CN101691893B - Underwater construction method of steel tube - Google Patents
Underwater construction method of steel tube Download PDFInfo
- Publication number
- CN101691893B CN101691893B CN2009100165249A CN200910016524A CN101691893B CN 101691893 B CN101691893 B CN 101691893B CN 2009100165249 A CN2009100165249 A CN 2009100165249A CN 200910016524 A CN200910016524 A CN 200910016524A CN 101691893 B CN101691893 B CN 101691893B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- air bag
- water
- steel tube
- work method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100165249A CN101691893B (en) | 2009-06-17 | 2009-06-17 | Underwater construction method of steel tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100165249A CN101691893B (en) | 2009-06-17 | 2009-06-17 | Underwater construction method of steel tube |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101691893A CN101691893A (en) | 2010-04-07 |
CN101691893B true CN101691893B (en) | 2011-10-12 |
Family
ID=42080601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100165249A Expired - Fee Related CN101691893B (en) | 2009-06-17 | 2009-06-17 | Underwater construction method of steel tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101691893B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102705578A (en) * | 2012-06-28 | 2012-10-03 | 西南石油大学 | Construction method of sleeving casing pipe in working pipe |
CN105042183A (en) * | 2015-07-08 | 2015-11-11 | 中国十七冶集团有限公司 | Method for installing super-long pipeline crossing river |
CN106122590B (en) * | 2016-08-11 | 2018-06-29 | 中铁上海工程局集团有限公司 | A kind of assist device and its application method for water under steel pipe globality offshore |
TWI611075B (en) * | 2016-09-26 | 2018-01-11 | Offshore wind turbine generator pipe pile laying method | |
CN107882026B (en) * | 2016-09-29 | 2019-08-02 | 海洋能源科技股份有限公司 | Offshore wind generating steel-pipe pile sets method |
CN112814118A (en) * | 2020-12-29 | 2021-05-18 | 中交第三航务工程局有限公司江苏分公司 | Connection construction method for turning section of sea pipeline |
CN113093762B (en) * | 2021-04-12 | 2024-03-19 | 中交第一航务工程局有限公司 | Intelligent immersed tube carrying and installing integrated ship docking control method and control system |
CN114923032B (en) * | 2022-04-08 | 2024-06-14 | 淮安市水利勘测设计研究院有限公司 | Construction method for integrally installing large-diameter long-distance river-crossing pipeline |
-
2009
- 2009-06-17 CN CN2009100165249A patent/CN101691893B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101691893A (en) | 2010-04-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101691893B (en) | Underwater construction method of steel tube | |
CN101649928A (en) | Method for installing pipelines assisted by air bags | |
CN103410133B (en) | Air bag is utilized to carry out the method for Attention problems to deep water jacket | |
KR101532234B1 (en) | Floating platform for operation in regions exposed to extreme weather conditions | |
CN206243403U (en) | A kind of semi-submersible offshore platform of adjustable floating body damage inflow | |
CN101648650A (en) | Method for floating tubular member by airbags | |
CN105200970B (en) | Method for dismantling discarded jacket through air bags | |
CN111692426B (en) | Offshore welded junction loosening treatment method for large-diameter HDPE pipeline | |
CN206634166U (en) | A kind of working ship | |
CN112709250A (en) | Be favorable to reducing seabed vacuum pipeline pile foundation cushion cap structure of buoyancy | |
CN218506092U (en) | C-shaped assembly type floating transportation structure for split floating transportation of offshore substation | |
CN111058418A (en) | Combined air bag floating breakwater and construction method thereof | |
JP3551180B2 (en) | Method and apparatus for dissolving water-soluble gas in the sea and isolating it in the deep sea, and laying method | |
JP2001071991A (en) | Semi-submersible type floating body structure, large offshore structure, and constructing method of large offshore structure | |
CN103253356A (en) | Large pipe fitting overwater welding floating platform and dry construction environment creating method | |
CN103498420B (en) | Large-scale steel box beam ashore construction method | |
CN104164885A (en) | Caisson towing method | |
CN101761691A (en) | Bound floating pipeline towing pipe method process | |
CN107021187A (en) | A kind of working ship and under water thing transportation installation method | |
CN104494792A (en) | Transportation device and transportation method for ocean engineering structures | |
CN211810156U (en) | Self-floating underwater caisson cover plate | |
CN210882532U (en) | Float structure capable of adjusting direction | |
CN113277023A (en) | Offshore wind power plant steel pipe pile foundation batch floating transportation system and working method thereof | |
CN107176273B (en) | Using method of rubber buoy for sunken ship salvage | |
CN115387371B (en) | Airbag floating assisting system of offshore wind power prefabricated platform and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: ZHONG PEICHENG Free format text: FORMER OWNER: ZHONG AIMIN Effective date: 20130417 Owner name: ZHUHAI AOXIN LIFTING TECHNOLOGY CO., LTD. Free format text: FORMER OWNER: ZHONG PEICHENG Effective date: 20130417 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 250000 JINAN, SHANDONG PROVINCE TO: 519055 ZHUHAI, GUANGDONG PROVINCE Free format text: CORRECT: ADDRESS; FROM: 250002 JINAN, SHANDONG PROVINCE TO: 250000 JINAN, SHANDONG PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20130417 Address after: 519055 Guangdong city of Zhuhai province Pingsha Town Industrial Zone No. 168 shamei Sheng Xian Lu Zhuhai Tianzhi ANZ Environmental Technology Co. Ltd. 1 workshop two Patentee after: Zhuhai New Zealand Lifting Technology Co.,Ltd. Address before: 302 room 1, unit 2, building 7-1, building 250000, Lixia District, Lixia District, Shandong, Ji'nan, Jiefang Road Patentee before: Zhong Peicheng Effective date of registration: 20130417 Address after: 302 room 1, unit 2, building 7-1, building 250000, Lixia District, Lixia District, Shandong, Ji'nan, Jiefang Road Patentee after: Zhong Peicheng Address before: 250002, West building, building two, building 238, heroic Road, Ji'nan, Ji'nan, Shandong Patentee before: Zhong Aimin |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111012 Termination date: 20140617 |
|
EXPY | Termination of patent right or utility model |