
CN105760272B (en) Monitoring backstage business customizing method and its system based on plug-in unit
CN107403044A (en) Towards the general-purpose interface implementation method of satellite navigation system protocol test
CN105630500A (en) CIM object model for data processing and programming frame thereof
KR101397381B1 (en) Method for integrating meta-modeling
CN105243116A (en) Automatic generation method for electronic device capability description file of intelligent substation
CN104750468B (en) A kind of server-side topological data conversion method and conversion equipment
CN104881739A (en) Marketing and distribution data consistency verification method based on IEC61970-61968 CIM standard
KR101397379B1 (en) System for transformation meta-modeling
CN105550431A (en) Three-dimensional layout design data integration method and system for nuclear power plant
CN103569421A (en) Data collection and analysis device for cigarette packing machine
CN103324693A (en) Modeling method based on international electro technical commission (IEC) 61850 protocol and extensive makeup language (XML) database
CN114123482A (en) Main plant station information joint debugging decoupling method
CN103353898B (en) The treatment system that a kind of system data transform to CIM XML format
Prior et al. A method for mapping novel product groups in AutomationML as the first step for creating their virtual twin

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant