CN103399244B - A kind of substation field test intelligently parsing data method - Google Patents
A kind of substation field test intelligently parsing data method Download PDFInfo
- Publication number
- CN103399244B CN103399244B CN201310365720.3A CN201310365720A CN103399244B CN 103399244 B CN103399244 B CN 103399244B CN 201310365720 A CN201310365720 A CN 201310365720A CN 103399244 B CN103399244 B CN 103399244B
- Authority
- CN
- China
- Prior art keywords
- tested
- data
- submodule
- processing module
- dictionary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention discloses a kind of substation field test intelligently parsing data method, it is characterized in that: the method specifically comprises the following steps: connect intelligent test system and device being tested; Data processing module is utilized to carry out intelligent data parsing; Start test.Substation field test intelligently parsing data method provided by the invention applies data processing module, this data processing module comprises the semantic basic dictionary submodule of LN and DO and LN and DO semantic extension dictionary submodule, there is highly versatile and " self study " function, enable the various devices being tested of intelligent test system on-the-spot test different manufacturers, and whole on-the-spot test process is controlled by data processing module completely, without the need to manual intervention, the test error greatly reducing on-the-spot test workload like this and bring due to human factor.
Description
Technical field
The present invention relates to a kind of substation field test intelligently parsing data method, belong to relay protection test technical field.
Background technology
IEC61850 in intelligent substation adopts the new technologies and methods such as layering, object-oriented modeling, and its bottom maps directly to and manufactures on message specification (MMS), and this function support is tested automatically.Relay protection manufacturer have for detect self produce the testing tool of correctness of Equipments Setting, work, but this kind equipment is facing to manufacture producer, is special.The important problem of of Common Testing instrument of exploitation onsite application is exactly the information to obtaining, particularly logical node (LogicNode, and data object (Data Objects LN), DO) problem analysis is carried out, because, although each producer all supports IEC61850 stipulations now, the different devices being tested of different manufacturers all comprise one or more logical device (LogicDevice, LD), each LD comprises a LN0 and several LN, LN is the least unit of function, LN as PTOC type represents band time limit overcurrent protection, comprise the time limit, the definite values such as overcurrent and protection starting operation state, MMXU represents the analog quantity of 3 phase systems, comprises the data such as electric current, voltage, power, the data such as CSWI represents switch object, comprises on off state, switch control point.The LN comprised from LD both can know the function that LD can support.The lower DBMS of LN is called DO, each DO implication of unified definition in IEC61850 stipulations; But different manufacturers is not quite identical to the understanding of stipulations, can be variant in detail, also there is a lot of difference in each producer such as the form of its communication data, correctly must resolve these data and could unify test, so it is compatible to be badly in need of now a kind of existing apparatus to each producer, and want the substation field test intelligently parsing data method that can have certain exploitability to new device.
Summary of the invention
Technical matters to be solved by this invention is, provides a kind of highly versatile and has the substation field test intelligently parsing data method of " self study " function.
For solving the problems of the technologies described above, the technical solution used in the present invention is:
A kind of substation field test intelligently parsing data method, is characterized in that: comprise the following steps:
Step 1: connect intelligent test system and device being tested: utilize MMS communication to be connected the network port of intelligent test system and the network port of device being tested, utilize GOOSE/SV communication to connect the optical fiber port of intelligent test system and the optical fiber port of device being tested, described intelligent test system is provided with data processing module;
Step 2: utilize data processing module to carry out Data Analysis: described intelligent test system obtains the MMS message of device being tested by the network port, the LD list of device being tested is opened in data processing module, input LD to be tested is required according to user test, by the intelligently parsing data submodule in data processing module the MMS message analysis of described device being tested is converted into the information under LD to be tested, by the dictionary file in data processing module, information analysis under LD to be tested is described as the authority data information of the LD to be tested of intelligent test system definition by inquiry submodule and dictionary reading submodule, be converted into the authority data information of unified LD to be tested by the Chinese of different expression form by the information under LD to be tested,
Described LD to be tested is a logical device to be measured of device being tested;
The MMS message of described device being tested is a string code needing to resolve, and the MMS message of the described device being tested of each producer has producer's otherness, needs to carry out intelligent data parsing, and forms unified and standard data;
Information under described LD to be tested is that a string Chinese describes, and the difference of each producer is that the Chinese of same device being tested describes form of expression difference;
The authority data information of described LD to be tested is self-defining, unique, and user is familiar with understandable Chinese definition, and the information under the LD described to be tested of different manufacturers is carried out unified definition;
Step 3: start test.
Described data processing module comprises by data relationship table corresponding to the authority data information of the information under described LD to be tested and described LD to be tested, described data relationship table is a dictionary file, and described dictionary file comprises the semantic basic dictionary submodule of LN and DO and LN and DO semantic extension dictionary submodule; Described data processing module comprises following functions module:
The semantic basic dictionary submodule of LN and DO: because the formulation of IEC61850 specification is issued, the MMS message specification of each producer is unanimous on the whole, sets up a basic dictionary submodule, resolves most of data; The semantic basic dictionary submodule of described LN and DO adopts XML file form, sets up the description document of various LN and various DO;
LN and DO semantic extension dictionary submodule: the difference of each producer is mainly at the form of MMS message, order and specifically define difference, user oneself writes described LN and DO semantic extension dictionary submodule or utilizes extension dictionary generator program to produce described LN and DO semantic extension dictionary submodule, described LN and DO semantic extension dictionary submodule associates with the device being tested of each producer, such as the extension dictionary file of southern auspicious science and technology or the extension dictionary file in four directions, Beijing, when user runs into new device being tested data, by self-defined or amendment, generate new LN and DO semantic extension dictionary file,
Inquiry submodule: support the retrieval of various LD to be tested, inquiry;
Intelligently parsing data submodule: the MMS message data of described device being tested is analyzed, obtain the information under LD to be tested, described intelligently parsing data submodule reads dictionary file according to different devices being tested, obtaining data relationship table, is the authority data information of intelligent test system definition the convert information under LD to be tested according to data relationship table;
Dictionary reading submodule: read above-mentioned authority data information and test.
Described authority data information comprises setting valve parameter and communications parameter.
Described device being tested comprises protective device.
This method solves each producer variability issues by dictionary file, intelligently parsing data.There is different representations in the information of same data in the authority data information of LD to be tested under the LD to be tested of different manufacturers, its one_to_one corresponding, a form will be formed in dictionary file.
Intelligent test system is according to the unified and standard data of successfully resolved, and can obtain the specifying information of the process layer data generated, such as definite value parameter etc., just can production process layer data test automatically.
General Analytical data are directly resolved by program, when resolved data variation, must change analysis program; And this method have employed dictionary file mode, resolution data carrys out intellectual analysis according to the content of dictionary file, and analysis program has nothing to do, and when resolved data variation, just can adapt to new change by LN and DO semantic extension dictionary file.Such system just can not stop to adapt to new intelligent apparatus and new producer's test request by extension dictionary file, and master routine of need not upgrading.
A kind of substation field test intelligently parsing data method provided by the invention applies data processing module, this data processing module has versatility and " self study " function, enable the various devices being tested of intelligent test system on-the-spot test different manufacturers, and whole on-the-spot test process is controlled by data processing module completely, without the need to manual intervention, the test error greatly reducing on-the-spot test workload like this and bring due to human factor.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is intelligent data analytic method schematic diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the present invention is further described.
As shown in Figure 1-2, a kind of substation field test intelligently parsing data method, is characterized in that: comprise the following steps:
Step 1: connect intelligent test system and device being tested: utilize MMS communication to be connected the network port of intelligent test system and the network port of device being tested, utilize GOOSE/SV communication to connect the optical fiber port of intelligent test system and the optical fiber port of device being tested, described intelligent test system is provided with data processing module;
Step 2: utilize data processing module to carry out Data Analysis: described intelligent test system obtains the MMS message of device being tested by the network port, the LD list of device being tested is opened in data processing module, input LD to be tested is required according to user test, by the intelligently parsing data submodule in data processing module the MMS message analysis of described device being tested is converted into the information under LD to be tested, by the dictionary file in data processing module, information analysis under LD to be tested is described as the authority data information of the LD to be tested of intelligent test system definition by inquiry submodule and dictionary reading submodule, be converted into the authority data information of unified LD to be tested by the Chinese of different expression form by the information under LD to be tested,
Described LD to be tested is a logical device to be measured of device being tested;
The MMS message of described device being tested is a string code needing to resolve, and the MMS message of the described device being tested of each producer has producer's otherness, needs to carry out intelligent data parsing, and forms unified and standard data;
Information under described LD to be tested is that a string Chinese describes, and the difference of each producer is that the Chinese of same device being tested describes form of expression difference;
The authority data information of described LD to be tested is self-defining, unique, and user is familiar with understandable Chinese definition, and the information under the LD described to be tested of different manufacturers is carried out unified definition;
Step 3: start test.
Described data processing module comprises by data relationship table corresponding to the authority data information of the information under described LD to be tested and described LD to be tested, described data relationship table is a dictionary file, and described dictionary file comprises the semantic basic dictionary submodule of LN and DO and LN and DO semantic extension dictionary submodule; Described data processing module comprises following functions module:
The semantic basic dictionary submodule of LN and DO: because the formulation of IEC61850 specification is issued, the MMS message specification of each producer is unanimous on the whole, sets up a basic dictionary submodule, resolves most of data; The semantic basic dictionary submodule of described LN and DO adopts XML file form, sets up the description document of various LN and various DO;
LN and DO semantic extension dictionary submodule: the difference of each producer is mainly at the form of MMS message, order and specifically define difference, user oneself writes described LN and DO semantic extension dictionary submodule or utilizes extension dictionary generator program to produce described LN and DO semantic extension dictionary submodule, described LN and DO semantic extension dictionary submodule associates with the device being tested of each producer, such as the extension dictionary file of southern auspicious science and technology or the extension dictionary file in four directions, Beijing, when user runs into new device being tested data, by self-defined or amendment, generate new LN and DO semantic extension dictionary file,
Inquiry submodule: support the retrieval of various LD to be tested, inquiry;
Intelligently parsing data submodule: the MMS message data of described device being tested is analyzed, obtain the information under LD to be tested, described intelligently parsing data submodule reads dictionary file according to different devices being tested, obtaining data relationship table, is the authority data information of intelligent test system definition the convert information under LD to be tested according to data relationship table;
Dictionary reading submodule: read above-mentioned authority data information and test.
Described authority data information comprises setting valve parameter and communications parameter.
Described device being tested comprises protective device.
The above is only the preferred embodiment of the present invention; be noted that for those skilled in the art; under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.
Claims (4)
1. a substation field test intelligently parsing data method, is characterized in that: comprise the following steps:
Step 1: connect intelligent test system and device being tested: utilize MMS communication to be connected the network port of intelligent test system and the network port of device being tested, utilize GOOSE/SV communication to connect the optical fiber port of intelligent test system and the optical fiber port of device being tested, described intelligent test system is provided with data processing module, step 2: utilize data processing module to carry out Data Analysis: described intelligent test system obtains the MMS message of device being tested by the network port, the LD list of device being tested is opened in data processing module, input LD to be tested is required according to user test, by the intelligently parsing data submodule in data processing module the MMS message analysis of described device being tested is converted into the information under LD to be tested, by the dictionary file in data processing module, information analysis under LD to be tested is described as the authority data information of the LD to be tested of intelligent test system definition by inquiry submodule and dictionary reading submodule, by the information under LD to be tested by different pieces of information specification, the code of different-format is converted into the authority data information of unified LD to be tested,
Described LD to be tested is a logical device to be measured of device being tested;
The MMS message of described device being tested is a string code needing to resolve;
Information under described LD to be tested is that a string Chinese describes, and the difference of each producer is that the description form of expression of same device being tested is different;
The authority data information of described LD to be tested is self-defining, unique, and the information under the LD described to be tested of different manufacturers is carried out unified definition;
Step 3: start test.
