CN102009786B - Buffer structure, packaging module and related shelf thereof - Google Patents

Buffer structure, packaging module and related shelf thereof Download PDF

Info

Publication number
CN102009786B
CN102009786B CN2010105292239A CN201010529223A CN102009786B CN 102009786 B CN102009786 B CN 102009786B CN 2010105292239 A CN2010105292239 A CN 2010105292239A CN 201010529223 A CN201010529223 A CN 201010529223A CN 102009786 B CN102009786 B CN 102009786B
Authority
CN
China
Prior art keywords
fluting board
board seat
main
time
spacer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010105292239A
Other languages
Chinese (zh)
Other versions
CN102009786A (en
Inventor
丁崇宽
詹黛玲
陈士琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AU Optronics Corp
Original Assignee
AU Optronics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AU Optronics Corp filed Critical AU Optronics Corp
Priority to CN2010105292239A priority Critical patent/CN102009786B/en
Publication of CN102009786A publication Critical patent/CN102009786A/en
Application granted granted Critical
Publication of CN102009786B publication Critical patent/CN102009786B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buffer Packaging (AREA)

Abstract

The invention relates to a buffer structure, a packaging module and a related shelf thereof. The buffer structure comprises a corrugated paper block and an inverted U-shaped clamping piece, wherein the bottom end of the inverted U-shaped clamping piece is connected with the corrugated paper block, and the two front ends of the inverted U-shaped clamping piece are dismountably fixed on the corrugated paper block. The packaging module comprises four corrugated paper blocks, four inverted U-shaped clamping pieces and four paper-plastic structures, wherein the bottom end of each inverted U-shaped clamping piece is connected with the corrugated paper blocks, two front ends of each inverted U-shaped clamping piece are dismountably fixed on the corrugated paper blocks, the four paper-plastic structures are respectively arranged in the corrugated paper blocks and form four buffer structures together with the corrugated paper blocks and the inverted U-shaped clamping pieces, and the buffer structures are respectively clamped at the corners of an LCD (Liquid Crystal Screen) main body. By utilizing the corrugated paper blocks with stronger structural intensity, the invention can provide stable support and the protection function of shock absorption and buffer for articles to be packaged so that the articles in the conveying process are hardly damaged by external impact.

Description

Buffer structure, packing module and related shelf thereof
The application is divided an application according to what female case (application number: 200910179723.1, denomination of invention: packaging structure and related shelf thereof) proposed.
Technical field
The invention relates to a kind of packaging structure and related shelf thereof, refer to especially a kind ofly have high structural strength and can reclaim the packaging structure and the related shelf thereof of use again.
Background technology
Generally speaking; Receive easily on the packing of article of external force damage at some; Like LCD screen etc., the material that its common manner of packing is to use Styrofoam etc. can absorb external vibrations and pooling feature is provided is with as inserting and putting four corners of article or coating the article package buffering structure of both sides up and down; The defencive function of article firm support and shock-absorbing buffering in carton so can be provided, so that article are difficult for being subjected to external impacts and damage in the process of transporting.Yet; The Styrofoam packaging structure not only needs comparatively huge storage space; Also have simultaneously structure and meet the shortcomings of clashing into easy cracked and the article that can't be applicable to other different external forms, in addition, the material behavior that the Styrofoam packaging structure can't be recycled also is easy to generate the waste problem of resource.
On the other hand; Be used for replacing the environmental protection paper plastic structure of Styrofoam packaging structure, though can solve the problem of the wasting of resources, its structural strength a little less than; The situation of easy recurring structure crimp when carrying large-sized article, and then influence the function that its shock-absorbing is protected.
In sum, the packaging structure of how designing high structural strength and can reclaiming use again is one of important topic on article packing now.
Summary of the invention
The object of the invention is to provide a kind of buffer structure, packing module and related shelf thereof, and it has high structural strength and can reclaim use again.
The object of the present invention is to provide and a kind ofly have high structural strength and can reclaim the packaging structure of use again; It is the snap-on design of utilizing between paper plastic structure and the fluting board seat; Paper plastic structure is arranged in the fluting board seat, so as to solving the problem of above-mentioned environmental protection paper plastic structure undercapacity.In addition, see through spacer and engagement groove and slip locating piece and the snap-on design that cushions rib on the fluting board seat, the fluting board seat that the present invention disclosed also can be assembled into the rack that is used for placing article, so as to reaching the environment protecting that the fluting board seat reclaims use again.
For realizing that the object of the invention provides a kind of packaging structure; It includes one first buffer structure; It is one first corner that is used for inserting and putting article; This first buffer structure includes one first fluting board seat, and it has one first spacer, and this first spacer is the one first spacer socket that is removable installed on this first fluting board seat; And one first paper plastic structure, it is to be removable installed in this first fluting board seat; And one second buffer structure, it is one second corner that is used for inserting and putting these article, this second buffer structure includes one second paper plastic structure; And one second fluting board seat; This second paper plastic structure is to be removable installed in this second fluting board seat; This second fluting board seat has one second spacer socket; This first spacer is intended to be when this first fluting board seat and this second fluting board seat separate with this first paper plastic structure and this second paper plastic structure respectively and engages this first fluting board seat and this second fluting board seat, so that common one first rack that forms of this first fluting board seat and this second fluting board seat.
Be to be formed with one first slotted eye on this first spacer; Be to be formed with one first main engagement groove on this first fluting board seat; Be to be formed with one second main engagement groove on this second fluting board seat, this first slotted eye is after this first spacer doubling, to engage each other with this first main engagement groove and this second main engagement groove.
This second fluting board seat has one second spacer; It is to be to be formed with one second slotted eye on this second spacer socket and its that is removable installed on this second fluting board seat; Be to be formed with one to want engagement groove for the first time on this first fluting board seat; Be to be formed with one for the second time to want engagement groove, this second slotted eye be after this second spacer doubling, to want engagement groove for the first time and want this second time engagement groove to engage each other with this on this second fluting board seat.
This first buffer structure includes one the one ㄇ shape holding piece in addition; It is to be formed with one first terminal trip and the one of which end is to be connected in this first fluting board seat; Be formed with one first terminal draw-in groove on this first fluting board seat; Be formed with one the one ㄇ shape fixed plate on this first paper plastic structure; The one ㄇ shape holding piece is when this first terminal trip is sticked in this first terminal draw-in groove and common clamping the one ㄇ shape fixed plate of this first fluting board seat, so that this first paper plastic structure is fixed in this first fluting board seat.
The one ㄇ shape holding piece is formed with one first stage casing trip; Be formed with one first stage casing draw-in groove on this first fluting board seat; Be to be formed with one first on-slip breach on the one ㄇ shape fixed plate; This first stage casing trip is when being sticked in this first stage casing draw-in groove, to be connected to this first on-slip breach, so that this first paper plastic structure is fixed in this first fluting board seat.
Being to be formed with one first depressed part on this first fluting board seat, is to be formed with one first salient on this first paper plastic structure, and this first salient is to be arranged in this first depressed part, so that this first paper plastic structure is positioned in this first fluting board seat.
This second buffer structure includes one the 2nd ㄇ shape holding piece in addition; It is to be formed with one second terminal trip and the one of which end is to be connected in this second fluting board seat; Be formed with one second terminal draw-in groove on this second fluting board seat; Be formed with one the 2nd ㄇ shape fixed plate on this second paper plastic structure; The 2nd ㄇ shape holding piece is when this second terminal trip is sticked in this second terminal draw-in groove and common clamping the 2nd ㄇ shape fixed plate of this second fluting board seat, so that this second paper plastic structure is fixed in this second fluting board seat.
The 2nd ㄇ shape holding piece is formed with one second stage casing trip; Be formed with one second stage casing draw-in groove on this second fluting board seat; Be to be formed with one second on-slip breach on the 2nd ㄇ shape fixed plate; This second stage casing trip is when being sticked in this second stage casing draw-in groove, to be connected to this second on-slip breach, so that this second paper plastic structure is fixed in this second fluting board seat.
Being to be formed with one second depressed part on this second fluting board seat, is to be formed with one second salient on this second paper plastic structure, and this second salient is to be arranged in this second depressed part, so that this second paper plastic structure is positioned in this second fluting board seat.
Described packaging structure, other includes:
One the 3rd buffer structure, it is one the 3rd corner that is used for inserting and putting these article, the 3rd buffer structure includes:
One the 3rd fluting board seat, it has one the 3rd spacer, and the 3rd spacer is one the 3rd spacer socket that is removable installed on the 3rd fluting board seat; And
One the 3rd paper plastic structure, it is to be removable installed in the 3rd fluting board seat; And
One the 4th buffer structure, it is one the 4th corner that is used for inserting and putting these article, the 4th buffer structure includes:
One the 4th paper plastic structure; And
One the 4th fluting board seat; The 4th paper plastic structure is to be removable installed in the 4th fluting board seat; The 4th fluting board seat has one the 4th spacer socket; The 3rd spacer is when the 3rd fluting board seat and the 4th fluting board seat separate with the 3rd paper plastic structure and the 4th paper plastic structure respectively, to engage the 3rd fluting board seat and the 4th fluting board seat, so that common one second rack that forms of the 3rd fluting board seat and the 4th fluting board seat.
The volume of this first rack is the volume greater than this second rack.
Described packaging structure; Other includes one first slip locating piece; It is to be removable installed in this first fluting board seat, and superimposed on this first rack the time when this second rack, this first spacer socket and the 3rd spacer socket form one first accommodation space; This first slip locating piece is fixed in this second rack on this first rack when being placed in this first accommodation space.
Be formed with one first main positioning groove on this first slip locating piece; This first fluting board seat is on should the position of the first spacer socket, being formed with one first main buffering rib; The 3rd fluting board seat is on should the position of the 3rd spacer socket, being formed with one the 3rd main buffering rib; This first main positioning groove is when this first slip locating piece is placed in this first accommodation space, is sticked in this first main buffering rib and the 3rd main buffering rib.
Be formed with two on this first slip locating piece and want positioning groove for the first time; It is the both sides that lay respectively at this first main positioning groove; Side in this first main buffering rib on this first fluting board seat is to be formed with one will cushion rib for the first time; Side in the 3rd main buffering rib on the 3rd fluting board seat is to be formed with one will cushion rib for the third time; Those want positioning groove for the first time is when this first main buffering rib of this first main positioning groove engaging and the 3rd main buffering rib, is sticked in respectively that will cushion rib this first time and this will cushion rib for the third time.
Described packaging structure; Other includes one second slip locating piece; It is to be removable installed in this second fluting board seat, and superimposed on this first rack the time when this second rack, this second spacer socket and the 4th spacer socket form one second accommodation space; This second slip locating piece is fixed in this second rack on this first rack when being placed in this second accommodation space.
Be formed with one second main positioning groove on this second slip locating piece; This second fluting board seat is on should the position of the second spacer socket, being formed with one second main buffering rib; The 4th fluting board seat is on should the position of the 4th spacer socket, being formed with one the 4th main buffering rib; This second main positioning groove is when this second slip locating piece is placed in this second accommodation space, is sticked in this second main buffering rib and the 4th main buffering rib.
Be formed with two on this second slip locating piece and want positioning groove for the second time; It is the both sides that lay respectively at this second main positioning groove; Side in this second main buffering rib on this second fluting board seat is to be formed with one will cushion rib for the second time; Side in the 4th main buffering rib on the 4th fluting board seat is to be formed with one the 4th less important buffering rib; Those want positioning groove for the second time is when this this second main buffering rib and the 4th of second main positioning groove engaging mainly cushions rib, is sticked in respectively and will cushions rib and the 4th less important buffering rib this second time.
Be to be formed with a runners draw-in groove respectively on this first fluting board seat and the 3rd fluting board seat, its be used for common fixing to a runners that should article in a side of the first fluting board seat and the 3rd fluting board seat.
This runners draw-in groove is to be a ㄇ shape draw-in groove.
This runners draw-in groove is to be a degree of lip-rounding draw-in groove.
For realizing that the object of the invention more provides a kind of buffer structure, comprise a fluting board seat; And a ㄇ shape holding piece, the bottom of its ㄇ shape is connected on this fluting board seat, and two front ends of ㄇ shape then are fixed on this fluting board seat removably.
This fluting board seat has a pair of terminal draw-in groove, and this ㄇ shape holding piece comprises a pair of terminal trip, is positioned on two front ends of ㄇ shape, and this can insert terminal trip and be sticked in this in the terminal draw-in groove.
Described buffer structure, other comprises a paper plastic structure, is arranged in this fluting board seat.
This paper plastic structure comprises a ㄇ shape fixed plate, is held between this fluting board seat and this ㄇ shape holding piece.
This ㄇ shape fixed plate of this paper plastic structure has a pair of on-slip breach in addition.
This fluting board seat has a pair of stage casing draw-in groove, and this ㄇ shape holding piece comprises a pair of stage casing trip, and between the bottom of two front ends of ㄇ shape and ㄇ shape, this is via this on-slip breach to the stage casing trip, is sticked in this in the draw-in groove of stage casing and can insert.
This fluting board seat has a depressed part in addition, and this paper plastic structure then comprises a salient, and salient is to be placed in this depressed part.
For realizing that the object of the invention more provides a kind of packing module, in order to pack a fixing LCD screen main body, it has four corners, and this packing module comprises four fluting board seats; Four ㄇ shape holding pieces, the bottom of each those ㄇ shape holding piece is connected on those fluting board seats, and two front ends of each those ㄇ shape holding piece then are fixed on those fluting board seats removably; And four paper plastic structures, be arranged at respectively in those fluting board seats, and constitute four buffer structures, and those buffer structures are to be folded in respectively on those corners of this LCD screen main body with those fluting board seats and those ㄇ shape holding pieces.
Wherein two of those fluting board seats have a runners draw-in groove respectively, can be in order to pack a fixing runners.
For realizing that the object of the invention more provides a kind of rack, comprise one first fluting board seat, comprise one first main engagement groove, and want engagement groove and one first spacer for the first time, this first spacer has one first slotted eye; One the one ㄇ shape holding piece, the bottom of its ㄇ shape are connected on this first fluting board seat, and two front ends of ㄇ shape then are fixed on this first fluting board seat removably; One second fluting board seat comprises one second main engagement groove, and wants engagement groove and one second spacer for the second time, and this second spacer has one second slotted eye; And one the 2nd ㄇ shape holding piece, the bottom of its ㄇ shape is connected on this first fluting board seat, and two front ends of ㄇ shape then are fixed on this first fluting board seat removably; Wherein, This first spacer is after doubling; This first slotted eye is to engage simultaneously to be inserted in this first main engagement groove and this second main engagement groove, and this second spacer is after doubling, and this second slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and this to want engagement groove for the second time for the first time; Perhaps; This second spacer is after doubling; This second slotted eye is to engage simultaneously to be inserted in this first main engagement groove and this second main engagement groove, and this first spacer is after doubling, and this first slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and this to want engagement groove for the second time for the first time.
For realizing that the object of the invention more provides a kind of Double layer shelf, comprise one according to the above rack of claim; Wherein, this first fluting board seat comprises one first slip locating piece in addition, one first main buffering rib and will cushion rib for the first time, and this first slip locating piece has one first main positioning groove and two and wants positioning groove for the first time; Wherein, this second fluting board seat comprises one second slip locating piece in addition, one second main buffering rib and will cushion rib for the second time, and this second slip locating piece has one second main positioning groove and two and wants positioning groove for the second time; One the 3rd fluting board seat comprises one the 3rd main engagement groove, and wants engagement groove, one the 3rd spacer for the third time, and the 3rd spacer has one the 3rd slotted eye, one the 3rd main buffering rib and will cushion rib for the third time; One the 3rd ㄇ shape holding piece, the bottom of its ㄇ shape are connected on the 3rd fluting board seat, and two front ends of ㄇ shape then are fixed on the 3rd fluting board seat removably; One the 4th fluting board seat comprises one the 4th main engagement groove, one the 4th less important engagement groove, one the 4th spacer, and the 4th spacer has one the 4th slotted eye, one the 4th main buffering rib and one the 4th less important buffering rib; And one the 4th ㄇ shape holding piece, the bottom of its ㄇ shape is connected on the 3rd fluting board seat, and two front ends of ㄇ shape then are fixed on the 3rd fluting board seat removably; Wherein, The 3rd spacer is after doubling; The 3rd slotted eye is to engage simultaneously to be inserted in the 3rd main engagement groove and the 4th main engagement groove, and the 4th spacer is after doubling, and the 4th slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and the 4th less important engagement groove for the third time; Perhaps; The 4th spacer is after doubling; The 4th slotted eye is to engage simultaneously to be inserted in the 3rd main engagement groove and the 4th main engagement groove, and the 3rd spacer is after doubling, and the 3rd slotted eye is to engage simultaneously to be inserted in this and to want engagement groove and the 4th less important engagement groove for the third time; Wherein, this first main positioning groove of this first slip locating piece is sticked in this first main buffering rib and the 3rd main buffering rib; Those want positioning groove for the first time; Be sticked in respectively then that will cushion rib this first time and this will cushion rib for the third time, this second main positioning groove of this second slip locating piece is sticked in this second main buffering rib and mainly cushions rib with the 4th; Those want positioning groove for the second time, then are sticked in respectively and will cushion rib and the 4th less important buffering rib this second time; Perhaps, this second main positioning groove of this second slip locating piece is sticked in this first main buffering rib and the 3rd main buffering rib; Those want positioning groove for the second time; Be sticked in respectively then that will cushion rib this first time and this will cushion rib for the third time, this first main positioning groove of this first slip locating piece is sticked in this second main buffering rib and mainly cushions rib with the 4th; Those want positioning groove for the first time, then are sticked in respectively and will cushion rib and the 4th less important buffering rib this second time.
Utilize Styrofoam or environmental protection paper plastic structure to carry out the packing of article compared to prior art, the present invention utilizes the snap-on design between paper plastic structure and the fluting board seat, so that paper plastic structure is arranged in the fluting board seat.Thus; The fluting board seat that the present invention's structural strength not only capable of using is stronger; Support that the article of desire packing are firm to offer and the defencive function that the shock-absorbing buffering is provided; Damage so as to making article in the process of transporting, be difficult for being subjected to external impacts, simultaneously also capable of usingly be arranged at the characteristic that the soft material of fluting board seat in-to-in paper plastic structure is difficult for the scratch article surface, take place with the situation of avoiding the scratch article surface.On the other hand, be applied on the packing of LCD screen, the design of runners draw-in groove on the present invention's fluting board seat also capable of using, so that LCD screen main body and runners branch be arranged, and then reduction LCD screen main body and runners required occupation space when packing.
Describe the present invention below in conjunction with accompanying drawing and specific embodiment, but not as to qualification of the present invention.
Description of drawings
Fig. 1 is the expansion scheme drawing of preferred embodiment first buffer structure of the present invention;
Fig. 2 is arranged at the scheme drawing in the first fluting board seat for first paper plastic structure shown in Figure 1;
Fig. 3 is the scheme drawing of preferred embodiment packaging structure of the present invention;
Fig. 4 is the expansion scheme drawing of second buffer structure shown in Figure 3;
Fig. 5 is the scheme drawing of preferred embodiment packing module of the present invention;
Fig. 6 is the enlarged diagram of the first fluting board seat shown in Figure 5;
Fig. 7 is the enlarged diagram of the second fluting board seat shown in Figure 5;
Fig. 8 is arranged side by side to form the scheme drawing of first rack for first fluting board seat shown in Figure 6 and the second fluting board seat shown in Figure 7;
Fig. 9 is the enlarged diagram of the 3rd fluting board seat shown in Figure 5;
Figure 10 is the enlarged diagram of the 4th fluting board seat shown in Figure 5;
Figure 11 is arranged side by side to form the scheme drawing of second rack for the 3rd fluting board seat shown in Figure 9 and the 4th fluting board seat shown in Figure 10;
Figure 12 is the superimposed part enlarged diagram on first rack shown in Figure 8 time of second rack shown in Figure 11;
Figure 13 is the superimposed another part enlarged diagram right on first rack shown in Figure 8 time of second rack shown in Figure 11;
The scheme drawing that Figure 14 is built up Double layer shelf for first rack shown in Figure 8 and second rack shown in Figure 11.
Wherein, Reference numeral
10,108 first buffer structures, 12,112 first fluting board seats
14 first paper plastic structures 16 a ㄇ shape holding piece
18 first terminal draw-in groove 20 first stage casing draw-in grooves
22 first depressed parts 24 a ㄇ shape fixed plate
26 first salients, 28 first on-slip breach
30 first terminal trip 32 first stage casing trips
50 packaging structures, 52 second buffer structures
54,110 the 3rd buffer structures 56 the 4th buffer structure
58 second fluting board seats, 60 second paper plastic structures
62 the 2nd ㄇ shape holding pieces, 64 second terminal draw-in grooves
66 second stage casing draw-in grooves, 68 second depressed parts
70 the 2nd ㄇ shape fixed plates, 72 second salients
74 second on-slip breach, 76 second terminal trips
78 second stage casing trips, 100 packing modules
102 packaging structures, 104 LCD screen main bodys
106 runners 114 the 3rd fluting board seat
116 the 3rd paper plastic structures 118 the 4th fluting board seat
120 the 4th paper plastic structures, 122 runners draw-in grooves
124 corners, 150 first spacers
152 first main engagement grooves 154 are wanted engagement groove for the first time
156 first spacer sockets, 158 first slotted eyes
160 second spacers, 162 second main engagement grooves
164 want engagement groove 166 second spacer sockets for the second time
168 second slotted eyes, 170 first racks
172 first material-putting spaces 200 the 3rd spacer
202 the 3rd main engagement grooves 204 are wanted engagement groove for the third time
206 the 3rd spacer sockets 208 the 3rd slotted eye
210 the 4th spacers 212 the 4th main engagement groove
214 the 4th less important engagement groove 216 the 4th spacer sockets
218 the 4th slotted eyes, 220 second racks
221 second material-putting spaces, 222 first slip locating pieces
224 second slip locating pieces, 226 first accommodation spaces
228 second accommodation spaces, 230 first main positioning grooves
