CN101671143B - SBS modified asphalt and preparation method thereof - Google Patents

SBS modified asphalt and preparation method thereof Download PDF

Info

Publication number
CN101671143B
CN101671143B CN2008101413114A CN200810141311A CN101671143B CN 101671143 B CN101671143 B CN 101671143B CN 2008101413114 A CN2008101413114 A CN 2008101413114A CN 200810141311 A CN200810141311 A CN 200810141311A CN 101671143 B CN101671143 B CN 101671143B
Authority
CN
China
Prior art keywords
sbs
preparation
asphalt
agent
stablizer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008101413114A
Other languages
Chinese (zh)
Other versions
CN101671143A (en
Inventor
尹建军
闫勇
姚斌
关京
刘伟
任晓东
郭海云
陈�峰
齐明
付立军
苗保民
陈扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Modern Traffic & Road Technology Co Ltd
Original Assignee
Henan Modern Traffic & Road Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Modern Traffic & Road Technology Co Ltd filed Critical Henan Modern Traffic & Road Technology Co Ltd
Priority to CN2008101413114A priority Critical patent/CN101671143B/en
Publication of CN101671143A publication Critical patent/CN101671143A/en
Application granted granted Critical
Publication of CN101671143B publication Critical patent/CN101671143B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Abstract

The invention provides an SBS modified asphalt, which is prepared from asphalt, a starlike SBS, a ductility improver and a stabilizing agent, wherein the usage of the starlike SBS is 2.5 to 5 percent of that of the asphalt; the dosage of the ductility improver is 1.0 to 5.0 percent of that of the asphalt; the dosage of the stabilizing agent is 0.5 to 2.0 percent of that of the asphalt; the ductility improver is prepared by stirring rubber softening oil and diethyl phthalate for 0.5 to 1.5 hours at the temperature of between 120 and 140 DEG C; and the stabilizing agent is prepared by stirring an accelerant, namely tetramethyl thiuram monosulfide, and an antioxidant for 0.5 to 1 hour at the temperature of between 65 and 75 DEG C. The asphalt product prepared by the invention has the characteristics of high softening point, great ductility, wide temperature range of application and large elastic restitution, can improve the high temperature anti-deforming capability and the low temperature anti-cracking and fatigue resisting capabilities of a road surface remarkably, and simultaneously improves the temperature stability, the water stability and the durability of the road surface effectively.

Description

A kind of SBS modifying asphalt and preparation method thereof
Technical field
The invention belongs to field of bitumen technology, relate to a kind of SBS modifying asphalt, relate to this bituminous preparation method simultaneously.
Background technology
It is the requirement of the development of modern road traffic to bituminous pavement that pitch is carried out modification, the highroad particularly characteristics of high-grade highway is that the volume of traffic is big, weight-carrying capacity is big and the speed of a motor vehicle is fast, this just proposes more and more higher specification of quality to pitch, common pitch is difficult to reach requirement, therefore just must carry out modification to pitch.Modifying asphalt mainly is made up of properties-correcting agent and matrix pitch, and properties-correcting agent commonly used has styrene-butadiene-styrene thermoplastic elastomer (SBS), styrene-butadiene rubber(SBR) (SBR), polyethylene (PE) and other kind properties-correcting agent.Because styrene-butadiene-styrene thermoplastic elastomer (SBS) can improve the bituminous high temperature performance simultaneously with the characteristic of rubber-like and resene properties-correcting agent, significantly improves the bituminous pavement performance, prolong the work-ing life on road surface.Therefore, SBS is a kind of rising properties-correcting agent, generally adopts SBS to prepare modifying asphalt as properties-correcting agent at present both at home and abroad, and its consumption accounts for about 65% of properties-correcting agent total amount.
Along with being extensive use of of SBS modifying asphalt, requirement to the SBS modifying asphalt is also more and more higher, be mainly reflected in and require the SBS modifying asphalt that good storage stability is arranged, (most high-grade highway engine requests are higher than more than 60 ℃ higher softening temperature, a lot of engine request softening temperatures are higher than 70 ℃, even the part engine request is higher than 80 ℃), good low-temperature ductility (5 ℃ of ductilities after code requirement is aging are greater than 15cm, and a lot of engine requests are greater than 20cm).In addition, also require 135 ℃ of viscosity of SBS modifying asphalt low more good more, be beneficial to construction.But the softening temperature of existing SBS modifying asphalt and aging effect can't meet the demands, and the production cost height of existing SBS modifying asphalt.
Summary of the invention
The purpose of this invention is to provide a kind of softening temperature height, SBS modifying asphalt that ductility is big.
Another object of the present invention provides this bituminous preparation method.
For achieving the above object, the present invention is by the following technical solutions: a kind of SBS modifying asphalt, by pitch, star shaped SBS, increase and prolong agent and stablizer is made, the star shaped SBS consumption is 2.5~5% of an asphalt content, increasing and prolonging the agent consumption is 1.0~5.0% of asphalt content, stabilizing agent dosage is 0.5 of asphalt content~2.0 ‰, describedly increase that to prolong agent be to be stirred down at 120~140 ℃ by rubber softening oil and Phthalic acid, diallyl ester to be prepared from 0.5~1.5 hour, described stablizer be the promotor TBTM tetrabutyl thiuram monosulfide with oxidation inhibitor 65~75 ℃ down stirrings be prepared from 0.5~1 hour.
Described oxidation inhibitor is antioxidant 1076.
The SBS modified asphalt preparation method may further comprise the steps: (1) preparation increases prolongs agent, and rubber softening oil is mixed with Phthalic acid, diallyl ester, stirs 0.5~1.5 hour promptly down at 120~140 ℃ then; (2) the preparation stablizer mixes the promotor TBTM tetrabutyl thiuram monosulfide with oxidation inhibitor, under 65~75 ℃, stirred 0.5~1 hour then; (3) preparation SBS modifying asphalt, pitch is heated to 165~180 ℃, after the pitch dissolving increasing of star shaped SBS and step (1) preparation being prolonged agent adds, star shaped SBS prolongs the agent dissolving after colloidal mill grinds or high speed shear with increasing, stirred then 2~3 hours, the stablizer that adds step (2) preparation again, continue to stir 2~4 hours.
Described oxidation inhibitor is antioxidant 1076.
The advantage that the present invention had:
1, the present invention prepared increases and prolongs agent and can make stablizer, star shaped SBS and pitch reaction more abundant, and speed of response is fast, and the high temperature ageing time is short; Can make star shaped SBS form even, stable space three-dimensional reticulated structure system in pitch, star shaped SBS and bituminous compatibility are good, are difficult for producing segregation, steady quality;
2, contain oxidation inhibitor in the stablizer of the present invention preparation, ageing resistance is good, and is little to the ductility influence during production, and this stablizer has good preservation stability, can store more than 2 years, and emanate little (≤1.8 ℃) are convenient to standing storage and use;
3, product softening temperature height, generally more than 70 ℃, viscosity is big, has the good high-temperature stability, can resist rut effectively, pass, gathers around pavement diseases such as bag;
4, agent is prolonged in increasing that the present invention prepared, and can make the bituminous ductility increase (5 ℃ of ductility 35~50cm, 5 ℃ of ductilities of TFOT (or RTFOT) back residue〉25cm), has good low-temperature performance, can significantly improve the anti-cold cracking performance on road surface;
5, product recovery of elasticity big (recovery of elasticity〉90%) has good sticking toughness and elasticity, can significantly improve the permanent deformation resistance and the fatigue lifetime on road surface;
6, the product adhesion performance is good, has good anti-water stripping performance, can effectively improve the water stability on road surface, reduces the generation of pavement diseases such as frost boiling, loose, hole groove;
7, product broad application temperature range can significantly reduce the susceptibility to temperature, and promptly low-temperature flexibility is not crisp, and high temperature is sticking tough not soft, thereby significantly improves the temperature stability on road surface.
The prepared SBS modifying asphalt of the present invention has that softening temperature height, ductility are big, broad application temperature range and the big characteristics of recovery of elasticity, also has good preservation stability, can improve anti-deforming ability, low temperature cracking resistance and the anti-fatigue ability on road surface significantly, simultaneously can also improve temperature stability, water stability and the weather resistance on road surface effectively, also can strengthen the disease resistance ability on road surface, improve the service level on road surface and reduce the maintenance work amount.SBS modifying asphalt of the present invention can be successfully used to build fields such as Heavy Traffic Road face, drainage pavement, deck paving, airfield runway, cycling track and building waterproof layer.
Embodiment
Embodiment 1: pitch 500g, star shaped SBS 17.5g, increase and prolong agent 25g and stablizer 0.25g.
The preparation method: (1) preparation increases prolongs agent, and rubber softening oil is mixed with Phthalic acid, diallyl ester, stirs 1.5 hours promptly down at 120 ℃ then;
(2) the preparation stablizer mixes the promotor TBTM tetrabutyl thiuram monosulfide with antioxidant 1076, under 65 ℃, stirred 1 hour then;
(3) preparation SBS modifying asphalt, 500g pitch is heated to 165 ℃, pitch dissolving back adds the 17.5g star shaped SBS and increasing of 25g step (1) preparation prolongs agent, star shaped SBS prolongs the agent dissolving after colloidal mill grinds with increasing, stirred then 2 hours, the stablizer that adds 0.25g step (2) preparation again, continue to stir 4 hours.
Embodiment 2: pitch 500g, star shaped SBS 25g, increase and prolong agent 5g and stablizer 1g.
The preparation method: (1) preparation increases prolongs agent, and rubber softening oil is mixed with Phthalic acid, diallyl ester, stirs 1 hour promptly down at 130 ℃ then;
(2) the preparation stablizer mixes the promotor TBTM tetrabutyl thiuram monosulfide with antioxidant 1076, under 70 ℃, stirred 0.8 hour then;
(3) preparation SBS modifying asphalt, 500g pitch is heated to 175 ℃, pitch dissolving back adds the 25g star shaped SBS and increasing of 5g step (1) preparation prolongs agent, star shaped SBS prolongs the agent dissolving after high-speed shearing machine mixed 30 minutes down at 3000 rev/mins with increasing, stirred then 2.5 hours, the stablizer that adds 1g step (2) preparation again, continue to stir 3 hours.
Embodiment 3: pitch 500g, star shaped SBS 12.5g, increase and prolong agent 15g and stablizer 0.45g.
The preparation method: (1) preparation increases prolongs agent, and rubber softening oil is mixed with Phthalic acid, diallyl ester, stirs 0.5 hour promptly down at 140 ℃ then;
(2) the preparation stablizer mixes the promotor TBTM tetrabutyl thiuram monosulfide with antioxidant 1076, under 75 ℃, stirred 0.5 hour then;
(3) preparation SBS modifying asphalt, 500g pitch is heated to 180 ℃, pitch dissolving back adds the 12.5g star shaped SBS and increasing of 15g step (1) preparation prolongs agent, star shaped SBS prolongs the agent dissolving after colloidal mill grinds with increasing, stirred then 3 hours, the stablizer that adds 0.45g step (2) preparation again, continue to stir 2 hours.
The contrast experiment 1: 500 gram pitches are added in the stainless steel cup, be heated to 175 ℃, 17.5 gram star-shaped sbs are joined in the cup, stirred 10 minutes with machine,massing, mixed 30 minutes under 3000 commentaries on classics/min with high-speed shearing machine again, continue to stir and add 9g stablizer SULPHUR POWDER after 2~3 hours, continue stirring again and promptly got modifying asphalt in 3 hours.
The contrast experiment 2: 500 gram SK70# pitches are joined in the stainless steel cup, be heated to 175 ℃, with 5 the gram increase prolong agent and 17.5 the gram SBS join in the cup, stirred 10 minutes with machine,massing, mixed 30 minutes down at 3000 rev/mins with high-speed shearing machine again, continue to stir and add 8.5g stablizer SULPHUR POWDER after 2~3 hours, continue stirring again and promptly got modifying asphalt in 3 hours.
SBS modifying asphalt that three embodiment of the present invention are prepared and contrast experiment 1 and contrast experiment 2 carry out the character comparative analysis, and be as shown in table 1 below.
Table 1
Numbering The contrast experiment 1 The contrast experiment 2 Embodiment 1 Embodiment 2 Embodiment 3
Asphalt stock, g 500 500 500 500 500
Star shaped SBS, g 17.5 17.5 17.5 25 12.5
Increase and prolong agent, g 0 5 25 5 15
SULPHUR POWDER, g 9 8.5 0 0 0
The preparation stablizer, g 0 0 0.25 1 0.45
Penetration degree, 0.1mm 60 58 51 54 56
Softening temperature, ℃ 58.5 64.5 87 81 78
Ductility, cm, 5 ℃ 17 25 33 35 37
The segregation experiment, ℃ 3.0 2.2 1.5 1.3 0.8
Ductility behind the RTFOT, cm, 5 ℃ 10.2 18 19 21 24
Found out obviously that by the data comparative analysis in the table 1 the prepared SBS modifying asphalt softening temperature of three embodiment of the present invention all reaches more than 75 ℃, ductility also obviously increases, and ductility reaches more than the 30cm, and ductility reaches more than the 20cm behind the RTFOT, and segregation is less than 1 ℃.

Claims (2)

1. SBS modifying asphalt, it is characterized in that: by pitch, star shaped SBS, increase and prolong agent and stablizer is made, the star shaped SBS consumption is 2.5~5% of an asphalt content, increasing and prolonging the agent consumption is 1.0~5.0% of asphalt content, stabilizing agent dosage is 0.5 of asphalt content~2.0 ‰, describedly increase that to prolong agent be to be stirred down at 120~140 ℃ by rubber softening oil and Phthalic acid, diallyl ester to be prepared from 0.5~1.5 hour, described stablizer be the promotor TBTM tetrabutyl thiuram monosulfide with antioxidant 1076 65~75 ℃ down stirrings be prepared from 0.5~1 hour.
2. SBS modified asphalt preparation method according to claim 1, it is characterized in that may further comprise the steps: (1) preparation increases prolongs agent, rubber softening oil is mixed with Phthalic acid, diallyl ester, then 120~140 ℃ times stirrings 0.5~1.5 hour promptly; (2) the preparation stablizer mixes the promotor TBTM tetrabutyl thiuram monosulfide with antioxidant 1076, under 65~75 ℃, stirred 0.5~1 hour then; (3) preparation SBS modifying asphalt, pitch is heated to 165~180 ℃, after the pitch dissolving increasing of star shaped SBS and step (1) preparation being prolonged agent adds, star shaped SBS prolongs the agent dissolving after colloidal mill grinds or high speed shear with increasing, stirred then 2~3 hours, the stablizer that adds step (2) preparation again, continue to stir 2~4 hours.
CN2008101413114A 2008-09-09 2008-09-09 SBS modified asphalt and preparation method thereof Expired - Fee Related CN101671143B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101413114A CN101671143B (en) 2008-09-09 2008-09-09 SBS modified asphalt and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101413114A CN101671143B (en) 2008-09-09 2008-09-09 SBS modified asphalt and preparation method thereof

Publications (2)

Publication Number Publication Date
CN101671143A CN101671143A (en) 2010-03-17
CN101671143B true CN101671143B (en) 2011-09-14

Family

ID=42018601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101413114A Expired - Fee Related CN101671143B (en) 2008-09-09 2008-09-09 SBS modified asphalt and preparation method thereof

Country Status (1)

Country Link
CN (1) CN101671143B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106751968A (en) * 2016-12-16 2017-05-31 漳州新立基沥青有限公司 A kind of high performance modified bitumen and preparation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101092295A (en) * 2007-05-22 2007-12-26 当阳市公路管理段 Rare earth modified cold repaired maintenance material for asphalt pavement, and preparation method
CN101186469A (en) * 2007-12-19 2008-05-28 吉林省交通科学研究所 Lava ash modified asphalt mixed material
CN101219870A (en) * 2007-12-29 2008-07-16 哈尔滨工业大学 Rubber particle sheet pavement material and method for paving rubber particle sheet pavement

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101092295A (en) * 2007-05-22 2007-12-26 当阳市公路管理段 Rare earth modified cold repaired maintenance material for asphalt pavement, and preparation method
CN101186469A (en) * 2007-12-19 2008-05-28 吉林省交通科学研究所 Lava ash modified asphalt mixed material
CN101219870A (en) * 2007-12-29 2008-07-16 哈尔滨工业大学 Rubber particle sheet pavement material and method for paving rubber particle sheet pavement

Also Published As

Publication number Publication date
CN101671143A (en) 2010-03-17

Similar Documents

Publication Publication Date Title
CN102977621A (en) SBS (styrene-butadiene-styrene)/scrap rubber powder composite modified asphalt and preparation method thereof
CN102304289B (en) Road asphalt prepared by adding plant asphalt to petroleum asphalt and production method thereof
CN102766338B (en) Wide temperature range modified asphalt for roads and preparation method thereof
CN101085871A (en) Asphalt modified by epoxy resin and rubber powder
CN102433007A (en) Caulking asphalt for roads and bridges, and preparation method for caulking asphalt
CN107722653A (en) A kind of modified asphalt mixture and preparation method thereof
CN103665899B (en) A kind of modifying asphalt base embedding agent and preparation method utilizing waste foam
CN103773008B (en) A kind of high-viscosity modified asphalt and preparation method thereof
CN102276790B (en) Method for preparing bulking agent of epoxy resin modified asphalt
CN103849153B (en) The preparation method of high-viscosity high-elasticity asphalt and high-viscosity high-elasticity asphalt
CN103773009B (en) A kind of preparation method of high-viscosity modified asphalt
CN105482475A (en) Composite modified hard asphalt and preparation method thereof
CN101831187A (en) Rubber modified asphalt warm-mixing agent, preparation method and application
CN101550276B (en) Crumb rubber modified asphalt and prepration method thereof
CN102796387A (en) Epoxy glue powder asphalt material and preparation method thereof
CN101003688A (en) High performance pavement material of epoxy asphalt, preparation method and application
CN107619609A (en) A kind of novel high-strength rubber powder modified asphalt material and preparation method thereof
CN105482474A (en) Low-viscosity crumb rubber modified asphalt and preparation method thereof
CN103897594A (en) Rubber powder modified emulsified asphalt waterproof coating
CN101671143B (en) SBS modified asphalt and preparation method thereof
CN1290928C (en) High performanced composite emulsifying modified asphaltum material and its preparing process
CN1554708A (en) Method for preparing cold stirring cold laying road asphalt
CN105086477A (en) SBS modified asphalt and production method thereof
CN101671144B (en) Rubber powder modified asphalt and preparation method thereof
CN103965492A (en) Method for preparing low-temperature cross-linked emulsified SBS pitch modifier

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110914

Termination date: 20160909