CN101705711A - System for preventing sewer pipeline of building from being blocked - Google Patents

System for preventing sewer pipeline of building from being blocked Download PDF

Info

Publication number
CN101705711A
CN101705711A CN200910175223A CN200910175223A CN101705711A CN 101705711 A CN101705711 A CN 101705711A CN 200910175223 A CN200910175223 A CN 200910175223A CN 200910175223 A CN200910175223 A CN 200910175223A CN 101705711 A CN101705711 A CN 101705711A
Authority
CN
China
Prior art keywords
shunt pipe
sewer pipeline
pipe
pipeline
vertical tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910175223A
Other languages
Chinese (zh)
Other versions
CN101705711B (en
Inventor
勾越阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction & Investment Baosu Pipe Industry Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009101752230A priority Critical patent/CN101705711B/en
Publication of CN101705711A publication Critical patent/CN101705711A/en
Application granted granted Critical
Publication of CN101705711B publication Critical patent/CN101705711B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The invention relates to a system for preventing a sewer pipeline of a building from being blocked, used for solving the problem of blocking and backflowing of the sewer pipeline. The technical scheme thereof is as follows: the system comprises a main pipe of the sewer pipeline, consisting of a vertical pipe, a horizontal pipe and a turning elbow communicated with the vertical pipe and the horizontal pipe, wherein the horizontal pipe is led to a sewage well; after improvement, two ends of the turning elbow are connected with a distribution branch pipe in parallel; and an inlet end of the distribution branch pipe is positioned on the vertical pipe and an outlet end thereof is positioned on the horizontal pipe. In the system, an alarm device which can find the blocking of the pipeline in time is arranged on the sewer pipeline, and simultaneously the distribution branch pipe is arranged at the position of the main sewer pipeline so as to keep normal water flow state of the pipeline temporarily, thus effectively preventing the occurrence of the condition that the sewage returns upwards and overflows due to the blocking of the main pipe, avoiding adverse consequences and solving the worries in the future for residents at the downstairs of the building.

Description

A kind of anti-clogging sewer pipeline of building system
Technical field
Type of the present invention relates to a kind of building water drain pipe-line system, particularly has the sewer pipeline of building anti-blockage structure of warning function, belongs to the water discharge technology field.
Background technology
In recent years, along with the quickening of Development of China's Urbanization, increasing people have lived in building, and the sewer pipeline of building clogging more and more becomes a difficult problem of puzzlement resident normal life.After sewer pipe stops up, not only influence the normal life daily life of whole unit resident family, serious resident family of the lower floor property loss that also can cause.The sewer pipe of building is the position that the easiest generation is stopped up usually by vertical sewer pipe and be positioned at the underground transverse tube that passes to sink hole or septic tank and constitute in the elbow that turns to of vertical tube and transverse tube.Because sewer pipe is interior through thick substances such as regular meeting's inflow animal and plant fats; or with the hair of water discharging, plastics, rag etc.; after these things flow into sewer pipe; can be attached to the tube wall inboard; particularly in the elbow that vertical tube is connected with transverse tube, because water (flow) direction is undergone mutation, flowing velocity is also slowed down suddenly; thereby above-mentioned substance is easy to accumulate over a long period and cause line clogging at the dirty body of elbow delay formation.This elbow is usually in the underground or basement of residential building bottom, this place is in case stop up, user does not upstairs find that sewer pipe is blocked, therefore continue water, it is indoor to cause sewage to pour in down a chimney into Stall even second floor user from sewer pipe, thereby resident family of lower floor is produced very serious consequence.This phenomenon is not accidental, causes the thing of neighbourhood's dispute of common occurrence in some biotopes because of sewer pipe stops up.
Summary of the invention
Technical problem to be solved by this invention is the defective that overcomes above-mentioned prior art, and a kind of anti-clogging sewer pipeline of building system that can keep the normal water flowing of pipeline temporarily and can report to the police automatically when main sewer pipe stop up is provided.
The alleged problem of the present invention is solved by following technical scheme:
A kind of anti-clogging sewer pipeline of building system, it comprises by vertical tube, transverse tube and the sewer pipe that elbow forms that turns to that is communicated with vertical tube, transverse tube is responsible for, wherein, transverse tube leads to sink hole, after the improvement, shunt pipe in parallel at the two ends that turn to elbow, the arrival end of shunt pipe is positioned on the vertical tube, and the shunt pipe port of export is positioned on the transverse tube.
Above-mentioned anti-clogging sewer pipeline of building system sets up liquid level alarm, is provided with to survey mouthful on vertical tube, and the position of surveying mouthful is lower than the arrival end of shunt pipe, is higher than the shunt pipe port of export; The probe of described liquid level alarm is positioned at surveys mouth.
Above-mentioned anti-clogging sewer pipeline of building system, described shunt pipe arrival end is higher than surveys a mouthful 200-500mm, and the described shunt pipe port of export is to turning to elbow outlet distance greater than 500mm.
Above-mentioned anti-clogging sewer pipeline of building system, described shunt pipe arrival end is communicated with the vertical tube level through reducer tee, shunt pipe compares less than 1 with the diameter of vertical tube, and described detection mouth is installed in 45 ° of arm positions of 45 ° of reducer tees, and reducer tee arm and vertical tube are 45 ° upwards.
Above-mentioned anti-clogging sewer pipeline of building system, described system also is provided with the heating dredging mechanism, described heating dredging mechanism is made of ribbon heater and heating controller, the ribbon heater is looped around on the transverse tube that turns to the elbow, heating controller connects the ribbon heater, and the signal of telecommunication of liquid level alarm output is delivered to heating controller.
Above-mentioned anti-clogging sewer pipeline of building system, described vertical tube is positioned at shunt pipe arrival end top and is provided with expansion coupling; Described transverse tube is positioned at the shunt pipe port of export outside and is provided with down expansion coupling.
Above-mentioned anti-clogging sewer pipeline of building system, inspection hole is set up at the described dorsal part middle part that turns to elbow.
The present invention is directed to sewer pipeline of building obstruction backing up of sewage problem improves existing sewer pipeline system, it is provided with the warning device that can in time find line clogging, in time obtain the sewer pipe block information with caution administrative staff or owner, adopt corresponding measure repairing pipeline, simultaneously set up shunt pipe at main sewer pipe place, can keep the normal water flowing state of pipeline temporarily, thereby effectively prevent to cause the generation of returning flooded conditions on the sewage because of being responsible for to stop up, for pipe-dredging gains time, avoid producing adverse consequences.The present invention is simple in structure, and is easy to use, and cost is lower, is beneficial to pipe-dredging.It is not only applicable to new building, and can be used for the aging blocks pipeline modification.This structure has thoroughly solved sewer pipeline of building and has stopped up the problem of backflowing, and for resident family of building lower floor has solved trouble and worry, has very real using value.
Description of drawings
Fig. 1 is structural representation of the present invention (during the sewer pipe blocked state).
Number in the figure is expressed as follows: 1. vertical tube; 2. liquid level alarm; 3. survey mouth; 3-1. end cap 4. shunt pipes; 4-1. shunt pipe arrival end; 4-2. the shunt pipe port of export; 5. turn to elbow; 6. transverse tube; 7, go up expansion coupling; 8. descend expansion coupling; 9, inspection hole; 10. heating controller; 11. ribbon heater.
The specific embodiment
The present invention is arranged in unit building Stall below ground or the basement, its design is a shunt pipe in parallel on sewer is responsible for, and on being responsible for, liquid level alarm is set, the position of liquid level alarm be lower than shunt pipe arrival end, be higher than the shunt pipe port of export, thereby when sewer pipe stops up, can keep the normal water flowing state of pipeline temporarily, and in time send alarm signal.
Referring to Fig. 1, the described person in charge comprise sewer pipe vertical tube 1, transverse tube 6 and be communicated with vertical tube, transverse tube turn to elbow 5, transverse tube leads to sink hole.The arrival end 4-1 of described shunt pipe 4 is communicated with the vertical tube level through reducer tee, and shunt pipe port of export 4-2 is communicated with transverse tube 6 or directly is communicated with sink hole, and the shunt pipe port of export is to turning to elbow outlet distance to need greater than 500mm, to avoid elbow obstruction place.Shunt pipe compares less than 1, such as 0.5~0.8 with the diameter of vertical tube.This system is when turning to elbow 5 places to take place to stop up, the unit building user still can continue water, and the water level in the sewer pipe can continue to raise, when water level arrives shunt pipe arrival end height, sewage can flow into sink hole through shunt pipe 4, does not return flooded conditions on the sewage thereby can not cause.At the dorsal part middle part that turns to elbow 5, set up inspection hole 9, the sewage draining exit when can be used as line clogging mediation cleaning is for the work of removing contamination is provided convenience.
Still referring to Fig. 1, described vertical tube 1 place is provided with and surveys mouth 3, and liquid level alarm 2 is installed in surveys a mouthful place.Survey a mouthful position and be lower than shunt pipe arrival end 200-500mm, the detection mouthful arm through 45 ° of reducer tees is to make progress 45 ° with vertical tube and is communicated with.Survey mouth and be provided with the end cap 3-1 that is threaded, cover liquid level alarm 2 is installed.Opening end cap can clear up detector probe and pipeline, surveys mouth simultaneously and can be used as access hole, adds dredging agent from this mouth in pipeline, so that the mediation of pipeline.When stopping up generation, the sewage level of discharging rises, when sewage rises to the probe positions of liquid level alarm, the conducting of probe contact owing to the electric action of sewage, the warning circuit that triggers in the liquid level alarm sends alarm signal, after the main frame of liquid level alarm receives signal, carry out sound and light alarm automatically.The signal that liquid level alarm sends can trigger a plurality of alarm main frames that are contained in different floors, thus the purpose that reaches caution and inform.In time notify administrative staff or pipe first-aid company, take suitable emergency repair measure.Because sewage corrosivity is stronger in the sewer pipe, the probe of easy corrosion detector is so liquid level alarm probe material must have good corrosion resistance, and reduces the contact area of probe and sewage as far as possible, to guarantee the application life of alarm.
Still referring to Fig. 1, consider that sewer pipe often causes obstruction by thick substances such as animal and plant fats, the present invention is provided with the heating dredging mechanism at obstruction character, described heating dredging mechanism is made of ribbon heater 11 and heating controller 10, the ribbon heater is looped around transverse tube and the link that turns to elbow, heating controller connects the ribbon heater, and heating controller is by liquid level alarm 2 controls.This device starts heating controller when liquid level alarm sends the sewer jam signal, heating is slowly heated up near turning to the transverse tube of elbow and turning to elbow in the ribbon heater, and then with the pipeline heating, grease dissolves, and pipeline is promptly dredged automatically.
Still referring to Fig. 1, the old pipeline that blocks during for ease of the aging blocks pipeline modification connects, and also is convenient to pipe-dredging dismounting and maintenance at need simultaneously, is positioned at shunt pipe arrival end top at vertical tube expansion coupling 7 is set; Be positioned at expansion coupling 8 under the shunt pipe port of export arranged outside at transverse tube.
The present invention both had been applicable to the building bottom, also can be every layer of installation.