232 want positioning groove 234 first main buffering ribs for the first time
236 will cushion rib 238 the 3rd main buffering rib for the first time
240 will cushion rib 242 second main positioning grooves for the third time
244 want positioning groove 246 second main buffering ribs for the second time
248 will cushion rib 250 the 4th main buffering rib for the second time
252 the 4th less important buffering rib 254 Double layer shelfs
256 first accommodation spaces, 258 second accommodation spaces
117 the 3rd ㄇ shape holding pieces 121 the 4th ㄇ shape holding piece
The specific embodiment
See also Fig. 1; It is the expansion scheme drawing of one first buffer structure 10 of the present invention's one preferred embodiment; First buffer structure 10 can be used to when article (like a LCD screen etc.) are in packing is placed in carton, insert and put the corner of these article, to reach the protection effect of shock-absorbing buffering.First buffer structure 10 includes one first fluting board seat 12, one first paper plastic structure 14, and one the one ㄇ shape holding piece 16.As shown in Figure 1; Be formed with at least one first terminal draw-in groove 18 (in the preferred embodiment of Fig. 1, showing two), at least one first stage casing draw-in groove 20 (in the preferred embodiment of Fig. 1, showing two) on the first fluting board seat 12; And one first depressed part, 22, the first fluting board seats 12 can assemble according to the design of the broken line on it bending in regular turn by corresponding corrugation is dull and stereotyped; Be formed with one the one ㄇ shape fixed plate 24 and one first salient 26 on first paper plastic structure 14; Be formed with at least one first on-slip breach 28 (in the preferred embodiment of Fig. 1, showing two) on the one ㄇ shape fixed plate 24,14 of first paper plastic structures are to be formed by existing common paper manufacturing process manufacturing; One end of the one ㄇ shape holding piece 16 is connected on the first fluting board seat 12; The bottom of ㄇ shape particularly; In the present invention; The one ㄇ shape holding piece 16 and the first fluting board seat 12 preferably are one of the forming, and perhaps also can be a solid memder, utilize general common connection mode (as paste etc.) to be connected on the first fluting board seat 12.Can know by Fig. 1; The one ㄇ shape holding piece 16 is formed with the corresponding first terminal trip 30 (in the preferred embodiment of Fig. 1, showing two) on the position of the first terminal draw-in groove 18 of the corresponding first fluting board seat 12; It is positioned on two front ends of ㄇ shape; And on the position of the first stage casing draw-in groove 20 of the corresponding first fluting board seat 12, being formed with the corresponding first stage casing trip 32 (in the preferred embodiment of Fig. 1, showing two), it is between the bottom and two front ends of ㄇ shape.
Below carry out detailed explanation to the disassembly and assembly between the first fluting board seat 12 and first paper plastic structure 14 and the ㄇ shape holding piece 16.At first, aspect assembling, see also Fig. 1 and Fig. 2, Fig. 2 is arranged at the scheme drawing in the first fluting board seat 12 for first paper plastic structure 14 shown in Figure 1.If in the time of will being assembled in first paper plastic structure 14 in the first fluting board seat 12; Can press down a ㄇ shape holding piece 16 shown in Figure 1 earlier; The first terminal trip 30 and the first stage casing trip 32 on the one ㄇ shape holding piece 16 inserted respectively be sticked in the corresponding first terminal draw-in groove 18 and the first stage casing draw-in groove 20 on the first fluting board seat 12; Perhaps can press down a ㄇ shape holding piece 16 shown in Figure 1 earlier; Make the first terminal trip 30 on the ㄇ shape holding piece 16, insert earlier and be sticked on the first fluting board seat 12 corresponding first terminal draw-in groove 18, the first stage casing trips 32 and can insert again after a while with the first stage casing draw-in groove 20 and engage.Then; Can be with first depressed part 22 on first salient, 26 alignings, the first fluting board seat 12 on first paper plastic structure 14; And first salient 26 is placed in first depressed part 22, and the ㄇ shape fixed plate 24 on first paper plastic structure 14 is aimed at a ㄇ shape holding piece 16 in the gaps that are being sticked in 12 common formation of the 12 last times of the first fluting board seat and the first fluting board seat.By the assist location of first depressed part 22, can first paper plastic structure, 14 as shown in Figure 1-X-directions be pushed in the first fluting board seat 12, up to as shown in Figure 2, be arranged at first paper plastic structure 14 in the first fluting board seat 12 till.Utilize the locator card between first depressed part 22 and first salient 26 to merge the mode that grasps a ㄇ shape fixed plate 24 with a ㄇ shape holding piece 16 and the first fluting board seat 12 jointly, first paper plastic structure 14 can be fixed in the first fluting board seat 12.In addition; Can also earlier first paper plastic structure 14 be placed earlier or sliding putting in the first fluting board seat 12; Make the salient 26 of winning engage the location mutually with first depressed part 22; Again a ㄇ shape holding piece 16 is covered; Win terminal trip 30 and the first stage casing trip 32 are inserted respectively be sticked on the first fluting board seat 12 in the corresponding first terminal draw-in groove 18 and the first stage casing draw-in groove 20; Promptly grasp the mode of a ㄇ shape fixed plate 24 jointly, thereby accomplish the assembling between the first fluting board seat 12 and first paper plastic structure 14 and the ㄇ shape holding piece 16 apace, for the usefulness of these article of subsequent packages with a ㄇ shape holding piece 16 and the first fluting board seat 12.
In other words, this article packing is being placed in the process in the carton, first buffer structure 10 of having assembled completion capable of using is to insert and put the corner of these article.In inserting and putting the process of these article; The first fluting board seat 12 in first buffer structure, 10 outsides capable of using offer these article in carton firm support and in the process of transporting the defencive function of shock-absorbing buffering; And the soft material of the first inboard paper plastic structure 14 has the characteristic that is difficult for the scratch article surface, can when first buffer structure 10 inserts and puts the corner of these article, protect this article surface.
In addition, in the time of in the first fluting board seat 12 that first paper plastic structure 14 is packed into, a ㄇ shape fixed plate 24 of first paper plastic structure 14 can-X-direction past along the gap between a ㄇ shape holding piece 16 and the first fluting board seat 12 move.When first paper plastic structure, the 14 relative first fluting board seats 12 move to position as shown in Figure 2; The first stage casing trip 32 that is arranged in a ㄇ shape holding piece 16 both sides can be connected to the first on-slip breach 28 (preferred embodiment in Fig. 1 shows two) on a ㄇ shape fixed plate 24 both sides respectively; Can't on the first fluting board seat 12, slide arbitrarily to limit first paper plastic structure 14, first paper plastic structure 14 can more firmly be fixed in the first fluting board seat 12.That is the first stage casing trip 32 is via the first on-slip breach 28, is sticked in the first stage casing draw-in groove 20 and can insert.
In other embodiment of the present invention, first paper plastic structure 14 and a ㄇ shape holding piece 16 also can omit the structure design of the first on-slip breach 28 and the first stage casing trip 32.In other words; First paper plastic structure 14 can only utilize first depressed part 22 to cooperate with location between first salient 26; And be fixed in the first fluting board seat 12 with the mode that a ㄇ shape holding piece 16 and the first fluting board seat 12 grasp a ㄇ shape fixed plate 24 jointly; So as to simplifying the structure design of first buffer structure 10, and then reach manufacturing cost that reduces by first buffer structure 10 and the effect of simplifying relevant assembling flow path.
In other embodiment of the present invention, the first stage casing trip 32 engages with insertion between the first stage casing draw-in groove 20, and mode that can viscose replaces, and the first terminal trip 30 and the first terminal draw-in groove 18, and mode that also can viscose replaces.In addition; If between the first fluting board seat 12 and first paper plastic structure 14; The viscose that only need see through the first stage casing trip 32 and the first stage casing draw-in groove 20, be positioned at viscose, the first terminal trip 30 and the first terminal draw-in groove 18 of middle section and/or be positioned at end section gets final product surely to be fixed firmly, and first depressed part 22 and first salient 26 also are omissible.A ㄇ shape holding piece 16 in other embodiments, two front ends of its ㄇ shape then are fixed on the first fluting board seat 12 removably.
If will first paper plastic structure 14 be disassembled on the first fluting board seat 12; Then only must a ㄇ shape holding piece 16 shown in Figure 2 outwards be pulled open, make the first terminal trip 30 and the first stage casing trip 32 on the ㄇ shape holding piece 16 break away from the first terminal draw-in groove 18 and the first stage casing draw-in groove 20 on the first fluting board seat 12 respectively.This moment is owing to a ㄇ shape fixed plate 24 of first paper plastic structure 14 is no longer lived by a ㄇ shape holding piece 16 and the first fluting board seat, 12 clampings; Therefore can directly first paper plastic structure 14 be taken out from the first fluting board seat 12; Or first paper plastic structure 14 is pulled out, and then accomplish the dismounting flow process between the first fluting board seat 12 and first paper plastic structure 14 and the ㄇ shape holding piece 16 along first depressed part 22.
Then, see also Fig. 3, it is for the scheme drawing of a packaging structure 50 of the present invention's one preferred embodiment, and is as shown in Figure 3, and packaging structure 50 includes first buffer structure 10, one second buffer structure 52, one the 3rd buffer structure 54, and one the 4th buffer structure 56.In this embodiment, second buffer structure 52, the 3rd buffer structure 54 and the 4th buffer structure 56 all can have identical in fact structure design with above-mentioned first buffer structure 10 shown in Figure 1.
With second buffer structure 52 is that example describes; See also Fig. 4, it is the expansion scheme drawing of second buffer structure 52 shown in Figure 3, can be known by Fig. 4; Second buffer structure 52 includes one second fluting board seat 58, one second paper plastic structure 60, and one the 2nd ㄇ shape holding piece 62.As shown in Figure 4, be formed with at least one second terminal draw-in groove 64 (in the preferred embodiment of Fig. 4, showing two), at least one second stage casing draw-in groove 66 (in the preferred embodiment of Fig. 4, showing two) on the second fluting board seat 58, and one second depressed part 68; Be formed with on second paper plastic structure 60 and be formed with at least one second on-slip breach 74 (in the preferred embodiment of Fig. 4, showing two) on one the 2nd ㄇ shape fixed plate 70 and one second salient, 72, the two ㄇ shape fixed plates 70; One end of the 2nd ㄇ shape holding piece 62 is connected on the second fluting board seat 58; The bottom of ㄇ shape particularly; And it is formed with the corresponding second terminal trip 76 (show two) in the preferred embodiment of Fig. 4 on the position of the second terminal draw-in groove 64 of the corresponding second fluting board seat 58, and on the position of the second stage casing draw-in groove 66 of the corresponding second fluting board seat 58, is formed with the corresponding second stage casing trip 78 (in the preferred embodiment of Fig. 4, showing two).About the disassembly and assembly between the second fluting board seat 58 and second paper plastic structure 60 and the 2nd ㄇ shape holding piece 62, it is identical with the assembly and disassembly flow process of above-mentioned first buffer structure 10, repeats no more in this.Structure design as for the 3rd buffer structure 54 and the 4th buffer structure 56 then is also no longer to detail in this by that analogy with relevant disassembly and assembly flow process.
Then; In the use of packaging structure 50; First buffer structure 10, second buffer structure 52, the 3rd buffer structure 54 can be accomplished according to the assembling flow path of above-mentioned mentioned first buffer structure 10 respectively; And after the assembling of the 4th buffer structure 56, respectively with first buffer structure 10, second buffer structure 52, the 3rd buffer structure 54, and the 4th buffer structure 56 is folded in respectively on four corners of article.Thus; Packaging structure 50 promptly can utilize the fluting board seat in each buffer structure outside to offer four supports that corner is firm of these article; So that these article are difficult for rocking in carton; And the defencive function that shock-absorbing buffering is provided, so that these article are difficult for being subjected to external impacts in the process of transporting and damage, in addition; Packaging structure 50 also can utilize the soft material of the inboard paper plastic structure of each buffer structure to be difficult for the characteristic of scratch article surface, when inserting and putting four corners of these article, protects the effect of this article surface to reach packaging structure 50.
Preferably, packaging structure provided by the present invention can be applicable on the packing of a LCD screen.See also Fig. 5, it is the scheme drawing of a packing module 100 of the present invention's one preferred embodiment.Can know that by Fig. 5 packing module 100 includes a packaging structure 102, a LCD screen main body 104, and a runners 106.The identical person with the element number described in the foregoing description of element described in the present embodiment representes that it has similar function or structure, repeats no more in this.As shown in Figure 5, packaging structure 102 includes one first buffer structure 108, second buffer structure 52, one the 3rd buffer structure 110, and the 4th buffer structure 56.First buffer structure 108 and the 3rd buffer structure 110 and above-mentioned first buffer structure 10 and the 3rd buffer structure 54 main difference parts are the design of the runners draw-in groove on the fluting board seat.
Can know that by Fig. 5 first buffer structure 108 includes one first fluting board seat 112 and first paper plastic structure, 14, the first paper plastic structures 14 are removable installed in the first fluting board seat 112; Second buffer structure 52 includes the second fluting board seat 58 and second paper plastic structure, 60, the second paper plastic structures 60 are removable installed in the second fluting board seat 58; The 3rd buffer structure 110 includes one the 3rd fluting board seat 114 and one the 3rd paper plastic structure, 116, the three paper plastic structures 116 are to be removable installed in the 3rd fluting board seat 114 by the 3rd ㄇ shape holding piece 117 shown in figure 11; The 4th buffer structure 56 includes one the 4th fluting board seat 118 and one the 4th paper plastic structure, 120, the four paper plastic structures 120 are to be removable installed in the 4th fluting board seat 118 by the 4th ㄇ shape holding piece 121 shown in figure 11; And the first fluting board seat 112 and the 3rd fluting board seat 114 have a corresponding runners draw-in groove 122 up and down respectively; It is used for runners 106 is fixed in jointly a side of the first fluting board seat 112 and the 3rd fluting board seat 114; In this embodiment, runners draw-in groove 122 preferably is a ㄇ shape draw-in groove, but not limit by this; It also can be other and can be used to pack the draw-in groove structure of fixing runners 106, like degree of lip-rounding draw-in groove etc.
Then the flow package to packing module 100 describes.At first; Accomplish first buffer structure 108, second buffer structure 52, the 3rd buffer structure 110 respectively according to the assembling flow path of above-mentioned mentioned first buffer structure 10; And after the assembling of the 4th buffer structure 56; Can be in regular turn with first buffer structure 108, second buffer structure 52, the 3rd buffer structure 110, and the 4th buffer structure 56 is folded in respectively on four corners 124 of LCD screen main body 104.Then; Can again the two ends of runners 106 be inserted respectively in the runners draw-in groove 122 of the first fluting board seat 112 and the 3rd fluting board seat 114; Runners 106 is arranged at a side of the first fluting board seat 112 and the 3rd fluting board seat 114, so as to accomplishing the assembling of packing module 100.Last packing module 100 vannings that will assemble completion more, thus the flow package of packing module 100 accomplished.
Thus; The fluting board seat in each buffer structure outside is with firm support of four corners offering LCD screen main body 104 124 and the defencive function that the shock-absorbing buffering is provided in packing module 100 packaging structures 102 capable of using; So that LCD screen main body 104 is difficult for being subjected to external impacts in the process of transporting and damages; And the soft material of the inboard paper plastic structure of each buffer structure is difficult for the characteristic of scratch article surface in packing module 100 packaging structure 102 also capable of using, takes place with the situation of avoiding scratch LCD screen main body 104 surfaces when utilizing four buffer structures to insert and put four corners 124 of LCD screen main body 104 respectively.In addition; The design of runners draw-in groove 122 on the packing module 100 fluting board seat also capable of using; Runners 106 is arranged at a side of the first fluting board seat 112 and the 3rd fluting board seat 114; So as to LCD screen main body 104 and runners 106 can be packed in the carton with the mode that branch is arranged, and then reduction LCD screen main body 104 and runners 106 required occupation space when packing.The structure of above-mentioned runners draw-in groove 122 also can change into and designing on the second fluting board seat 58 and the 4th fluting board seat 118; So as to runners 106 being arranged at a side of the second fluting board seat 58 and the 4th fluting board seat 118; As for adopting which kind of packing configuration, look closely the practical application of packing module 100.
Packaging structure 102 provided by the present invention on can be applicable to article packing; Also can see through the spacer be formed on the first fluting board seat 112 and the second fluting board seat 58 and the structure design of engagement groove; Reclaim the function of using again so that the first fluting board seat 112 and the second fluting board seat 58 can have, below use flow process to carry out detailed explanation to reclaiming again of the first fluting board seat 112 and the second fluting board seat 58.
At first introduce to the spacer on the first fluting board seat 112 and the second fluting board seat 58 and the structure design of engagement groove, see also Fig. 6 and Fig. 7, it is respectively the enlarged diagram of the first fluting board seat 112 shown in Figure 5 and the second fluting board seat 58.As shown in Figure 6; The first fluting board seat 112 has and is formed with one first main engagement groove 152 on one first spacer 150 and the first fluting board seat 112, is adjacent to the first terminal draw-in groove 18 and is provided with, one wants engagement groove 154 for the first time, corresponding to the first main engagement groove 152; And can be adjacent to 22 settings of first depressed part; And one first spacer socket, 156, the first spacers 150 are removable installed on the first spacer socket 156, and are formed with one first slotted eye 158 on first spacer 150; And it is as shown in Figure 7; 58 of the second fluting board seats are to have to be formed with one second main engagement groove 162 on one second spacer 160 and the second fluting board seat 58; Be adjacent to second terminal draw-in groove 64 settings, and want engagement groove 164 for the second time; Corresponding to the second main engagement groove 162, and can be adjacent to 68 settings of second depressed part, and one second spacer socket 166; Second spacer 160 is removable installed on the second spacer socket 166, and is formed with one second slotted eye 168 on second spacer 160.
When above-mentioned packaging structure 102 is not used for LCD screen main body 104 and runners 106 packed; Then take out be placed in the first fluting board seat 112 and second fluting board seat 58 in-to-ins, first paper plastic structure 14 and second paper plastic structure 60 respectively after, can first spacer 150 and second spacer 160 be taken out from the second spacer socket 166 of the first spacer socket 156 of the first fluting board seat 112 and the second fluting board seat 58 respectively.Then see also Fig. 8, it is arranged side by side to form the scheme drawing of one first rack 170 for first fluting board seat 112 shown in Figure 6 and the second fluting board seat 58 shown in Figure 7.Can know by Fig. 8; After first spacer 150 after will taking out and the 160 difference doublings of second spacer; Can first slotted eye 158 of first spacer 150 be aimed at and inserts the first main engagement groove 152 of the first fluting board seat 112 as shown in Figure 8 and the second main engagement groove 162 (or wanting engagement groove 164 second time of wanting the engagement groove 154 and the second fluting board seat 58 first time of the first fluting board seat 112) of the second fluting board seat 58 along+Y direction engaging simultaneously downwards, follow again second slotted eye, 168 alignings of second spacer 160 and want the second time of the engagement groove 154 and the second fluting board seat 58 along the first time that+Y direction engages the insertion first fluting board seat 112 as shown in Figure 8 downwards simultaneously and want engagement groove 164 (or second main engagement groove 162 of the first main engagement groove 152 of the first fluting board seat 112 and the second fluting board seat 58).Thus; By first slotted eye 158 and the first main engagement groove 152 and the second main engagement groove 162 engage and second slotted eye 168 with want for the first time the engagement groove 154 and the second time and want engaging of engagement groove 164; The first fluting board seat 112 can be fixedly set in a side of the second fluting board seat 58; And then with common first racks 170 that form of the second fluting board seat 58; One first material-putting space 172 of its formation can supply to place the usefulness of article, thereby reaches the first fluting board seat 112 and the second fluting board seat 58 can reclaim the purpose of use again.
In like manner; Packaging structure 102 provided by the present invention also can see through the spacer be formed on the 3rd fluting board seat 114 and the 4th fluting board seat 118 and the structure design of engagement groove; Reclaim the function of using again so that the 3rd fluting board seat 114 and the 4th fluting board seat 118 have, below the assembling flow path that uses that reclaims again to the 3rd fluting board seat 114 and the 4th fluting board seat 118 carries out detailed explanation.
At first; Introduce to the spacer on the 3rd fluting board seat 114 and the 4th fluting board seat 118 and the structure design of engagement groove earlier; See also Fig. 9 and Figure 10, it is respectively the enlarged diagram of the 3rd fluting board seat 114 shown in Figure 5 and the 4th fluting board seat 118.As shown in Figure 9; The 3rd fluting board seat 114 has and is formed with one the 3rd main engagement groove 202, on one the 3rd spacer 200 and the 3rd fluting board seat 114 and wants engagement groove 204 for the third time; And one the 3rd spacer socket 206; The 3rd spacer 200 is removable installed on the 3rd spacer socket 206, and is formed with one the 3rd slotted eye 208 on the 3rd spacer 200; And it is shown in figure 10; 118 of the 4th fluting board seats are to have to be formed with one the 4th main engagement groove 212, one the 4th less important engagement groove 214 on one the 4th spacer 210 and the 4th fluting board seat 118; And one the 4th spacer socket 216; The 4th spacer 210 is removable installed on the 4th spacer socket 216, and is formed with one the 4th slotted eye 218 on the 4th spacer 210.