2. a kind of substation field test intelligently parsing data method according to claim 1, it is characterized in that: described data processing module comprises by data relationship table corresponding to the authority data information of the information under described LD to be tested and described LD to be tested, described data relationship table is a dictionary file, and described dictionary file comprises the semantic basic dictionary submodule of LN and DO and LN and DO semantic extension dictionary submodule; Described data processing module comprises following functions module:
The semantic basic dictionary submodule of LN and DO: set up a basic dictionary submodule, resolve most of data; The semantic basic dictionary submodule of described LN and DO adopts XML file form, sets up the description document of various LN and various DO;
LN and DO semantic extension dictionary submodule: when user runs into new device being tested data, by self-defined or amendment, generates new LN and DO semantic extension dictionary file;
Inquiry submodule: support the retrieval of various LD to be tested, inquiry;
Intelligently parsing data submodule: the MMS message data of described device being tested is analyzed, obtain the information under LD to be tested, described intelligently parsing data submodule reads dictionary file according to different devices being tested, obtaining data relationship table, is the authority data information of the LD to be tested of intelligent test system definition the convert information under LD to be tested according to data relationship table;
Dictionary reading submodule: read the authority data information of above-mentioned LD to be tested and test.
3. a kind of substation field test intelligently parsing data method according to claim 1, is characterized in that: described authority data information comprises setting valve parameter and communications parameter.
4. a kind of substation field test intelligently parsing data method according to claim 1, is characterized in that: described device being tested comprises protective device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310365720.3A CN103399244B (en) | 2013-08-21 | 2013-08-21 | A kind of substation field test intelligently parsing data method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310365720.3A CN103399244B (en) | 2013-08-21 | 2013-08-21 | A kind of substation field test intelligently parsing data method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103399244A CN103399244A (en) | 2013-11-20 |
CN103399244B true CN103399244B (en) | 2015-10-28 |
Family
ID=49562901
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310365720.3A Active CN103399244B (en) | 2013-08-21 | 2013-08-21 | A kind of substation field test intelligently parsing data method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103399244B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103605293B (en) * | 2013-11-27 | 2016-05-04 | 南京南瑞集团公司 | A kind of substation relay protection emulation test system and emulation test method thereof |
CN104572898B (en) * | 2014-12-22 | 2017-09-22 | 上海找钢网信息科技股份有限公司 | The data analysis method and system of a kind of steel trade industry stock resource |
CN105606929B (en) * | 2015-12-30 | 2018-11-13 | 国网浙江省电力公司 | A kind of intelligent substation relay protection test signal isolation and recombination method |
CN105866567B (en) * | 2016-03-24 | 2018-12-07 | 南京能云电力科技有限公司 | A kind of automatic test system of relay protection device based on foundation forms technology |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101035099A (en) * | 2007-02-09 | 2007-09-12 | 浙江大学 | General gateway design method for realizing the IEC61850 standard |
CN101706773A (en) * | 2009-11-19 | 2010-05-12 | 北京四方继保自动化股份有限公司 | Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination |
CN102723784A (en) * | 2012-06-20 | 2012-10-10 | 湖州电力局 | IEC 61850-based transformer protection fixed value automatic generation system and setting-free implementation method |
WO2013019123A1 (en) * | 2011-07-19 | 2013-02-07 | Auckland Uniservices Limited | Improvements to the control of networks |
CN103151845A (en) * | 2013-03-29 | 2013-06-12 | 国家电网公司 | Intelligent substation state monitoring platform based on IEC 61850 |
CN103200051A (en) * | 2013-04-27 | 2013-07-10 | 国家电网公司 | Intelligent substation message simulation testing and association message analysis system and method |
CN203054133U (en) * | 2013-01-29 | 2013-07-10 | 江西省电力科学研究院 | Intelligent test system of intelligent protection and measuring control device |
-
2013
- 2013-08-21 CN CN201310365720.3A patent/CN103399244B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101035099A (en) * | 2007-02-09 | 2007-09-12 | 浙江大学 | General gateway design method for realizing the IEC61850 standard |
CN101706773A (en) * | 2009-11-19 | 2010-05-12 | 北京四方继保自动化股份有限公司 | Method for realizing fast and automatic modeling of transformer substation IEC 61850 by adopting XML information recombination |
WO2013019123A1 (en) * | 2011-07-19 | 2013-02-07 | Auckland Uniservices Limited | Improvements to the control of networks |
CN102723784A (en) * | 2012-06-20 | 2012-10-10 | 湖州电力局 | IEC 61850-based transformer protection fixed value automatic generation system and setting-free implementation method |
CN203054133U (en) * | 2013-01-29 | 2013-07-10 | 江西省电力科学研究院 | Intelligent test system of intelligent protection and measuring control device |
CN103151845A (en) * | 2013-03-29 | 2013-06-12 | 国家电网公司 | Intelligent substation state monitoring platform based on IEC 61850 |
CN103200051A (en) * | 2013-04-27 | 2013-07-10 | 国家电网公司 | Intelligent substation message simulation testing and association message analysis system and method |
Also Published As
Publication number | Publication date |
---|---|
CN103399244A (en) | 2013-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103399244B (en) | A kind of substation field test intelligently parsing data method | |
CN103869190A (en) | Real time simulation system-based power distribution terminal automatic closed-loop test platform | |
CN104699801A (en) | Method and device of secondary equipment associating configuration | |
CN106126528B (en) | A kind of moonlet test basic information generation method based on platform model | |
CN102497027B (en) | Automatic modeling method of digital fault recorder | |
CN103268325A (en) | Dynamic checking method of intelligent substation IED (intelligent electronic device) model configuration correctness based on SCD (security coding device) files | |
CN104851056A (en) | Intelligent transformer station secondary system model standard library management system and method | |
CN106709143A (en) | VFTO batch simulation analysis method and system based on ATP automatic modeling | |
CN104569903A (en) | Automatic test system and test method | |
CN105989206B (en) | Wind power plant and photovoltaic plant model verification method based on fast reaction generator | |
CN107247827B (en) | Virtual terminal model modeling and automatic wiring method based on machine learning | |
CN106780150A (en) | Intelligent telecontrol fixed value list platform for making and method | |
CN105205039A (en) | Customizable SCD (substation configuration description) file verification method | |
CN109374994A (en) | A kind of detection system suitable for protective relaying device | |
CN106229974A (en) | A kind of method that electric power networks rapid topology based on chart database is analyzed | |
CN104463699A (en) | Intelligent substation control layer information extraction method and device | |
CN103207378B (en) | A kind of arrester resistance current source analogue system | |
CN103760775A (en) | Merging unit simulator | |
CN203217070U (en) | An arrester resistive current source simulation system | |
Zhang et al. | Research on the key technology of smart substation model configuration and check | |
CN108808862B (en) | Master station number changing method based on frequent change of distribution automation station number | |
CN106407534A (en) | Method and device for processing electromagnetic transient simulation data | |
CN103207795B (en) | A kind of electric flux collocation method based on lightweight WEB server | |
CN104331552A (en) | Data description method of transformer substation secondary device | |
Guddanti et al. | Better data structures for co-simulation of distribution system with gridlab-d and python |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Co-patentee after: NARI Group Corp. Patentee after: STATE GRID WUHAN HIGH VOLTAGE Research Institute Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Co-patentee before: NARI Group CORPORATION STATE GRID ELECTRIC POWER INSTITUTE Patentee before: STATE GRID WUHAN HIGH VOLTAGE Research Institute |
|
CP01 | Change in the name or title of a patent holder |