Claims (7)

1. anti-clogging sewer pipeline of building system, it comprises by vertical tube (1), transverse tube (6) and the sewer pipe that elbow (5) forms that turns to that is communicated with vertical tube, transverse tube is responsible for, wherein, transverse tube leads to sink hole, it is characterized in that: a shunt pipe (4) in parallel at the two ends that turn to elbow, the arrival end of shunt pipe (4-1) is positioned on the vertical tube, and the shunt pipe port of export (4-2) is positioned on the transverse tube.
2. anti-clogging sewer pipeline of building according to claim 1 system, it is characterized in that: set up liquid level alarm (2), be provided with on vertical tube and survey mouthful (3), the position of surveying mouthful (3) is lower than the arrival end (4-1) of shunt pipe, is higher than the shunt pipe port of export (4-2); The probe of described liquid level alarm (2) is positioned at surveys mouth.
3. anti-clogging sewer pipeline of building according to claim 2 system is characterized in that: described shunt pipe arrival end (4-1) is higher than surveys mouthful (a 3) 200-500mm, and the described shunt pipe port of export (4-2) is to turning to elbow outlet distance greater than 500mm.
4. anti-clogging sewer pipeline of building according to claim 3 system, it is characterized in that: described shunt pipe arrival end (4-1) is communicated with the vertical tube level through reducer tee, shunt pipe compares less than 1 with the diameter of vertical tube, described detection mouthful (3) is installed in 45 ° of arm positions of 45 ° of reducer tees, and reducer tee arm and vertical tube are 45 ° upwards.
5. according to claim 1,2,3 or 4 described anti-clogging sewer pipeline of building systems, it is characterized in that: described system also is provided with the heating dredging mechanism, described heating dredging mechanism is made of ribbon heater (11) and heating controller (10), the ribbon heater is looped around on the transverse tube that turns to the elbow, heating controller connects the ribbon heater, and the signal of telecommunication of liquid level alarm output is delivered to heating controller.
6. anti-clogging sewer pipeline of building according to claim 5 system, it is characterized in that: described vertical tube (1) is positioned at shunt pipe arrival end (4-1) top and is provided with expansion coupling on (7); Described transverse tube (6) is positioned at the shunt pipe port of export (4-2) outside and is provided with expansion coupling (8).
7. anti-clogging sewer pipeline of building according to claim 6 system is characterized in that: the described dorsal part middle part that turns to elbow (5), set up inspection hole (9).
CN2009101752230A 2009-11-25 2009-11-25 System for preventing sewer pipeline of building from being blocked Active CN101705711B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101752230A CN101705711B (en) 2009-11-25 2009-11-25 System for preventing sewer pipeline of building from being blocked

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101752230A CN101705711B (en) 2009-11-25 2009-11-25 System for preventing sewer pipeline of building from being blocked

Publications (2)

Publication Number Publication Date
CN101705711A true CN101705711A (en) 2010-05-12
CN101705711B CN101705711B (en) 2012-01-18

Family

ID=42375960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101752230A Active CN101705711B (en) 2009-11-25 2009-11-25 System for preventing sewer pipeline of building from being blocked

Country Status (1)

Country Link
CN (1) CN101705711B (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251557A (en) * 2011-05-30 2011-11-23 西华大学 Sewer structure
CN107227770A (en) * 2017-02-28 2017-10-03 陈彦国 Sewer pipe anti-clogging alarm and anti-clogging warning system mounting technique scheme
CN107419798A (en) * 2017-07-03 2017-12-01 河北水利电力学院 A kind of building water supply and drainage preventing clogging up device
CN107524206A (en) * 2017-08-01 2017-12-29 陈彦国 Sewer pipe anti-clogging alarm and anti-clogging warning system mounting technique scheme
CN108035410A (en) * 2017-12-28 2018-05-15 中冶置业集团有限公司 A kind of remove device of kitchen drainage pipeline greasy dirt
CN108755872A (en) * 2018-06-01 2018-11-06 北京劲威环保科技发展有限公司 A kind of blow-off line multistage dredging method
CN110057422A (en) * 2019-05-31 2019-07-26 成都基准方中建筑设计有限公司 Gravity drainage pipeline anti-effect returning water flows backward warning device and alarm system
CN110847305A (en) * 2019-12-19 2020-02-28 成都基准方中建筑设计有限公司 Gravity drainage water return backflow alarm and emergency treatment system
CN111042273A (en) * 2019-12-25 2020-04-21 中建三局第一建设工程有限责任公司 Launching device and control method thereof
CN111042272A (en) * 2018-10-15 2020-04-21 株式会社普利司通 Joint and drainage system
CN111549867A (en) * 2020-05-18 2020-08-18 张平 Double-groove hand washing sink convenient for draining water for kitchen
CN111720660A (en) * 2020-07-28 2020-09-29 陈根华 Hydraulic engineering is with preventing stifled pipeline
CN113833923A (en) * 2021-08-27 2021-12-24 上海平安高压调节阀门有限公司 Drainage bypass system of large valve
CN114215144A (en) * 2022-01-17 2022-03-22 江苏伟中景观建设有限公司 Building drainage structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201068588Y (en) * 2007-07-25 2008-06-04 袁子洋 Electric heating type kitchen anti-block device of sewer

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251557A (en) * 2011-05-30 2011-11-23 西华大学 Sewer structure
CN107227770A (en) * 2017-02-28 2017-10-03 陈彦国 Sewer pipe anti-clogging alarm and anti-clogging warning system mounting technique scheme
CN107227770B (en) * 2017-02-28 2019-08-20 陈彦国 Sewer pipe anti-clogging alarm and anti-clogging alarm system mounting technique scheme
CN107419798A (en) * 2017-07-03 2017-12-01 河北水利电力学院 A kind of building water supply and drainage preventing clogging up device
CN107524206A (en) * 2017-08-01 2017-12-29 陈彦国 Sewer pipe anti-clogging alarm and anti-clogging warning system mounting technique scheme
CN108035410A (en) * 2017-12-28 2018-05-15 中冶置业集团有限公司 A kind of remove device of kitchen drainage pipeline greasy dirt
CN108035410B (en) * 2017-12-28 2024-06-18 中冶置业集团有限公司 Kitchen drainage pipeline greasy dirt clearing device
CN108755872A (en) * 2018-06-01 2018-11-06 北京劲威环保科技发展有限公司 A kind of blow-off line multistage dredging method
CN111042272A (en) * 2018-10-15 2020-04-21 株式会社普利司通 Joint and drainage system
CN110057422A (en) * 2019-05-31 2019-07-26 成都基准方中建筑设计有限公司 Gravity drainage pipeline anti-effect returning water flows backward warning device and alarm system
CN110847305A (en) * 2019-12-19 2020-02-28 成都基准方中建筑设计有限公司 Gravity drainage water return backflow alarm and emergency treatment system
CN111042273A (en) * 2019-12-25 2020-04-21 中建三局第一建设工程有限责任公司 Launching device and control method thereof
CN111549867A (en) * 2020-05-18 2020-08-18 张平 Double-groove hand washing sink convenient for draining water for kitchen
CN111720660A (en) * 2020-07-28 2020-09-29 陈根华 Hydraulic engineering is with preventing stifled pipeline
CN111720660B (en) * 2020-07-28 2021-11-23 宁夏尧宇建筑有限公司 Hydraulic engineering is with preventing stifled pipeline
CN113833923A (en) * 2021-08-27 2021-12-24 上海平安高压调节阀门有限公司 Drainage bypass system of large valve
CN113833923B (en) * 2021-08-27 2022-11-18 上海平安高压调节阀门有限公司 Drainage bypass system of large valve
CN114215144A (en) * 2022-01-17 2022-03-22 江苏伟中景观建设有限公司 Building drainage structure

Also Published As

Publication number Publication date
CN101705711B (en) 2012-01-18

Similar Documents

Publication Publication Date Title
CN101705711B (en) System for preventing sewer pipeline of building from being blocked
CN201649263U (en) Anti-clogging building sewer pipe system
CN108679451B (en) High-rise building drainage pipeline blocking fault positioning and monitoring device
CN111287296A (en) Method and device for intelligent operation of rainwater storage tank
CN201588276U (en) Anti-blockage storied building sewer pipeline with auto-alarm function
CN103469881A (en) Comprehensive intelligent municipal pipe trench system
CN206399938U (en) Water dispensing apparatus and dam water quality monitoring system
CN205259329U (en) Water draining inspection well
JP4295416B2 (en) Automatic drainage blockage avoidance facility
CN205591330U (en) Stifled alarm device is arranged to sewer anti -overflow
CN216446106U (en) Drainage flushing system with U-shaped pipe group and sight glass
CN208650242U (en) A kind of Self-cleaning type sewage lifting device
CN104238535B (en) Intelligent fluid management system
CN207079711U (en) Block the drainpipe for anti-overflow function of alarming
AU2011101115A4 (en) Apparatus and method for detecting fluid back-up
CN213751319U (en) Sewage and waste water pipeline blocking alarm device
CN112081192A (en) Cut-off device, cut-off system and cut-off method for vertical pipe
CN217974618U (en) Device for preventing water return from second floor
CN207851056U (en) A kind of monitoring system for being drained outside thermal power plant
CN207812620U (en) A kind of sewage discharge monitoring device
CN214940729U (en) Water collector with rear flat tubes
CN108396852A (en) A kind of Self-cleaning type sewage lifting device
TWM517217U (en) High floor waste water pipeline system with drainage clog detection and alarm function
CN105672462A (en) Electronic control current-limiting intelligent intercepting well with partition board dreg retaining device
CN219118312U (en) Rain and sewage diversion device for sponge city

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HEBEI JIANTOU BAOSU PIPE INDUSTRY CO., LTD.

Free format text: FORMER OWNER: GOU YUEYANG

Effective date: 20100908

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 071051 5-4-302, BAOSHUO RESIDENTIAL QUARTER, BAODING CITY, HEBEI PROVINCE TO: 072750 TOWNSHIP ENTERPRISES INDUSTRIAL ZONE DIRECTLY UNDER THE MUNICIPAL AUTHORITY (XINHUA CURTAIN WALL CO., LTD.), ZHUOZHOU DEVELOPMENT AREA, HEBEI PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20100908

Address after: 072750 Hebei Zhuozhou development zone directly under the township enterprise industrial zone (Xinhua curtain wall Co., Ltd.)

Applicant after: HEBEI CONSTRUCTION & INVESTMENT BAOSU PIPE INDUSTRY Co.,Ltd.

Address before: 071051 Hebei province Baoding bsho District 5-4-302

Applicant before: Gou Yueyang

C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 072750 Yixian Economic Development Zone, Baoding City, Hebei Province

Patentee after: HEBEI CONSTRUCTION & INVESTMENT BAOSU PIPE INDUSTRY Co.,Ltd.

Address before: 072750 Hebei Zhuozhou development zone directly under the township enterprise industrial zone (Xinhua curtain wall Co., Ltd.)

Patentee before: HEBEI CONSTRUCTION & INVESTMENT BAOSU PIPE INDUSTRY Co.,Ltd.

CP02 Change in the address of a patent holder
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An anti clogging building drainage system

Granted publication date: 20120118

Pledgee: Bank of China Limited Baoding Branch

Pledgor: HEBEI CONSTRUCTION & INVESTMENT BAOSU PIPE INDUSTRY Co.,Ltd.

Registration number: Y2024980019935