When above-mentioned packaging structure 102 is not used for LCD screen main body 104 and runners 106 packed; Then take out be placed in the 3rd fluting board seat 114 and the 4th fluting board seat 118 in-to-ins the 3rd paper plastic structure 116 and the 4th paper plastic structure 120 respectively after, can the 3rd spacer 200 and the 4th spacer 210 be taken out from the 4th spacer socket 216 of the 3rd spacer socket 206 of the 3rd fluting board seat 114 and the 4th fluting board seat 118 respectively.Then see also Figure 11, it is arranged side by side to form the scheme drawing of one second rack 220 for the 3rd fluting board seat 114 shown in Figure 9 and the 4th fluting board seat 118 shown in Figure 10.Can know by Figure 11; After the 3rd spacer 200 after will taking out and the 210 difference doublings of the 4th spacer; Can the 3rd slotted eye 208 of the 3rd spacer 200 be aimed at and inserts the 3rd main engagement groove 202 of the 3rd fluting board seat 114 shown in figure 11 and the 4th main engagement groove 212 (perhaps wanting the 4th less important engagement groove 214 of engagement groove 204 and the 4th fluting board seat 118 first time of the 3rd fluting board seat 114) of the 4th fluting board seat 118 along+Y direction engaging simultaneously downwards, then engage the 4th less important engagement groove 214 of wanting engagement groove 204 and the 4th fluting board seat 118 first time (perhaps the 4th main engagement groove 212 of the 3rd of the 3rd fluting board seat 114 the main engagement groove 202 and the 4th fluting board seat 118) of insertion the 3rd fluting board seat 114 shown in figure 11 downwards simultaneously with second slotted eye, 218 alignings of the 4th spacer 210 and along+Y direction again.Thus; By the 3rd slotted eye 208 and the 3rd main engagement groove 202 and the 4th main engagement groove 212 engage and the 4th slotted eye 218 with want for the third time engaging of engagement groove 204 and the 4th less important engagement groove 214; The 3rd fluting board seat 114 can be fixedly set in a side of the 4th fluting board seat 118; And then with common second racks 220 that form of the 4th fluting board seat 118; One second accommodation space 221 of its formation can supply the usefulness of follow-up placement article, thereby reaches the 3rd fluting board seat 114 and the 4th fluting board seat 118 can reclaim the purpose of use again.
At last; According to above-mentioned assembling flow path with after the first fluting board seat 112 and the second fluting board seat 58 and the 3rd fluting board seat 114 and the 4th fluting board seat 118 are assembled into first rack 170 and second rack 220 respectively; The present invention is cooperatively interacting through spacer socket on slip locating piece and the fluting board seat in addition; So that first rack 170 and second rack 220 further are assembled into the pair of lamina rack; So as to increasing the application of elastic of fluting board seat on recycling, its relevant assembling instruction is described below.
See also Figure 12 and Figure 13; Figure 12 is that second rack 220 shown in Figure 11 is superimposed in shown in Figure 8 first rack part enlarged diagram in 170 last times, and Figure 13 is that second rack 220 shown in Figure 11 is superimposed in shown in Figure 8 first rack another part enlarged diagram in 170 last times.Can know by Figure 12 and Figure 13; Packaging structure 102 can include one first slip locating piece 222 and one second slip locating piece 224 in addition, and it is arranged at removably respectively in one second accommodation space 228 of one first accommodation space 226 and the second fluting board seat 58 of the first fluting board seat 112 as shown in Figure 8.
Shown in figure 12, be formed with one first main positioning groove 230 and two on the first slip locating piece 222 and want positioning groove 232 for the first time, want positioning groove 232 to be arranged at the both sides of the first main positioning groove 230 respectively for the first time.In addition; Be formed with one first main buffering rib 234 and on the position of the first fluting board seat, the 112 corresponding first spacer sockets 156 and will cushion rib 236 for the first time, will cushion rib 240 for the third time and be formed with one the 3rd main buffering rib 238 and on the position of the 3rd fluting board seat 114 corresponding the 3rd spacer sockets 206.
In addition, shown in figure 13, be formed with one second main positioning groove 242 and two on the second slip locating piece 224 and want positioning groove 244 for the second time, want positioning groove 244 to be arranged at the both sides of the second main positioning groove 242 respectively for the second time.In addition; Be formed with one second main buffering rib 246 and on the position of the second fluting board seat, the 58 corresponding second spacer sockets 166 and will cushion rib 248 for the second time, and be formed with one the 4th main buffering rib 250 and one the 4th less important buffering rib 252 on the position of the 4th fluting board seat 118 corresponding the 4th spacer sockets 216.
From the above; When above-mentioned packaging structure 102 is not used for LCD screen main body 104 and runners 106 packed; Can according to above-mentioned assembling flow path; The first fluting board seat 112 and the second fluting board seat 58 are assembled into first rack 170 as shown in Figure 8, and the 3rd fluting board seat 114 and the 4th fluting board seat 118 are assembled into second rack 220 shown in figure 11.Then; If further assemble use to first rack 170 and second rack 220; Then can see through and utilize first slip locating piece 222 shown in figure 12 and the second slip locating piece 224 shown in figure 13; With first rack 170 and the 220 superimposed assemblings of second rack, its related procedure is described below with further.
Please consult Figure 12, Figure 13 and Figure 14 simultaneously, the scheme drawing that Figure 14 is built up pair of lamina rack 254 for first rack 170 shown in Figure 8 and second rack 220 shown in Figure 11.When will be further first rack 170 and second rack 220 being combined into Double layer shelf 254 shown in figure 14, then can earlier the first slip locating piece 222 be taken out in first accommodation space 226 of the first fluting board seat 112.Then; Second rack 220 that to assemble completion more is superimposed on first rack 170; And with the first spacer socket 156 on the 3rd spacer socket 206 alignings first fluting board seat 112 on the 3rd fluting board seat 114; And the 4th spacer socket 216 on the 4th fluting board seat 118 aimed at the second spacer socket 166 on the second fluting board seat 58, so as to form respectively can the ccontaining first slip locating piece 222 one first accommodation space 256 and one second accommodation space 258 that can the ccontaining second slip locating piece 224.
Then; After the 3rd main buffering rib 238 of the first main buffering rib 234 of the first main positioning groove 230 on the first slip locating piece 222 that is taken out being aimed at the first fluting board seat 112 and the 3rd fluting board seat 114; Can the first slip locating piece 222 be pushed in first accommodation space 256; In this process; The first main positioning groove 230 on the first slip locating piece 222 can engage first main buffering rib 234 of the first fluting board seat 112 and the 3rd main buffering rib 238 of the 3rd fluting board seat 114 (perhaps the 4th of second of the second fluting board seat 58 main buffering rib 246 and the 4th fluting board seat 118 the main buffering rib 250) accordingly, and what two on the first slip locating piece 222 want positioning groove 232 can engage the first fluting board seat 112 accordingly respectively will cushion rib 236 and the 3rd fluting board seat 114 for the first time for the first time simultaneously will cushion rib 240 (perhaps two on the second slip locating piece 224 want positioning groove 244 can engage the second fluting board seat 58 accordingly respectively the second time the 4th less important buffering rib 252 that will cushion rib 248 and the 4th fluting board seat 118 second time) for the third time.Thus, second rack 220 can superimposed being fixed on first rack 170.
In addition; If make second rack 220 can more firmly superimposedly be fixed on first rack 170; Then can from second accommodation space 228 of the second fluting board seat 58, take out the second slip locating piece 224 again, and the second main positioning groove 242 on the second slip locating piece 224 is aimed at second main buffering rib 246 of the second fluting board seat 58 and the 4th main buffering rib 250 of the 4th fluting board seat 118.Next the second slip locating piece 224 is pushed in second accommodation space 258; In this process; The second main positioning groove 242 on the second slip locating piece 224 can engage second main buffering rib 246 of the second fluting board seat 58 and the 4th main rib 250 (perhaps the 3rd of first of the first fluting board seat 112 main buffering rib 234 and the 3rd fluting board seat 114 the main buffering rib 238), the 4th less important buffering rib 252 that will cushion rib 248 and the 4th fluting board seat 118 second time (that perhaps will cushion rib 236 and the 3rd fluting board seat 114 first time of the first fluting board seat 112 will cushion rib 240 for the third time) that two on the while second slip locating piece 224 wants positioning groove 244 can engage the second fluting board seat 58 accordingly respectively for the second time of cushioning of the 4th fluting board seat 118 accordingly.Thus; By the first slip locating piece 222 and the second slip locating piece 224 respectively with the engaging of corresponding buffering rib; Second rack 220 can more firmly superimposedly be fixed on first rack 170, and then forms Double layer shelf 254 shown in figure 14 jointly with first rack 170.
In the present invention; The number of the number of the positioning groove on the slip locating piece and corresponding buffering rib can be not limited to above-mentioned number; That is to say that it can be according to the practical application of packaging structure 102 and increase and decrease to some extent promotes the commodity shelf structure stability or the effect of simplified structure design to receive.In addition, the volume of above-mentioned first rack 170 and second rack 220 can be not quite similar.For instance; First rack 170 can be designed to the rack greater than the volume of second rack 220; The fluting board seat that meaning promptly is used for being assembled into first rack 170 can be designed to the structure greater than the volume of the fluting board seat that is assembled into second rack 220; So as to make its superimposed Double layer shelf that assembles have bigger article container space; See through the structure superposition mode of different volumes simultaneously, the Double layer shelf that is assembled by the fluting board seat also can have more the hierarchical Design sense on overall appearance.
Utilize Styrofoam or environmental protection paper plastic structure to carry out the packing of article compared to prior art, the present invention utilizes the snap-on design between paper plastic structure and the fluting board seat, so that paper plastic structure is arranged in the fluting board seat.Thus; The fluting board seat that the present invention's structural strength not only capable of using is stronger; Support that the article of desire packing are firm to offer and the defencive function that the shock-absorbing buffering is provided; Damage so as to making article in the process of transporting, be difficult for being subjected to external impacts, simultaneously also capable of usingly be arranged at the characteristic that the soft material of fluting board seat in-to-in paper plastic structure is difficult for the scratch article surface, take place with the situation of avoiding the scratch article surface.On the other hand, be applied on the packing of LCD screen, the design of runners draw-in groove on the present invention's fluting board seat also capable of using, so that LCD screen main body and runners branch be arranged, and then reduction LCD screen main body and runners required occupation space when packing.
In addition; In the time need not using packaging structure provided by the present invention and carry out the packing of article; The present invention also can see through spacer and engagement groove and slip locating piece and the snap-on design that cushions rib on the fluting board seat; So that the fluting board seat is assembled into the rack that is used for placing article, thereby reach the environment protecting that the fluting board seat reclaims use again.
Certainly; The present invention also can have other various embodiments; Under the situation that does not deviate from spirit of the present invention and essence thereof; Those of ordinary skill in the art work as can make various corresponding changes and distortion according to the present invention, but these corresponding changes and distortion all should belong to the protection domain of the appended claim of the present invention.

Claims (8)

1. a buffer structure is characterized in that, comprises:
One fluting board seat; One ㄇ shape holding piece, the bottom of its ㄇ shape are connected on this fluting board seat, and two front ends of ㄇ shape then are fixed on this fluting board seat removably; And
One paper plastic structure is arranged in this fluting board seat, and this paper plastic structure comprises a ㄇ shape fixed plate, is held between this fluting board seat and this ㄇ shape holding piece.
2. buffer structure according to claim 1 is characterized in that, this fluting board seat has a pair of terminal draw-in groove, and this ㄇ shape holding piece comprises a pair of terminal trip, is positioned on two front ends of ㄇ shape, and this can insert terminal trip and be sticked in this in the terminal draw-in groove.
3. buffer structure according to claim 1; It is characterized in that this ㄇ shape fixed plate of this paper plastic structure has a pair of on-slip breach in addition, this fluting board seat has a pair of stage casing draw-in groove; And this ㄇ shape holding piece comprises a pair of stage casing trip; Between the bottom of two front ends of ㄇ shape and ㄇ shape, this is via this on-slip breach to the stage casing trip, is sticked in this in the draw-in groove of stage casing and can insert.
4. buffer structure according to claim 1 is characterized in that, this fluting board seat has a depressed part in addition, and this paper plastic structure then comprises a salient, and salient is placed in this depressed part.
5. a packing module is characterized in that, in order to pack a fixing LCD screen main body, it has four corners, and this packing module comprises:
Four fluting board seats;
Four ㄇ shape holding pieces, the bottom of these four ㄇ shape holding pieces are connected on these four fluting board seats, and two front ends of these four ㄇ shape holding pieces then are fixed on these four fluting board seats removably; And
Four paper plastic structures are arranged at respectively in these four fluting board seats, and constitute four buffer structures with four ㄇ shape holding pieces of these four fluting board seats and this, and these four buffer structures are to be folded in respectively on these four corners of this LCD screen main body.
6. packing module according to claim 5 is characterized in that, wherein two of those fluting board seats have a runners draw-in groove respectively, can be in order to pack a fixing runners.
7. a rack is characterized in that, comprises:
One first fluting board seat comprises one first main engagement groove, and wants engagement groove and one first spacer for the first time, and this first spacer has one first slotted eye;
One the one ㄇ shape holding piece, the bottom of its ㄇ shape are connected on this first fluting board seat, and two front ends of ㄇ shape then are fixed on this first fluting board seat removably;
One second fluting board seat comprises one second main engagement groove, and wants engagement groove and one second spacer for the second time, and this second spacer has one second slotted eye; And
One the 2nd ㄇ shape holding piece, the bottom of its ㄇ shape are connected on this second fluting board seat, and two front ends of ㄇ shape then are fixed on this second fluting board seat removably;
Wherein, This first spacer is after doubling; This first slotted eye engages simultaneously and is inserted in this first main engagement groove and this second main engagement groove, and this second spacer is after doubling, and this second slotted eye engages simultaneously and is inserted in this and wants engagement groove and this to want engagement groove for the second time for the first time;
Perhaps; This second spacer is after doubling; This second slotted eye engages simultaneously and is inserted in this first main engagement groove and this second main engagement groove, and this first spacer is after doubling, and this first slotted eye engages simultaneously and is inserted in this and wants engagement groove and this to want engagement groove for the second time for the first time.
8. a Double layer shelf is characterized in that, comprises:
One rack according to claim 7;
Wherein, this first fluting board seat comprises one first slip locating piece in addition, one first main buffering rib and will cushion rib for the first time, and this first slip locating piece has one first main positioning groove and wants positioning groove two first time;
Wherein, this second fluting board seat comprises one second slip locating piece in addition, one second main buffering rib and will cushion rib for the second time, and this second slip locating piece has one second main positioning groove and wants positioning groove two second time;
One the 3rd fluting board seat comprises one the 3rd main engagement groove, and wants engagement groove, one the 3rd spacer for the third time, and the 3rd spacer has one the 3rd slotted eye, one the 3rd main buffering rib and will cushion rib for the third time;
One the 3rd ㄇ shape holding piece, the bottom of its ㄇ shape are connected on the 3rd fluting board seat, and two front ends of ㄇ shape then are fixed on the 3rd fluting board seat removably;
One the 4th fluting board seat comprises one the 4th main engagement groove, one the 4th less important engagement groove, one the 4th spacer, and the 4th spacer has one the 4th slotted eye, one the 4th main buffering rib and one the 4th less important buffering rib; And
One the 4th ㄇ shape holding piece, the bottom of its ㄇ shape are connected on the 4th fluting board seat, and two front ends of ㄇ shape then are fixed on the 4th fluting board seat removably;
Wherein, The 3rd spacer is after doubling; The 3rd slotted eye engages simultaneously and is inserted in the 3rd main engagement groove and the 4th main engagement groove, and the 4th spacer is after doubling, and the 4th slotted eye engages simultaneously and is inserted in this and wants engagement groove and the 4th less important engagement groove for the third time;
Perhaps; The 4th spacer is after doubling; The 4th slotted eye engages simultaneously and is inserted in the 3rd main engagement groove and the 4th main engagement groove, and the 3rd spacer is after doubling, and the 3rd slotted eye engages simultaneously and is inserted in this and wants engagement groove and the 4th less important engagement groove for the third time;
Wherein, this first main positioning groove of this first slip locating piece is sticked in this first main buffering rib and the 3rd main buffering rib; Want positioning groove these two first time; Be sticked in respectively then that will cushion rib this first time and this will cushion rib for the third time, this second main positioning groove of this second slip locating piece is sticked in this second main buffering rib and mainly cushions rib with the 4th; Want positioning groove these two second time, then is sticked in respectively and will cushions rib and the 4th less important buffering rib this second time;
Perhaps, this second main positioning groove of this second slip locating piece is sticked in this first main buffering rib and the 3rd main buffering rib; Want positioning groove these two second time; Be sticked in respectively then that will cushion rib this first time and this will cushion rib for the third time, this first main positioning groove of this first slip locating piece is sticked in this second main buffering rib and mainly cushions rib with the 4th; Want positioning groove these two first time, then is sticked in respectively and will cushions rib and the 4th less important buffering rib this second time.
CN2010105292239A 2009-09-30 2009-09-30 Buffer structure, packaging module and related shelf thereof Active CN102009786B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105292239A CN102009786B (en) 2009-09-30 2009-09-30 Buffer structure, packaging module and related shelf thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105292239A CN102009786B (en) 2009-09-30 2009-09-30 Buffer structure, packaging module and related shelf thereof

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN2009101797231A Division CN101691160B (en) 2009-09-30 2009-09-30 Packing structure and related shelf thereof

Publications (2)

Publication Number Publication Date
CN102009786A CN102009786A (en) 2011-04-13
CN102009786B true CN102009786B (en) 2012-03-28

Family

ID=43840160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105292239A Active CN102009786B (en) 2009-09-30 2009-09-30 Buffer structure, packaging module and related shelf thereof

Country Status (1)

Country Link
CN (1) CN102009786B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW201309561A (en) * 2011-08-23 2013-03-01 Briview Corp Cushion and package assembly
CN103754492B (en) * 2014-01-13 2015-11-18 友达光电股份有限公司 Packaging structure
CN104495071A (en) * 2014-12-10 2015-04-08 深圳市华星光电技术有限公司 Buffer packing material
CN113215850A (en) * 2020-01-21 2021-08-06 精工爱普生株式会社 Storage body, cushioning material, method for producing cushioning material, and cushioning material production device
CN116119187B (en) * 2023-04-17 2023-06-20 佛山市波谱达通信科技有限公司 Antenna packaging structure and packaging method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3854650A (en) * 1972-05-24 1974-12-17 Sony Corp Cushion
CN2656334Y (en) * 2003-11-17 2004-11-17 华硕电脑股份有限公司 Buffer structure
CN1757574A (en) * 2004-10-09 2006-04-12 华硕电脑股份有限公司 Buffering element
CN201276266Y (en) * 2008-09-27 2009-07-22 四川长虹电器股份有限公司 Composite buffering liner

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3854650A (en) * 1972-05-24 1974-12-17 Sony Corp Cushion
CN2656334Y (en) * 2003-11-17 2004-11-17 华硕电脑股份有限公司 Buffer structure
CN1757574A (en) * 2004-10-09 2006-04-12 华硕电脑股份有限公司 Buffering element
CN201276266Y (en) * 2008-09-27 2009-07-22 四川长虹电器股份有限公司 Composite buffering liner

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开平10-59425A 1998.03.03
JP特开平8-26345A 1996.01.30

Also Published As

Publication number Publication date
CN102009786A (en) 2011-04-13

Similar Documents

Publication Publication Date Title
CN102009786B (en) Buffer structure, packaging module and related shelf thereof
US7604120B2 (en) Cushion structure
CN102582962B (en) Buffer material
CN201121004Y (en) Thin panel packing box
CN103253459B (en) Cushion packaging box for display
CN102673889A (en) Honeycomb structure and buffer box body
CN101691160B (en) Packing structure and related shelf thereof
CN203497408U (en) Cushion packaging box
JP3120707U (en) Bearing device with cushion
CN201109542Y (en) Liquid crystal panel packing container
CN201419866Y (en) Cushion packaging material
CN102627173A (en) Buffer piece and packaging combination
CN103359396B (en) Integrated computer buffering package
CN201043056Y (en) Pad for buffering and separating
CN212530554U (en) Buffering inner clamp and packaging box
EP2590873B1 (en) Dual-purpose packaging insert and packaging box for sensitive flat objects
CN203638414U (en) Buffer packaging structure
CN103600924B (en) Telltale buffer packing gasket and buffer packing case
CN103449031B (en) Display buffering packing device and display buffering packing box
CN1323904C (en) Partition structure for buffering package material
CN211919596U (en) Packaging structure
CN203392186U (en) Cushioning package for all-in-one computer
CN203392202U (en) Cushioning package of finished product displayer
CN210392008U (en) Buffering packing carton
CN204726814U (en) Easy-to-mount packing chest

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant