CN101691160A - Packing structure and related shelf thereof - Google Patents

Packing structure and related shelf thereof Download PDF

Info

Publication number
CN101691160A
CN101691160A CN200910179723A CN200910179723A CN101691160A CN 101691160 A CN101691160 A CN 101691160A CN 200910179723 A CN200910179723 A CN 200910179723A CN 200910179723 A CN200910179723 A CN 200910179723A CN 101691160 A CN101691160 A CN 101691160A
Authority
CN
China
Prior art keywords
fluting board
board seat
main
spacer
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910179723A
Other languages
Chinese (zh)
Other versions
CN101691160B (en
Inventor
丁崇宽
詹黛玲
陈士琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AU Optronics Corp
Original Assignee
AU Optronics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AU Optronics Corp filed Critical AU Optronics Corp
Priority to CN2009101797231A priority Critical patent/CN101691160B/en
Publication of CN101691160A publication Critical patent/CN101691160A/en
Application granted granted Critical
Publication of CN101691160B publication Critical patent/CN101691160B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buffer Packaging (AREA)

Abstract

The invention discloses a packing structure and a related shelf thereof. The packing structure comprises a first buffer structure and a second buffer structure. The first buffer structure is used for clamping a first corner of an article, and comprises a first corrugated paper seat and a first paper plastic structure. The first corrugated paper seat is provided with a first positioning plate. The first paper plastic structure is detachably arranged in the first corrugated paper seat. The second buffer structure is used for clamping a second corner of the article, and comprises a second paper plastic structure and a second corrugated paper seat. The second paper plastic structure is detachably arranged in the second corrugated paper seat. The first positioning plate is used for blocking the first corrugated paper seat and the second corrugated paper seat when the first corrugated paper seat and the second corrugated paper seat are separated from the first paper plastic structure and the second paper plastic structure respectively to form a first shelf.

Description

Packaging structure and related shelf thereof
Technical field
The invention relates to a kind of packaging structure and related shelf thereof, refer to especially a kind ofly have high structural strength and can reclaim the packaging structure and the related shelf thereof of use again.
Background technology
Generally speaking; be subjected to easily on the packing of article of external force damage at some; as LCD screen etc.; the material that its common manner of packing is to use Styrofoam etc. can absorb external vibrations and pooling feature is provided; with as inserting and putting four corners of article or coating the article package buffering structure of both sides up and down; so can provide the defencive function of article firm support and shock-absorbing buffering in carton, so that article are difficult for being subjected to external impacts and damage in the process of transporting.Yet, the Styrofoam packaging structure not only needs comparatively huge storage space, also have simultaneously structure and meet the shortcomings of clashing into easy cracked and the article that can't be applicable to other different external forms, in addition, the material behavior that the Styrofoam packaging structure can't be recycled also is easy to generate the waste problem of resource.
On the other hand; be used for replacing the environmental protection paper plastic structure of Styrofoam packaging structure, though can solve the problem of the wasting of resources, its structural strength a little less than; the situation of easy recurring structure crimp when the large-sized article of carrying, and then influence the function that its shock-absorbing is protected.
In sum, the packaging structure of how designing high structural strength and can reclaiming use again is one of important topic on article packing now.
Summary of the invention
Therefore, the object of the present invention is to provide and a kind ofly have high structural strength and can reclaim the packaging structure of use again, it is the snap-on design of utilizing between paper plastic structure and the fluting board seat, paper plastic structure is arranged in the fluting board seat, so as to solving the problem of above-mentioned environmental protection paper plastic structure undercapacity.In addition, see through spacer and engagement groove and slip locating piece and the snap-on design that cushions rib on the fluting board seat, the disclosed fluting board seat of the present invention also can be assembled into the rack that is used for placing article, so as to reaching the environment protecting that the fluting board seat reclaims use again.
For realizing that purpose of the present invention provides a kind of packaging structure, it includes one first buffer structure, it is one first corner that is used for inserting and putting article, this first buffer structure includes one first fluting board seat, it has one first spacer, and this first spacer is the one first spacer socket that is removable installed on this first fluting board seat; And one first paper plastic structure, it is to be removable installed in this first fluting board seat; And one second buffer structure, it is one second corner that is used for inserting and putting these article, this second buffer structure includes one second paper plastic structure; And one second fluting board seat, this second paper plastic structure is to be removable installed in this second fluting board seat, this second fluting board seat has one second spacer socket, this first spacer is intended to be when this first fluting board seat and this second fluting board seat separate with this first paper plastic structure and this second paper plastic structure respectively and engages this first fluting board seat and this second fluting board seat, so that common one first rack that forms of this first fluting board seat and this second fluting board seat.
Be to be formed with one first slotted eye on this first spacer, be to be formed with one first main engagement groove on this first fluting board seat, be to be formed with one second main engagement groove on this second fluting board seat, this first slotted eye is to engage mutually with this first main engagement groove and this second main engagement groove after this first spacer doubling.
This second fluting board seat has one second spacer, it is that being removable installed on this second spacer socket on this second fluting board seat and its is to be formed with one second slotted eye, be to be formed with one to want engagement groove for the first time on this first fluting board seat, be to be formed with one for the second time to want engagement groove, this second slotted eye be to want engagement groove for the first time and want this second time engagement groove to engage mutually with this after this second spacer doubling on this second fluting board seat.
This first buffer structure includes one the one ㄇ shape holding piece in addition, it is to be formed with one first terminal trip and the one end is to be connected in this first fluting board seat, be formed with one first terminal draw-in groove on this first fluting board seat, be formed with one the one ㄇ shape fixed plate on this first paper plastic structure, the one ㄇ shape holding piece is when this first terminal trip is sticked in this first terminal draw-in groove and common clamping the one ㄇ shape fixed plate of this first fluting board seat, so that this first paper plastic structure is fixed in this first fluting board seat.
The one ㄇ shape holding piece is formed with one first stage casing trip, be formed with one first stage casing draw-in groove on this first fluting board seat, be to be formed with one first on-slip breach on the one ㄇ shape fixed plate, this first stage casing trip is to be connected to this first on-slip breach when being sticked in this first stage casing draw-in groove, so that this first paper plastic structure is fixed in this first fluting board seat.
Being to be formed with one first depressed part on this first fluting board seat, is to be formed with one first salient on this first paper plastic structure, and this first salient is to be arranged in this first depressed part, so that this first paper plastic structure is positioned in this first fluting board seat.
This second buffer structure includes one the 2nd ㄇ shape holding piece in addition, it is to be formed with one second terminal trip and the one end is to be connected in this second fluting board seat, be formed with one second terminal draw-in groove on this second fluting board seat, be formed with one the 2nd ㄇ shape fixed plate on this second paper plastic structure, the 2nd ㄇ shape holding piece is when this second terminal trip is sticked in this second terminal draw-in groove and common clamping the 2nd ㄇ shape fixed plate of this second fluting board seat, so that this second paper plastic structure is fixed in this second fluting board seat.
The 2nd ㄇ shape holding piece is formed with one second stage casing trip, be formed with one second stage casing draw-in groove on this second fluting board seat, be to be formed with one second on-slip breach on the 2nd ㄇ shape fixed plate, this second stage casing trip is to be connected to this second on-slip breach when being sticked in this second stage casing draw-in groove, so that this second paper plastic structure is fixed in this second fluting board seat.
Being to be formed with one second depressed part on this second fluting board seat, is to be formed with one second salient on this second paper plastic structure, and this second salient is to be arranged in this second depressed part, so that this second paper plastic structure is positioned in this second fluting board seat.
Described packaging structure, other includes:
One the 3rd buffer structure, it is a third angle corner that is used for inserting and putting these article, the 3rd buffer structure includes:
One the 3rd fluting board seat, it has one the 3rd spacer, and the 3rd spacer is one the 3rd spacer socket that is removable installed on the 3rd fluting board seat; And
One the 3rd paper plastic structure, it is to be removable installed in the 3rd fluting board seat; And
One the 4th buffer structure, it is one the 4th corner that is used for inserting and putting these article, the 4th buffer structure includes:
One the 4th paper plastic structure; And
One the 4th fluting board seat, the 4th paper plastic structure is to be removable installed in the 4th fluting board seat, the 4th fluting board seat has one the 4th spacer socket, the 3rd spacer is to engage the 3rd fluting board seat and the 4th fluting board seat when the 3rd fluting board seat and the 4th fluting board seat separate with the 3rd paper plastic structure and the 4th paper plastic structure respectively, so that common one second rack that forms of the 3rd fluting board seat and the 4th fluting board seat.
The volume of this first rack is the volume greater than this second rack.
Described packaging structure, other includes one first slip locating piece, it is to be removable installed in this first fluting board seat, when this second rack superimposed on this first rack the time, this first spacer socket and the 3rd spacer socket form one first accommodation space, this first slip locating piece is fixed in this second rack on this first rack when being placed in this first accommodation space.
Be formed with one first main positioning groove on this first slip locating piece, this first fluting board seat is in be formed with one first main buffering rib on should the position of the first spacer socket, the 3rd fluting board seat is in be formed with one the 3rd main buffering rib on should the position of the 3rd spacer socket, this first main positioning groove is when this first slip locating piece is placed in this first accommodation space, is sticked in this first main buffering rib and the 3rd main buffering rib.
Be formed with two on this first slip locating piece and want positioning groove for the first time, it is the both sides that lay respectively at this first main positioning groove, side in this first main buffering rib on this first fluting board seat is to be formed with one will cushion rib for the first time, side in the 3rd main buffering rib on the 3rd fluting board seat is to be formed with one will cushion rib for the third time, those want positioning groove for the first time is when this first main positioning groove engages this first main buffering rib and the 3rd main buffering rib, is sticked in respectively that will cushion rib this first time and this will cushion rib for the third time.
Described packaging structure, other includes one second slip locating piece, it is to be removable installed in this second fluting board seat, when this second rack superimposed on this first rack the time, this second spacer socket and the 4th spacer socket form one second accommodation space, this second slip locating piece is fixed in this second rack on this first rack when being placed in this second accommodation space.
Be formed with one second main positioning groove on this second slip locating piece, this second fluting board seat is in be formed with one second main buffering rib on should the position of the second spacer socket, the 4th fluting board seat is in be formed with one the 4th main buffering rib on should the position of the 4th spacer socket, this second main positioning groove is when this second slip locating piece is placed in this second accommodation space, is sticked in this second main buffering rib and the 4th main buffering rib.
Be formed with two on this second slip locating piece and want positioning groove for the second time, it is the both sides that lay respectively at this second main positioning groove, side in this second main buffering rib on this second fluting board seat is to be formed with one will cushion rib for the second time, side in the 4th main buffering rib on the 4th fluting board seat is to be formed with one the 4th less important buffering rib, those want positioning groove for the second time is when this second main positioning groove engages this second main buffering rib and the 4th main buffering rib, is sticked in respectively and will cushions rib and the 4th less important buffering rib this second time.
Be to be formed with a runners draw-in groove respectively on this first fluting board seat and the 3rd fluting board seat, its be used for common fixing to a runners that should article in a side of the first fluting board seat and the 3rd fluting board seat.
This runners draw-in groove is to be a ㄇ shape draw-in groove.
This runners draw-in groove is to be a degree of lip-rounding draw-in groove.
For realizing that purpose of the present invention more provides a kind of buffer structure, comprise a fluting board seat; And a ㄇ shape holding piece, the bottom of its ㄇ shape is connected on this fluting board seat, and two front ends of ㄇ shape then are fixed on this fluting board seat removably.
This fluting board seat has a pair of terminal draw-in groove, and this ㄇ shape holding piece comprises a pair of terminal trip, is positioned on two front ends of ㄇ shape, and this can insert terminal trip and be sticked in this in the terminal draw-in groove.
Described buffer structure, other comprises a paper plastic structure, is arranged in this fluting board seat.
This paper plastic structure comprises a ㄇ shape fixed plate, is held between this fluting board seat and this ㄇ shape holding piece.
This ㄇ shape fixed plate of this paper plastic structure has a pair of on-slip breach in addition.
This fluting board seat has a pair of stage casing draw-in groove, and this ㄇ shape holding piece comprises a pair of stage casing trip, and between the bottom of two front ends of ㄇ shape and ㄇ shape, this is via this on-slip breach to the stage casing trip, is sticked in this in the draw-in groove of stage casing and can insert.
This fluting board seat has a depressed part in addition, and this paper plastic structure then comprises a salient, and salient is to be placed in this depressed part.
For realizing that purpose of the present invention more provides a kind of packing module, fix a LCD screen main body in order to packing, it has four corners, and this packing module comprises four fluting board seats; Four ㄇ shape holding pieces, the bottom of each those ㄇ shape holding piece is connected on those fluting board seats, and two front ends of each those ㄇ shape holding piece then are fixed on those fluting board seats removably; And four paper plastic structures, be arranged at respectively in those fluting board seats, and constitute four buffer structures, and those buffer structures are to be folded in respectively on those corners of this LCD screen main body with those fluting board seats and those ㄇ shape holding pieces.
Wherein two of those fluting board seats have a runners draw-in groove respectively, can fix a runners in order to packing.
For realizing that purpose of the present invention more provides a kind of rack, comprise one first fluting board seat, comprise one first main engagement groove, and want engagement groove and one first spacer for the first time, this first spacer has one first slotted eye; One the one ㄇ shape holding piece, the bottom of its ㄇ shape are connected on this first fluting board seat, and two front ends of ㄇ shape then are fixed on this first fluting board seat removably; One second fluting board seat comprises one second main engagement groove, and wants engagement groove and one second spacer for the second time, and this second spacer has one second slotted eye; And one the 2nd ㄇ shape holding piece, the bottom of its ㄇ shape is connected on this first fluting board seat, and two front ends of ㄇ shape then are fixed on this first fluting board seat removably; Wherein, this first spacer is after doubling, this first slotted eye is to engage simultaneously to be inserted in this first main engagement groove and this second main engagement groove, and this second spacer is after doubling, and this second slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and this to want engagement groove for the second time for the first time; Perhaps, this second spacer is after doubling, this second slotted eye is to engage simultaneously to be inserted in this first main engagement groove and this second main engagement groove, and this first spacer is after doubling, and this first slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and this to want engagement groove for the second time for the first time.
For realizing that purpose of the present invention more provides a kind of Double layer shelf, comprise one according to the above rack of claim; Wherein, this first fluting board seat comprises one first slip locating piece in addition, one first main buffering rib and will cushion rib for the first time, and this first slip locating piece has one first main positioning groove and two and wants positioning groove for the first time; Wherein, this second fluting board seat comprises one second slip locating piece in addition, one second main buffering rib and will cushion rib for the second time, and this second slip locating piece has one second main positioning groove and two and wants positioning groove for the second time; One the 3rd fluting board seat comprises one the 3rd main engagement groove, and wants engagement groove, one the 3rd spacer for the third time, and the 3rd spacer has one the 3rd slotted eye, one the 3rd main buffering rib and will cushion rib for the third time; One the 3rd ㄇ shape holding piece, the bottom of its ㄇ shape are connected on the 3rd fluting board seat, and two front ends of ㄇ shape then are fixed on the 3rd fluting board seat removably; One the 4th fluting board seat comprises one the 4th main engagement groove, one the 4th less important engagement groove, one the 4th spacer, and the 4th spacer has one the 4th slotted eye, one the 4th main buffering rib and one the 4th less important buffering rib; And one the 4th ㄇ shape holding piece, the bottom of its ㄇ shape is connected on the 3rd fluting board seat, and two front ends of ㄇ shape then are fixed on the 3rd fluting board seat removably; Wherein, the 3rd spacer is after doubling, the 3rd slotted eye is to engage simultaneously to be inserted in the 3rd main engagement groove and the 4th main engagement groove, and the 4th spacer is after doubling, and the 4th slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and the 4th less important engagement groove for the third time; Perhaps, the 4th spacer is after doubling, the 4th slotted eye is to engage simultaneously to be inserted in the 3rd main engagement groove and the 4th main engagement groove, and the 3rd spacer is after doubling, and the 3rd slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and the 4th less important engagement groove for the third time; Wherein, this first main positioning groove of this first slip locating piece, be sticked in this first main buffering rib and the 3rd main buffering rib, those want positioning groove for the first time, be sticked in respectively then that will cushion rib this first time and this will cushion rib for the third time, this second main positioning groove of this second slip locating piece is sticked in this second main buffering rib and mainly cushions rib with the 4th, those want positioning groove for the second time, then are sticked in respectively and will cushion rib and the 4th less important buffering rib this second time; Perhaps, this second main positioning groove of this second slip locating piece, be sticked in this first main buffering rib and the 3rd main buffering rib, those want positioning groove for the second time, be sticked in respectively then that will cushion rib this first time and this will cushion rib for the third time, this first main positioning groove of this first slip locating piece is sticked in this second main buffering rib and mainly cushions rib with the 4th, those want positioning groove for the first time, then are sticked in respectively and will cushion rib and the 4th less important buffering rib this second time.
Utilize Styrofoam or environmental protection paper plastic structure to carry out the packing of article compared to prior art, the present invention utilizes the snap-on design between paper plastic structure and the fluting board seat, so that paper plastic structure is arranged in the fluting board seat.Thus; the present invention not only can utilize the stronger fluting board seat of structural strength; support that the article of desire packing are firm to offer and the defencive function that the shock-absorbing buffering is provided; damage so as to making article in the process of transporting, be difficult for being subjected to external impacts; also can utilize simultaneously to be arranged at the characteristic that the soft material of fluting board seat in-to-in paper plastic structure is difficult for the scratch article surface, take place with the situation of avoiding the scratch article surface.On the other hand, be applied on the packing of LCD screen, the present invention also can utilize the design of runners draw-in groove on the fluting board seat, so that LCD screen main body and runners branch be arranged, and then reduction LCD screen main body and runners required occupation space when packing.
Describe the present invention below in conjunction with the drawings and specific embodiments, but not as a limitation of the invention.
Description of drawings
Fig. 1 is the expansion scheme drawing of preferred embodiment first buffer structure of the present invention;
Fig. 2 is arranged at the interior scheme drawing of the first fluting board seat for first paper plastic structure shown in Figure 1;
Fig. 3 is the scheme drawing of preferred embodiment packaging structure of the present invention;
Fig. 4 is the expansion scheme drawing of second buffer structure shown in Figure 3;
Fig. 5 is the scheme drawing of preferred embodiment packing module of the present invention;
Fig. 6 is the enlarged diagram of the first fluting board seat shown in Figure 5;
Fig. 7 is the enlarged diagram of the second fluting board seat shown in Figure 5;
Fig. 8 is arranged side by side to form the scheme drawing of first rack for first fluting board seat shown in Figure 6 and the second fluting board seat shown in Figure 7;
Fig. 9 is the enlarged diagram of the 3rd fluting board seat shown in Figure 5;
Figure 10 is the enlarged diagram of the 4th fluting board seat shown in Figure 5;
Figure 11 is arranged side by side to form the scheme drawing of second rack for the 3rd fluting board seat shown in Figure 9 and the 4th fluting board seat shown in Figure 10;
Figure 12 is the superimposed part enlarged diagram on first rack shown in Figure 8 time of second rack shown in Figure 11;
Figure 13 is the superimposed another part enlarged diagram right on first rack shown in Figure 8 time of second rack shown in Figure 11;
The scheme drawing that Figure 14 is built up Double layer shelf for first rack shown in Figure 8 and second rack shown in Figure 11.
Wherein, Reference numeral
10,108 first buffer structures, 12,112 first fluting board seats
14 first paper plastic structures 16 a ㄇ shape holding piece
18 first terminal draw-in groove 20 first stage casing draw-in grooves
22 first depressed parts 24 a ㄇ shape fixed plate
26 first salients, 28 first on-slip breach
30 first terminal trip 32 first stage casing trips
50 packaging structures, 52 second buffer structures
54,110 the 3rd buffer structures 56 the 4th buffer structure
58 second fluting board seats, 60 second paper plastic structures
62 the 2nd ㄇ shape holding pieces, 64 second terminal draw-in grooves
66 second stage casing draw-in grooves, 68 second depressed parts
70 the 2nd ㄇ shape fixed plates, 72 second salients
74 second on-slip breach, 76 second terminal trips
78 second stage casing trips, 100 packing modules
102 packaging structures, 104 LCD screen main bodys
106 runners 114 the 3rd fluting board seat
116 the 3rd paper plastic structures 118 the 4th fluting board seat
120 the 4th paper plastic structures, 122 runners draw-in grooves
124 corners, 150 first spacers
152 first main engagement grooves 154 are wanted engagement groove for the first time
156 first spacer sockets, 158 first slotted eyes
160 second spacers, 162 second main engagement grooves
164 want engagement groove 166 second spacer sockets for the second time
168 second slotted eyes, 170 first racks
172 first material-putting spaces 200 the 3rd spacer
202 the 3rd main engagement grooves 204 are wanted engagement groove for the third time
206 the 3rd spacer sockets 208 the 3rd slotted eye
210 the 4th spacers 212 the 4th main engagement groove
214 the 4th less important engagement groove 216 the 4th spacer sockets
218 the 4th slotted eyes, 220 second racks
221 second material-putting spaces, 222 first slip locating pieces
224 second slip locating pieces, 226 first accommodation spaces
228 second accommodation spaces, 230 first main positioning grooves
232 want positioning groove 234 first main buffering ribs for the first time
236 will cushion rib 238 the 3rd main buffering rib for the first time
240 will cushion rib 242 second main positioning grooves for the third time
244 want positioning groove 246 second main buffering ribs for the second time
248 will cushion rib 250 the 4th main buffering rib for the second time
252 the 4th less important buffering rib 254 Double layer shelfs
256 first accommodation spaces, 258 second accommodation spaces
117 the 3rd ㄇ shape holding pieces 121 the 4th ㄇ shape holding piece
The specific embodiment
See also Fig. 1; it is the expansion scheme drawing of one first buffer structure 10 of a preferred embodiment of the present invention; first buffer structure 10 can be used to insert and put the corner of these article when article (as a LCD screen etc.) are in packing is placed in carton, to reach the protection effect of shock-absorbing buffering.First buffer structure 10 includes one first fluting board seat 12, one first paper plastic structure 14, and one the one ㄇ shape holding piece 16.As shown in Figure 1, be formed with at least one first terminal draw-in groove 18 (in the preferred embodiment of Fig. 1, showing two), at least one first stage casing draw-in groove 20 (in the preferred embodiment of Fig. 1, showing two) on the first fluting board seat 12, and one first depressed part, 22, the first fluting board seats 12 can be assembled according to the design of the broken line on it bending in regular turn by corresponding corrugation flat board; Be formed with one the one ㄇ shape fixed plate 24 and one first salient 26 on first paper plastic structure 14, be formed with at least one first on-slip breach 28 (showing two in the preferred embodiment of Fig. 1) on the one ㄇ shape fixed plate 24,14 of first paper plastic structures are to be formed by existing common paper manufacturing process manufacturing; One end of the one ㄇ shape holding piece 16 is connected on the first fluting board seat 12, the bottom of ㄇ shape particularly, in the present invention, the one ㄇ shape holding piece 16 and the first fluting board seat 12 preferably are one of the forming, perhaps also can be a solid memder, utilize general common connection mode (as paste etc.) to be connected on the first fluting board seat 12.As shown in Figure 1, the one ㄇ shape holding piece 16 is formed with the corresponding first terminal trip 30 (showing two in the preferred embodiment of Fig. 1) on the position of the first terminal draw-in groove 18 of the corresponding first fluting board seat 12, it is positioned on two front ends of ㄇ shape, and on the position of the first stage casing draw-in groove 20 of the corresponding first fluting board seat 12, being formed with the corresponding first stage casing trip 32 (in the preferred embodiment of Fig. 1, showing two), it is between the bottom and two front ends of ㄇ shape.
Below be described in detail at the disassembly and assembly between the first fluting board seat 12 and first paper plastic structure 14 and the ㄇ shape holding piece 16.At first, aspect assembling, see also Fig. 1 and Fig. 2, Fig. 2 is that first paper plastic structure 14 shown in Figure 1 is arranged at the scheme drawing in the first fluting board seat 12.In the time of if first paper plastic structure 14 will being assembled in the first fluting board seat 12, can press down a ㄇ shape holding piece 16 shown in Figure 1 earlier, the first terminal trip 30 on the one ㄇ shape holding piece 16 and the first stage casing trip 32 are inserted respectively be sticked in the corresponding first terminal draw-in groove 18 and the first stage casing draw-in groove 20 on the first fluting board seat 12, perhaps can press down a ㄇ shape holding piece 16 shown in Figure 1 earlier, make the first terminal trip 30 on the ㄇ shape holding piece 16, insert earlier and be sticked on the first fluting board seat 12 corresponding first terminal draw-in groove 18, the first stage casing trips 32 and can insert again after a while with the first stage casing draw-in groove 20 and engage.Then, first depressed part 22 that first salient 26 on first paper plastic structure 14 can be aimed on the first fluting board seat 12, and first salient 26 is placed in first depressed part 22, and with the ㄇ shape fixed plate 24 on first paper plastic structure 14 aim at a ㄇ shape holding piece 16 on being sticked in the first fluting board seat 12 time with the gaps of 12 common formation of the first fluting board seat.By the auxiliary positioning of first depressed part 22, can with first paper plastic structure 14 as shown in Figure 1-X-direction pushes in the first fluting board seat 12, up to as shown in Figure 2, be arranged at first paper plastic structure 14 in the first fluting board seat 12 till.Utilize the locator card between first depressed part 22 and first salient 26 to merge the mode that clamps a ㄇ shape fixed plate 24 with a ㄇ shape holding piece 16 and the first fluting board seat 12 jointly, first paper plastic structure 14 can be fixed in the first fluting board seat 12.In addition, can also earlier first paper plastic structure 14 be placed earlier or sliding putting in the first fluting board seat 12, make the salient 26 of winning engage the location mutually with first depressed part 22, again a ㄇ shape holding piece 16 is covered, win terminal trip 30 and the first stage casing trip 32 are inserted respectively be sticked on the first fluting board seat 12 in the corresponding first terminal draw-in groove 18 and the first stage casing draw-in groove 20, promptly clamp the mode of a ㄇ shape fixed plate 24 jointly with a ㄇ shape holding piece 16 and the first fluting board seat 12, thereby finish the assembling between the first fluting board seat 12 and first paper plastic structure 14 and the ㄇ shape holding piece 16 apace, for the usefulness of these article of subsequent packages.
In other words, in the process that this article packing is placed in the carton, can utilize and assemble first buffer structure 10 finished to insert and put the corner of these article.In inserting and putting the process of these article; first buffer structure 10 can utilize the first fluting board seat 12 in the outside offer these article in carton firm support and in the process of transporting the defencive function of shock-absorbing buffering; and the soft material of the first inboard paper plastic structure 14 has the characteristic that is difficult for the scratch article surface, can protect this article surface when first buffer structure 10 inserts and puts the corner of these article.
In addition, in the time of in the first fluting board seat 12 that first paper plastic structure 14 is packed into, a ㄇ shape fixed plate 24 of first paper plastic structure 14 can-X-direction past along the gap between a ㄇ shape holding piece 16 and the first fluting board seat 12 move.When first paper plastic structure, the 14 relative first fluting board seats 12 move to as shown in Figure 2 position, the first stage casing trip 32 that is arranged in a ㄇ shape holding piece 16 both sides can be connected to the first on-slip breach 28 (preferred embodiment in Fig. 1 shows two) on a ㄇ shape fixed plate 24 both sides respectively, can't on the first fluting board seat 12, slide arbitrarily to limit first paper plastic structure 14, first paper plastic structure 14 can more firmly be fixed in the first fluting board seat 12.That is the first stage casing trip 32 is via the first on-slip breach 28, is sticked in the first stage casing draw-in groove 20 and can insert.
In other embodiment of the present invention, first paper plastic structure 14 and a ㄇ shape holding piece 16 also can omit the structure design of the first on-slip breach 28 and the first stage casing trip 32.In other words, first paper plastic structure 14 can only utilize first depressed part 22 to cooperate with location between first salient 26, and be fixed in the first fluting board seat 12 in the mode that a ㄇ shape holding piece 16 and the first fluting board seat 12 clamp a ㄇ shape fixed plate 24 jointly, so as to simplifying the structure design of first buffer structure 10, and then reach manufacturing cost that reduces by first buffer structure 10 and the effect of simplifying relevant assembling flow path.
In other embodiment of the present invention, the first stage casing trip 32 engages with insertion between the first stage casing draw-in groove 20, and mode that can viscose replaces, and the first terminal trip 30 and the first terminal draw-in groove 18, and mode that also can viscose replaces.In addition, if between the first fluting board seat 12 and first paper plastic structure 14, the viscose that only need see through the first stage casing trip 32 and the first stage casing draw-in groove 20, the viscose that is positioned at the middle section, the first terminal trip 30 and the first terminal draw-in groove 18 and/or be positioned at end section can be steady be fixed firmly, and first depressed part 22 and first salient 26 also are omissible.A ㄇ shape holding piece 16 in other embodiments, two front ends of its ㄇ shape then are fixed on the first fluting board seat 12 removably.
If first paper plastic structure 14 will be disassembled on the first fluting board seat 12, then only a ㄇ shape holding piece 16 shown in Figure 2 outwards must be pulled open, make the first terminal trip 30 on the ㄇ shape holding piece 16 and the first stage casing trip 32 break away from the first terminal draw-in groove 18 and the first stage casing draw-in groove 20 on the first fluting board seat 12 respectively.This moment is owing to a ㄇ shape fixed plate 24 of first paper plastic structure 14 is no longer lived by a ㄇ shape holding piece 16 and the first fluting board seat, 12 clampings, therefore can directly first paper plastic structure 14 be taken out from the first fluting board seat 12, or first paper plastic structure 14 is pulled out, and then finish dismounting flow process between the first fluting board seat 12 and first paper plastic structure 14 and the ㄇ shape holding piece 16 along first depressed part 22.
Then, see also Fig. 3, it is the scheme drawing of a packaging structure 50 of a preferred embodiment of the present invention, and as shown in Figure 3, packaging structure 50 includes first buffer structure 10, one second buffer structure 52, one the 3rd buffer structure 54, and one the 4th buffer structure 56.In this embodiment, second buffer structure 52, the 3rd buffer structure 54 and the 4th buffer structure 56 all can have identical in fact structure design with above-mentioned first buffer structure 10 shown in Figure 1.
With second buffer structure 52 is that example describes, see also Fig. 4, it is the expansion scheme drawing of second buffer structure 52 shown in Figure 3, as shown in Figure 4, second buffer structure 52 includes one second fluting board seat 58, one second paper plastic structure 60, and one the 2nd ㄇ shape holding piece 62.As shown in Figure 4, be formed with at least one second terminal draw-in groove 64 (in the preferred embodiment of Fig. 4, showing two), at least one second stage casing draw-in groove 66 (in the preferred embodiment of Fig. 4, showing two) on the second fluting board seat 58, and one second depressed part 68; Be formed with on second paper plastic structure 60 and be formed with at least one second on-slip breach 74 (in the preferred embodiment of Fig. 4, showing two) on one the 2nd ㄇ shape fixed plate 70 and one second salient, 72, the two ㄇ shape fixed plates 70; One end of the 2nd ㄇ shape holding piece 62 is connected on the second fluting board seat 58, the bottom of ㄇ shape particularly, and it is formed with the corresponding second terminal trip 76 (show two) in the preferred embodiment of Fig. 4 on the position of the second terminal draw-in groove 64 of the corresponding second fluting board seat 58, and is formed with the corresponding second stage casing trip 78 (showing two in the preferred embodiment of Fig. 4) on the position of the second stage casing draw-in groove 66 of the corresponding second fluting board seat 58.About the disassembly and assembly between the second fluting board seat 58 and second paper plastic structure 60 and the 2nd ㄇ shape holding piece 62, it is identical with the assembly and disassembly flow process of above-mentioned first buffer structure 10, repeats no more in this.Structure design as for the 3rd buffer structure 54 and the 4th buffer structure 56 then is also no longer to describe in detail in this by that analogy with relevant disassembly and assembly flow process.
Then, in the use of packaging structure 50, can finish first buffer structure 10, second buffer structure 52, the 3rd buffer structure 54 respectively according to the assembling flow path of above-mentioned mentioned first buffer structure 10, and after the assembling of the 4th buffer structure 56, respectively with first buffer structure 10, second buffer structure 52, the 3rd buffer structure 54, and the 4th buffer structure 56 is folded in respectively on four corners of article.Thus; packaging structure 50 can utilize the fluting board seat in each buffer structure outside to offer four supports that corner is firm of these article; so that these article are difficult for rocking in carton; and the defencive function that the shock-absorbing buffering is provided; so that these article are difficult for being subjected to external impacts in the process of transporting and damage; in addition; packaging structure 50 also can utilize the soft material of the paper plastic structure of each buffer structure inboard to be difficult for the characteristic of scratch article surface, protects the effect of this article surface to reach packaging structure 50 when inserting and putting four corners of these article.
Preferably, packaging structure provided by the present invention can be applicable on the packing of a LCD screen.See also Fig. 5, it is the scheme drawing of a packing module 100 of a preferred embodiment of the present invention.As shown in Figure 5, packing module 100 includes a packaging structure 102, a LCD screen main body 104, and a runners 106.The identical person with the element number described in the foregoing description of element described in the present embodiment represents that it has similar function or structure, repeats no more in this.As shown in Figure 5, packaging structure 102 includes one first buffer structure 108, second buffer structure 52, one the 3rd buffer structure 110, and the 4th buffer structure 56.First buffer structure 108 and the 3rd buffer structure 110 and above-mentioned first buffer structure 10 and the 3rd buffer structure 54 main difference parts are the design of the runners draw-in groove on the fluting board seat.
As shown in Figure 5, first buffer structure 108 includes one first fluting board seat 112 and first paper plastic structure, 14, the first paper plastic structures 14 are removable installed in the first fluting board seat 112; Second buffer structure 52 includes the second fluting board seat 58 and second paper plastic structure, 60, the second paper plastic structures 60 are removable installed in the second fluting board seat 58; The 3rd buffer structure 110 includes one the 3rd fluting board seat 114 and one the 3rd paper plastic structure, 116, the three paper plastic structures 116 are to be removable installed in the 3rd fluting board seat 114 by the 3rd ㄇ shape holding piece 117 as shown in figure 11; The 4th buffer structure 56 includes one the 4th fluting board seat 118 and one the 4th paper plastic structure, 120, the four paper plastic structures 120 are to be removable installed in the 4th fluting board seat 118 by the 4th ㄇ shape holding piece 121 as shown in figure 11; And the first fluting board seat 112 and the 3rd fluting board seat 114 have a corresponding runners draw-in groove 122 up and down respectively, it is used for runners 106 is fixed in jointly a side of the first fluting board seat 112 and the 3rd fluting board seat 114, in this embodiment, runners draw-in groove 122 preferably is a ㄇ shape draw-in groove, but not limit by this, it also can be other and can be used to pack the draw-in groove structure of fixing runners 106, as degree of lip-rounding draw-in groove etc.
Then the flow package at packing module 100 describes.At first, finish first buffer structure 108, second buffer structure 52, the 3rd buffer structure 110 respectively according to the assembling flow path of above-mentioned mentioned first buffer structure 10, and after the assembling of the 4th buffer structure 56, can be in regular turn with first buffer structure 108, second buffer structure 52, the 3rd buffer structure 110, and the 4th buffer structure 56 is folded in respectively on four corners 124 of LCD screen main body 104.Then, can again the two ends of runners 106 be inserted respectively in the runners draw-in groove 122 of the first fluting board seat 112 and the 3rd fluting board seat 114, runners 106 is arranged at a side of the first fluting board seat 112 and the 3rd fluting board seat 114, so as to finishing the assembling of packing module 100.The last packing module of finishing 100 of will assembling is again cased, thereby finishes the flow package of packing module 100.
Thus; the fluting board seat that packing module 100 can be utilized in the packaging structure 102 each buffer structure outside is with firm support of four corners 124 of offering LCD screen main body 104 and the defencive function that the shock-absorbing buffering is provided; so that LCD screen main body 104 is difficult for being subjected to external impacts in the process of transporting and damages; and packing module 100 also can utilize the soft material of the paper plastic structure of each buffer structure inboard in the packaging structure 102 to be difficult for the characteristic of scratch article surface, takes place with the situation of avoiding scratch LCD screen main body 104 surfaces when utilizing four buffer structures to insert and put four corners 124 of LCD screen main body 104 respectively.In addition, packing module 100 also can be utilized the design of runners draw-in groove 122 on the fluting board seat, runners 106 is arranged at a side of the first fluting board seat 112 and the 3rd fluting board seat 114, so as to LCD screen main body 104 and runners 106 can be packed in the carton with the mode that branch is arranged, and then reduction LCD screen main body 104 and runners 106 required occupation space when packing.The structure of above-mentioned runners draw-in groove 122 also can change into and designing on the second fluting board seat 58 and the 4th fluting board seat 118, so as to runners 106 being arranged at a side of the second fluting board seat 58 and the 4th fluting board seat 118, as for adopting which kind of packing configuration, look closely the practical application of packing module 100.
Packaging structure 102 provided by the present invention on can be applicable to article packing, also can see through the spacer be formed on the first fluting board seat 112 and the second fluting board seat 58 and the structure design of engagement groove, reclaim the function of using so that the first fluting board seat 112 and the second fluting board seat 58 can have again, below use flow process to be described in detail at the recovery again of the first fluting board seat 112 and the second fluting board seat 58.
At first be introduced at the spacer on the first fluting board seat 112 and the second fluting board seat 58 and the structure design of engagement groove, see also Fig. 6 and Fig. 7, it is respectively the enlarged diagram of the first fluting board seat 112 shown in Figure 5 and the second fluting board seat 58.As shown in Figure 6, the first fluting board seat 112 has and is formed with one first main engagement groove 152 on one first spacer 150 and the first fluting board seat 112, be adjacent to first terminal draw-in groove 18 settings, and want engagement groove 154 for the first time, corresponding to the first main engagement groove 152, and can be adjacent to 22 settings of first depressed part, and one first spacer socket, 156, the first spacers 150 are removable installed on the first spacer socket 156, and are formed with one first slotted eye 158 on first spacer 150; And as shown in Figure 7,58 of the second fluting board seats are to have to be formed with one second main engagement groove 162 on one second spacer 160 and the second fluting board seat 58, be adjacent to second terminal draw-in groove 64 settings, and want engagement groove 164 for the second time, corresponding to the second main engagement groove 162, and can be adjacent to 68 settings of second depressed part, and one second spacer socket 166, second spacer 160 is removable installed on the second spacer socket 166, and is formed with one second slotted eye 168 on second spacer 160.
When above-mentioned packaging structure 102 is not used for LCD screen main body 104 and runners 106 packed, then take out be placed in the first fluting board seat 112 and second fluting board seat 58 in-to-ins, first paper plastic structure 14 and second paper plastic structure 60 respectively after, first spacer 150 and second spacer 160 can be taken out from the second spacer socket 166 of the first spacer socket 156 of the first fluting board seat 112 and the second fluting board seat 58 respectively.Then see also Fig. 8, it is arranged side by side to form the scheme drawing of one first rack 170 for first fluting board seat 112 shown in Figure 6 and the second fluting board seat 58 shown in Figure 7.As shown in Figure 8, after first spacer 150 after will taking out and the 160 difference doublings of second spacer, first slotted eye 158 of first spacer 150 can be aimed at and insert the first main engagement groove 152 of the first fluting board seat 112 as shown in Figure 8 and the second main engagement groove 162 (or wanting engagement groove 164 second time of wanting the engagement groove 154 and the second fluting board seat 58 first time of the first fluting board seat 112) of the second fluting board seat 58, follow again second slotted eye, 168 alignings of second spacer 160 and want the second time of the engagement groove 154 and the second fluting board seat 58 along the first time that+Y direction engages the insertion first fluting board seat 112 as shown in Figure 8 downwards simultaneously and want engagement groove 164 (or second main engagement groove 162 of the first main engagement groove 152 of the first fluting board seat 112 and the second fluting board seat 58) along+Y direction engaging simultaneously downwards.Thus, by first slotted eye 158 and the first main engagement groove 152 and the second main engagement groove 162 engage and second slotted eye 168 with want for the first time the engagement groove 154 and the second time and want engaging of engagement groove 164, the first fluting board seat 112 can be fixedly set in a side of the second fluting board seat 58, and then with common first racks 170 that form of the second fluting board seat 58, one first material-putting space 172 of its formation can be for the usefulness of placing article, thereby reach the first fluting board seat 112 and the second fluting board seat 58 can reclaim the purpose of use again.
In like manner, packaging structure 102 provided by the present invention also can see through the spacer be formed on the 3rd fluting board seat 114 and the 4th fluting board seat 118 and the structure design of engagement groove, reclaim the function of using so that the 3rd fluting board seat 114 and the 4th fluting board seat 118 have again, below be described in detail at the assembling flow path that uses that reclaims again of the 3rd fluting board seat 114 and the 4th fluting board seat 118.
At first, be introduced at the spacer on the 3rd fluting board seat 114 and the 4th fluting board seat 118 and the structure design of engagement groove earlier, see also Fig. 9 and Figure 10, it is respectively the enlarged diagram of the 3rd fluting board seat 114 shown in Figure 5 and the 4th fluting board seat 118.As shown in Figure 9, the 3rd fluting board seat 114 has and is formed with one the 3rd main engagement groove 202, on one the 3rd spacer 200 and the 3rd fluting board seat 114 and wants engagement groove 204 for the third time, and one the 3rd spacer socket 206, the 3rd spacer 200 is removable installed on the 3rd spacer socket 206, and is formed with one the 3rd slotted eye 208 on the 3rd spacer 200; And as shown in figure 10,118 of the 4th fluting board seats are to have to be formed with one the 4th main engagement groove 212, one the 4th less important engagement groove 214 on one the 4th spacer 210 and the 4th fluting board seat 118, and one the 4th spacer socket 216, the 4th spacer 210 is removable installed on the 4th spacer socket 216, and be formed with one the 4th slotted eye 218 on the 4th spacer 210.
When above-mentioned packaging structure 102 is not used for LCD screen main body 104 and runners 106 packed, then take out be placed in the 3rd fluting board seat 114 and the 4th fluting board seat 118 in-to-ins the 3rd paper plastic structure 116 and the 4th paper plastic structure 120 respectively after, the 3rd spacer 200 and the 4th spacer 210 can be taken out from the 4th spacer socket 216 of the 3rd spacer socket 206 of the 3rd fluting board seat 114 and the 4th fluting board seat 118 respectively.Then see also Figure 11, it is arranged side by side to form the scheme drawing of one second rack 220 for the 3rd fluting board seat 114 shown in Figure 9 and the 4th fluting board seat 118 shown in Figure 10.As shown in Figure 11, after the 3rd spacer 200 after will taking out and the 210 difference doublings of the 4th spacer, the 3rd slotted eye 208 of the 3rd spacer 200 can be aimed at and insert the 3rd main engagement groove 202 of the 3rd fluting board seat 114 as shown in figure 11 and the 4th main engagement groove 212 (perhaps wanting the 4th less important engagement groove 214 of engagement groove 204 and the 4th fluting board seat 118 first time of the 3rd fluting board seat 114) of the 4th fluting board seat 118, then engage the 4th less important engagement groove 214 of wanting engagement groove 204 and the 4th fluting board seat 118 first time (perhaps the 4th main engagement groove 212 of the 3rd of the 3rd fluting board seat 114 the main engagement groove 202 and the 4th fluting board seat 118) of insertion the 3rd fluting board seat 114 as shown in figure 11 downwards simultaneously with second slotted eye, 218 alignings of the 4th spacer 210 and along+Y direction again along+Y direction engaging simultaneously downwards.Thus, by the 3rd slotted eye 208 and the 3rd main engagement groove 202 and the 4th main engagement groove 212 engage and the 4th slotted eye 218 with want for the third time engaging of engagement groove 204 and the 4th less important engagement groove 214, the 3rd fluting board seat 114 can be fixedly set in a side of the 4th fluting board seat 118, and then with common second racks 220 that form of the 4th fluting board seat 118, one second accommodation space 221 of its formation can be for the usefulness of follow-up placement article, thereby reach the 3rd fluting board seat 114 and the 4th fluting board seat 118 can reclaim the purpose of use again.
At last, according to above-mentioned assembling flow path with after the first fluting board seat 112 and the second fluting board seat 58 and the 3rd fluting board seat 114 and the 4th fluting board seat 118 are assembled into first rack 170 and second rack 220 respectively, the present invention is cooperatively interacting through spacer socket on slip locating piece and the fluting board seat in addition, so that first rack 170 and second rack 220 further are assembled into the pair of lamina rack, so as to increasing the application elasticity of fluting board seat on recycling, its relevant assembling instruction is as described below.
See also Figure 12 and Figure 13, Figure 12 is the superimposed part enlarged diagram on first rack 170 shown in Figure 8 time of second rack 220 shown in Figure 11, and Figure 13 is the superimposed another part enlarged diagram on first rack 170 shown in Figure 8 time of second rack 220 shown in Figure 11.By Figure 12 and Figure 13 as can be known, packaging structure 102 can include one first slip locating piece 222 and one second slip locating piece 224 in addition, and it is arranged at removably respectively in one second accommodation space 228 of one first accommodation space 226 of the first fluting board seat 112 as shown in Figure 8 and the second fluting board seat 58.
As shown in figure 12, be formed with one first main positioning groove 230 and two on the first slip locating piece 222 and want positioning groove 232 for the first time, want positioning groove 232 to be arranged at the both sides of the first main positioning groove 230 respectively for the first time.In addition, be formed with one first main buffering rib 234 and on the position of the first fluting board seat, the 112 corresponding first spacer sockets 156 and will cushion rib 236 for the first time, will cushion rib 240 for the third time and be formed with one the 3rd main buffering rib 238 and on the position of the 3rd fluting board seat 114 corresponding the 3rd spacer sockets 206.
In addition, as shown in figure 13, be formed with one second main positioning groove 242 and two on the second slip locating piece 224 and want positioning groove 244 for the second time, want positioning groove 244 to be arranged at the both sides of the second main positioning groove 242 respectively for the second time.In addition, be formed with one second main buffering rib 246 and on the position of the second fluting board seat, the 58 corresponding second spacer sockets 166 and will cushion rib 248 for the second time, and be formed with one the 4th main buffering rib 250 and one the 4th less important buffering rib 252 on the position of the 4th fluting board seat 118 corresponding the 4th spacer sockets 216.
From the above, when above-mentioned packaging structure 102 is not used for LCD screen main body 104 and runners 106 packed, can be according to above-mentioned assembling flow path, the first fluting board seat 112 and the second fluting board seat 58 are assembled into as shown in Figure 8 first rack 170, and the 3rd fluting board seat 114 and the 4th fluting board seat 118 are assembled into as shown in figure 11 second rack 220.Then, if further assemble use at first rack 170 and second rack 220, then can see through utilize as shown in figure 12 the first slip locating piece 222 and the second slip locating piece 224 as shown in figure 13, with first rack 170 and the 220 superimposed assemblings of second rack, its related procedure is as described below with further.
Please consult Figure 12, Figure 13 and Figure 14 simultaneously, the scheme drawing that Figure 14 is built up pair of lamina rack 254 for first rack 170 shown in Figure 8 and second rack 220 shown in Figure 11.When the Double layer shelf 254 that will be further first rack 170 and second rack 220 be combined into as shown in figure 14, then can earlier the first slip locating piece 222 be taken out in first accommodation space 226 of the first fluting board seat 112.Then, it is superimposed on first rack 170 to assemble second rack of finishing 220 more, and with the first spacer socket 156 on the 3rd spacer socket 206 alignings first fluting board seat 112 on the 3rd fluting board seat 114, and the 4th spacer socket 216 on the 4th fluting board seat 118 aimed at the second spacer socket 166 on the second fluting board seat 58, so as to form respectively can the ccontaining first slip locating piece 222 one first accommodation space 256 and one second accommodation space 258 that can the ccontaining second slip locating piece 224.
Then, the first main positioning groove 230 on the first slip locating piece 222 that will be taken out is aimed at the 3rd main the buffering after the rib 238 of the first main buffering rib 234 and the 3rd fluting board seat 114 of the first fluting board seat 112, the first slip locating piece 222 can be pushed in first accommodation space 256, in this process, the first main positioning groove 230 on the first slip locating piece 222 can engage first main buffering rib 234 of the first fluting board seat 112 and the 3rd main buffering rib 238 of the 3rd fluting board seat 114 (perhaps the 4th of second of the second fluting board seat 58 main buffering rib 246 and the 4th fluting board seat 118 the main buffering rib 250) accordingly, and that will cushion rib 236 and the 3rd fluting board seat 114 simultaneously for the first time two first time of wanting positioning groove 232 can engage the first fluting board seat 112 accordingly respectively on the first slip locating piece 222 will cushion rib 240 (perhaps two on the second slip locating piece 224 want positioning groove 244 can engage the second fluting board seat 58 accordingly respectively the second time the 4th less important buffering rib 252 that will cushion rib 248 and the 4th fluting board seat 118 second time) for the third time.Thus, second rack 220 can superimposed being fixed on first rack 170.
In addition, if make second rack 220 can more firmly superimposedly be fixed on first rack 170, then can from second accommodation space 228 of the second fluting board seat 58, take out the second slip locating piece 224 again, and the second main positioning groove 242 on the second slip locating piece 224 is aimed at second main buffering rib 246 of the second fluting board seat 58 and the 4th main buffering rib 250 of the 4th fluting board seat 118.Next the second slip locating piece 224 is pushed in second accommodation space 258, in this process, the second main positioning groove 242 on the second slip locating piece 224 can engage the second main buffering rib 246 of the second fluting board seat 58 and the 4th main buffering rib 250 of the 4th fluting board seat 118 (perhaps the 3rd of first of the first fluting board seat 112 main buffering rib 234 and the 3rd fluting board seat 114 the main buffering rib 238), two the 4th less important buffering ribs 252 that will cushion rib 248 and the 4th fluting board seat 118 second time (that perhaps will cushion rib 236 and the 3rd fluting board seat 114 first time of the first fluting board seat 112 will cushion rib 240 for the third time) of wanting positioning groove 244 can engage the second fluting board seat 58 accordingly respectively for the second time on the second slip locating piece 224 simultaneously accordingly.Thus, by the first slip locating piece 222 and the second slip locating piece 224 respectively with the engaging of corresponding buffering rib, second rack 220 can more firmly superimposedly be fixed on first rack 170, so with the common Double layer shelfs 254 that form as shown in figure 14 of first rack 170.
In the present invention, the number of the number of the positioning groove on the slip locating piece and corresponding buffering rib can be not limited to above-mentioned number, that is to say that it can be according to the practical application of packaging structure 102 and increase and decrease to some extent promotes the commodity shelf structure stability or the effect of simplified structure design to receive.In addition, the volume of above-mentioned first rack 170 and second rack 220 can be not quite similar.For instance, first rack 170 can be designed to the rack greater than the volume of second rack 220, the fluting board seat that meaning promptly is used for being assembled into first rack 170 can be designed to the structure greater than the volume of the fluting board seat that is assembled into second rack 220, so as to make its superimposed Double layer shelf that assembles have bigger article container space, see through the structure superposition mode of different volumes simultaneously, the Double layer shelf that is assembled by the fluting board seat also can have more the hierarchical Design sense on overall appearance.
Utilize Styrofoam or environmental protection paper plastic structure to carry out the packing of article compared to prior art, the present invention utilizes the snap-on design between paper plastic structure and the fluting board seat, so that paper plastic structure is arranged in the fluting board seat.Thus; the present invention not only can utilize the stronger fluting board seat of structural strength; support that the article of desire packing are firm to offer and the defencive function that the shock-absorbing buffering is provided; damage so as to making article in the process of transporting, be difficult for being subjected to external impacts; also can utilize simultaneously to be arranged at the characteristic that the soft material of fluting board seat in-to-in paper plastic structure is difficult for the scratch article surface, take place with the situation of avoiding the scratch article surface.On the other hand, be applied on the packing of LCD screen, the present invention also can utilize the design of runners draw-in groove on the fluting board seat, so that LCD screen main body and runners branch be arranged, and then reduction LCD screen main body and runners required occupation space when packing.
In addition, in the time need not using packaging structure provided by the present invention and carry out the packing of article, the present invention also can see through spacer and engagement groove and slip locating piece and the snap-on design that cushions rib on the fluting board seat, so that the fluting board seat is assembled into the rack that is used for placing article, thereby reach the environment protecting that the fluting board seat reclaims use again.
Certainly; the present invention also can have other various embodiments; under the situation that does not deviate from spirit of the present invention and essence thereof; those of ordinary skill in the art work as can make various corresponding changes and distortion according to the present invention, but these corresponding changes and distortion all should belong to the protection domain of the appended claim of the present invention.

Claims (31)

1. a packaging structure is characterized in that, includes:
One first buffer structure, it is one first corner that is used for inserting and putting article, this first buffer structure includes:
One first fluting board seat, it has one first spacer, and this first spacer is the one first spacer socket that is removable installed on this first fluting board seat; And
One first paper plastic structure, it is to be removable installed in this first fluting board seat; And
One second buffer structure, it is one second corner that is used for inserting and putting these article, this second buffer structure includes:
One second paper plastic structure; And
One second fluting board seat, this second paper plastic structure is to be removable installed in this second fluting board seat, this second fluting board seat has one second spacer socket, this first spacer is to engage this first fluting board seat and this second fluting board seat when this first fluting board seat and this second fluting board seat separate with this first paper plastic structure and this second paper plastic structure respectively, so that common one first rack that forms of this first fluting board seat and this second fluting board seat.
2. packaging structure according to claim 1, it is characterized in that, be to be formed with one first slotted eye on this first spacer, be to be formed with one first main engagement groove on this first fluting board seat, be to be formed with one second main engagement groove on this second fluting board seat, this first slotted eye is to engage mutually with this first main engagement groove and this second main engagement groove after this first spacer doubling.
3. packaging structure according to claim 2, it is characterized in that, this second fluting board seat has one second spacer, it is that being removable installed on this second spacer socket on this second fluting board seat and its is to be formed with one second slotted eye, be to be formed with one to want engagement groove for the first time on this first fluting board seat, be to be formed with one for the second time to want engagement groove, this second slotted eye be to want engagement groove for the first time and want this second time engagement groove to engage mutually with this after this second spacer doubling on this second fluting board seat.
4. packaging structure according to claim 1, it is characterized in that, this first buffer structure includes one the one ㄇ shape holding piece in addition, it is to be formed with one first terminal trip and the one end is to be connected in this first fluting board seat, be formed with one first terminal draw-in groove on this first fluting board seat, be formed with one the one ㄇ shape fixed plate on this first paper plastic structure, the one ㄇ shape holding piece is when this first terminal trip is sticked in this first terminal draw-in groove and common clamping the one ㄇ shape fixed plate of this first fluting board seat, so that this first paper plastic structure is fixed in this first fluting board seat.
5. packaging structure according to claim 4, it is characterized in that, the one ㄇ shape holding piece is formed with one first stage casing trip, be formed with one first stage casing draw-in groove on this first fluting board seat, be to be formed with one first on-slip breach on the one ㄇ shape fixed plate, this first stage casing trip is to be connected to this first on-slip breach when being sticked in this first stage casing draw-in groove, so that this first paper plastic structure is fixed in this first fluting board seat.
6. packaging structure according to claim 1, it is characterized in that, be to be formed with one first depressed part on this first fluting board seat, be to be formed with one first salient on this first paper plastic structure, this first salient is to be arranged in this first depressed part, so that this first paper plastic structure is positioned in this first fluting board seat.
7. packaging structure according to claim 1, it is characterized in that, this second buffer structure includes one the 2nd ㄇ shape holding piece in addition, it is to be formed with one second terminal trip and the one end is to be connected in this second fluting board seat, be formed with one second terminal draw-in groove on this second fluting board seat, be formed with one the 2nd ㄇ shape fixed plate on this second paper plastic structure, the 2nd ㄇ shape holding piece is when this second terminal trip is sticked in this second terminal draw-in groove and common clamping the 2nd ㄇ shape fixed plate of this second fluting board seat, so that this second paper plastic structure is fixed in this second fluting board seat.
8. packaging structure according to claim 7, it is characterized in that, the 2nd ㄇ shape holding piece is formed with one second stage casing trip, be formed with one second stage casing draw-in groove on this second fluting board seat, be to be formed with one second on-slip breach on the 2nd ㄇ shape fixed plate, this second stage casing trip is to be connected to this second on-slip breach when being sticked in this second stage casing draw-in groove, so that this second paper plastic structure is fixed in this second fluting board seat.
9. packaging structure according to claim 1, it is characterized in that, be to be formed with one second depressed part on this second fluting board seat, be to be formed with one second salient on this second paper plastic structure, this second salient is to be arranged in this second depressed part, so that this second paper plastic structure is positioned in this second fluting board seat.
10. packaging structure according to claim 1 is characterized in that other includes:
One the 3rd buffer structure, it is a third angle corner that is used for inserting and putting these article, the 3rd buffer structure includes:
One the 3rd fluting board seat, it has one the 3rd spacer, and the 3rd spacer is one the 3rd spacer socket that is removable installed on the 3rd fluting board seat; And
One the 3rd paper plastic structure, it is to be removable installed in the 3rd fluting board seat; And
One the 4th buffer structure, it is one the 4th corner that is used for inserting and putting these article, the 4th buffer structure includes:
One the 4th paper plastic structure; And
One the 4th fluting board seat, the 4th paper plastic structure is to be removable installed in the 4th fluting board seat, the 4th fluting board seat has one the 4th spacer socket, the 3rd spacer is to engage the 3rd fluting board seat and the 4th fluting board seat when the 3rd fluting board seat and the 4th fluting board seat separate with the 3rd paper plastic structure and the 4th paper plastic structure respectively, so that common one second rack that forms of the 3rd fluting board seat and the 4th fluting board seat.
11. packaging structure according to claim 10 is characterized in that, the volume of this first rack is the volume greater than this second rack.
12. packaging structure according to claim 10, it is characterized in that, other includes one first slip locating piece, it is to be removable installed in this first fluting board seat, when this second rack superimposed on this first rack the time, this first spacer socket and the 3rd spacer socket form one first accommodation space, and this first slip locating piece is fixed in this second rack on this first rack when being placed in this first accommodation space.
13. packaging structure according to claim 12, it is characterized in that, be formed with one first main positioning groove on this first slip locating piece, this first fluting board seat is in be formed with one first main buffering rib on should the position of the first spacer socket, the 3rd fluting board seat is in be formed with one the 3rd main buffering rib on should the position of the 3rd spacer socket, this first main positioning groove is when this first slip locating piece is placed in this first accommodation space, is sticked in this first main buffering rib and the 3rd main buffering rib.
14. packaging structure according to claim 13, it is characterized in that, be formed with two on this first slip locating piece and want positioning groove for the first time, it is the both sides that lay respectively at this first main positioning groove, side in this first main buffering rib on this first fluting board seat is to be formed with one will cushion rib for the first time, side in the 3rd main buffering rib on the 3rd fluting board seat is to be formed with one will cushion rib for the third time, those want positioning groove for the first time is when this first main positioning groove engages this first main buffering rib and the 3rd main buffering rib, is sticked in respectively that will cushion rib this first time and this will cushion rib for the third time.
15. packaging structure according to claim 12, it is characterized in that, other includes one second slip locating piece, it is to be removable installed in this second fluting board seat, when this second rack superimposed on this first rack the time, this second spacer socket and the 4th spacer socket form one second accommodation space, and this second slip locating piece is fixed in this second rack on this first rack when being placed in this second accommodation space.
16. packaging structure according to claim 15, it is characterized in that, be formed with one second main positioning groove on this second slip locating piece, this second fluting board seat is in be formed with one second main buffering rib on should the position of the second spacer socket, the 4th fluting board seat is in be formed with one the 4th main buffering rib on should the position of the 4th spacer socket, this second main positioning groove is when this second slip locating piece is placed in this second accommodation space, is sticked in this second main buffering rib and the 4th main buffering rib.
17. packaging structure according to claim 16, it is characterized in that, be formed with two on this second slip locating piece and want positioning groove for the second time, it is the both sides that lay respectively at this second main positioning groove, side in this second main buffering rib on this second fluting board seat is to be formed with one will cushion rib for the second time, side in the 4th main buffering rib on the 4th fluting board seat is to be formed with one the 4th less important buffering rib, those want positioning groove for the second time is when this second main positioning groove engages this second main buffering rib and the 4th main buffering rib, is sticked in respectively and will cushions rib and the 4th less important buffering rib this second time.
18. packaging structure according to claim 10, it is characterized in that, be to be formed with a runners draw-in groove respectively on this first fluting board seat and the 3rd fluting board seat, its be used for common fixing to a runners that should article in a side of the first fluting board seat and the 3rd fluting board seat.
19. packaging structure according to claim 18 is characterized in that, this runners draw-in groove is to be a ㄇ shape draw-in groove.
20. packaging structure according to claim 19 is characterized in that, this runners draw-in groove is to be a degree of lip-rounding draw-in groove.
21. a buffer structure is characterized in that, comprises:
One fluting board seat; And
One ㄇ shape holding piece, the bottom of its ㄇ shape are connected on this fluting board seat, and two front ends of ㄇ shape then are fixed on this fluting board seat removably.
22. buffer structure according to claim 21, it is characterized in that this fluting board seat has a pair of terminal draw-in groove, and this ㄇ shape holding piece comprises a pair of terminal trip, be positioned on two front ends of ㄇ shape, this can insert terminal trip and be sticked in this in the terminal draw-in groove.
23. buffer structure according to claim 21 is characterized in that, other comprises a paper plastic structure, is arranged in this fluting board seat.
24. buffer structure according to claim 23 is characterized in that, this paper plastic structure comprises a ㄇ shape fixed plate, is held between this fluting board seat and this ㄇ shape holding piece.
25. buffer structure according to claim 23 is characterized in that, this ㄇ shape fixed plate of this paper plastic structure has a pair of on-slip breach in addition.
26. buffer structure according to claim 25, it is characterized in that, this fluting board seat has a pair of stage casing draw-in groove, and this ㄇ shape holding piece comprises a pair of stage casing trip, between the bottom of two front ends of ㄇ shape and ㄇ shape, this is via this on-slip breach to the stage casing trip, is sticked in this in the draw-in groove of stage casing and can insert.
27. buffer structure according to claim 23 is characterized in that, this fluting board seat has a depressed part in addition, and this paper plastic structure then comprises a salient, and salient is to be placed in this depressed part.
28. a packing module is characterized in that fix a LCD screen main body in order to packing, it has four corners, this packing module comprises:
Four fluting board seats;
Four ㄇ shape holding pieces, the bottom of each those ㄇ shape holding piece is connected on those fluting board seats, and two front ends of each those ㄇ shape holding piece then are fixed on those fluting board seats removably; And
Four paper plastic structures are arranged at respectively in those fluting board seats, and constitute four buffer structures with those fluting board seats and those ㄇ shape holding pieces, and those buffer structures are to be folded in respectively on those corners of this LCD screen main body.
29. packing module according to claim 28 is characterized in that, wherein two of those fluting board seats have a runners draw-in groove respectively, can fix a runners in order to packing.
30. a rack is characterized in that, comprises:
One first fluting board seat comprises one first main engagement groove, and wants engagement groove and one first spacer for the first time, and this first spacer has one first slotted eye;
One the one ㄇ shape holding piece, the bottom of its ㄇ shape are connected on this first fluting board seat, and two front ends of ㄇ shape then are fixed on this first fluting board seat removably;
One second fluting board seat comprises one second main engagement groove, and wants engagement groove and one second spacer for the second time, and this second spacer has one second slotted eye; And
One the 2nd ㄇ shape holding piece, the bottom of its ㄇ shape are connected on this first fluting board seat, and two front ends of ㄇ shape then are fixed on this first fluting board seat removably;
Wherein, this first spacer is after doubling, this first slotted eye is to engage simultaneously to be inserted in this first main engagement groove and this second main engagement groove, and this second spacer is after doubling, and this second slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and this to want engagement groove for the second time for the first time;
Perhaps, this second spacer is after doubling, this second slotted eye is to engage simultaneously to be inserted in this first main engagement groove and this second main engagement groove, and this first spacer is after doubling, and this first slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and this to want engagement groove for the second time for the first time.
31. a Double layer shelf is characterized in that, comprises:
One rack according to claim 30;
Wherein, this first fluting board seat comprises one first slip locating piece in addition, one first main buffering rib and will cushion rib for the first time, and this first slip locating piece has one first main positioning groove and two and wants positioning groove for the first time;
Wherein, this second fluting board seat comprises one second slip locating piece in addition, one second main buffering rib and will cushion rib for the second time, and this second slip locating piece has one second main positioning groove and two and wants positioning groove for the second time;
One the 3rd fluting board seat comprises one the 3rd main engagement groove, and wants engagement groove, one the 3rd spacer for the third time, and the 3rd spacer has one the 3rd slotted eye, one the 3rd main buffering rib and will cushion rib for the third time;
One the 3rd ㄇ shape holding piece, the bottom of its ㄇ shape are connected on the 3rd fluting board seat, and two front ends of ㄇ shape then are fixed on the 3rd fluting board seat removably;
One the 4th fluting board seat comprises one the 4th main engagement groove, one the 4th less important engagement groove, one the 4th spacer, and the 4th spacer has one the 4th slotted eye, one the 4th main buffering rib and one the 4th less important buffering rib; And
One the 4th ㄇ shape holding piece, the bottom of its ㄇ shape are connected on the 3rd fluting board seat, and two front ends of ㄇ shape then are fixed on the 3rd fluting board seat removably;
Wherein, the 3rd spacer is after doubling, the 3rd slotted eye is to engage simultaneously to be inserted in the 3rd main engagement groove and the 4th main engagement groove, and the 4th spacer is after doubling, and the 4th slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and the 4th less important engagement groove for the third time;
Perhaps, the 4th spacer is after doubling, the 4th slotted eye is to engage simultaneously to be inserted in the 3rd main engagement groove and the 4th main engagement groove, and the 3rd spacer is after doubling, and the 3rd slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and the 4th less important engagement groove for the third time;
Wherein, this first main positioning groove of this first slip locating piece, be sticked in this first main buffering rib and the 3rd main buffering rib, those want positioning groove for the first time, be sticked in respectively then that will cushion rib this first time and this will cushion rib for the third time, this second main positioning groove of this second slip locating piece is sticked in this second main buffering rib and mainly cushions rib with the 4th, those want positioning groove for the second time, then are sticked in respectively and will cushion rib and the 4th less important buffering rib this second time;
Perhaps, this second main positioning groove of this second slip locating piece, be sticked in this first main buffering rib and the 3rd main buffering rib, those want positioning groove for the second time, be sticked in respectively then that will cushion rib this first time and this will cushion rib for the third time, this first main positioning groove of this first slip locating piece is sticked in this second main buffering rib and mainly cushions rib with the 4th, those want positioning groove for the first time, then are sticked in respectively and will cushion rib and the 4th less important buffering rib this second time.
CN2009101797231A 2009-09-30 2009-09-30 Packing structure and related shelf thereof Active CN101691160B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101797231A CN101691160B (en) 2009-09-30 2009-09-30 Packing structure and related shelf thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101797231A CN101691160B (en) 2009-09-30 2009-09-30 Packing structure and related shelf thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN2010105292239A Division CN102009786B (en) 2009-09-30 2009-09-30 Buffer structure, packaging module and related shelf thereof

Publications (2)

Publication Number Publication Date
CN101691160A true CN101691160A (en) 2010-04-07
CN101691160B CN101691160B (en) 2011-04-13

Family

ID=42079900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101797231A Active CN101691160B (en) 2009-09-30 2009-09-30 Packing structure and related shelf thereof

Country Status (1)

Country Link
CN (1) CN101691160B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101850880A (en) * 2010-06-09 2010-10-06 友达光电股份有限公司 Package structure
CN101948034A (en) * 2010-09-27 2011-01-19 友达光电股份有限公司 Packaging structure and packaging method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101850880A (en) * 2010-06-09 2010-10-06 友达光电股份有限公司 Package structure
CN101948034A (en) * 2010-09-27 2011-01-19 友达光电股份有限公司 Packaging structure and packaging method thereof

Also Published As

Publication number Publication date
CN101691160B (en) 2011-04-13

Similar Documents

Publication Publication Date Title
CN102582962B (en) Buffer material
CN102009786B (en) Buffer structure, packaging module and related shelf thereof
US7604120B2 (en) Cushion structure
CN102774567B (en) Packing box (Chinese character' jiangsu
CN201121004Y (en) Thin panel packing box
TW200811006A (en) Packaging cushion and cushion assembly
WO2013166740A1 (en) Mould for plastic products and method for using same, as well as a liquid crystal glass package box
CN101691160B (en) Packing structure and related shelf thereof
US9156225B2 (en) Packing structure and assembling method thereof
CN201068230Y (en) Packing box construction
CN201321215Y (en) Protective box for fragile boards
CN202175245U (en) Packing box
CN203497408U (en) Cushion packaging box
CN103264845A (en) Packaging carton box
CN204737180U (en) Packaging assembly for packaging notebook computer and buffer structure thereof
CN201158509Y (en) Protective inner lining of packing box
CN201043056Y (en) Pad for buffering and separating
CN103359396B (en) Integrated computer buffering package
EP2590873B1 (en) Dual-purpose packaging insert and packaging box for sensitive flat objects
CN1323904C (en) Partition structure for buffering package material
CN210063898U (en) Buffer gasket for notebook computer
CN211919596U (en) Packaging structure
CN211417925U (en) Folding type easy-to-store wooden box
CN104477474A (en) Automobile sound packaging box
CN218617727U (en) Novel folding paper holds in palm and packing carton

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant