CN101684651A - 超长深预应力高强度混凝土离心管桩施工方法 - Google Patents
超长深预应力高强度混凝土离心管桩施工方法 Download PDFInfo
- Publication number
- CN101684651A CN101684651A CN200810200463A CN200810200463A CN101684651A CN 101684651 A CN101684651 A CN 101684651A CN 200810200463 A CN200810200463 A CN 200810200463A CN 200810200463 A CN200810200463 A CN 200810200463A CN 101684651 A CN101684651 A CN 101684651A
- Authority
- CN
- China
- Prior art keywords
- stake
- pile
- construction method
- ultradeep
- ultralong
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102004637A CN101684651B (zh) | 2008-09-25 | 2008-09-25 | 超长深预应力高强度混凝土离心管桩施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102004637A CN101684651B (zh) | 2008-09-25 | 2008-09-25 | 超长深预应力高强度混凝土离心管桩施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101684651A true CN101684651A (zh) | 2010-03-31 |
CN101684651B CN101684651B (zh) | 2012-05-23 |
Family
ID=42048000
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008102004637A Active CN101684651B (zh) | 2008-09-25 | 2008-09-25 | 超长深预应力高强度混凝土离心管桩施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101684651B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425164A (zh) * | 2011-09-05 | 2012-04-25 | 恒天九五重工有限公司 | 一种河堤防护抗滑预制桩施工方法 |
CN103132522A (zh) * | 2011-11-23 | 2013-06-05 | 中国建筑第七工程局有限公司 | 浅厚淤泥层软土场地锤击桩施工方法 |
CN106193036A (zh) * | 2015-04-30 | 2016-12-07 | 五冶集团上海有限公司 | 大直径phc管桩施工方法 |
CN106522242A (zh) * | 2016-12-21 | 2017-03-22 | 大连交通大学 | 用于软弱地层紧邻地下结构的基坑支护体系及其施工方法 |
-
2008
- 2008-09-25 CN CN2008102004637A patent/CN101684651B/zh active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102425164A (zh) * | 2011-09-05 | 2012-04-25 | 恒天九五重工有限公司 | 一种河堤防护抗滑预制桩施工方法 |
CN103132522A (zh) * | 2011-11-23 | 2013-06-05 | 中国建筑第七工程局有限公司 | 浅厚淤泥层软土场地锤击桩施工方法 |
CN103132522B (zh) * | 2011-11-23 | 2015-07-22 | 中国建筑第七工程局有限公司 | 浅厚淤泥层软土场地锤击桩施工方法 |
CN106193036A (zh) * | 2015-04-30 | 2016-12-07 | 五冶集团上海有限公司 | 大直径phc管桩施工方法 |
CN106522242A (zh) * | 2016-12-21 | 2017-03-22 | 大连交通大学 | 用于软弱地层紧邻地下结构的基坑支护体系及其施工方法 |
CN106522242B (zh) * | 2016-12-21 | 2018-12-14 | 大连交通大学 | 用于软弱地层紧邻地下结构的基坑支护体系的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101684651B (zh) | 2012-05-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102286970B (zh) | 沉管灌注桩全过程施工方法及其专用装置 | |
CN101684651B (zh) | 超长深预应力高强度混凝土离心管桩施工方法 | |
KR100886922B1 (ko) | 구조물 기초 보강 또는 보수방법 | |
CN109680702A (zh) | 吸力筒式单桩基础结构及其施工方法 | |
CN104328810B (zh) | 预制管桩单桩地基承载力检测改进方法 | |
CN110258571A (zh) | 一种灌注桩沉管压灌施工方法 | |
CN100406652C (zh) | 劲性钢结构塔吊基础 | |
CN106320360B (zh) | 海上岩石地基条件下预应力自锁锚杆加强变径单桩风机基础及其施工方法 | |
CN106930274B (zh) | 一种钢筋笼位置固定的全套筒回转钻孔灌注桩施工方法 | |
CN2756706Y (zh) | 桩底后注浆预应力管桩 | |
CN114808973B (zh) | 基于基坑盖件的提高钢筋笼对中性的基坑施工方法 | |
CN106013096A (zh) | 一种建筑基础施工方法 | |
CN202865837U (zh) | 一种预应力混凝土管桩加固填芯结构 | |
WO2010106216A1 (en) | Method for placing a pile or anchoring pile into ground | |
CN210766789U (zh) | 一种人工挖孔桩钢筋笼定位及垂直度控制的装置 | |
CN211113669U (zh) | 一种预应力钢筋砼护壁桩 | |
CN105649015A (zh) | 一种爆炸注浆防沉降管桩 | |
CN209975503U (zh) | 装配式围护桩静压下桩 | |
CN1245558C (zh) | 管桩施工方法 | |
CN102758434A (zh) | 中掘预应力离心管桩(方桩)沉桩装置及其新型沉桩法 | |
CN207143937U (zh) | 一种预应力混凝土管桩桩尖 | |
CN111058441A (zh) | 一种深水急流条件下大直径钢护筒安放的施工装置及方法 | |
CN216515593U (zh) | 一种旋挖引孔植桩法中接桩固定装置 | |
CN219547809U (zh) | 一种灌注桩定位灌浆架 | |
CN217150178U (zh) | 一种预制混凝土桩尖和安装该桩尖的预制桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: MCC5 GROUP CORPORATION LIMITED (SHANGHAI) Free format text: FORMER OWNER: SHANGHAI WUYE CONSTRUCTION OF ZHONGYE CHENGGONG CO.LTD Owner name: CHINA MCC5 GROUP CORP. LTD. Free format text: FORMER OWNER: MCC CHENGGONG CONSTRUCTION CO., LTD. Effective date: 20110608 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 610082 NO. 8, FIRST SECTION OF RENMIN NORTH ROAD, CHENGDU CITY, SICHUAN PROVINCE TO: 610063 NO. 199, SANSE ROAD, JINJIANG INDUSTRIAL PARK, CHENGDU CITY, SICHUAN PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20110608 Address after: 610063 No. 199, tricolor Road, Jinjiang Industrial Park, Sichuan, Chengdu, China Applicant after: China MCC5 Group Corp., Ltd. Co-applicant after: MCC5 Group Corporation Limited (Shanghai) Address before: 610082 section eight, Renmin North Road, Sichuan, Chengdu Applicant before: MCC Chenggong Construction Co., Ltd. Co-applicant before: Shanghai Wuye Construction Of Zhongye Chenggong Co.Ltd |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |