CN101694505B - 变电站母线差动保护电流模拟带负荷试验方法 - Google Patents

变电站母线差动保护电流模拟带负荷试验方法 Download PDF

Info

Publication number
CN101694505B
CN101694505B CN 200910035548 CN200910035548A CN101694505B CN 101694505 B CN101694505 B CN 101694505B CN 200910035548 CN200910035548 CN 200910035548 CN 200910035548 A CN200910035548 A CN 200910035548A CN 101694505 B CN101694505 B CN 101694505B
Authority
CN
China
Prior art keywords
current
bus differential
differential protection
transformer
transformer substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200910035548
Other languages
English (en)
Other versions
CN101694505A (zh
Inventor
金志荣
张海帆
顾建军
季建
张新民
缪晓卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nantong Power Supply Co of Jiangsu Electric Power Co Ltd
Original Assignee
Nantong Power Supply Co of Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Power Supply Co of Jiangsu Electric Power Co Ltd filed Critical Nantong Power Supply Co of Jiangsu Electric Power Co Ltd
Priority to CN 200910035548 priority Critical patent/CN101694505B/zh
Publication of CN101694505A publication Critical patent/CN101694505A/zh
Application granted granted Critical
Publication of CN101694505B publication Critical patent/CN101694505B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

本发明公开了一种变电站母线差动保护电流模拟带负荷试验方法,利用大电流装置代替送电电源,接入主变接地隔离开关与主变电流互感器之间,利用出线接地隔离开关模拟负荷,利用大电流装置三相接线零线接地,通一相、通相间模拟不同故障。本发明可代替母线差动电流回路的带负荷试验并可模拟故障状态,同时可改变传统变电站母线差动保护电流回路间接试验方法。在送电前对变电站双母线差动保护电流回路、相关断路器,隔离开关、电流互感器控制操作回路,精确模拟,很好地模拟母差保护正常运行状态和故障状态,确保送电前保护电流回路处于正确状态。消除了变电站带负荷试验时才可能发现的缺陷。更准确、安全、可靠。

Description

变电站母线差动保护电流模拟带负荷试验方法
技术领域:
本发明涉及一种电力系统中变电站母线差动保护电流回路模拟带负荷试验方法。
背景技术:
随着国民经济的发展,变电站如雨后春笋出现。现在110kV~220kV以上电压等级的母线普遍使用母线保护,母线是变电站的重要设备。其动作的正确性与一次设备的断路器,隔离开关、电流互感器,保护装置的试验,二次接线、直流控制回路有关。传统电流回路试验采用分别、分段试验方法,如电流互感器的变比、极性、保护试验、二次回路试验。因此规程规范规定。母线差动保护投运前必须做带负荷试验,以保证母差保护电流回路的正确性,由于新建的变电站附近的负荷不大或变电站与线路安装完成时间不一致,会出现变电站带负荷试验时母差二次回路电流小,正确性无法判断,或没上线路只有等线路形成后再做的情况。
发明内容:
本发明的目的在于提供一种精确模拟,很好地模拟母差保护正常运行状态和故障状态,确保送电前保护电流回路处于正确状态的变电站母线差动保护电流模拟带负荷试验方法。
本发明的技术解决方案是:
一种变电站母线差动保护电流模拟带负荷试验方法,其特征是:利用大电流装置代替送电电源,接入主变接地隔离开关与主变电流互感器之间,利用出线接地隔离开关模拟负荷,利用大电流装置三相接线零线接地,通一相、通相间模拟不同故障。
利用不同的隔离开关断开和合上模拟单母、双母等不同地点和不同故障。
本发明可代替母线差动电流回路的带负荷试验并可模拟故障状态。同时可改变传统变电站母线差动保护电流回路间接试验方法。在送电前对变电站双母线差动保护电流回路、相关断路器,隔离开关、电流互感器控制操作回路,精确模拟,很好地模拟母差保护正常运行状态和故障状态,确保送电前保护电流回路处于正确状态。消除了变电站带负荷试验时才可能发现的缺陷。更准确、安全、可靠。
附图说明:
下面结合附图和实施例对本发明作进一步说明。
图1是双母线专用母联一次接线示图。
图2是变比试验接线示图。
图3是一种极性和差流试验接线示图。
图4是另一种极性和差流试验接线示图。
图5是模拟I母故障示图。
图中Z:主变间隔;C1:出线1间隔;CN:出线第N个间隔;M:母联间隔;G:隔离开关;GD:接地隔离开关;CT:电流互感器;DL:断路器。
具体实施方式:
1、母差带负荷回路变比试验(图2所示)
母差带负荷回路变比试验(以主变CT为例),将保护装置出口压板退出,主变隔离开关Z3G断开,大电流试验装置接在接地隔离开关3GD1与ZCT间,主变断路器ZDL和主变I母接地隔离开关Z1GD合上(操作过程检查该回路控制回路,与保护相关的辅助接点,可发现回路的开路或接触不良及接线的正确性),分别通入各相电流可核对A、B、C相别的正确性(零线接地)。
大电流试验装置中的显示的电流与微机保护装置显示屏中二次电流比较,(电磁型的保护回路电流不会自动显示,可用钳型电流表比较)可检查变比正确性。同时可发现回路的开路或接触不良及接线正确性得以检查。
2、带负荷试验中极性、差流试验(此接线可模拟正常运行和穿越性故障)
如图3所示,以主变间隔和出线1间隔合2G刀闸为例。将主变侧隔离开关Z3G隔离开关断开,使用大电流发生装置,接入Z3GD1与电流互感器间,(接三相地线接地)合上主变断路器ZDL、主变隔离刀闸Z2G和线路隔离刀闸C2G、(以II母为例)线路断路器CDL、线路接地隔离刀闸C3GD1合上。
加入大电流发生装置的电流。再检查I母小差电流、和II母小差电流和大差电流(带负荷试验检查内容)即极性试验。同理可已做过的间隔与其它间隔试验,所有回路都可得以检查。本试验用试验电源与变电所是否送电、是否有负荷和线路是否形成无关,克服了新建变电所负荷小或无出线,无法试验的情况。
当大电流达到正常负荷电流时,本接线实际上模拟母线保护正常工作状况。
当大电流达到区外故障电流时,本接线实际上模拟母线保护区外故障。且所有一次设备、二次设备、接线与故障时状况基本相同。
同理主变运行于1G,母联运行,出线运行于2母试验方法如图4。将隔离开关如主变侧Z3G隔离开关断开,使用大电流发生装置,接入Z3GD1与电流互感器间,如图合上主变断路器ZDL、主变隔离刀闸Z1G和母联MG1、MDL、MG2线路隔离刀闸C2G、线路断路器CDL、线路接地隔离刀闸C3GD1。检查内容同上。
3、模拟I母故障以主变间隔为例如图5所示
1G合上,将隔离开关如主变侧Z3G隔离开关断开,使用大电流发生装置,接入Z3GD1与电流互感器间,如图合上主变断路器ZDL、主变接地隔离刀闸Z1GD。当通入电流达到设定故障值时,母差继电器I母小差,和大差达到差电流保护保护的定值,跳I母所有断路器。
若合变压器Z2G,其余不变可模拟II母区内故障,同时合Z1G、Z2G应跳母线所有断路器。同理主变换成线路相应一次设备,可进行各条线路的模拟。
这种方法是带负荷试验不可能达到模拟情况,而且在一次上模拟,比传统分别、分段模拟更符合线路短路实际情况。
同理通过隔离隔离开关的切换可进行母联断路器失灵试验、母联死区保护试验,在一次上模拟,比传统分别、分段模拟更符合线路短路实际情况。
4、如主变保护如不使用套管电流互感器,可将主变各侧按相短接,合上相应一次设备,在出线处短接,此方法推广可模拟主变差动电流带负荷试验。

Claims (1)

1.一种变电站母线差动保护电流模拟带负荷试验方法,其特征是:利用大电流装置代替送电电源,接入主变接地隔离开关与主变电流互感器之间,利用出线接地隔离开关模拟负荷,利用大电流装置三相接线零线接地,通一相、通相间模拟不同故障,是利用不同的出线接地隔离开关断开和合上模拟单母、双母不同地点和不同故障。
CN 200910035548 2009-09-24 2009-09-24 变电站母线差动保护电流模拟带负荷试验方法 Active CN101694505B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910035548 CN101694505B (zh) 2009-09-24 2009-09-24 变电站母线差动保护电流模拟带负荷试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910035548 CN101694505B (zh) 2009-09-24 2009-09-24 变电站母线差动保护电流模拟带负荷试验方法

Publications (2)

Publication Number Publication Date
CN101694505A CN101694505A (zh) 2010-04-14
CN101694505B true CN101694505B (zh) 2011-07-13

Family

ID=42093488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910035548 Active CN101694505B (zh) 2009-09-24 2009-09-24 变电站母线差动保护电流模拟带负荷试验方法

Country Status (1)

Country Link
CN (1) CN101694505B (zh)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102095950B (zh) * 2010-11-10 2012-12-26 中冶建工有限公司 大型变压器差动保护系统的整组试验施工方法
CN102510010B (zh) * 2011-10-13 2014-08-13 河北省电力建设调整试验所 用于新建变电站投运之前的继电保护向量检查试验方法
CN102565592B (zh) * 2012-01-18 2015-09-30 绍兴电力局 一种智能变电站技术系统化实证短路试验方法
CN103048586B (zh) * 2012-12-14 2016-01-20 辽宁省电力有限公司锦州供电公司 电压互感器接线正确性的验证方法
CN103606903B (zh) * 2013-11-18 2017-02-22 国家电网公司 母线差动保护闭锁装置及利用其实现母线差动保护闭锁的方法
CN105044430B (zh) * 2015-06-05 2018-01-16 广东电网有限责任公司佛山供电局 双母线配电设备并列出线的支流电流检测方法和系统
CN104849602B (zh) * 2015-06-05 2017-12-22 广东电网有限责任公司佛山供电局 Gis双母线配电设备故障检测方法和系统
CN105388385A (zh) * 2015-12-16 2016-03-09 国家电网公司 母差保护向量的集中测试方法
CN105738751B (zh) * 2016-02-25 2018-02-16 国网山西省电力公司电力科学研究院 一种母线差动保护电流回路断线告警定值的整定计算方法
CN106885959B (zh) * 2017-02-14 2020-03-06 山东中实易通集团有限公司 发电厂电气总启动试验接地刀闸代替短路铜排的试验方法
CN106771841B (zh) * 2017-03-30 2019-02-22 西安西热节能技术有限公司 一种变电站s型一次通流系统及方法
CN107015487B (zh) * 2017-06-08 2023-09-15 国网山东省电力公司莱芜供电公司 一种能提醒母线甩负荷的变电站一次模拟系统及方法
CN111007439B (zh) * 2019-12-24 2022-07-12 深圳供电局有限公司 一种变电站母线保护二次回路投运带负荷测试方法
CN111123172B (zh) * 2019-12-26 2022-01-25 深圳供电局有限公司 母线差动保护的各间隔ct二次绕组极性的一致性校验方法
CN111060771B (zh) * 2019-12-31 2024-07-09 中国能源建设集团华东电力试验研究院有限公司 继电保护与自动化带模拟负荷校验系统
CN113945858B (zh) * 2021-02-02 2024-03-01 保定钰鑫电气科技有限公司 一种便于处理单相接地故障的三相非有效接地供电系统
CN117031171B (zh) * 2023-08-26 2024-04-19 国家电网有限公司 一种继电保护设备不带实际负荷仿真极性测试的方法

Also Published As

Publication number Publication date
CN101694505A (zh) 2010-04-14

Similar Documents

Publication Publication Date Title
CN101694505B (zh) 变电站母线差动保护电流模拟带负荷试验方法
CN102364352B (zh) 判断电力刀闸实际位置的激光探测显示器
CN207440195U (zh) 一种多功能通电试验台
CN207066733U (zh) 一种开关柜机械特性试验二次调理装置
CN201789272U (zh) 防止变压器差动保护误动的继电保护电路
CN204375298U (zh) 分界开关仿真实训装置
CN206480263U (zh) 一种低压集抄故障培训装置
CN209543688U (zh) 一种变电站实训系统
CN201230204Y (zh) 供配电系统中微机型保护测控模块的逻辑测试装置
CN102565614B (zh) 交流电压回路检验方法
CN103077631B (zh) 一种三相断路器弹簧操作机构培训装置
CN210142411U (zh) 一种全能供电所实训操作系统及其反窃电实训电路
CN112216174A (zh) 交直流电源故障模拟仿真系统
CN209591250U (zh) 电工维修实作训练台
CN204440161U (zh) 一种配电自动化装置技术性能测试平台
CN202256523U (zh) 用于高压电气系统通电检测的综合测试台
CN202009236U (zh) 变电所单母线分段运行控制装置
CN110009959B (zh) 一种全能供电所实训操作系统及其反窃电实训电路
CN108279345B (zh) 一种变电所送电检验装置
CN202651659U (zh) 带负荷更换隔离开关的引流装置
CN207457398U (zh) 一种小电流接地系统模拟装置
CN201886111U (zh) 配电网低压模拟试验单元
Yang et al. Research on the rationalization of field commissioning for multi-terminal HVDC projects-taking lugaozhao HVDC project for example
CN201584101U (zh) 高电压技术实训场
Ma et al. Design of the state simulation for the primary equipment of smart substation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: NANTONG POWER SUPPLY COMPANY, JIANGSU ELECTRIC POWER CO., LTD.

Effective date: 20121130

Owner name: JIANGSU ELECTRIC POWER COMPANY NANTONG POWER SUPPL

Effective date: 20121130

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 226006 NANTONG, JIANGSU PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20121130

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Jiangsu Electric Power Company

Patentee after: Nantong Power Supply Company, Jiangsu Electric Power Co., Ltd.

Address before: 226006 No. 69 middle Youth Road, Jiangsu, Nantong

Patentee before: Nantong Power Supply Company, Jiangsu Electric Power Co., Ltd.