CN101672046A CN200910074259A CN200910074259A CN101672046A CN 101672046 A CN101672046 A CN 101672046A CN 200910074259 A CN200910074259 A CN 200910074259A CN 200910074259 A CN200910074259 A CN 200910074259A CN 101672046 A CN101672046 A CN 101672046A
Authority
CN
China
Prior art keywords
hoisting
rope
wire rope
drum
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910074259A
Other languages
Chinese (zh)
Other versions
CN101672046B (en
Inventor
李洪
苏运动
毛瑞
李爱峰
李晋桓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Heavy Industry Co Ltd
Original Assignee
Taiyuan Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Heavy Industry Co Ltd filed Critical Taiyuan Heavy Industry Co Ltd
Priority to CN200910074259XA priority Critical patent/CN101672046B/en
Publication of CN101672046A publication Critical patent/CN101672046A/en
Application granted granted Critical
Publication of CN101672046B publication Critical patent/CN101672046B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a method for replacing a hoisting rope of an excavator and relates to a hoisting mechanism of the excavator. The method comprises the following steps: (1) putting down a traction steel wire rope from a crane boom along a flywheel on two sides of a hoisting drum, wherein, one end of the traction steel wire rope is connected with the hoisting rope, and the other end thereof is fixed on the hoisting drum; (2) starting a hoisting motor, winding the traction steel wire rope on the hoisting drum, and braking the hoisting drum; (3) connecting one end of a short fixed steel wire rope and one end of a long fixed steel wire rope with a base, and fixedly combining the other end of the short fixed steel wire rope and the other end of the long fixed steel wire rope with a frontfixed connecting plate and a back fixed connecting plate; (4) reversely rotating the hoisting drum, loosening the traction steel wire rope with the hoisting rope, and removing the traction steel wirerope; (5) starting the hoisting motor, rotating the hoisting drum to the fixed position of the hoisting rope and fixing the hoisting rope; (6) micro-rotating the hoisting drum, winding the hoisting rope, loosening the short fixed steel wire rope and the long fixed steel wire rope, braking the hoisting motor, and removing the front fixed connecting plate and the back fixed connecting plate; and (7)winding the hoisting rope and completing the replacement operation. The method not only has simple and convenient replacement operation, time-saving and effort-saving properties and high efficiency,but also ensures the safety during the replacement.

Description

A kind of method of changing hoisting rope of excavator
Technical field
The present invention relates to the hoisting mechanism of mechanical type excavator, particularly a kind of method of changing the excavator boom hoist cable.
Background technology
The excavator boom hoist cable is a consumable accessory, needs often to change.The method of changing hoisting rope of excavator at present is to use traditional mechanism, with the pulley bracket on the wire rope process A shape frame of auxiliary volume poplar, pass canopy again to the preceding truckle of hoisting mechanism, direction along hoisting rope extends to top pulleys, fix hoisting rope down to ground, start auxiliary elevator then hoisting rope is pulled to hoisting drum.The method is time and effort consuming relatively, and it is loaded down with trivial details to work.Also there is the user that the big rope mouth that hoisting rope is pulled on the canopy is fixed earlier, bit by bit drops on again in the canopy, after two ropes are fixed, promote the driven by motor reel and begin to roll up big rope.This method also compares time and effort consuming, and efficient is on the low side.In addition, auxiliary elevator exposes work at the canopy top, has increased maintenance cost.
Summary of the invention
Purpose of the present invention is intended to overcome the shortcoming of prior art, and a kind of method of changing hoisting rope of excavator is provided, and this method is convenient field replacement operation not only, saves time, laborsaving efficient height, and the safety can guarantee to change the time.
The present invention is achieved through the following technical solutions:
A kind of method of changing hoisting rope of excavator is characterized in that: the step of changing hoisting rope is as follows:
1, in the both sides of hoisting drum, haulage cable is put down from boom upper edge head sheave, an end links to each other with hoisting rope, and an end is fixed on the hoisting drum;
2, slowly start the lifting motor, haulage cable is wrapped on the hoisting drum, when hoisting rope is wound into hoisting drum 0.5 to 1 circle, hoisting drum is braked;
3, will lack fixedly wire rope, a long fixedly end of wire rope is connected with firm banking, an other end is pressed 0.5 meter to 0.7 meter position, interval, front and back and preceding fixed connecting plate, afterwards fixed connecting plate is fixed;
4, the counter-rotating hoisting drum must not unclamp haulage cable and hoisting rope greater than 0.3 circle, and the hoisting drum that then slowly reverses unloads haulage cable;
5, start the lifting motor, hoisting drum is turned to the hoisting rope permanent position, hoisting rope is fixed;
6, the little commentaries on classics hoisting drum of beginning twines hoisting rope, makes short fixedly wire rope, long after fixedly wire rope no longer is in tensioned state, and braking promotes motor, at this moment with preceding fixed connecting plate, after fixed connecting plate unload;
7, begin to twine hoisting rope, finish and change operation.
The present invention has the following advantages compared with the prior art:
Make simply, reduced cost of production;
Utilize hoisting drum to substitute the winding action of former auxiliary elevator, save cost;
On-the-spot to change operation not only simple and convenient, saves time, laborsaving efficient height, and the safety can guarantee to change the time.
On-the-spot replacing operation does not need extra professional tool, saving fund.
Description of drawings
Fig. 1 is a kind of device schematic diagram of changing the method for hoisting rope of excavator.
The present invention is further illustrated by preferred embodiment below in conjunction with accompanying drawing.
The specific embodiment
As shown in Figure 1, a kind of method of changing hoisting rope of excavator, its step of changing hoisting rope is as follows:
1, in the both sides of hoisting drum 1, haulage cable 3 is put down from boom 9 upper edge head sheaves 10, an end links to each other with hoisting rope 2, and an end is fixed on the hoisting drum 1;
2, slowly start lifting motor 8, haulage cable 3 is wrapped on the hoisting drum 1, when hoisting rope 2 is wound into hoisting drum 0.5 to 1 circle, hoisting drum 1 braking;
3, will lack fixedly wire rope 5, a long fixedly end of wire rope 6 is connected with firm banking 7, an other end is pressed 0.5 meter to 0.7 meter position, interval, front and back and preceding fixed connecting plate 4-1, afterwards fixed connecting plate 4-2 is fixed;
4, counter-rotating hoisting drum 1 must not unclamp haulage cable 3 and hoisting rope 2 greater than 0.3 circle, and the hoisting drum 1 that then slowly reverses unloads haulage cable 3;
5, start lifting motor 8, hoisting drum 1 is turned to hoisting rope 2 permanent positions, hoisting rope 2 is fixing;
6, the little commentaries on classics hoisting drum 1 of beginning twines hoisting rope 2, makes short fixedly wire rope 5, long after fixedly wire rope 6 no longer is in tensioned state, and braking promotes motor 8, at this moment with preceding fixed connecting plate 4-1, after fixed connecting plate 4-2 unload;
7, begin to twine hoisting rope 2, finish and change operation.

Claims (1)

1, a kind of method of changing hoisting rope of excavator is characterized in that: the step of changing hoisting rope is as follows:
(1) in the both sides of hoisting drum (1), haulage cable (3) is put down from boom (9) upper edge head sheave (10), an end links to each other with hoisting rope (2), and an end is fixed on the hoisting drum (1);
(2) slowly start lifting motor (8), haulage cable (3) is wrapped on the hoisting drum (1), when hoisting rope (2) is wound into hoisting drum 0.5 to 1 circle, hoisting drum (1) is braked;
(3) will lack fixedly wire rope (5), a long fixedly end of wire rope (6) is connected with firm banking (7), an other end is pressed 0.5 meter to 0.7 meter position, interval, front and back and preceding fixed connecting plate (4-1), afterwards fixed connecting plate (4-2) is fixed;
(4) counter-rotating hoisting drum (1) must not unclamp haulage cable (3) and hoisting rope (2) greater than 0.3 circle, and the hoisting drum (1) that then slowly reverses unloads haulage cable (3);
(5) start lifting motor (8), hoisting drum (1) is turned to hoisting rope (2) permanent position, hoisting rope (2) is fixing;
(6) beginning little commentaries on classics hoisting drum (1), twine hoisting rope (2), make short fixedly wire rope (5), long after fixedly wire rope (6) no longer is in tensioned state, braking promotes motor (8), at this moment with preceding fixed connecting plate (4-1), after fixed connecting plate (4-2) unload;
(7) begin to twine hoisting rope (2), finish and change operation.
CN200910074259XA 2009-04-29 2009-04-29 Method for replacing hoisting rope of excavator Expired - Fee Related CN101672046B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910074259XA CN101672046B (en) 2009-04-29 2009-04-29 Method for replacing hoisting rope of excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910074259XA CN101672046B (en) 2009-04-29 2009-04-29 Method for replacing hoisting rope of excavator

Publications (2)

Publication Number Publication Date
CN101672046A true CN101672046A (en) 2010-03-17
CN101672046B CN101672046B (en) 2010-12-08

Family

ID=42019436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910074259XA Expired - Fee Related CN101672046B (en) 2009-04-29 2009-04-29 Method for replacing hoisting rope of excavator

Country Status (1)

Country Link
CN (1) CN101672046B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101898691A (en) * 2010-07-15 2010-12-01 中国神华能源股份有限公司 Method for replacing pitching steel wire ropes of ship loader
CN103482518A (en) * 2013-09-06 2014-01-01 中联重科股份有限公司 Method and system for processing faults of hoisting equipment and crane
CN104743430A (en) * 2015-03-26 2015-07-01 神华集团有限责任公司 Device for replacing winch steel wire rope
CN106906866A (en) * 2011-04-14 2017-06-30 哈尼施费格尔技术公司 The revolution automation of rope shovel
CN109279519A (en) * 2018-10-11 2019-01-29 湖北江汉建筑工程机械有限公司 A kind of replacing options of Lift Mechanism in Power Hoist wirerope

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101898691A (en) * 2010-07-15 2010-12-01 中国神华能源股份有限公司 Method for replacing pitching steel wire ropes of ship loader
CN101898691B (en) * 2010-07-15 2013-09-11 中国神华能源股份有限公司 Method for replacing pitching steel wire ropes of ship loader
CN106906866A (en) * 2011-04-14 2017-06-30 哈尼施费格尔技术公司 The revolution automation of rope shovel
US10227754B2 (en) 2011-04-14 2019-03-12 Joy Global Surface Mining Inc Swing automation for rope shovel
US11028560B2 (en) 2011-04-14 2021-06-08 Joy Global Surface Mining Inc Swing automation for rope shovel
US12018463B2 (en) 2011-04-14 2024-06-25 Joy Global Surface Mining Inc Swing automation for rope shovel
CN103482518A (en) * 2013-09-06 2014-01-01 中联重科股份有限公司 Method and system for processing faults of hoisting equipment and crane
CN103482518B (en) * 2013-09-06 2015-09-23 中联重科股份有限公司 Method and system for processing faults of hoisting equipment and crane
CN104743430A (en) * 2015-03-26 2015-07-01 神华集团有限责任公司 Device for replacing winch steel wire rope
CN109279519A (en) * 2018-10-11 2019-01-29 湖北江汉建筑工程机械有限公司 A kind of replacing options of Lift Mechanism in Power Hoist wirerope
CN109279519B (en) * 2018-10-11 2020-04-21 湖北江汉建筑工程机械有限公司 Method for replacing steel wire rope of tower crane hoisting mechanism

Also Published As

Publication number Publication date
CN101672046B (en) 2010-12-08

Similar Documents

Publication Publication Date Title
CN101672046B (en) Method for replacing hoisting rope of excavator
CN2918343Y (en) Cable storing and discharging machine
CN103626058B (en) Auxiliary luffing device, hoisting crane and auxiliary luffing method
CN213085317U (en) Steel rope tensioning system for hoisting device
CN215756056U (en) Wall connecting machine based on double-traction hoisting mechanism and double-traction hoisting mechanism
CN102312450A (en) Bucket-opening mechanism of mining excavator bucket
CN213171204U (en) Construction equipment hoisting device
CN210655931U (en) Steel cord spool hoisting structure
CN219078756U (en) Hydraulic turnover machine for wire frame
CN201865109U (en) Variable-frequency control device of piling machine
CN104709833B (en) Novel luffing rib ropewalking crawler crane
CN201105959Y (en) Tower crane amplitude automatic rope tightener
CN202542743U (en) Auxiliary reeving mechanism for mounting tower crane
CN111453530B (en) Lifting steel wire rope replacing device and control method thereof
CN206188250U (en) And a work efficiency is increased
CN202175522U (en) Device for hoisting concrete pole
CN213595757U (en) Rope-arranging guide wheel device of auxiliary hoisting mechanism
CN206798524U (en) A kind of wire rod threader
CN211769979U (en) Super-load forced rope-arranging hoist
CN110980520A (en) Method for quickly replacing steel wire rope
CN212559239U (en) Multi-hoisting point self-rope-arranging winch
CN211226118U (en) Double-wheel electric rope pulling machine
CN210419156U (en) Bearing turning device for overhauling steam turbine bearing
CN219259421U (en) Winding engine
CN215101629U (en) Electric power accessory overhead hoist

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101208

Termination date: 20200429

CF01 Termination of patent right due to non-payment of annual fee